100% found this document useful (1 vote)
430 views20 pages

Track Earned Value

Earned value management involves planning work at a detailed level and assigning budget values to work units. As each work unit is completed, the project earns the associated budget value. This allows comparing actual costs and schedule to planned values. Effective earned value tracking requires defining work, scheduling and budgeting, and then measuring performance through metrics like cost and schedule variance. Regular communication of performance status using earned value helps manage projects and promote accountability.

Uploaded by

yoursasim
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
430 views20 pages

Track Earned Value

Earned value management involves planning work at a detailed level and assigning budget values to work units. As each work unit is completed, the project earns the associated budget value. This allows comparing actual costs and schedule to planned values. Effective earned value tracking requires defining work, scheduling and budgeting, and then measuring performance through metrics like cost and schedule variance. Regular communication of performance status using earned value helps manage projects and promote accountability.

Uploaded by

yoursasim
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 20

DACS Gold Practice Document Series

Track Earned Value (EV)

GP-29 V 1.2
Last Updated: 11/16/04

SOFTWARE ACQUISITION G
GO
OLLD
DP
PR
RA
AC
CTTIIC
CE
E
TRACK EARNED VALUE
FOCUS AREA: COST Project Management
DESCRIPTION OF THE PRACTICE:
SUMMARY DESCRIPTION
Earned value project management involves planning work to a manageable level of detail such
that it is feasible to allocate a portion of the budget to each planned work unit (work package),
and then tracking progress by the accumulated value of completed work units. As work is
performed, it is earned on the same basis as it was planned, in dollars or other quantifiable
units. As the work units are completed, the project earns the budgeted value associated with
those work units. This method associates a dollar value with work completed so that it can be
compared with the actual spending (to determine cost variance potential cost overruns), and the
planned spending (to determine schedule variance potential schedule slippage). In this
manner, planned and actual spending are integrated with actual work performed. The integration
provides greater visibility into the real project status for all stakeholders and thus creates a
scenario for better management of risks, for early determination of whether a project is in trouble,
and for estimating what will be needed to complete it.
Although tracking earned value occurs during project execution, it cannot be
accomplished if appropriate project planning and budget allocation has not occurred up
front. The figure below depicts, at a high level, the activities that are necessary in order to
effectively implement the principles of earned value management.

DEFINE THE WORK

SCHEDULE & BUDGET

MEASURE PERFORMANCE

DACS Gold Practice Document Series


Track Earned Value (EV)

GP-29 V 1.2
Last Updated: 11/16/04

DETAILED DESCRIPTION
Earned value (EV) management is an integrated system of project management and control
that enables a Contractor and their customer to monitor the progress of a project in terms of
integrated cost, schedule, and technical performance measures. The Contractor/developer
owns the process but the Acquirer/customer has full and timely visibility of the information
contained within it. This represents a recent migration in focus from acquirers using EV for
inspection and oversight to developers using EV for project management. Traditional project
management practice tends to compare actual costs with planned expenditures, and confuses
actual costs with actual progress. EVM provides a third reference point that is an objective
view of the status of the effort, i.e., the value to the end goal of the work completed to date.
Although tracking earned value occurs during project execution, it cannot be
accomplished if appropriate project planning and budget allocation has not occurred up
front. The figure below depicts, at a high level, the activities that are necessary in order to
effectively implement the principles of earned value management.

DEFINE THE WORK

SCHEDULE & BUDGET

MEASURE PERFORMANCE

DEFINE THE WORK: The Project Manager must decompose the project into distinct discrete
manageable tasks or groups of tasks (work packages) with decisive outputs and specific
measurable entry and exit criteria. Each work package has a short duration, or can be divided
into a series of milestones whose status can be objectively measured. Each work package can
be assigned a start and finish date, a budget value, and can be integrated with higher-level
schedules. This activity is often referred to as developing the Work Breakdown Structure
(WBS). It is important to balance the level of detail in the WBS with the needs of the
project, with the ultimate goal being the ability to realistically estimate the cost of
accomplishing each task (earned value). Providing too much detail creates an overload of
data, creating a tracking nightmare, and stifling the creativity of developers; lack of detail may
mask vital information. Guidelines on EVM from the UK Ministry of Defense suggest that 3-4
levels in the WBS are sufficient for most projects, but complex projects (such as building a ship)
may require five or six levels.

DACS Gold Practice Document Series


Track Earned Value (EV)

GP-29 V 1.2
Last Updated: 11/16/04

SCHEDULE AND BUDGET: Once the effort is identified through the WBS, the project manager
must prepare a budget and schedule for accomplishing the work. This is in contrast to
backing into a schedule based on an arbitrary fixed dollar amount. Details of budgeting and
scheduling are beyond the scope of this document, but essentially involve identifying what
resources are needed and how much effort will be required in what time frame to complete each
of the tasks in the WBS. What is critical to being able to track earned value is that a portion of
the budget is allocated for each work package that comprises the WBS and that the WBS
adequately defines all work necessary to meet the agreed-upon requirements for the
project.
MEASURE PERFORMANCE: This activity focuses on performance, not just planned vs.
actual spending. It involves tracking a number of measures starting very early in the project,
and analyzing the data to determine real project status. Important measures are:
Primary Measures

Budget Cost of Work Scheduled (BCWS) the spending plan; the dollars (or hours)
planned for the effort. The cumulative planned expenditures would equal the total
dollars budgeted for the effort for the specified time period. With EVM, the spending
plan serves as a performance baseline for making predictions about cost and schedule
variance and estimates of completion.

Actual Cost of Work Performed (ACWP) actual spending; the cumulative actual
expenditures on the effort viewed at regular intervals within the project duration.

Budgeted Cost of Work Performed (BCWP) earned value, the measure of


technical accomplishment; the cumulative budgeted value (dollars or hours) of work
actually completed. It may be calculated as the sum of the values budgeted for the work
packages actually completed, or calculated as the percent work complete multiplied by
the planned cost of the project.

Derived/Calculated Measures
From the three primary measures it is possible to derive measures that can be used to
accurately assess the status of the project and predict its future state.

Cost Variance (CV) The numerical difference between the earned value (BCWP) and
the actual cost (ACWP). CV = BCWP ACWP. (Another way of thinking of this is the
difference between the planned and actual costs of work completed.)

Schedule Variance (SV) - An indicator of how much a program is ahead of or behind


schedule. SV = BCWP BCWS. (Another way of thinking of this: earned value
planned budget, or the difference between the value of work accomplished for a given
period and the value of the work planned). Schedule variance is presented well in chart
format.

Cost Performance Index (CPI) The cost efficiency factor representing the relationship
between the actual cost expended and the earned value. CPI = BCWP/ACWP. A CPI
1 suggests a relatively efficient cost factor, while a CPI <1 may be cause for concern.

Schedule Performance Index (SPI) The planned schedule efficiency factor


representing the relationship between the earned value and the initial planned schedule.
SPI = BCWP/BCWS. A SPI 1 is good. SPI < 1 suggests actual work is falling behind
the planned schedule.

Budget at Completion (BAC) sum total of the time-phased budget. Synonymous with
Performance Measurement Baseline.

Estimate to Complete (ETC) A calculated value, in dollars or hours, that represents


the cost of work required to complete remaining project tasks. ETC = BAC BCWP.

DACS Gold Practice Document Series


Track Earned Value (EV)

GP-29 V 1.2
Last Updated: 11/16/04

Estimate at Complete (EAC) A calculated value, in dollars or hours, that represents


the projected total final costs of work when completed. EAC = ACWP + ETC.

In looking at the list of important measures earned value (BCWP) is one of the three basic
measures from which the other measures are derived. Without it, the other measures are
not possible.
Earned value credit should be binary, with 0 percent being given before task completion and 100
percent given when completion of each work unit is validated. Establishing specific measurable
exit criteria for each task makes it easier to track task completion, and thus credit the earned
value of the task to the project so that the earned value of the project at any given point in time is
obtained by simple math rather than by subjective assessment.
COMMUNICATE PERFORMANCE STATUS: Tracking earned value is of little value if the
estimating and analysis capability that it provides is not used to manage the project.
Although originally required for reporting project status to the acquirer, in recent years there has
been a migration of focus. EVM is now viewed as a project management technique, as well. Its
usefulness is broader than simply reporting project status up the management chain. There are
some important reasons to communicate the project status (represented in terms of earned
value) to all stakeholders.

Promote Accountability - When developers understand how their individual work (or
lack thereof) influences the project, they tend to be more focused on their specific work
goals. They also better understand the significance of estimating the amount of work
needed to complete specific tasks. There exists a mindset among some project
managers that they should protect their developers from the distraction of project
metrics. In reality, communicating project status to the development staff tends to
establish a sense of accountability for their assigned pieces of the project and often
results in more realistic estimates for completion of future tasks.

Reporting real project status, including earned value, at regular intervals provides an
opportunity to address potential problems early in the project when it is still possible to
resolve problems and avoid cost overruns and schedule slippage. The project team
takes a proactive approach to prevent problems from occurring. Management uses
the information to resolve issues that are beyond the control of the project team.
The time interval should be at least monthly, regardless of the size and duration of a
project, and more frequent for some projects. Many practitioners experienced with
earned value management indicate that the project team should review project earned
value weekly, because it can alert the team to specific problem areas before they develop
into major problems.

Illustrative Example:
Here are some examples of how tracking earned value improves the accuracy of communicating
real project status.
Assuming a project budget of $300K (with $100K allocated for the first four months), planned to
be implemented over 12 reporting periods (1st 4 periods shown here), a sufficiently detailed WBS,
and an accurate method of crediting earned value, Table 1 provides the primary project level data
that would be captured under principles of EVM to communicate project status. Data typically
captured (and measures reported) under a traditional approach are shaded blue in both tables.
Rows shaded gold represent additional data collected and measures reported using an EVM
approach.

DACS Gold Practice Document Series


Track Earned Value (EV)

GP-29 V 1.2
Last Updated: 11/16/04

Table 1: Primary Measures of Earned Value Management


(K$)

Total
Allocation

Work
Planned

25

25

25

25

100

Actual Costs

22

20

25

25

92

Earned Value
(Value of completed
work)

20

20

20

20

80

Under the traditional project-reporting paradigm (Planned vs. Actual spending), at the end of 4
periods this data shows that the project is underrun by $8K. However, when tracking earned
value is added as an additional reference point, the data shows that the project is overrun by
$12K (see Cost Variance in Table 2). This is the effect of integrating EV into the project
monitoring process. It focuses on reporting progress from the perspective of work completed,
and that focus brings a whole new dimension to the status of a project. In this case, the
difference in project status ($20K), as reported by the two approaches, amounts to 20% of the
funding ($100K). Table 2 illustrates other metrics derived from earned value data that can be
used, not only to better assess the current status of the project, but also to make more realistic
predictions about where the project is headed.
Table 2: Derived Measures of Project Status
Cum (Planned Actual)
Spending

$3K

$8K

$8K

$8K

$8K

Cost Variance (CV)


Cum EV- Cum Actual Cost

-$2K

-$2K

-$7K

-$12K

-$12K

Schedule Variance (SV)


Cum EV Cum Planned

-$5K

-$10K

-$15K

-$20K

-$20K

Cost Performance Index (CPI)


Cum EV/Cum Actual

20/22

40/42

60/67

80/92

0.87

0.91

0.95

0.90

0.87

Schedule Performance Index (SPI)


Cum EV/Cum Planned

20/25

40/50

60/75

80/100

0.80

0.80

0.80

0.80

Estimate to Complete (ETC)


Total Budget (BAC) Cum EV

300 20 =
$280K

300 40 =
$260K

300 60 =
$240K

300 80 =
$220K

$20K

Estimate at Complete (EAC)


Cum Actual + ETC

22 + 280 =

42 + 260 =

67 + 240 =

92 + 20 =

$312K

$302K

$302K

$307K

$312K

0.80

Communicating earned value does not make problems go away automatically, but it can provide
objective consistent measures that are useful in focusing attention on the real status of the
project, as follows:

Cost and schedule efficiency factors <1 are cause for concern

Downward trend in CPI is consistent with government findings in monitoring projects


since the 1970s (see below)

Even with fluctuation, data reported early in the project is a good predictor of what will
happen later

Frequent reporting of EV data supports trend analysis that can better communicate the
direction of the project

DACS Gold Practice Document Series


Track Earned Value (EV)

GP-29 V 1.2
Last Updated: 11/16/04

The DoD has been able to make several determinations about projects in general by using data
collected from projects where tracking earned value was required (over 400 projects since 1977).

Without exception, the cumulative CPI does not significantly improve between the
period of 15% and 85% of contract performance period. In fact, it tends to decline.
For example, a CPI of 0.75, derived from data at the 15% mark suggests that if the
budget and schedule remain constant, only 75% of the work will be completed at project
end. This clearly indicates early in the project a need to adjust budget, schedule, and/or
the scope of work.

Studies show that EACs based on both the CPI and the SPI tend to be significantly
higher and are generally more accurate (Christensen, 1996)

By adding the 3rd primary measure, earned value, to project reporting we provide the
opportunity to uncover, address, and resolve problems early. The Figure below (EVM
Workshop) presents a typical project status report used with EV. In graphical form, it quickly
communicates cost variance and schedule status in addition to the technical completion status of
the project relative to the baseline.

Typical Project Status Chart Using EV

DACS Gold Practice Document Series


Track Earned Value (EV)

GP-29 V 1.2
Last Updated: 11/16/04

CHARACTERISTICS OF IMPLEMENTATION:
SUMMARY CHARACTERISTICS
NO DATA CURRENTLY AVAILABLE
ANTICIPATED BENEFITS OF IMPLEMENTATION:
Successful implementation of the Earned Value Management principles can result in:

Better Visibility into Program Performance


The combination of advance planning, baseline maintenance, and earned value analysis
yields earlier and better visibility into program performance than is provided by nonintegrated methods of planning and control.

Reduced Cycle Time to Deliver a Product


Earned value management is premised on careful detailed planning task
decomposition, scheduling, and budgeting. This planning often addresses/prevents
problems from surfacing later in the effort that result in rework. Thus, as rework is
prevented cycle time may, in fact, be reduced.

Fosters Accountability
When the developer, at the personal level, understands how their pieces fit into the
overall project effort they tend to focus on delivery of a quality product. Additionally, over
time they are better able to estimate the work required to complete a task, thereby
improving the overall accuracy of the budget/estimating process for future efforts.

Reduced Risk
Because earned value measures enable realistic estimates of completion (for both cost
and schedule) to be derived early in the project, it is possible to make adjustments and
take corrective action to mitigate the risk of cost overruns and schedule slippage.

DACS Gold Practice Document Series


Track Earned Value (EV)

GP-29 V 1.2
Last Updated: 11/16/04

DETAILED CHARACTERISTICS
Key Characteristics of the Track Earned Value Gold Practice
Characteristic
Comments
Required on DoD projects >$40M. See DoD Instruction 5000.2-R.
Required Practice on Large
DoD Software Intensive
Systems
Formalized planning and reporting processes must be established as
Requires a Disciplined
part of the project management infrastructure.
Approach to Project
Planning
Work completed is represented as a dollar value portion of the
Integrates Cost, Schedule
budget, and compared with planned and actual expenditures to
and Performance Metrics

Decompose Project Tasks


to Inch-Pebbles
Allocate Budget at the
Detailed Task Level
Report Project Status at
Frequent Regular Intervals
Involve Development Team
in Developing Task
Estimates

Track Task Completion at


the Detail Level
Credit Earned Value Only
on Full Completion of Task
Communicate Project
Status to Developers as
Well as Customers
Not a Silver Bullet for
Already Failing Projects

Applicable to Most Projects


with a Duration of Longer
Than a Few Months
Necessitates Educating
Project Team on EVMS
Based on Mutual Integrity
and Trust

measure progress and communicate project status.


Removes the myth that actual costs equate to actual technical
progress.
A work breakdown structure is a necessary part of project planning.
Task decomposition must be performed with granularity sufficient to
enable accurate estimation of cost and resources for task completion.
A portion of the spending plan (budget) is allocated to each specific
task
At least monthly more frequently on short projects
Realistic estimates are critical to making EV a useful, meaningful
practice
Developers improve their estimating ability over time
Other factors in the organizational culture can impact the credibility of
developer estimates. Teams built on trust and mutual respect are
more successful at estimating.
Use binary status done or not done on detailed tasks and
activities within the project to aid in determining work unit completion
Binary quality gates done or not done no partial credit
Apply earned value credits at the detailed task level (inch-pebbles)
EV principles are used to manage projects, not just report project
status
Individual developers take on ownership for their efforts when the
focus of the project is outcome-based
If a project is more than 50% expended and in trouble, implementing
EVM at that point does not guarantee success, although it may
provide sufficient insight about the project status to enable
discussions about the best course of action
EVM is a prevention-based approach to project management
In general, the larger/longer the project, the greater the need for
implementing EVM, and the greater its value for project management
Developers need to understand how it works, what it is used for, and
how it contributes to a successful project
Managers need to practice what they preach regarding use of EV
data
Establishing arbitrary budgets will degrade the integrity of earned
value data
Developers must be trained to estimate, and then trusted. If their
estimates are not used, they will stop providing true estimates

DACS Gold Practice Document Series


Track Earned Value (EV)

GP-29 V 1.2
Last Updated: 11/16/04

RELATIONSHIPS TO OTHER PRACTICES:


The Figure below represents a high-level process architecture for the subject practice, depicting
relationships among this practice and the nature of the influences on the practice (describing how
other practices might relate to this practice). These relationship statements are based on
definitions of specific best practices found in the literature and the notion that the successful
implementation of practices may influence (or are influenced by) the ability to successfully
implement other practices. A brief description of these influences is included in the table below.

Alert PMs to
potential schedule
and cost risks early

Facilitate establishing
and tracking earned
value metrics

Support/encourage
use of earned
value metrics

Management
involvement and
support is critical

Provide a documented
project performance trail
for use

Track
Earned
Value

Provide objective data


for determining
earned value credits

Provide quantitative
data for decisionmaking

Communicate
project status

Process Architecture for the "Track Earned Value" Gold Practice


Summary of Relationship Factors for the Track Earned Value Practice
INPUTS TO THE PRACTICE
The significance of earned value tracking is based on the notion that the
Facilitate Establishing and
Manager is able to accurately estimate the resources (and therefore
Tracking Earned Value Metrics Project
cost) necessary to complete each task in order to allocate a portion of the

Support/Encourage Use of
Earned Value Metrics

budget to it (earned value). The following practices may help the project
manager (and the team) to do the planning that is necessary to provide
accurate earned value estimates that are ultimately used to track progress on
the project:
Establish Clear Goals and Decision Points
Performance-Based Specifications
Goal-Question-Metric Approach
Binary Quality Gates at the Inch Pebble Level
The DoD acquisition process has undergone a paradigm shift with regard to
tracking earned value, from a reactive project monitoring role (as evidenced
by the requirements to use CSSR, or Cost Schedule Status Report) to a
proactive project management role that supercedes CSSR with a requirement
for contractors to comply with the industry standard earned value
management system. This allows contractors to use their own systems and
provides more flexibility for internal management than the previously rigid
requirements of the CSSR. Earned value is now perceived as a management
tool as well as a reporting tool.

DACS Gold Practice Document Series


Track Earned Value (EV)

GP-29 V 1.2
Last Updated: 11/16/04

Management Involvement and


Support Is Critical

Tracking earned value cannot work unless managers have the planning skills,
the appropriate work ethic, and the tools to facilitate maintaining project data.
Management must be accountable for their planning and for providing the
estimates that are used to establish earned value. They must have the
proper training, and they must establish and maintain good working
relationships with the team an environment in which truth and trust prevail.
They must implement a disciplined process for estimating work and tracking it
through completion. Implementing configuration management of the project
data is essential for managing and communicating the metrics relating to
earned value as the project progresses.

Provide Objective Data for


Determining Earned Value
Credits

A tasks earned value cannot be credited until the task is complete. The
Project Manager must determine up front (during planning) what constitutes
completion of a task. There may be several criteria that must be met. No
partial credit is given. Formal inspections and demonstration-based reviews
provide an objective basis for determining task completion, thus facilitating
crediting earned value. This is in contrast to completion status based on
subjective assessment of the developer, for example saying, I just have a
little bit more to do on it so its essentially done but it really isnt done.

OUTPUTS FROM THE PRACTICE


Alert PMs to Potential
Schedule and Cost Risks
Early

Measures derived from tracking earned value can be used to establish


thresholds that automatically trigger alerts to situations that are then
addressed through formal risk management. This is viable in the early stages
of the project (near 15% completion). This is probably the most significant
benefit of tracking earned value.

Provide a Documented Project


Performance Trail for Use

Since tracking earned value integrates planning (budgeting), actual spending,


and actual technical accomplishment, project data that encompasses earned
value tracking provides a comprehensive historical performance trail that can
be used internally for planning future projects, for improving the task
estimating process (and therefore the acquisition process), and for
determining which contractors have the best record for delivery of quality
products, on time, and within budget thus providing data to support best value
awards.

Provide Quantitative Data for


Decision Making

Tracking earned value quantifies project completion status by providing a


means for viewing actual accomplishment in terms of planned value (dollars
or hours) and integrating it with other quantitative measures such as budget,
and actual costs, thereby facilitating more meaningful analysis of schedule,
effort, and costs. The subjectivity exists only during the initial estimation
required to establish the earned value for a task. Thereafter, the measures
are quantitative, including the binary completion status of each task. The
resulting project data can be used to improve the task estimation process for
future efforts as well.

Communicate Project Status

Integrating earned value within the typical project progress charts that
compare actual spending to planned spending provides another important
dimension for better communicating project status. It enables accurate
predictions of the real cost to complete a project (and the real schedule) to be
made early in the project so that adjustments can be made before a crisis
situation develops.
Using earned value to communicate progress provides the overall picture and
should be part of any scheduled project reviews. There is a tendency for
project reviews to include demonstrations of accomplishments in lieu of dialog
about them. The practice of tracking earned value is not just for reporting to
the customer. It should be included in regular internal project team reviews,
as well providing all stakeholders with visibility of progress vs. plan.

10

DACS Gold Practice Document Series


Track Earned Value (EV)

GP-29 V 1.2
Last Updated: 11/16/04

RESOURCES:

Websites

Management-Technologies, Inc. has developed an Earned Value Maturity Model


http://www.mgmt-technologies.com/evmtech.html

Earned Value Management (EVM) website (sponsored by OSD)


http://www.acq.osd.mil/pm/

NASA Earned Value Management (EVM) Website: The mission of this site is to
provide a primary on-line reference point for EVM theory, application, and use as an
integrated project management tool within NASA.
http://evm.nasa.gov/

Defense Material Organization Australia: Provides insight into how EVM is


being implemented within the Australian Defense community.
http://www.defence.gov.au/dmo/esd/evm/index.cfm

Ministry of Defense, United Kingdom Acquisition Management Website


http://www.ams.mod.uk/ams/content/docs/evm2/evmacq2.htm

Tools and Methods

State-of-the-art methods and tools that may be useful in implementing and improving the
effectiveness of earned value management include:

Team Software Process


Personal Software Process
Earned Value Management Maturity Model
Project Management Tools that aid in establishing and tracking EV

This site, part of DAUs Acquisition community Connection (ACC), provides links to material on
software tools for earned value management.
http://pmcop.dau.mil/simplify/ev.php?ID=52966_201&ID2=DO_TOPIC
Dekker, Ltd., founded in 1984, provides a complete product line of management solution tools
including Trakker Earned Value Management System.
http://www.dtrakker.com/products/dt_evm.htm

Experts/Contact Points

Paul Solomon, Northrop Grumman Corp. ([email protected])


Quentin W. Fleming, Primavera Systems, Inc. ([email protected])

Training Opportunities:

DAU Acquisition Community Connection (ACC) EVM Training Center has


several on-line references and training resources
http://pmcop.dau.mil/simplify/ev.php?ID=52967_201&ID2=DO_TOPIC

Tecolote Research, Inc. is a privately held firm that is nationally known for providing
integrated financial management services, including earned value training, for clients
within the U.S. Government
http://www.tecolote.com/Services/EarnedValue.htm

11

DACS Gold Practice Document Series


Track Earned Value (EV)

GP-29 V 1.2
Last Updated: 11/16/04

Humphreys & Associates, Inc. is a management consulting firm specializing in


Earned Value Project Management since 1978 with both on-line and conventional
courses customized for both public and private sector organizations
http://www.humphreys-assoc.com/on-line/courses/courses.html
http://www.humphreys-assoc.com/products/materials/materials.html
http://www.humphreys-assoc.com/workshops/workshops.html

Management Technologies provides two courses in EVM


http://www.mgmt-technologies.com/seminars.html

VitalThought is a Project Management company that specializes in the Earned


Value technique of project management as defined by the DoD Cost Schedule
Control System Criteria
http://www.vitalthought.com/Training/training.html

Quentin W. Fleming Project Management Consultancy provides a one-day


seminar covering all fundamentals necessary to implement projects that employ the
earned value project management concept
http://www.quentinf.com/#Project%20Management

Program Management Associates, Inc. (PMA) is an SBA-qualified small business,


incorporated in 1988, dedicated to project management support and training
http://www.pma-inc.com/earned.htm

Bibliography:

[Christensen, 1996]

Christensen, David S., Ph.D., Project Advocacy and the Estimate at Completion Problem,
Journal of Cost Analysis, Spring 1996

[Christensen, 2001]

Christensen, Mark J., Thayer, Richard H., The Project Managers Guide to Software
Engineering Best Practices, IEEE Computer Society, 2001, ISBN 0-7695-1199-6

[Christle, 1994]

Christle, Gary, Implementation of Earned Value: A Model Program Approach, 1994,


http://www.acq.osd.mil/pm/newpolicy/misc/modelpro.html

[CMU/SEI-2002-TR-012]

Capability Maturity Model Integration (CMMI), Version 1.1 Staged Representation,


Software Engineering Institute, CMU/SEI-2002-TR-012, March 2002
http://www.sei.cmu.edu/pub/documents/02.reports/pdf/02tr002.pdf

[DODD 5000.2]

DoD 5000.2-R, Mandatory Procedures for Major Defense Acquisition Programs (MDAPS)
and Major Automated Information System (MAIS) Acquisition Programs, 5 April 2002

[EIA-748, 1998]

EIA/ANSI 748 Earned Value Management Systems Standard, approved May 19,1998

[EVM3, 2000]

The Earned Value Management Maturity Model, Version 0.0, Initial Public Draft,
Management Technologies, September 2000
http://www.mgmt-technologies.com/evmtech.html

[Fleming, 1998]

Fleming, Quentin W., Koppelman, Joel M., Earned Value Project Management: A Powerful
Tool for Software Projects, Crosstalk, July 1998
http://stsc.hill.af.mil/crosstalk/1998/07/value.asp

[Fleming, 1999]

Fleming, Quentin W., Koppelman, Joel M., Earned Value Project Management An
Introduction, Crosstalk, July 1999
http://stsc.hill.af.mil/crosstalk/1999/07/fleming.asp

[INTERIM, 2002]

Interim Defense Acquisition Guidebook, 30 October 2002


(Replaces DoD 5000.2-R, canceled 30 October 2002)

[Jones, 2000]

Jones, Capers, Software Assessments, Benchmarks, and Best Practices, Addison-Wesley,


2000, ISBN 0-201-48542-7

[Lipke, 2002]

Lipke, Walter H., EVM and Software Project Management Our Story, CrossTalk,
November 2002

12

DACS Gold Practice Document Series


Track Earned Value (EV)

GP-29 V 1.2
Last Updated: 11/16/04

http://stsc.hill.af.mil/crosstalk/2002/11/lipke.html
[OSD-EVM Website]

Illustrative Explanation of Earned Value, OSD-sponsored web site for Earned Value
Management, last updated Nov. 2002
http://www.acq.osd.mil/pm/evbasics.htm

[Petro, 2000]

Petro, Tom, Milani, Ken, Northrop Grummans Four-Tier Approach to Earning Value,
Management Accounting Quarterly, Summer 2000
http://www.imanet.org/ima/view.asp?CID=1017&DID=1661 (Requires registration with IMA)

[ProjMag, 2000]

Earned Value Management Part One, Project Magazine, November 2000


http://www.projectmagazine.com/nov00/evm1.html

[Schulte, 2002]

Schulte, Ruthanne, The Use and Benefits of Earned Value, Project Magazine, Vol. 3, Issue
7, Sept. 2002.
http://www.projectmagazine.com/v3i7/evmv3i7.html

[Skratulia, 2000]

Skratulia, Mike, Earned Value Management (EVM) TOC/CAIV Workshop, Naval Surface
Warfare Center, Port Hueneme, CA, 2000
http://www.ar.navy.mil/navyaos/content/view/full/1183

[Smith, 1999]

Smith, Larry W., Steadman, A. Todd, Gaining Confidence in Using Return on Investment
and Earned Value, Crosstalk, April 1999
http://stsc.hill.af.mil/crosstalk/1999/04/smith.asp

[Solomon, 2001]

Solomon, Paul, Practical Software Measurement, Performance-Based Earned Value,


Crosstalk, September 2001
http://www.testablerequirements.com/Articles/solomon.htm

[Solomon, 2001a]

Solomon, Paul, Using Earned Value to Manage Successful Software Projects, Northrop
Grumman Corp., 2001
http://www.softwaredioxide.com/Channels/Content/Northrop_USING_EARNED_VALUE.pdf

[Solomon, 2002]

Solomon, Paul, Going From Performance-Based Earned Value to the CMMI, Crosstalk,
September 2002
http://stsc.hill.af.mil/crosstalk/2002/09/solomon.html
The Program Managers Guide to Software Acquisition Best Practices, Version 2.1, DoD
Software Program Managers Network, April, 1998
http://www.spmn.com/products_guidebooks.html
Turner, R.G., Implementation of Best Practices in U.S. Department of Defense SoftwareIntensive System Acquisitions, Ph.D. Dissertation, George Washington University, 31
January 2002

[SPMN, 1998]
[Turner, 2002]

13

DACS Gold Practice Document Series


Track Earned Value (EV)

GP-29 V 1.2
Last Updated: 11/16/04

APPENDICES
DEFINITIONS:
Earned Value Management (EVM) is an integrated system of project management and
control that enables a contractor and their customer to monitor the progress of a project in
terms of integrated cost, schedule, and technical performance measures.
- [Acquisition Management Website, Ministry of Defense, UK]
Earned value is a management technique that relates resource planning to schedules and
to technical cost and schedule requirements. All work is planned, budgeted, and scheduled in
time-phased ''planned value'' increments constituting a cost and schedule measurement baseline.
There are two major objectives of an earned value system: to encourage contractors to use
effective internal cost and schedule management control systems; and to permit the customer to
be able to rely on timely data produced by those systems for determining product-oriented
contract status.
- Earned Value Management Website

14

DACS Gold Practice Document Series


Track Earned Value (EV)

GP-29 V 1.2
Last Updated: 11/16/04

SOURCES (Origins of the Practice):


The concept of earned value originated with industrial engineers in factory settings in the early
1900s. They assessed their cost performance by comparing the physical factory work output
(earned value) against the actual costs incurred, and then to the physical work planned. They
defined cost variance as the difference between the actual costs and the earned value. This
definition is critical to implementing the earned value concept.
.

DoD Financial Management Orders, since 1967


Although expressed with different terminology the basic principles of earned value
management have been recommended for use in the DoD since the early 1960s when it
issued a directive that imposed 35 Cost/Schedule Control Systems Criteria (C/SCSC)
on all private and industrial firms that wished to participate in future major systems
procurements. That directive focused on oversight and inspection and caused EV to
be viewed only as a reporting tool.
In 1996, and as a result of participation by private industry, the DoD endorsed a
replacement of the C/SCSC, which became known as the industry standard Earned
Value Management System (EVMS) and reduced the number of formal criteria to 32.
The standard, identified as EIA-748, has since been updated and is now available (for a
fee) from the ANSI Standards body.

15

DACS Gold Practice Document Series


Track Earned Value (EV)

GP-29 V 1.2
Last Updated: 11/16/04

RECOMMENDING SOURCES:

USD (A&T), August 1999


In August of 1999, Dr. Jack Gansler, USD (A&T), signed a memorandum announcing that
the DoD had adopted the ANSI Earned Value Management System (EVMS) Standard
for use on defense acquisitions. The standard incorporates best business practices that
have proven to provide strong benefits for program and enterprise planning and control.
It is available electronically for a fee (Doc # EIA-748) from Global Engineering
Documents.

DoD 5000.2-R, Mandatory Procedures for Major Defense Acquisition


Programs (MDAPS) and Major Automated Information System (MAIS)
Acquisition Programs, 5 April 2002, (canceled 30 October 2002)
Interim Defense Acquisition Guidebook, 30 October 2002 [INTERIM 2002]
[This document now supercedes DoD 5000.2-R.]

C2.9.3.4 INTEGRATED CONTRACT PERFORMANCE MANAGEMENT. The four


paragraphs within section C2.9.3.4 provide detail on the contract situations in which the
ANSI EVMS guidelines and the Cost/Schedule Status Report (C/SSR) DID DI-MGMT81467 (DoD 5010.12-L) must be followed.
C2.9.3.4.1 The PM shall obtain integrated cost and schedule performance data to
monitor program execution. The PM shall require contractors to use internal
management control systems that produce data that a) indicate work progress; b)
properly relate cost, schedule, and technical accomplishment; c) are valid, timely and
able to be audited; and d) provide DoD PMs with information at a practical level of
summarization. Unless waived by the Milestone Decision Authority (MDA), the PM shall
require that contractors management information systems used in planning and
controlling contract performance meet the EVMS Guidelines set forth in the ANSI/EIA748-98 document.
AP4 APPENDIX 4 EVMS GUIDELINES, MANDATORY PROCEDURES, &
REPORTING. This appendix reproduces the guidelines contained in the ANSI/EIA-74898 document.

Capability Maturity Model Integration (CMMI), Version 1.1 Staged,


Software Engineering Institute, CMU/SEI-2002-TR-012, TR-012, March
2002
Three key process areas (KPAs) specifically address tracking work performance and
comparing it to scheduled or planned activity, although they do not specifically require the
use of the earned value measure.
PG 97 Project Planning KPA. SP1.1. Establish a top-level work breakdown structure
(WBS) to estimate the scope of the project. In the list of sub-practices the following text
appears:
The top-level WBS is intended to help in gauging the project work effort in terms of tasks and
organizational roles and responsibilities. The amount of detail in the WBS at this more detailed
level helps in developing realistic schedules, thereby minimizing the need for management reserve.
PG 101 SP 1.4 Estimate the project effort and cost for the work products and tasks
based on estimation rationale.

16

DACS Gold Practice Document Series


Track Earned Value (EV)

GP-29 V 1.2
Last Updated: 11/16/04

PG 104 SP 2.1. Establish and maintain the projects budget and schedule.
PP 124 125 Project Monitoring and Control KPA. SG 1 Monitor Project Against
Plan. Actual performance and progress of the project are monitored against the project
plan. The sub-practices include the following:
Monitor progress against the schedule. Progress monitoring typically includes:

Periodically measuring the actual completion of activities and milestones

Comparing actual completion of activities and milestones against the schedule


documented in the project plan

Identifying significant deviations from the schedule estimates in the project plan

Monitor the project's cost and expended effort. Effort and cost monitoring typically
includes:
Periodically measuring the actual effort and cost expended and staff assigned

Comparing actual effort, costs, staffing, and training to the estimates and budgets
documented in the project plan

Identifying significant deviations from the budgets in the project plan.

PG 154 Measurement & Analysis KPA. The purpose of M&A is to develop and sustain
a measurement capability that is used to support management information needs.
The integration of measurement and analysis activities into the processes of the project
supports the following:

Objective planning and estimating


Tracking actual performance against established plans and objectives
Identifying and resolving process-related issues
Providing a basis for incorporating measurement into additional processes in the
future

PG 159 SP 1.2 Specify Measures. Measurement objectives are refined into precise
quantifiable measures. Earned Value is identified as an example of a commonly used
derived measure.

17

DACS Gold Practice Document Series


Track Earned Value (EV)

GP-29 V 1.2
Last Updated: 11/16/04

GLOSSARY
ACWP

Actual Cost of Work Performed. The actual cost incurred on the project to date,
irrespective of what was budgeted.

Airlie Council

Refers to a group of experts convened by the Navys Software Program


Managers Network (SPMN) in 1995 who established/identified nine best
practices. These practices have been augmented with other practices since
1995, and in current literature are referenced as the original Airlie best practices.

BAC

Budget At Completion. The total original budget for the project, representing the
total value of work to be performed, synonymous with performance baseline.

Baseline

With respect to Earned Value, a baseline is the planned value of project tasks to
be completed in a given reporting period, broken out by task.

BCWP

Budgeted Cost of Work Performed. Interchangeable with cumulative earned


value; a metric representing the planned value for the amount of work completed
on the project to date.

BCWS

Budgeted Cost of Work Scheduled. The total value of work that was originally
scheduled for completion by the end of a reporting period.

Best Practice

A documented practice aimed at lowering an identified risk in a system


acquisition and is required or recommended by a bona fide DoD, industry, or
academic source.
Methodologies and tools that consistently yield productivity and quality results
when implemented in a minimum of 10 organizations and 50 software projects,
and is asserted by those who use it to have been beneficial in all or most of the
projects.

C/SCSC

Cost/Schedule Control Systems Criteria

Cost Variance

The difference between the earned value and the actual cost of work performed
(Cost Variance = BCWP - ACWP). A negative variance means more money was
spent for the work accomplished than was planned.

CSSR

Cost Schedule Status Report (DI-MGMT-81467)

EAC

Estimate at Completion. The current best estimate for the total cost of the
project. This value may differ from the BAC over time because better estimates
can be made as the project progresses.

Earned Value
Management

An integrated system of project management and control that enables a


Contractor and their customer to jointly monitor the progress of a project in terms
of integrated cost, schedule and technical performance measures.

EV

Earned Value. A means of evaluating budgetary performance by relating actual


expenditures to technical achievement as measured by a milestone
accomplishment scheme. EV may be used interchangeably with BCWP.
An objective measurement of how much work has been accomplished on a
project.

18

DACS Gold Practice Document Series


Track Earned Value (EV)

GP-29 V 1.2
Last Updated: 11/16/04

Gold Practice

A term coined by the DACS to identify a practice that provides intrinsic value to
an organization or program that acquires or develops software. The DACS term
focuses on the realization that a practice may be worth its weight in gold in cost
savings and process improvements for specific programs and organizations,
irrespective of whether other organizations have successfully or unsuccessfully
implemented it, by emphasizing that there are other practices/processes that
influence, or are influenced by, the success or failure of the Gold Practice.

PM

Program Manager

Schedule
Variance

The difference between the earned value and the planned value of the project
at/for a specific reporting period (Schedule Variance = BCWP BCWS). A
negative variance indicates that less work was accomplished than was planned.

SPMN

Software Program Managers Network

19

DACS Gold Practice Document Series


Track Earned Value (EV)

GP-29 V 1.2
Last Updated: 11/16/04

CASE STUDIES FROM THE LITERATURE:


Practical Software Measurement: Performance-Based Earned Value
Successful software project management can be achieved by focusing on requirements, selecting
the most effective software metrics, and using Earned Value Management. Best practices and
lessons learned by the Northrop Grumman team in developing weapons system software for the
B-2 Stealth Bomber are discussed.
http://www.testablerequirements.com/Articles/solomon.htm

EVM and Software Project Management Our Story


The Software Division at Tinker Air Force Base in Oklahoma has used earned value management
(EVM) methods for more than 15 years. These management methods have had significant
influence in the improvement of software development and maintenance practices of the
organization. This article, in a story-telling manner, describes the use of EVM for managing
software, and how its system of management facilitated a natural evolution that lead to
recognition, awards, and more importantly, on-time, at-cost, quality software.
http://stsc.hill.af.mil/crosstalk/2002/11/lipke.html

All the Right Behavior


Software projects using the Team Software ProcessSM (TSPSM) have an unusually high rate of
on-time completion. One of several key factors contributing to this accomplishment is the
effective way TSP teams make use of earned value techniques to iteratively refine their plan as
they work it. Because earned value is reviewed weekly, and because no value is earned either at
the personal or the team levels until a task is fully completed, software engineers are highly
motivated to perform good earned value practices. This article expounds upon this principle and
examines how TSP teams succeed with earned value.
http://stsc.hill.af.mil/crosstalk/2002/09/webb.html

20

You might also like