Spesification Design Loading Ramp
Spesification Design Loading Ramp
1. Design Concept
The basic concept of the Loading Ramp is to store the FFB received from the
scheme before brought to the mill processing. The basic factors had to be
considered;
1. Mill throughput and standard design operation hours.
2. Size & No. of cages/sterilizer
3. No. of sterilizer
4. System layout for unloading and loading the FFB to and from the loading
ramp.
: T Ton ffb/hr
: 20 hrs
3. Cage size
: C cages.
5. No. of sterilizer
: S Nos
: 10 Ton
: 8 hrs (8am-4pm)
The selection no. of doors (bays) are tabulated as per table 1 below;
BI
L
1
2
3
4
5
6
7
8
9
1
0
PARAMETERS
No. of cage per sterilizer
No. of sterilizer used
Estimated FFB received per day, Ton
FFB processed from 8 am to 4 pm (8 hours) Ton
Balance to be stored inside the loading ramp,
Ton
Loading Ramp capacity per door, Ton
No. of doors required.
Existing No. of doors.
Existing storage capacity, Ton
Surplus capacity to be stored on the concrete
platform, Ton
MILL THROUGHPUT
30
MT/H
40 MT/H 60 MT/H
9
8
11
3
4
4
600
800
1200
240
320
480
360
10
36
24
240
480
10
48
32
320
720
10
72
48
480
120
160
240
From Table 1 above, the actual total storage capacity is 50% higher than the
existing storage capacity. The excess of 50% FFB normally will be dumped onto
the unloading concrete platform. It is estimated that 30% of the concrete area
will be utilized. This phenomena is only happened during crop season.
3. Hydraulic System Selection
: A (P)
: A (P)
: hydraulic pressure
: 3643103 N/m
: 36.43 bar
: 528.25 psi
: 550 psi
: 15.5m
No. of door/side
: 24 Nos/Twin Pump
Total Length
: 186 m
: 1050 psi
Speed of cylinder
Volume swept when cylinder extend
: 4.91 x 36 in
: 2.5 x 36 in
: 90 in (1.475 lit.)
Pump flowrate
Therefore,
Extend time : 7.65 sec.
Retract time : 3.9 sec.
Cycle time
: 11.55 sec.
Extend speed
: 4.7 in/sec.
Retract speed
: 9.2 in/sec.
Ave speed
: 35 fpm