Plank Prelim Pile Only Loading
Plank Prelim Pile Only Loading
Plank Prelim Pile Only Loading
Demands
Bridge Checks
Bridge Type
Typical Span
Plank Depth
Average Plank Spacing
No of Planks
Plank area
Total plank area
Average Deck Thickness
Concrete Area
Dead Load
Deck Width
Carriageway Width
Surfacing Allowance
Surfacing UDL
Single Barrier UDL
No of Barriers
total Barrier UDL
Utilities
Utilities UDL
Plank
17.5
700
869
13
333839
4339907
190
6.5
162.2
11.3
10.5
1.5
15.75
5
2
10
0.25
2.6
m
mm
mm must be < 920
mm2
mm2
mm
m2
kN/m
m
m
kPa
kN/m
kN/m
N2U Bid
Max Reaction at
Abutment
1419
138
276
87.5
175
23
46
1419
248
2838
497
634
603
1156
1131
0
Total ALF
-5.95
e
M1600 transverse moment
S1600 transverse moment
2.2
2.91
1845
1755
3364
3291
SLS Demands
M1600
S1600
3555
3068
2398
1755
6790
5972
4373
3291
5463
4587
4317
3159
10350
8878
7872
5924
kN/m
kPa
kN/m
Dead Load
SDL
Live Load for one lane
No of design lanes
Lane factor (ALF)
Lane position
M1600
S1600
3
1
3.65
ULS Live Load only Demands for Shear for all lanes
TP \\vboxsrv\conversion_tmp\scratch_6\
256057649.xlsx.ms_office
0.8
0.45
0.4
-2.75
M1600
S1600
3264 kN
2388 kN
12/6/12
page1 of 10
HBJV
Span
N2U Bid
Pile Demands
17.5 m
Pier
Cross Beam Dimensions
Column Dimension
Pile Cap
Substructure Weight
Plank
No of
Width
1
3
0
Depth
1.2
1.2
0
Length / Height
1.2
1.2
0
Superstructure DL+1.3SDL
Superstructure LL
Negative Skin Friction
Weight
432
648
0
1080
12
6
0
kN
kN
kN
kN
3484 kN
3306 kN
kN
7870 kN
4373 kNm
1924 kN
SLS
NSF
total Working Load
Live load transverse SLS moment
max pile SLS Demand
ULS Check
Substructure; 1.2DL
Superstructure DL+LL
1.2Creep & Shrinkage
Negative Skin Friction (1.5xNSF)
Total ULS Demand
Live load transverse ULS moment
Max ULS Pile Demand
Foundation Material
Medium to high
ULS
Pile Diameter
End Bearing Geotech ULS
strength reduction factor
skin friction
skin friction length
strength reduction factor
0.55
30
0.4
2000
0
0.4
m
Mpa
end bearing
skin friction
Total ULS Pile Capacity fNb
Demand
2851
0
2851
2959
kN
kN
kN
kN
No of Piles Required =
5.0
kpa
m
ULS
ULS Pile Capacity
TP \\vboxsrv\conversion_tmp\scratch_6\256057649.xlsx.ms_office
Working
0.55
6
1
600
0.2
1
Working
1425
207
Working Capacity
1633
Demand
1924
1296
10350
0
0
11646
7872
2959
kN
kN
kN
kN
kN
kNm
kN
Mpa
kpa
kN
kN
5.0
Pile Demands
page 2 of 10
Pile Coordinate
No of Piles
Pier 1
No of Rows in x direction
No of Rows in y direction
Axial Load
Moment in x direction
Moment in y Direction
11646 kN
7872 kNm
0 kNm
3.5 m
0m
Pile
1
2
3
4
5
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2.5
5
7.5
10
0
0
0
xave axis
yave axis
5.00
0.20
x-xave
0
0
0
0
0
1
0
0
-5.00
-2.50
0.00
2.50
5
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Eccentric Loading
c & S + EQ/T
(x-xave)2
25.00
6.25
0.00
6.25
25
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
y-yave
-0.20
-0.20
-0.20
-0.20
-0.2
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
62.50
Pile Spacing
3
2.5
Y dist
1.5
5
0
Pile Demands
(y-yave)2
Axial
0.04
0.04
0.04
0.04
0.04
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.20
2329
2329
2329
2329
2329
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Mx axial
-630
-315
0
315
630
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.5
0
0
X dist
2.5 m
transverse spacing
C&S
moment
pile axial demand from model
My axial
Total
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1699
2014
2329
2644
2959
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
11646
2959 kN
0 kN
Other case
0
0
0
0
Pile Coordinate
No of Piles
Pier 1
No of Rows in x direction
No of Rows in y direction
Axial Load
Moment in x direction
Moment in y Direction
7870 kN
4373 kNm
0 kNm
3.5 m
0m
Pile
1
2
3
4
5
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2.5
5
7.5
10
0
0
0
0
0
0
0
0
0
xave axis
yave axis
5.00
0.20
x-xave
0
0
0
0
0
1
0
0
0
0
0
0
0
0
-5.00
-2.50
0.00
2.50
5
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Eccentric Loading
c & S + EQ/T
(x-xave)2
25.00
6.25
0.00
6.25
25
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
y-yave
-0.20
-0.20
-0.20
-0.20
-0.2
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
62.50
Pile Spacing
3
2.5
Y dist
1.5
5
0
Pile Demands
(y-yave)2
Axial
0.04
0.04
0.04
0.04
0.04
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.20
1574
1574
1574
1574
1574
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Mx axial
-350
-175
0
175
350
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.5
0
0
X dist
2.5 m
transverse spacing
C&S
moment
pile axial demand from model
My axial
Total
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1224
1399
1574
1749
1924
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
7870
1924 kN
0 kN
Other case
0
0
0
0