Variation Difficulties in The FIDIC
FIDIC & Variations
Uploaded by
Jama 'Figo' Mustafa
AI-enhanced title
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download
Save
Save Variation Difficulties in the FIDIC For Later
Share
0%
0% found this document useful, undefined
0%
, undefined
Print
Embed
Report
0 ratings
0% found this document useful (0 votes)
313 views
10 pages
Variation Difficulties in The FIDIC
FIDIC & Variations
Uploaded by
Jama 'Figo' Mustafa
AI-enhanced title
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Carousel Previous
Carousel Next
Download
Save
Save Variation Difficulties in the FIDIC For Later
Share
0%
0% found this document useful, undefined
0%
, undefined
Print
Embed
Report
Download
Save Variation Difficulties in the FIDIC For Later
You are on page 1
/ 10
Search
Fullscreen
mities es for dance suring otion. rate as to the notely vels of 2A are pleted aliance volved as little such as are not in their cpected ares for regard sible, key to -failure stantial vin the i “Fair and Reasonable”: the Determination of Prices for Variations in FIDIC Contracts Dr Wolfgang Breyer © Construction disputes; FIDIC conditions of contract; Price; Valuation; Variation 1. Introduction One of the strange findings when working with the FIDIC forms of contract is that it appears to have omitted rules on one of the key factors Which invariably lead to disputes between parties. The factor in question here is the valuation of a variation, which becomes a key issue. Ordinarily, the contractor who obtains the contract was the bidder who submitted the best price to the employer, such a price is routinely difficult for the contractor to sustain throughout the works, and many contractors hope to improve their earnings by means of variations. Indeed, there appear to be contractors whose entire business model is built around the objective of acquiring the contract first by means of an undercut price, and then arriving at profit later by means of payment for variations. Are these hopes justified, or do variations only make things worse for such contractors? 2. Guidance currently contained in the FIDIC forms A quick glance at the FIDIC forms shows that of all the FIDIC forms, only the Red Book contains, in its subcl.12.3, entitled “Measurement and Evaluation”, any guidance on how the value of the works is to be determined. Subclause 12.3, second paragraph states that, “for each item of work, the appropriate rate, or price for the item should be the rate, or price specified for such item in the contract or, if there is no such item, specified for similar work.” This already begs the question: what is “similar” work? Is it work of a similar technical nature, ic. “welding” and “welding”, or only work of a similar nature executed under similar conditions? If so, when are conditions similar enough to warrant adapting the unit rate? Incase of variations, or other changes to the works, things get more complicated, even though some form of guidance is supposed to be provided. Subclause 12.3 of the Red Book then goes on to state that a new price should be fixed if: “@) (@ the work is instructed under clause 13 [Variations and Adjustments}, (ii) no rate, or price is specified in the contract for this item, and "Breyer Rechtsanwalt, Stutgrt, Germany, (2013) 29 Cons. LJ, Issue © 2013 Thomson Reuters (Profesional) UK Limited and Contributors 3132 Construction Law Journal (iii) no specified rate, or price is appropriate because the item of work is not of similar character, or is not executed under similar conditions, as any item in the contract. Each new rate, or price shall be derived from any relevant rates or prices in the contract, with reasonable adjustments to take account of the matters described in sub-paragraph (a) and/or (b), as applicable. If no rates, or prices are relevant for the derivation of a new rate, or price, it shall be derived from the reasonable costs of executing the work, together with reasonable profit, taking account of any other relevant matters.” This, in tur, leads to further questions: + Whenis the “newly instructed” work similar (enough?) to any work already contained, or accounted for in the contract? + And, if'so, is the rate, or price contained in the contract applicable? How should this be evaluated? + What rate is applicable? There might be several different rates for “similar” works available. Which rate should apply? + And, what should apply if there is no relevant rate, or price in the contract, from which a new rate, or price might be derived? Both the Yellow and the Silver Books, in their subcl.13.3, in the end revert to a determination, by the engineer, or the employer in the case of the Silver Book, to arrive at an adjustment of the contract price. The question is: How exactly does the engineer (or, in the case of the Silver Book, the employer) determine these prices? Could it be argued that a principle is contained in the Red Book that, by referring to “relevant rates, or prices in the contract”, the agreed price shall prevail? If so, should this be in the way of “good price remains good, and bad price remains bad”, or should adjustments be allowed? And if adjustments are allowed, to what extent, and how should those be determined? 3. Disputes are about money, not technical matters Tt appears to be a fairly commonplace occurrence that the parties will fail to agree on aprice. Based on the authors’ experience, there rarely is a construction project executed without variations being ordered. Although, whilst the ordering of a variation, or the receiving of an instruction is in itself seldom cause for dispute, payment of such variations and/or instructions is a distressingly common cause for disputes. In other words, the parties rarely disagree about the work (and, if they do, the contract has in place mechanisms to handle that), but the parties regularly disagree on how that extra, or varied work should be paid, especially if there is no relevant tate, or price available in the contract for the rate or, price to be derived from. It appears to be quite obvious that the parties will argue the most about the money, and not about technical issues about how to solve a technical problem, The parties usually have a joint common interest in carrying out the works, and—contractors being contractors—every contractor usually desires to get a project finished, preferably on time, to the satisfaction of the employer. (2013) 29 Const. J, Issue 1 © 2013 Thomson Reuters Profesional) UK Limited end Contributorsvot, ilar sin ters ices ofit, ork ble? + for the toa k, to does hese ring, fso, vad”, tent, aject ofa oute, ause tthe orks, eta i Determination of Prices for Variations in FIDIC Contracts 33 Employers being employers, they usually desire to get their best money’s worth, and not to pay more than they must. As long as a technical problem is adequately solved, the employer will usually opt for the solution that, for them, promises the best value for money. How exactly a given solution works is usually (there are exceptions) not a concem of the employer. The contractor, too, is usually perfectly happy with the technical solution which they deem to be acceptable (also in terms of their defects liability). Disputes thus usually arise over claims for money, and not over any technical issues which might have arisen in the course of executing the works. Technical disputes are, in the authors’ experience, by and large, disputes about the cost of a solution, not disputes about the solution itself. 4, FIDIC on valuing works Surprisingly, the FIDIC contracts provide little (Red Book) to no (Silver Book, Yellow Book) guidance on how much exactly a contractor should be paid for additional, or varied work. The guidance contained in the Red Book, along with some of the problems it poses, is described above, Especially in the case of the Yellow, or Silver Books, where the contract does not specify an obligation of the contractor to provide a price breakdown, there is no guidance whatsoever. Even if some form of price breakdown is available, sub-clause 14.1 first paragraph (d) clearly states that, “any quantities or price data which may be set out in a schedule shall be used for the purposes stated in the Schedule and may be inapplicable for other purposes.” The result is that, when an adjustment is made in a Silver, or Yellow Book contract, the parties will, at least at the beginning, have virtually nothing to go along with; at a time when some type of guidance on the price is needed the most, the Silver and Yellow Books fail to provide. It appears somewhat strange that, especially in these lump-sum contract forms, where just one price is available and therefore itis particularly difficult to find the right price for variations, no guidance is provided by FIDIC, ‘The FIDIC contract forms place the responsibility to resolve this matter with the engineer, who is supposed to agree, or determine an appropriate rate, or price, “taking account of any other relevant matters”: subel.13.3. While this installs the engineer as the person in charge, it leaves the parties to the contract somewhat at a loss as to what the engineer, even if he should be bound by the principles of the Red Book, in the end, will determine to be an appropriate rate, or price, especially if the contract contains no relevant rate, or price which the engineer, or the parties may refer to for guidance. Furthermore, at the end of the day, if either party is not satisfied with the engineer’s determination, either the contractor, or the employer will, in the usual course of things, escalate the matter to a Dispute Adjudication Board (DAB) and, ultimately, fo an arbitral tribunal. This has the effect of replacing the engineer as the “price-determining person” with a DAB, and, ultimately, an arbitral tribunal, ‘This means that a price for additional, or varied works, especially if there is no relevant price, or rate contained in the contract which the parties can “snag” onto, will, in the end, be decided by what an arbitral tribunal thinks is reasonable at the (2013) 29 Const LJ, Isue 1 © 2013 Thomson Reuters (Profesional) UK Limited and Contributors34 Construction Law Journal time. This is a bit of a “black box” for the parties, and means that the result will depend very much on the person ultimately put in charge of determining the price. Things are supposedly casier where there is a unit rate, or price agreed which is applicable, then this will apply.’ There is no provision in FIDIC for “correcting” a wrong price in a bill of quantities (BoQ), or price breakdown.’ A word of waming, though: this might hold true for most jurisdictions, but need not hold true for al This does not in itself suggest a broken system, quite the contrary; the fact that @ matter is escalated means that it has not been agreed, and this indicates that the parties are unable to reach an agreement by themselves. Referring such a decision to an independent third person is an acceptable way of dealing with such a situation. 5. Faults in the current system However, transferring the power to determine a price does not necessarily increase the predictability, or reasonableness of a decision, and also makes it difficult for the parties to plan ahead. Given the fact that the contractor is bound by the contract, under subcl.13.3, to proceed with the works (“the contractor shall not delay any work while awaiting a response”), it may well be that the question of payment for a variation which was ordered and already executed will only be decided several years after the work has already been carried out. This is unsatisfactory to both parties, both for the employer, who is forced to commit funds, and for the contractor, who has to wait for his payment. In such a situation, neither party is afforded timely closure. Also, the goal of the escalation system in FIDIC, to provide for a quick and reasonable settlement, is not always obtained. How can such a situation be alleviated? The FIDIC contract itself does not really provide guidance on this matter, for the reasons indicated above; the contract fails to provide any guidance in precisely such cases when guidance is most sorely needed, i.e. when there is no comparable rate, or price. 6. Current price evaluation suggestions Utilising an applicable unit rate, or price breakdown item The question which often arises is, when are items of work similar enough to consider a BoQ rate applicable? On this matter, the literature is strangely quiet. The FIDIC Contracts Guide does provide some advice by arguing that: “The question as to the similarity of work may be resolved by referring to the description in sub-paragraph (b)(iii), which refers to similarity in terms of work being of similar character and executed under similar conditions.” Dr. Nael G. Bunni, in his often cited work The FIDIC Forms of Contract (3rd edn), states: | Henry Boot Construction Lid» Alstom Combined Cycles Lid (2002) B.R.247, CA. 2 PIDIC Contracts: Law and Praclce, by Baker, Mellors, Chalmers and Laver, pars 458 onward, pp.169 and 170, hereafter referred to as FIDIC Contracts: Law and Practice. FIDIC Contracts Guide, page 209. (2015) 29 Const LJ, Issve 1© 2013 Thomson Reuter (Professional) UK Limited and Contributorswill rice. hich ing” all. that tthe ision tion. vease It for act, any. at for 2d to wha ation ways snot orely hto uiet. gto ms Grd and sing, * — Determination of Prices for Variations in FIDIC Contracts 35 “Varied work is valued in one of four different ways. The first is where the variation is valued at the rates and prices set out in the contract if, in the opinion of the engineer, these rates and prices are applicable to the items of varied work. In considering the applicability of the rates and prices in the contract to the varied work, the engineer would have to take into account the nature and amount of the varied work in addition to, presumably, preliminary items which may be affected, the time when the variation is ordered, the method ofits construction and its physical location compared with other work under the contract. The second way in which a variation may be valued is where there are no applicable rates and prices in the contract, then the contract rates and prices are to be used as the basis for valuation so far as may be reasonable.”* So, if an applicable unit rate is contained in the contract, or a unit rate is deemed reasonably applicable by the engineer, the question of valuation of the works is answered by the contract itself, at least in the case of the Red Book. Ifnot, itreverts to the opinion of the engineer. The question of Valuation suddenly becomes viable again, in the case of a Yellow, or Silver Book contract, where no unit rate is supplied; for example, for lack of a BoQ. Cana price breakdown take the place of a BoQ in such a matter? This appears not to have been decided yet by any meaningful authority, but some authors appear to say that yes, a price breakdown can be utilised as a BoQ; even though the FIDIC forms seem to suggest otherwise. This would require that a price breakdown is available, however; it is the authors’ experience that such price breakdowns are not always available, or accurate, And even if they are available, what price breakdown item of a unit rate should be deemed applicable? Valuing works when no unit rate is available If no unit rate, or price is available, the original question returns: How should works be valued when no unit rate, or other “comparable item” is available? The answers provided by the literature appear to revert to “reasonable cost”, Dr. Bunni writes that: “The third way in which a variation may be valued applies if the contract, rates and prices cannot be used as a basis for valuation; then the engineer is required to agree new suitable rates and prices through the procedure of “due consultation’ with the employer and the contractor. Where no agreement is reached between the engineer and the contractor, then the engineer is required to fix such rates and prices as arc, in his opinion, appropriate.”* In similar vein, Baker, Mellors, Chalmers and Lavers argue that, ‘{As ten from Dr, Nael G, Bunni, The FIDIC Forms of Contract, 3rd edn (2005), p:301. SFIDIC Contracts: Law and Practice, para4.35 onwatds p.169. “As taken fom Dr. Neel G. Bunni, The FIDIC Forms of Contract (2008), pp 301-2. (2013) 29 Const. LJ, Issue ] © 2013 Thomson Reuters (Profesional) UK Limited and Contributors36 Construction Law Journal “where a rate, or price cannot be derived from the contract, it is then to be derived from the reasonable costs of executing the work, together with reasonable profit, taking account of any other relevant matters”,” Reasonable costs, according to this text, are meant to mean costs incurred, including, overheads and similar surcharges.* The FIDIC Contracts Guide contains only one sentence as to this matter: “Ifa new rate, or price is to be assessed, it may be derived from relevant rates and/or ptices in the Bill of Quantities, or other appropriate Schedules, and/or from reasonable Costs,” Again, while this is an indication of what should be utilised when arriving at the price, or rate, it can still be very much a matter of dispute whether, or not the costs incurred by the contractor were economical and/or reasonable. This is unsatisfactory; what, exactly, is a reasonable price? What, exactly, does “reasonable” mean? According to Black's Law Dictionary,” “reasonable” means “fair, proper, or moderate under the circumstances”. Clearly, this meaning is what the parties expect, when they turn over the determination ofa price to a third person, as the alternative meaning would not be helpful. As is concisely stated, “reasoning does not help much in fixing a fair, or reasonable price... .”"" While there exist various methods propagated by engineers on how to value disruption, delay, extensions, and so on, there is not much guidance, either for the parties, or the engineer, for that matter, on how to arrive at a new rate, or price which was not considered in the existing contract. This leads to uncertainty as to what will, ultimately, be found to be reasonable. The black box remains opaque. 7. Possible solution: agreeing procedures for valuation? It can be argued that the parties might be more inclined to settle and/or agree on a price for variations if they had a way of gauging what a DAB, or ultimately an arbitral tribunal, would find to be a reasonable price. ‘The uncertainty in such a decision need not be prevalent. There exist other forms of contract, which, while not having an ultimate solution, do provide some guidance to their respective users as to how variations are to be valued and prices for variations should be determined. Many standard forms of contract outside of FIDIC contain at least hints for such procedures, or such guidance, such as the Austrian ONorm, the French AFNOR, the Swiss SIA, and the German VOB/B. For example, the VOB/B grants the employer the right to instruct variations. In consequence, the VOB/B (in para.2, ss.5 and 6) grants the contractor a right to payment for such varied, or additional work. According to the interpretation of the VOB/B by the competent courts, entitlements to payment arising out of para.2 of the VOB/B are, however, affixed 2 RIDIC Contracts: Law and Proce, para 4.1, p.1 SFIDIC Conracts, Law and Proce, par), p.17 SFIDIC Contracts Gude, 210. ¥ Blacks Law Dictionary, 9 ed (West Group, 2008), “reasonable”. "Black Law Dictionary, (2008), “easonsble (2013) 29 Cons. LJ, lsue 1 © 2013 Thomson Reuters (Professional) UK Limited and Contibutors
You might also like
The Perfect Shot-Kevin "Doctari" Robertson
PDF
100% (1)
The Perfect Shot-Kevin "Doctari" Robertson
6 pages
Fidic Final
PDF
100% (1)
Fidic Final
152 pages
An Overview of Construction Claims How T
PDF
No ratings yet
An Overview of Construction Claims How T
37 pages
Variations Under Fidic Contracts - Handling Cost, Time and Determination
PDF
No ratings yet
Variations Under Fidic Contracts - Handling Cost, Time and Determination
9 pages
FIDIC Comparison PeterAtkinson
PDF
No ratings yet
FIDIC Comparison PeterAtkinson
11 pages
BOQ For Villa Units
PDF
100% (1)
BOQ For Villa Units
26 pages
Extension of Time in Fidic
PDF
90% (10)
Extension of Time in Fidic
34 pages
Clauses Comparison FIDIC (1987-1999) - CLAC
PDF
100% (1)
Clauses Comparison FIDIC (1987-1999) - CLAC
4 pages
New FIDIC Gold Book Contract Guide
PDF
100% (1)
New FIDIC Gold Book Contract Guide
4 pages
Fidic Blue
PDF
No ratings yet
Fidic Blue
61 pages
CL-0021-ENG - Salini V Morocco - Decision On Jurisdiction
PDF
No ratings yet
CL-0021-ENG - Salini V Morocco - Decision On Jurisdiction
16 pages
JBCC Contract
PDF
No ratings yet
JBCC Contract
47 pages
Cost Report - Template
PDF
No ratings yet
Cost Report - Template
66 pages
Fidic Intro
PDF
100% (3)
Fidic Intro
24 pages
General Conditions of Contract - PWA
PDF
No ratings yet
General Conditions of Contract - PWA
22 pages
NewFidicGoldenBook PDF
PDF
100% (1)
NewFidicGoldenBook PDF
2 pages
Fidic Red 2017
PDF
No ratings yet
Fidic Red 2017
225 pages
Variation Claim VGLux
PDF
No ratings yet
Variation Claim VGLux
2 pages
Different Types of Contracts FIDIC Contracts EPC Contracts
PDF
No ratings yet
Different Types of Contracts FIDIC Contracts EPC Contracts
6 pages
Case Study - Contractor's Entitlement To Increased Costs On A Fixed Price Contract
PDF
0% (1)
Case Study - Contractor's Entitlement To Increased Costs On A Fixed Price Contract
3 pages
Project Specific Preliminaries MWA 2018 05
PDF
No ratings yet
Project Specific Preliminaries MWA 2018 05
13 pages
Clause 14 PDF
PDF
100% (1)
Clause 14 PDF
34 pages
Presentation On Resolution Plan by Suraksha & Lakshdeep
PDF
No ratings yet
Presentation On Resolution Plan by Suraksha & Lakshdeep
15 pages
FIDIC Rainbow Suite 2012
PDF
No ratings yet
FIDIC Rainbow Suite 2012
44 pages
EX20 FIDIC Green Turnkey - Contract Agreement & General Conditions
PDF
No ratings yet
EX20 FIDIC Green Turnkey - Contract Agreement & General Conditions
73 pages
Loss and Expense Claims
PDF
No ratings yet
Loss and Expense Claims
28 pages
Fidic Yellow
PDF
100% (1)
Fidic Yellow
151 pages
Bulletin: ICC International Court of Arbitration
PDF
No ratings yet
Bulletin: ICC International Court of Arbitration
30 pages
Coronavirus COVID19 - Client Guidance
PDF
50% (2)
Coronavirus COVID19 - Client Guidance
15 pages
Schoenherr Construction Conference Presentations 2016
PDF
No ratings yet
Schoenherr Construction Conference Presentations 2016
149 pages
Krishna Reddy CV
PDF
100% (1)
Krishna Reddy CV
29 pages
EOT Claim Under The GCC - Mashadi Motsogi
PDF
No ratings yet
EOT Claim Under The GCC - Mashadi Motsogi
2 pages
Avoiding Pitfalls in Construction - A Review of FIDIC Forms of Contract
PDF
No ratings yet
Avoiding Pitfalls in Construction - A Review of FIDIC Forms of Contract
5 pages
Fidic 1999 Red Book
PDF
0% (1)
Fidic 1999 Red Book
9 pages
Fidic IV Conditions of Contract - Overview
PDF
100% (2)
Fidic IV Conditions of Contract - Overview
8 pages
FIDIC
PDF
100% (2)
FIDIC
3 pages
Variation or Extra Works
PDF
No ratings yet
Variation or Extra Works
5 pages
Fidic Form Contract Lecture Note
PDF
No ratings yet
Fidic Form Contract Lecture Note
14 pages
Introduction FIDIC
PDF
No ratings yet
Introduction FIDIC
18 pages
Introduction To FIDIC Contracts
PDF
No ratings yet
Introduction To FIDIC Contracts
4 pages
Geo Instrumentation Tassometer
PDF
No ratings yet
Geo Instrumentation Tassometer
1 page
Fidic Yb 1999
PDF
No ratings yet
Fidic Yb 1999
27 pages
The FIDIC Contracts Guide
PDF
No ratings yet
The FIDIC Contracts Guide
9 pages
Fidic Contracts Management Practical Use of Fidic Contracts Module1
PDF
No ratings yet
Fidic Contracts Management Practical Use of Fidic Contracts Module1
4 pages
FIDIC and Internat UK Contract
PDF
No ratings yet
FIDIC and Internat UK Contract
16 pages
Al-Nahw Al-Wadih Primary Part One
PDF
No ratings yet
Al-Nahw Al-Wadih Primary Part One
11 pages
FIDIC Launches New Yellow Book Subcontract PDF
PDF
No ratings yet
FIDIC Launches New Yellow Book Subcontract PDF
5 pages
Beneficial Occupancy and Practical Completion
PDF
No ratings yet
Beneficial Occupancy and Practical Completion
3 pages
FIDIC Changes in Harmonized Edition (1999 Edition)
PDF
No ratings yet
FIDIC Changes in Harmonized Edition (1999 Edition)
37 pages
Standard Types of Contract: Construction Procurement Guidelines
PDF
No ratings yet
Standard Types of Contract: Construction Procurement Guidelines
4 pages
CM 5
PDF
No ratings yet
CM 5
10 pages
FIDIC-Guide To The Use
PDF
No ratings yet
FIDIC-Guide To The Use
259 pages
Infrastructure in Developing Countries
PDF
100% (1)
Infrastructure in Developing Countries
56 pages
Structural Flow Chart
PDF
No ratings yet
Structural Flow Chart
1 page
Saudi Labor Law - (Eng)
PDF
No ratings yet
Saudi Labor Law - (Eng)
56 pages
Fidic Red Book & Yellow Book Checklist of Potential Amendments
PDF
No ratings yet
Fidic Red Book & Yellow Book Checklist of Potential Amendments
11 pages
Pink Form - 1988 Edition
PDF
No ratings yet
Pink Form - 1988 Edition
24 pages
Fidic Construction Contract
PDF
No ratings yet
Fidic Construction Contract
3 pages
BIM Slides For Dubai - RICS Event Final
PDF
No ratings yet
BIM Slides For Dubai - RICS Event Final
56 pages
9.1 Conditions of Contract For Construction (FIDIC)
PDF
No ratings yet
9.1 Conditions of Contract For Construction (FIDIC)
29 pages
Which FIDIC Contract Should I Use ?
PDF
No ratings yet
Which FIDIC Contract Should I Use ?
5 pages
02 Fidic
PDF
No ratings yet
02 Fidic
38 pages
Understanding FIDIC by DCP PDF
PDF
100% (1)
Understanding FIDIC by DCP PDF
16 pages
FIDIC - New 1999 Edition of The Red Book Impartiality of The Engineer
PDF
No ratings yet
FIDIC - New 1999 Edition of The Red Book Impartiality of The Engineer
5 pages
The Four FIDIC 1999 Contract Condition
PDF
No ratings yet
The Four FIDIC 1999 Contract Condition
18 pages
Drawing Guidelines
PDF
0% (1)
Drawing Guidelines
8 pages
Claims Under FIDIC 2016 Hogan
PDF
No ratings yet
Claims Under FIDIC 2016 Hogan
4 pages
Notice Clauses in The Fidic Yellow Book Conditions
PDF
100% (1)
Notice Clauses in The Fidic Yellow Book Conditions
4 pages
DM001 o Acw Vom Om DCC 819228 A2
PDF
No ratings yet
DM001 o Acw Vom Om DCC 819228 A2
205 pages
Fidic Part 12
PDF
No ratings yet
Fidic Part 12
5 pages
SMM Schedule - Measurement
PDF
No ratings yet
SMM Schedule - Measurement
6 pages
Form P - End of Defects Liability Period Verification Pump Stations
PDF
No ratings yet
Form P - End of Defects Liability Period Verification Pump Stations
2 pages
Fidic Contracts
PDF
No ratings yet
Fidic Contracts
27 pages
Evaluating Quality in Tenders
PDF
No ratings yet
Evaluating Quality in Tenders
16 pages
Urban Development (Kabul)
PDF
No ratings yet
Urban Development (Kabul)
31 pages
Teaching Systematic Synthetic Phonics
PDF
No ratings yet
Teaching Systematic Synthetic Phonics
2 pages
Dls Dynamics April2010
PDF
No ratings yet
Dls Dynamics April2010
4 pages
Contracts of Muqawala and Decennial Liability
PDF
No ratings yet
Contracts of Muqawala and Decennial Liability
3 pages
Defects Under The NEC 3
PDF
No ratings yet
Defects Under The NEC 3
1 page
FIDIC: Termination by The Employer Under The Red and Yellow Books
PDF
No ratings yet
FIDIC: Termination by The Employer Under The Red and Yellow Books
8 pages