100% found this document useful (1 vote)
1K views58 pages

Work Breakdown

This document provides a 3-level work breakdown structure for construction activities for drainage, retaining structures, and protective treatments. The levels include: Level 1 categories such as site establishment, environmental management, and drainage/retaining structures; Level 2 subcategories such as provision for traffic, supply of culverts, and concrete in culverts; and Level 3 specific construction tasks.

Uploaded by

kmmansaf
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
1K views58 pages

Work Breakdown

This document provides a 3-level work breakdown structure for construction activities for drainage, retaining structures, and protective treatments. The levels include: Level 1 categories such as site establishment, environmental management, and drainage/retaining structures; Level 2 subcategories such as provision for traffic, supply of culverts, and concrete in culverts; and Level 3 specific construction tasks.

Uploaded by

kmmansaf
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 58

Department of Transport and Main Roads

Project Cost Estimating Manual

Annexure C
Work Breakdown Structure Construction Activities

Annexure C Work Breakdown Structure Construction Activities


EXAMPLE ONLY
WORK BREAKDOWN STRUCTURE CONSTRUCTION ACTIVITIES
Level 1
1100

1200

1300

SITE
ESTABLISHMENT

PROVISION FOR
TRAFFIC

ENVIRONMENTAL
MANAGEMENT

Level 2
1100A

1200A

1300A

Level 3

CONTRACTOR'S SITE
FACILITIES AND CAMP
1101
1102

Contractor's site facilities


Contractor's camp

1201
1202
1203
1204
1211
1221
1223
1225
1226
1227P
1228P
1231P

Provision for traffic


Traffic Management Plan
Roadwork signing records
Travel Time Surveys
Construction and removal of side track
Supply of Temporary Barriers
Installation of Temporary Barriers
Supply of temporary barrier end treatments
Installation of temporary barrier end treatments
Supply of anti-gawking screens (Provisional Quantity, if ordered)
Installation of anti-gawking screens (Provisional Quantity, if ordered)
Supply and installation of temporary road lighting including connection to
Electricity Supply Authority's network (Provisional Quantity, if ordered)

PROVISION FOR
TRAFFIC (MRS02 Oct 10
Type: RCC)

ENVIRONMENTAL
MANAGEMENT (MRS51
Jun 09 Type: RCC)
Page 1 of 58
Annexure C
March 2012

Department of Transport and Main Roads


Project Cost Estimating Manual

Annexure C
Work Breakdown Structure Construction Activities

WORK BREAKDOWN STRUCTURE CONSTRUCTION ACTIVITIES


Level 1

2000

DRAINAGE,RETAINI
NG STRUCTURES
AND PROTECTIVE
TRETMENTS

Page 2 of 58
Annexure C
March 2012

Level 2

2100

Level 3
1330
1331
1332
1333
1341P
1342
1343
1344
1345
1346
1351P
1355P
1361P
1365P
1371P
1375P
1381P

Environmental Inspections
Develop Environmental Management Plan (Construction)
Implement Environmental Management Plan (Construction)
Environmental Licences, Permits and Approvals
Water quality monitoring, if ordered (Provisional Quantity)
Environmental Rock Structures.
Sand Bag Structures
Silt / Sediment Fence
Erosion Control Matting
Erosion Control Blankets
Cultural Heritage Management, if ordered (Provisional Quantity)
Noise monitoring, if ordered (Provisional Quantity)
Condition survey and vibration monitoring, if ordered (Provisional Quantity)
Air quality monitoring, if ordered (Provisional Quantity)
Management of contaminated sites, if ordered (Provisional Quantity)
Fauna management, if ordered (Provisional Quantity)
Pest Control, if ordered (Provisional Quantity)

2101
2102
2103
2104
2105

Removal or demolition of culverts, complete


Removal or demolition of culvert end structures
Removal or demolition of culverts, excluding end structures
Removal or demolition of concrete kerb including kerb crossings
Removal or demolition of concrete channel

REMOVAL/DEMOLITION
(MRS03 Oct 10 Type:
RCC)

Department of Transport and Main Roads


Project Cost Estimating Manual

Annexure C
Work Breakdown Structure Construction Activities

WORK BREAKDOWN STRUCTURE CONSTRUCTION ACTIVITIES


Level 1

Level 2

2200

Level 3
2106
2107
2108
2109

Removal or demolition of concrete kerb and channel including kerb crossings


Removal or demolition of concrete slabs
Removal or demolition of gullies
Removal or demolition of access chambers

2201

2207
2208
2209
2211
2212
2213
2214

Supply of concrete pipe culvert components, Class [class], [diameter] mm


diameter
Supply of fibre reinforced concrete pipe culverts, Class [class], [diameter] mm
diameter
Supply of concrete box culvert components, [size]
Supply of concrete spanning slabs, [size]
Supply of helical lock-seam corrugated steel pipe culvert components, [size]
Supply of helical lock-seam corrugated aluminium pipe culvert components,
[size]
Supply of nestable corrugated steel pipe culvert components, [size]
Supply of multiple plate corrugated steel pipe culvert components, [size]
Supply of multiple plate corrugated steel pipe-arch culvert components, [size]
Supply of multiple plate corrugated steel arch culvert components, [size]
Supply of concrete pipe drainage trough components, [size]
Supply of concrete box trough components, [size]
Supply of nestable corrugated steel pipe drainage trough components, [size]

2221

Installation of concrete pipe culvert components, [diameter] mm diameter

SUPPLY OF CULVERTS
(MRS03 Oct 10 Type:
RCC)

2202
2203
2204
2205
2206

2220

INSTALLATION OF
CULVERTS (MRS03 Oct
10 Type: RCC)

Page 3 of 58
Annexure C
March 2012

Department of Transport and Main Roads


Project Cost Estimating Manual

Annexure C
Work Breakdown Structure Construction Activities

WORK BREAKDOWN STRUCTURE CONSTRUCTION ACTIVITIES


Level 1

Level 2

Level 3
2222
2223
2224
2225
2226
2227
2228
2229
2231
2232
2233
2234
2236

2240

SUPPLY AND
INSTALLATION OF
CULVERTS (MRS03 Oct
10 Type: RCC)
2241
2242
2243

Page 4 of 58
Annexure C
March 2012

Installation of fibre reinforced concrete pipe culvert components, [diameter]


mm diameter
Installation of concrete box culvert components, [size]
Installation of concrete spanning slabs,[size]
Installation of helical lock-seam corrugated steel pipe culvert components,
[size]
Installation of helical lock-seam corrugated aluminium pipe culvert
components, [size]
Installation of nestable corrugated steel pipe culvert components, [size]
Installation of multiple plate corrugated steel pipe culvert components, [size]
Installation of multiple plate corrugated steel pipe-arch culvert components,
[size]
Installation of multiple plate corrugated steel arch culvert components, [size]
Installation of concrete pipe drainage trough components, [size]
Installation of concrete box trough components, [size]
Installation of nestable corrugated steel pipe drainage trough components,
[size]
Installation of pipe culvert components using jacking methods, [diameter] mm
diameter

Supply and installation of concrete pipe culvert components, Class [class],


[diameter] mm diameter
Supply and installation of fibre reinforced concrete pipe culvert components,
Class [class], [diameter] mm diameter
Supply and installation of concrete box culvert components, [size]

Department of Transport and Main Roads


Project Cost Estimating Manual

Annexure C
Work Breakdown Structure Construction Activities

WORK BREAKDOWN STRUCTURE CONSTRUCTION ACTIVITIES


Level 1

Level 2

Level 3
2244
2245
2246
2247
2248
2249
2251
2252
2253
2254
2256

2300

Supply and installation of concrete spanning slabs,[size]


Supply and installation of helical lock-seam corrugated steel pipe culvert
components, [size]
Supply and installation of helical lock-seam corrugated aluminium pipe culvert
components, [size]
Supply and installation of nestable corrugated steel pipe culvert components,
[size]
Supply and installation of multiple plate corrugated steel pipe culvert
components, [size]
Supply and installation of multiple plate corrugated steel pipe-arch culvert
components, [size]
Supply and installation of multiple plate corrugated steel arch culvert
components, [size]
Supply and installation of concrete pipe drainage trough components, [size]
Supply and installation of concrete box trough components, [size]
Supply and installation of nestable corrugated steel pipe drainage trough
components, [size]
Supply and installation of pipe culvert components using jacking methods,
Class [class], [diameter] mm diameter

CONCRETE IN
CULVERTS AND END
STRUCTURES (MRS03
Oct 10 Type: RCC)
2301
2302
2303
2304
2305

Concrete end plugs for culverts


Concrete bases in culverts
Concrete footings in culverts
Concrete infill floors in culverts
Concrete abutments and piers in culverts
Page 5 of 58
Annexure C
March 2012

Department of Transport and Main Roads


Project Cost Estimating Manual

Annexure C
Work Breakdown Structure Construction Activities

WORK BREAKDOWN STRUCTURE CONSTRUCTION ACTIVITIES


Level 1

Level 2

2400

Page 6 of 58
Annexure C
March 2012

Level 3
2306
2307
2308
2309
2311
2312
2313
2314
2315
2316
2317

Concrete slab decks and kerbs in culverts


Concrete unitary box culverts
End structures to culverts, reinforced concrete
End structures to culverts, unreinforced concrete
End structures to culverts, rock masonry
End structures to culverts, concrete masonry
Aprons to culverts, reinforced concrete
Aprons to culverts, unreinforced concrete
Aprons to culverts, grouted rock pitching
Aprons to culverts, steel wire mattresses
Precast concrete end structures to culverts, [size]

2401
2402
2403
2404
2405
2406
2407
2408
2409
2411
2412
2413

Concrete kerb, [type]


Concrete kerb crossings, [type]
Concrete channel, [type]
Concrete kerb and channel, [type]
Concrete kerb and channel crossings, [type]
Precast concrete kerb blocks, [type]
Precast concrete channel blocks, [type]
Precast concrete kerb and channel blocks, [type]
Shoulder dykes, concrete
Shoulder dykes, asphalt
Shoulder dykes, precast concrete blocks
Concrete gullies, [size/description]

PAVEMENT DRAINAGE
(MRS03 Oct 10 Type:
RCC)

Department of Transport and Main Roads


Project Cost Estimating Manual

Annexure C
Work Breakdown Structure Construction Activities

WORK BREAKDOWN STRUCTURE CONSTRUCTION ACTIVITIES


Level 1

Level 2

2500

Level 3
2414
2415
2416
2417

Concrete access chambers, [size/description]


Precast concrete access chambers, [size/description]
Precast concrete side inlet gullies with precast shaft, [size/description]
Precast concrete side inlet gullies with cast-in-place pit, [size/description]

2501
2502
2503
2504
2505
2506
2507
2511
2512
2513
2514

2516

Subsoil drains, Type B, [size] mm diameter


Subsoil drains, Type D
Subsoil drain outlet connection, [size] mm diameter, [type]
Subsoil drain clean-out, [size] mm diameter, [type]
Sheet filter drains
Strip filter drains
Sheet or strip filter drain outlet connection, [type]
Vertical wick filter drains, plastic core
Vertical sand drains
Granular working platform for stone columns
Supply and installation of reinforcement geosynthetic material for stone
columns
Supply and installation of geotextile, Strength Class [strength class], Filtration
Class [filtration class]
Stone columns

2601
2611

Concrete paved inverts in corrugated steel/aluminium culverts, [size]


Linings in drains and channels, unreinforced concrete

SUBSURFACE DRAINAGE
(MRS03 Oct 10 Type:
RCC)

2515

2600

PROTECTIVE
TREATMENTS (MRS03
Oct 10 Type: RCC)

Page 7 of 58
Annexure C
March 2012

Department of Transport and Main Roads


Project Cost Estimating Manual

Annexure C
Work Breakdown Structure Construction Activities

WORK BREAKDOWN STRUCTURE CONSTRUCTION ACTIVITIES


Level 1

Level 2

Level 3
2612
2613
2614
2615
2621
2622
2623
2624
2631
2632
2633
2641
2642
2643
2644
2645
2646
2647
2651
2652
2653
2654
2656

Page 8 of 58
Annexure C
March 2012

Linings in drains and channels, reinforced concrete


Linings in drains and channels, grouted rock pitching
Linings in drains and channels, steel-wire mattresses
Berm drain, [width] mm wide
Concrete margins
Concrete batters
Concrete rail track crossings
Concrete machinery crossings
Hand placed concrete paving, [thickness] mm thick
Sprayed concrete paving, [thickness] mm thick
Block paving, [thickness] mm thick
Rock masonry
Grouted rock pitching
Rock protection
Steel wire gabion protection work
Steel wire mattress protection work
Fabric encased concrete batter protection on batter faces
Fabric encased concrete batter protection in cut-off walls
Bridge abutment protection Type 1 - rock spillthrough, [location] abutment
Bridge abutment protection Type 2 - reinforced concrete over road
embankment spillthrough, [location] abutment
Bridge abutment protection Type 3 - rockfill at toe of road embankment
spillthrough, [location] abutment
Bridge abutment protection Type 4 - rockwork over road embankment
spillthrough, [location] abutment
Bridge abutment protection Type 6 - interlocking blockwork over road
embankment spillthrough, [location] abutment

Department of Transport and Main Roads


Project Cost Estimating Manual

Annexure C
Work Breakdown Structure Construction Activities

WORK BREAKDOWN STRUCTURE CONSTRUCTION ACTIVITIES


Level 1

Level 2
2700

Level 3
2657

Shotcreting

2701
2702
2703
2711

2721
2731P
2741P
2751P

Concrete retaining wall, concrete in footing, [wall location / wall number]


Concrete retaining wall, concrete in wall, [wall location / wall number]
Concrete retaining wall, steel reinforcing bar, [wall location / wall number]
Concrete masonry retaining wall, concrete in footing, [wall location / wall
number]
Concrete masonry retaining wall, masonry in wall, [wall location / wall number]
Concrete masonry retaining wall, steel reinforcing bar, [wall location / wall
number]
Crib walls
Soil nailing (Provisional Quantity)
Passive rock dowels (Provisional Quantity)
Active rock bolts (Provisional Quantity)

2781
2782
2783
2784

Design of Reinforced Soil Structure, [structure number]


Reinforced Soil Structure materials, [structure number]
Construction of Reinforced Soil Structure, [structure number]
Designer's inspection and certification, [structure number]

2801
2802

Pavement Drain
Pavement Drain Outlets

RETAINING WALLS
(MRS03 Oct 10 Type:
RCC)

2712
2713

2780

2800

REINFORCED SOIL
STRUCTURES (MRS06
Oct 10 Type: RCC)

PAVEMENT DRAINS
(MRS38)

Page 9 of 58
Annexure C
March 2012

Department of Transport and Main Roads


Project Cost Estimating Manual

Annexure C
Work Breakdown Structure Construction Activities

WORK BREAKDOWN STRUCTURE CONSTRUCTION ACTIVITIES


Level 1

3000

GENERALEARTHWO
RKS,PREPARATION

Level 2

3100

Level 3
2803
2804P
2805P

Pavement Drain Cleanout Point


Additional Excavation (Provisional Quantity)
Additional No Fines Concrete Filter Materials (Provisional Quantity)

3101
3102
3103P
3104
3105
3106
3107P

Clearing and grubbing


Bridge site preparation
Stripping of topsoil (Provisional Quantity as directed)
Ground surface treatment under embankment, standard
Ground surface treatment, special (square metres)
Ground surface treatment, special (cubic metres)
Ground surface treatment, in situ treatment of acid sulphate soils with lime
(Provisional Quantity if ordered)
Excavation and disposal of Unsuitable Material with individual excavation <=
10 m3 (Provisional Quantity as directed)
Excavation and disposal of Unsuitable Material with individual excavation > 10
m3 (Provisional Quantity as directed)
Supply and storage of agricultural lime (Provisional Quantity as directed)
Quantitative laboratory testing of actual or potential acid sulphate soils
(Provisional Quantity if ordered)
Treatment of water contaminated by acid sulphate soil (Provisional Quantity if
ordered)
Supply and installation of geotextile, strength class [strength class], filtration
class [filtration class]

EARTHWORKS,
PREPARATION (MRS04
Oct 10 Type: RCC)

3108P
3109P
3111P
3112P
3113P
3304
3200

Page 10 of 58
Annexure C
March 2012

EARTHWORKS,
EXCAVATION (MRS04 Oct
10 Type: RCC)

Department of Transport and Main Roads


Project Cost Estimating Manual

Annexure C
Work Breakdown Structure Construction Activities

WORK BREAKDOWN STRUCTURE CONSTRUCTION ACTIVITIES


Level 1

Level 2

Level 3
3201
3202
3203
3204
3205
3206
3207
3208
3211P
3212P
3213
3215P
3216P
3221

3300

Road excavation, all materials


Excavation to clear waterways at bridge abutments, all materials
Excavation for culvert, pipe and conduit trenches, all materials [description]
Excavation for structures, all materials [description]
Excavation for diversion channels, all materials
Excavation for diversion drains, all materials
Excavation for catch drains, all materials
Special excavation, all materials [description]
Excavation of non-rippable material in road excavation, rate additional to rate
for Work Item 3201 (Provisional Quantity)
Excavation of non-rippable material in confined excavation, rate additional to
rates for Work Items 3203 to 3207 inclusive (Provisional Quantity)
Pre-splitting batters of rock cuttings
Excavation and disposal of Unsuitable Material in and below confined
excavations (Provisional Quantity as directed)
Excavation and disposal of Unsuitable Material within lines of cuttings, rate
additional to rate for Work Item 3201 (Provisional Quantity as directed)
Blinding concrete, [thickness] mm nominal thickness

EARTHWORKS,
EMBANKMENT (MRS04
Oct 10 Type: RCC)
3301
3302
3303
3305P

Road embankment
Levees, catch banks and diversion blocks using clay fill material from all
sources
Special embankment [description] from all sources
Addition of lime to embankment materials to neutralise acid sulphate soils,
rate additional to rates for Work Items 3301 to 3303 (Provisional Quantity as
directed)
Page 11 of 58
Annexure C
March 2012

Department of Transport and Main Roads


Project Cost Estimating Manual

Annexure C
Work Breakdown Structure Construction Activities

WORK BREAKDOWN STRUCTURE CONSTRUCTION ACTIVITIES


Level 1

Level 2
3400

Level 3
3306

Road verges using general fill material

3401P

Testing of existing material below subgrade level in cuttings (Provisional


Quantity if ordered)
Subgrade treatment Type A in cuttings and in embankments (Provisional
Quantity if ordered)
Subgrade in cuttings, subgrade treatment Type B, replace with subgrade fill
material (Provisional Quantity if ordered)
Subgrade in cuttings, subgrade treatment Type C, replace with unbound
pavement material (Provisional Quantity if ordered)
Subgrade in cuttings, subgrade treatment Type D, in situ stabilise existing
(Provisional Quantity if ordered)
Subgrade in cuttings, subgrade treatment Type E, replace with plant-mixed
stabilised material (Provisional Quantity if ordered)
Subgrade in cuttings, subgrade treatment Type F, replace with plant-mixed
stabilised and unbound drainage layers (Provisional Quantity if ordered)
Subgrade in cuttings, subgrade treatment Type G, replace with in situ
stabilised drainage layer (Provisional Quantity if ordered)
Subgrade in cuttings, subgrade treatment Type H, replace with plant-mixed
stabilised drainage layer (Provisional Quantity if ordered)
Subgrade in cuttings, subgrade treatment Type I, [description] (Provisional
Quantity if ordered)
Excavation of non-rippable material in road excavation, rate additional to rate
for Work Items 3406, 3407, 3408 and 3409 (Provisional Quantity)
Supply of stabilising agent, lime (Provisional Quantity as directed)
Supply of stabilising agent, Type GB cement (Provisional Quantity as
directed)

EARTHWORKS,
SUBGRADE (MRS04 Oct
10 Type: RCC)

3402P
3403P
3404P
3405P
3406P
3407P
3408P
3409P
3411P
3412P
3413P
3414P
Page 12 of 58
Annexure C
March 2012

Department of Transport and Main Roads


Project Cost Estimating Manual

Annexure C
Work Breakdown Structure Construction Activities

WORK BREAKDOWN STRUCTURE CONSTRUCTION ACTIVITIES


Level 1

Level 2
3500

3600

Level 3

EARTHWORKS,
BACKFILL (MRS04 Oct 10
Type: RCC)
3501
3502
3503
3504
3505
3506
3507
3508
3509
3511
3512
3513
3514
3521P

Backfill with general backfill material to [description]


Backfill with select backfill material to [description]
Backfill with free draining granular material to [description]
Backfill with sand to [description]
Backfill with cement stabilised pavement material to [description]
Backfill with stabilised sand to [description]
Backfill with lean mix concrete to [description]
Backfill with rock fill to [description]
Backfill with material for steel culverts to [description]
Bedding of [description]
Haunch zone for [description]
Side zone for [description]
Overlay zone for [description]
Addition of lime to backfill material in Acid Sulphate Soil areas (Provisional
Quantity as directed)

3601
3602
3603

Turnouts
Entrances to private property
Stopping Places

EARTHWORKS;
TURNOUTS, ENTRANCES
AND STOPPING PLACES
(MRS04 Oct 10 Type:
RCC)

Page 13 of 58
Annexure C
March 2012

Department of Transport and Main Roads


Project Cost Estimating Manual

Annexure C
Work Breakdown Structure Construction Activities

WORK BREAKDOWN STRUCTURE CONSTRUCTION ACTIVITIES


Level 1

Level 2
3700

3703

3707

3715

Page 14 of 58
Annexure C
March 2012

Level 3

WIDENING (MRS04 Oct 10


Type: RCC)
3701
3702

Widening of the existing formation (metres)


Widening of the existing formation (square metres)

3704
3705

Fencing around vegetation


Padding of trees and boarding of drip zones

3708
3710
3711
3713
3714

Preparation of a PMMP-C
Screening of stripped site soil
Amelioration of stripped site soil
Loading, haulage and placement of site planting media
Supply and placement of imported planting media

3716
3719
3720
3721
3722
3723
3725

Earth mounding
Spreading of amelioration agent prior to ground preparation
Roughening of batters - [cut batters | fill batters]
Ripping
Ploughing
Cultivation
Excavation of subsoil

VEGETATION
PROTECTION (MRS16A
Jun 09 Type: RCC)

PLANTING MEDIA
(MRS16B Jun 09 Type:
RCC)

GROUND PREPARATION
(MRS16B Jun 09 Type:
RCC)

Department of Transport and Main Roads


Project Cost Estimating Manual

Annexure C
Work Breakdown Structure Construction Activities

WORK BREAKDOWN STRUCTURE CONSTRUCTION ACTIVITIES


Level 1

Level 2
3727P

Level 3

WEED, PEST AND


DISEASE CONTROL
(MRS16E Jun 09 Type:
RCC)
3728P
3729P

3737

3743

3751

3730P
3731P
3732P
3733P

Weed, Pest and Disease Control Proposal - Provisional Item (if ordered)
Mechanical herbicide application [knock-down | residual] - Provisional
Quantity (if ordered)
Manual herbicide application [knock-down | residual]
Hand removal of weeds
Target herbicide application [additional rate to items 3729 | 3730]
Mechanical or manual pesticide application [pesticide type]

3738
3739

Slashing
Brushcutting

3744
3745
3746
3747

Timber planting bed edging


Concrete planting bed edging
Unit paver planting bed edging
Rock planting bed edging

3752

Loading, haulage and placement of site organic mulch - [chipped site mulch |
tub ground site mulch | other mulch]

SLASHING AND
BRUSHCUTTING
(MRS16E Jun 09 Type:
RCC)

PLANTING BED EDGING


(MRS16D Jun 09 Type:
RCC)

MULCHING (MRS16B Jun


09 Type: RCC)

Page 15 of 58
Annexure C
March 2012

Department of Transport and Main Roads


Project Cost Estimating Manual

Annexure C
Work Breakdown Structure Construction Activities

WORK BREAKDOWN STRUCTURE CONSTRUCTION ACTIVITIES


Level 1

Level 2

Level 3
3753

3759

3765

3770

Page 16 of 58
Annexure C
March 2012

3754
3755
3756
3757

Supply and placement of imported organic mulch - [chipped mulch | tub


ground mulch | Hoop Pine mulch | other mulch]
Loading, haulage and placement of site rock mulch - [type and size of rock]
Supply and placement of imported rock mulch - [type and size of rock]
Supply and / or blending and placement of organics blanket
Supply and placement of filter sock - [200 mm | 300 mm | 450 mm]

3760
3761

Environmental matting - [type]


Plant mats - [type]

3766
3767
3768

Irrigation system, design


Irrigation system, supply and installation
Irrigation system, commissioning

3771
3772
3773
3774
3775
3776
3777

Harvesting of native seed


Hydromulching - single pass [native seed mix | grass seed mix]
Hydromulching - double pass [native seed mix | grass seed mix]
Straw mulching [native seed mix | grass seed mix]
Drill seeding [native seed mix | grass seed mix]
Mechanical broadcast [native seed mix | grass seed mix]
Manual broadcast [native seed mix | grass seed mix]

ENVIRONMENTAL
MATTING (MRS16B Jun 09
Type: RCC)

IRRIGATION SYSTEM
(MRS16D Jun 09 Type:
RCC)

INPUT CONTROLLED
SEEDING (MRS16C Jun
09 Type: RCC)

Department of Transport and Main Roads


Project Cost Estimating Manual

Annexure C
Work Breakdown Structure Construction Activities

WORK BREAKDOWN STRUCTURE CONSTRUCTION ACTIVITIES


Level 1

Level 2
3778

3781

3786

3794

Level 3

PERFORMANCE BASED
SEEDING (MRS16C Jun
09 Type: RCC)
3779

Sample installation

3782
3783

Turf [type]
Reinforced Turf [type]

3787

3788
3789
3790
3791

Planting [viro-cell | viro-tube | 1/2 native tube (50 x 50 x75 mm) | full native
tube stock (50 x 50 x 120 mm) | 140 mm container | 300 mm container | 25 litre
container | 45 litre container | 75 litre container 100 litre container | 200 litre
container ]
Planting ex-ground stock [container size]
Harvesting and planting of site plant material [plant unit | container size]
site plant material [plant unit]
Potting on

3795
3797
3798

LR Construction Establishment Period - Input Controlled


LR Monitoring Period - Input Controlled
LR Monitoring Period - Performance Based

TURFING (MRS16C Jun 09


Type: RCC)

PLANTING OF
CONTAINER AND
EXGROUND STOCK
(MRS16C Jun 09 Type:
RCC)

LANDSCAPE AND
REVEGETATION (LR)
ESTABLISHMENT AND
MONITORING (MRS16E
Jun 09 Type: RCC)

Page 17 of 58
Annexure C
March 2012

Department of Transport and Main Roads


Project Cost Estimating Manual

Annexure C
Work Breakdown Structure Construction Activities

WORK BREAKDOWN STRUCTURE CONSTRUCTION ACTIVITIES


Level 1

4000

UNBOUND
PAVEMENTS

Level 2

4100

4150R

Level 3
3799P

Watering of plant material during LR monitoring period - Provisional (if


ordered)

4101
4102
4103
4104
4105
4106
4107
4108
4151
4152
4153
4154
4155

Base, unbound pavement, Type 1, Subtype [subtype], [location]


Subbase, unbound pavement, Type 1, Subtype [subtype], [location]
Base, unbound pavement, Type 2, Subtype [subtype], [location]
Subbase, unbound pavement, Type 2, Subtype [subtype], [location]
Base, unbound pavement, Type 3, Subtype [subtype], [location]
Subbase, unbound pavement, Type 3, Subtype [subtype], [location]
Base, unbound pavement, Type 4, Subtype [subtype], [location]
Subbase, unbound pavement, Type 4, Subtype [subtype], [location]
Type 2.1 Unbound Pavement [layer location in pavement]
Type 2.2 Unbound Pavement [layer location in pavement]
Type 2.3 Unbound Pavement [layer location in pavement]
Type 2.4 Unbound Pavement [layer location in pavement]
Type 2.5 Unbound Pavement [layer location in pavement]

4151R

Unbound Pavement, Recycled Material Blend Type RM001 [layer location in


pavement]
Unbound Pavement, Recycled Material Blend Type RM002 [layer location in
pavement]
Unbound Pavement, Recycled Material Blend Type RM003 [layer location in
pavement]

UNBOUND PAVEMENTS
(MRS05 Oct 10 Type:
RCC)

RECYCLED MATERIALS
FOR PAVEMENTS
(MRS35 Oct 10 Type:
RCC)

4152R
4153R
Page 18 of 58
Annexure C
March 2012

Department of Transport and Main Roads


Project Cost Estimating Manual

Annexure C
Work Breakdown Structure Construction Activities

WORK BREAKDOWN STRUCTURE CONSTRUCTION ACTIVITIES


Level 1

Level 2

Level 3
4154R
4155R
4156R
4157R

4234

IN SITU STABILISED
PAVEMENTS USING
QUICKLIME OR
HYDRATED LIME
(MRS07A Oct 10 Type:
RCC)
4235P
4236P
4238P
4246
4256
4266

4200

Unbound Pavement, Recycled Material Blend Type RM004 [layer location in


pavement]
Unbound Pavement, Recycled Material Blend Type RM005 [layer location in
pavement]
New Material to replace material not suitable for stabilisation, Recycled
Material Blend Type RM006
New Material to replace material not suitable for stabilisation, Recycled
Material Blend Type RM007

Excavation and disposal of overlying material [type of material] (Provisional


Quantity)
Excavation and disposal of material not suitable for stabilisation [type of
material] (Provisional Quantity)
New material to replace material not suitable for stabilisation [type of new
material], if ordered (Provisional Quantity)
In situ stabilisation using Quicklime or Hydrated Lime [Location]
Supply of stabilising agent [description; location]
Water curing [location]

IN SITU STABILISED
PAVEMENTS USING
CEMENT OR
CEMENTITIOUS BLENDS
(MRS07B Oct 10 Type:
RCC)
Page 19 of 58
Annexure C
March 2012

Department of Transport and Main Roads


Project Cost Estimating Manual

Annexure C
Work Breakdown Structure Construction Activities

WORK BREAKDOWN STRUCTURE CONSTRUCTION ACTIVITIES


Level 1

Level 2

Level 3
4201P
4202P
4203P
4210
4211
4221
4231

4265

IN SITU STABILISED
PAVEMENTS USING
FOAMED BITUMEN
(MRS07C Oct 10 Type:
RCC)
4266P
4267P
4268P
4275
4276
4281
4286
4296

Page 20 of 58
Annexure C
March 2012

Excavation and disposal of material not suitable for stabilisation, [type of


material] (Provisional Quantity)
Additional material for shape correction, [type of new material] (Provisional
Quantity)
New material to replace material not suitable for stabilisation [type of new
material], if ordered (Provisional Quantity)
Pulverisation prior to in situ stabilisation [location]
In situ stabilisation using cement or cementitious blends [description, location]
Supply of stabilising agent [description, location]
Water curing [location]

Excavation and disposal of material not suitable for stabilisation [type of


material] (Provisional Quantity)
Additional material for shape correction [type of new material] (Provisional
Quantity)
New material to replace material not suitable for stabilisation [type of new
material], if ordered (Provisional Quantity)
Pulverisation prior to in situ stabilisation using foamed bitumen [location]
In situ stabilisation using foamed bitumen [location]
Transport of Class 170 bitumen supplied by the Principal, from [supply
location]
Supply of secondary stabilising agent [description, location]
Water curing [location]

Department of Transport and Main Roads


Project Cost Estimating Manual

Annexure C
Work Breakdown Structure Construction Activities

WORK BREAKDOWN STRUCTURE CONSTRUCTION ACTIVITIES


Level 1

Level 2
4300

4400

4511

Level 3

PLANT-MIXED
STABILISED PAVEMENTS
(MRS08 Oct 10 Type:
RCC)
4301
4321
4331

Plant-mixed stabilised pavement


Supply of stabilising agent
Water curing

4401
4402
4403
4404
4405
4406

Trim substrate to tolerance


Supply of additional materials
Supply and place lean mix concrete sub-base
Finish and cure lean mix sub-base
Supply and place bitumen de-bonding treatment
Supply and place subgrade beams

4512
4514
4516
4518
4520
4522
4524

Supply and Place Concrete Jointed Unreinforced Base


Supply and Place Concrete Continuously Reinforced Base
Supply and Place Concrete Jointed Reinforced Base
Supply and Place Concrete Steel Fibre Reinforced Base
Supply and Place Concrete Non-Integral Shoulders Without Gutter
Supply and Place Concrete Non-Integral Shoulders With Gutter
Supply and Place Concrete Gutter

LEAN MIX CONCRETE


SUB-BASE FOR
PAVEMENTS (MRS39 Oct
10 Type: RCC)

CONCRETE BASE IN
PAVEMENTS (MRS40 Oct
10 Type: RCC)

Page 21 of 58
Annexure C
March 2012

Department of Transport and Main Roads


Project Cost Estimating Manual

Annexure C
Work Breakdown Structure Construction Activities

WORK BREAKDOWN STRUCTURE CONSTRUCTION ACTIVITIES


Level 1

Level 2

Level 3
4526
4528
4530
4532
4534
4536
4538
4540
4542

5000

SPRAYED
BITUMENT
SURFACING

5010

SUPPLY OF COVER
AGGREGATE (MRS22 Jun
09 Type: RCC)
5011
5012
5013
5021
5031

5100

Supply of cover aggregate [precoated | un-precoated], [nominal size] mm


nominal size
Supply of cover aggregate [precoated | un-precoated], [nominal size] mm
nominal size
Supply of prime cover material, [type of material]
Transport of materials, [type of material]
Construction of stockpile site

SPRAYED BITUMINOUS
SURFACING (EXCLUDING
EMULSION) (MRS11 Oct
10 Type: RCC)
5101
5102

Page 22 of 58
Annexure C
March 2012

Supply and Place Concrete Anchors


Supply and Place Concrete Bridge Approach Slabs
Finish, Cure and Texture Base
Install, including Supply of Materials: Longitudinal Joints.
Install, including Supply of Materials: Expansion Joints and Isolation Joints.
Install, including Supply of Materials: Transverse Contraction and Contraction
Joints.
Supply Reinforcing Mesh.
Supply Steel Bar Reinforcement.
Monitoring Testing (as per Clause 8 of MRTS40)(m3 of base).

Prime, grade [grade], spray rate [spray rate], [including | excluding] supply of
binder, [location]
Primerseal, grade [grade], spray rate [spray rate], [including | excluding]
supply of binder, [location]

Department of Transport and Main Roads


Project Cost Estimating Manual

Annexure C
Work Breakdown Structure Construction Activities

WORK BREAKDOWN STRUCTURE CONSTRUCTION ACTIVITIES


Level 1

Level 2

Level 3
5103
5104
5105
5106
5107P
5108P
5111
5112
5121
5131
5132
5141

5150

Seal, class [class], spray rate [spray rate], [including | excluding] supply of
binder, [location]
Reseal, class [class], spray rate [spray rate], [including | excluding] supply of
binder, [location]
Enrichment, grade [grade], spray rate [spray rate], [including | excluding]
supply of binder, [including | excluding] supply of additives, [location]
SAMI seal, class [class], spray rate [spray rate], [including | excluding] supply
of binder, [location]
Supply and addition of adhesion agent
Supply and addition of cutter oil
Spreading prime cover material [material], [spread rate], [location]
Spreading cover aggregate [size], [spread rate], [location]
Supply of bituminous material [material], [class / grade]
Transport of bituminous material supplied by the Principal [material], from
[supply location]
Transport of aggregate supplied by the Principal [material], from [supply
location]
Sprayed bituminous surfacing, [including | excluding] supply of binder,
[including | excluding] supply of additives, [including excluding] supply of cover
aggregates, [location], refer to Clause 2 of Annexure MRTS11.1|

GEOTEXTILES FOR
PAVING APPLICATIONS
(MRS57 Jun 09 Type:
RCC)
5151
5152
5153

Supply of Geotextile [grade] g/m2


Transport of material supplied by the Principal [material], from [supply
location]
Placement of Paving Geotextile [nominal weight] g/m2
Page 23 of 58
Annexure C
March 2012

Department of Transport and Main Roads


Project Cost Estimating Manual

Annexure C
Work Breakdown Structure Construction Activities

WORK BREAKDOWN STRUCTURE CONSTRUCTION ACTIVITIES


Level 1

Level 2
5200

Level 3

SPRAYED BITUMINOUS
EMULSION SURFACING
(MRS12 Jun 09 Type:
RCC)
5201
5202
5203
5204
5205
5211
5212
5221
5231
5232
5241

5300

BITUMINOUS SLURRY
SURFACING (MRS13 Jun
09 Type: RCC)
5301
5311

Page 24 of 58
Annexure C
March 2012

Prime, grade [grade], spray rate [spray rate], [including | excluding] supply of
binder, [location]
Primerseal, grade [grade], spray rate [spray rate], [including | excluding]
supply of binder, [location]
Seal, grade [grade], spray rate [spray rate], [including | excluding] supply of
binder, [location]
Reseal, grade [grade], spray rate [spray rate], [including | excluding] supply of
binder, [location]
Enrichment, grade [grade], spray rate [spray rate], [including | excluding]
supply of binder, [location]
Spreading prime cover material [material], [spread rate], [location]
Spreading cover aggregate [size], [spread rate], [location]
Supply of bituminous emulsion [material], [class / grade]
Transport of bituminous emulsion supplied by the Principal [material], from
[supply location]
Transport of aggregate supplied by the Principal [material], from [supply
location]
Sprayed bituminous emulsion surfacing, [including | excluding] supply of
binder, [including | excluding] supply of cover aggregates, [location], refer to
Clause 1 of Annexure MRS12.1

Preparation of existing surface


Bituminous slurry seal, QS3

Department of Transport and Main Roads


Project Cost Estimating Manual

Annexure C
Work Breakdown Structure Construction Activities

WORK BREAKDOWN STRUCTURE CONSTRUCTION ACTIVITIES


Level 1

Level 2

5400

5500

5541

Level 3
5312
5313
5314
5315
5316
5317

Bituminous slurry seal, QS5


Bituminous slurry seal, QS7
Bituminous slurry micro-surfacing, QS5
Bituminous slurry micro-surfacing, QS7
Bituminous slurry micro-surfacing, QS10
Bituminous slurry rut-filling

5401
5402P
5403P
5404
5405

Preparation of the existing surface


Crack filling (Provisional Quantity)
Strain alleviating fabric strips (Provisional Quantity)
Tack coat [application rate] litres/m2, residual bitumen
Dense graded asphalt corrector layer, DG [nominal size] mix

5501
5502
5503
5504
5505

Dense graded asphalt, DG7 mix


Dense graded asphalt, DG10 mix
Dense graded asphalt, DG14 mix
Dense graded asphalt, DG20 mix
Dense graded asphalt, DG28 mix

5542

Open graded asphalt, OG10 mix

PREPARATION OF THE
EXISTING SURFACE
(MRS30 Oct 10 Type:
RCC)

DENSE GRADED
ASPHALT (MRS30 Oct 10
Type: RCC)

OPEN GRADED ASPHALT


(MRS30 Oct 10 Type:
RCC)

Page 25 of 58
Annexure C
March 2012

Department of Transport and Main Roads


Project Cost Estimating Manual

Annexure C
Work Breakdown Structure Construction Activities

WORK BREAKDOWN STRUCTURE CONSTRUCTION ACTIVITIES


Level 1

Level 2

Level 3
5543

Open graded asphalt, OG14 mix

5563
5573
5574

Dense graded asphalt, DG14HS mix


Dense graded asphalt, DG14HM mix
Dense graded asphalt, DG20HM mix

6101
6103

Demolition of road furniture, as listed in Clause 3 of Annexure MRTS14.1


Removal and salvage of road furniture, as listed in Clause 1.1 of Annexure
MRTS14.1
Removal and re-erection of road furniture, as listed in Clause 4 of Annexure
MRTS14.1

HEAVY DUTY ASPHALT


(MRS31 Jun 09 Type:
RCC)

6000

REMOVAL,
DEMOLITION AND
RE-ERECTION OF
ROAD FURNITURE

6100

REMOVAL, DEMOLITION
AND RE-ERECTION
(MRS14 Jun 09 Type:
RCC)

6104
6110

GUIDANCE AND
INFORMATION SYSTEMS
(MRS14 Jun 09 Type:
RCC)

6120

GUIDANCE AND
INFORMATION SYSTEMS
(MRS14A Jun 09 Type:
RCC)

6111

Road edge guide posts

6121

Supply of regulatory, warning and hazard sign faces, as listed in Clause 1.3 of
Annexure MRS14A.1
Supply of regulatory, warning and hazard sign faces, [sign type]

6122
Page 26 of 58
Annexure C
March 2012

Department of Transport and Main Roads


Project Cost Estimating Manual

Annexure C
Work Breakdown Structure Construction Activities

WORK BREAKDOWN STRUCTURE CONSTRUCTION ACTIVITIES


Level 1

Level 2

Level 3
6123

6134
6135
6136

Supply of direction and information sign faces, as listed in Clause 2.3 of


Annexure MRS14A.1
Supply of direction and information sign faces, as listed in Clause 2.3 of
Annexure MRS14A.1
Installation of regulatory, warning and hazard signs, as listed in Clause 1.3 of
Annexure MRS14A.1
Installation of regulatory, warning and hazard signs, [number of posts]
Installation of direction and information signs, as listed in Clause 2.3 of
Annexure MRS14A.1
Installation of direction and information signs, [sign number]
Installation of direction and information signs, [sign size]
Supply, erection and removal of project signs

6181
6182

Fencing, [height] mm high, [type]


Gates, [height] mm high, [width] mm wide, [type]

6141
6142
6151
6152

Grid [type]
Grid with vermin and dog fencing [type]
Concrete traffic barrier, [type], [with|without] conduit, [with|without] dowels
Concrete traffic barrier at wall or pier, [type], [with|without] conduit,
[with|without] dowels
Concrete traffic barrier median terminal, [type], [with|without] conduit,
[with|without] dowels
Galvanised cover assembly at opening for light pole

6124
6131
6132
6133

6180

6140

ROADSIDE STRUCTURES
(MRS14 Jun 09 Type:
RCC)

ROADSIDE STRUCTURES
(MRS14A Jun 09 Type:
RCC)

6153
6154

Page 27 of 58
Annexure C
March 2012

Department of Transport and Main Roads


Project Cost Estimating Manual

Annexure C
Work Breakdown Structure Construction Activities

WORK BREAKDOWN STRUCTURE CONSTRUCTION ACTIVITIES


Level 1

Level 2

Level 3
6155

6157
6161
6162
6163
6164
6171
6172
6175
6186

Galvanised cover assembly at opening for cable pit, number [pit number /
type]
Split carriageway concrete traffic barrier, [type], [with|without] conduit,
[with|without] dowels
Precast concrete barrier
Steel beam guardrail, w beam
Steel beam guardrail, thrie beam
Steel beam guardrail, terminal type [number]
Steel beam guardrail, transition type [number]
Tensioned wire rope barrier system
Tensioned wire rope barrier system
Barrier end treatment
Steel traffic barriers

6211
6212
6213
6214
6215

Supply of noise fence, [height] m high


Construction of noise fence, [height] m high
Supply and construction of noise fence, [height] m high
Design, supply and construction of noise fence, [height] m high
Removal and salvage of existing noise fences, [height] m high

6301
6311

Spotting only for longitudinal lines


Dividing line, broken 100 mm wide, [line length] mm line length, [gap length]
mm gap length, colour [colour], material [material]
Dividing line, continuous 100 mm wide, [line length] mm line length, [gap
length] mm gap length, colour [colour], material [material]

6156

6210

6300

NOISE FENCES (MRS15


Jun 10 Type: RCC)

LINE MARKING (MRS45


Jun 09 Type: RCC)

6312
Page 28 of 58
Annexure C
March 2012

Department of Transport and Main Roads


Project Cost Estimating Manual

Annexure C
Work Breakdown Structure Construction Activities

WORK BREAKDOWN STRUCTURE CONSTRUCTION ACTIVITIES


Level 1

Level 2

Level 3
6313
6314

6315
6316
6317
6318
6319
6321
6322
6323
6324

6325

6331

6332
6341
6342

Barrier line, single, 100 mm wide


Barrier line, one direction, 80 mm wide each line, 80 mm lateral gap between
lines, 3000 mm line length and 9000 mm gap length on broken side, colour
[colour], material [material]
Barrier line, both directions, 80 mm wide each line, 80 mm lateral gap
between lines, colour [colour], material [material]
Lane line, broken, 100 mm wide, [line length] mm line length, [gap length] mm
gap length, colour [colour], material [material]
Freeway lane line, broken, 150 mm wide, [line length] mm line length, [gap
length] mm gap length, colour [colour], material [material]
Lane line, continuous, 100 mm wide, colour [colour], material [material]
Edge line, 150 mm wide, colour [colour], material [material]
Continuity line, 200 mm wide, colour [colour], material [material]
Turn line, 100 mm wide, colour [colour], material [material]
Outline, 150 mm wide, colour [colour], material [material]
Audio tactile line marking - edge line, 150 mm wide, 50 mm rib length, 250
mm gap length, 8 mm rib height, [with 1.5 m gap every 20 m for cyclists | with
no gaps for cyclists]
Audio tactile line marking - double barrier line, consisting of two barrier lines
each 80 mm wide, 50 mm rib length, 250 mm gap length, 8 mm rib height
(applied to both lines)
Transverse lines (stop lines, holding lines, markings at Stop and Give Way
signs, pedestrian crosswalk lines, arrows,shapes, symbols and numerals),
colour [colour], material [material]
Transverse lines (diagonal and chevron markings,parking areas and kerb
markings), colour [colour], material [material]
Removal of existing longitudinal line, [width] mm wide, by [method of removal]
Removal of existing transverse lines or shapes, by [method of removal]
Page 29 of 58
Annexure C
March 2012

Department of Transport and Main Roads


Project Cost Estimating Manual

Annexure C
Work Breakdown Structure Construction Activities

WORK BREAKDOWN STRUCTURE CONSTRUCTION ACTIVITIES


Level 1

Level 2
6350

6500

Level 3

RAISED PAVEMENT
MARKERS (MRS45 Jun 09
Type: RCC)
6351
6352
6353
6354
6355

Retroreflective raised pavement markers


Non-reflective raised pavement markers
Temporary raised pavement markers
Pavement bars
Removal of existing raised pavement markers, by [method of removal]

6501
6502
6503
6504
6505

Supply of [diameter] mm, [material], [type] conduit


Supply of [diameter] mm, [material], [type] conduit for boring or jacking
Supply of [diameter] mm, [angle] degrees, [material], [type] conduit bend
Installation of [No.] of [diameter] mm, [material], [type] conduit(s), in [surface]
Installation of [No.] of [diameter] mm, [material], [type] conduit(s) and [No.] of
[diameter] mm, [material], [type] conduit(s), in a shared trench, in [surface]
Installation of [diameter] mm, [material], [type] conduit, bored or jacked
Supply and installation of [No.] of [diameter] mm, [material], [type] conduit(s),
in [surface]
Supply and installation of [No.] of [diameter] mm, [material], [type] conduit(s)
and [No.] of [diameter] mm, [material], [type], conduit(s), in a shared trench, in
[surface]
Supply and installation of [diameter] mm, [material], [type] conduit, bored or
jacked

CONDUIT AND CONDUIT


FITTINGS
UNDERGROUND (MRS91
Jun 09 Type: RCC)

6506
6507
6508

6509

Page 30 of 58
Annexure C
March 2012

Department of Transport and Main Roads


Project Cost Estimating Manual

Annexure C
Work Breakdown Structure Construction Activities

WORK BREAKDOWN STRUCTURE CONSTRUCTION ACTIVITIES


Level 1

Level 2
6512

Level 3

CONDUIT AND CONDUIT


FITTINGS MOUNTED IN
CONCRETE STRUCTURE
/ BARRIER (MRS91 Jun 09
Type: RCC)
6513
6516

6520

CONDUIT AND CONDUIT


FITTINGS MOUNTED ON
THE SURFACE (MRS91
Jun 09 Type: RCC)
6521
6522
6523
6526

6530

Installation of [No.] of [diameter] mm, [material], [type] conduit(s) in concrete


structure / barrier
Supply and installation of [No.] of [diameter] mm, [material], [type] conduit(s)
in concrete structure / barrier

Supply of [diameter] mm, [material], [type] conduit, suitable for mounting on a


surface
Supply of [diameter] mm, [angle] degrees, [material], [type] conduit bend
suitable for mounting on a surface
Installation of [No.] of [diameter] mm, [material], [type] conduit(s), surface
mounted
Supply and installation of [No.] of [diameter] mm, [material], [type] conduit(s),
surface mounted

ANCILLARY WORKS
(MRS91 Jun 09 Type:
RCC)
6531
6532
6533
6534
6535

Supply of Draw Rope


Installation of draw rope in existing conduit
Supply and installation of draw rope in existing conduit
Flush and clear conduit (all types)
Removal and transport of conduit(s), (all diameters, all materials, all types)
Page 31 of 58
Annexure C
March 2012

Department of Transport and Main Roads


Project Cost Estimating Manual

Annexure C
Work Breakdown Structure Construction Activities

WORK BREAKDOWN STRUCTURE CONSTRUCTION ACTIVITIES


Level 1

Level 2
6550

6600

Level 3
6536

Removal of cable joining pit(s) (all types)

6551
6552
6553
6554
6555
6556
6557
6558

Supply of cable jointing pit [type]


Supply of conduit bell mouth of [diameter] to suit pit [type]
Installation of cable jointing pit [type]
Supply and installation of cable jointing pit [type]
Construction of pit surround
Supply of maintenance marker post
Installation of maintenance marker post
Supply and installation of maintenance marker post

6601
6602
6603P

6605

Traffic signal post footing


Traffic signal mast arm footing
Traffic signal mast arm footing extension for poor soil, 300 mm long , if
ordered (Provisional Quantity)
Excavation in excessively hard material, rate additional to rate for Work Items
6601, 6602 and 6603P (Provisional Quantity)
Traffic signal controller base

6611
6612

Supply of traffic signal equipment, [description]


Installation of traffic signal equipment, [description]

CABLE JOINTING PITS


(MRS91 Jun 09 Type:
RCC)

TRAFFIC SIGNAL
FOOTINGS (MRS92 Jun
09 Type: RCC)

6604P

6610

Page 32 of 58
Annexure C
March 2012

TRAFFIC SIGNAL
EQUIPMENT (MRS93 Jun
09 Type: RCC)

Department of Transport and Main Roads


Project Cost Estimating Manual

Annexure C
Work Breakdown Structure Construction Activities

WORK BREAKDOWN STRUCTURE CONSTRUCTION ACTIVITIES


Level 1

Level 2
6620

Level 3
6613

Supply and installation of traffic signal equipment, [description]

6621

Supply of traffic signal post, [length] metres long, [with | without] hinged
baseplate
Supply of traffic signal mast arm, [with/without] road lighting luminaire spigot,
with a [length] meters long outreach arm, [with length] mm long luminaire
transition piece
Supply of joint use traffic signal and road lighting pole,[length] metres long
Supply of push button post, [length] metres long, [with | without] hinged
baseplate
Installation of traffic signal post, [length] metres long, [with | without] hinged
baseplate
Installation of traffic signal mast arm [with/without] road lighting luminaire
spigot, with [length] meters long outreach arm.
Installation of joint use traffic signal and road lighting pole, [length] metres
long
Installation of push button post, [length] metres long, [with | without] hinged
baseplate
Supply and installation of traffic signal post, [length] metres long, [with |
without] hinged baseplate
Supply and installation of traffic signal mast arm with a [length] metre long
outreach arm, [without road lighting luminaire
Supply and installation of joint use traffic signal and road lighting pole, [length]
metres long
Supply and installation of push button post, [length] metres long, [with |
without] hinged baseplate

TRAFFIC SIGNAL POSTS


AND MAST ARMS (MRS93
Jun 09 Type: RCC)

6622

6623
6624
6631
6632
6633
6634
6635
6636
6637
6638

Page 33 of 58
Annexure C
March 2012

Department of Transport and Main Roads


Project Cost Estimating Manual

Annexure C
Work Breakdown Structure Construction Activities

WORK BREAKDOWN STRUCTURE CONSTRUCTION ACTIVITIES


Level 1

Level 2
6640

Level 3

TRAFFIC SIGNAL
LANTERNS (MRS93 Jun
09 Type: RCC)
6641
6642
6643
6644
6645
6646
6647

6648
6650

6660

PEDESTRIAN PUSH
BUTTONS (MRS93 Jun 09
Type: RCC)
6651
6652
6653

Supply of traffic signal pedestrian push button, [standard | audio-tactile]


Installation of traffic signal pedestrian push button, [standard | audio-tactile]
Supply and installation of traffic signal pedestrian push button, [standard |
audio-tactile]

6661

Supply and installation of vehicle detector loops, [description]

DETECTOR LOOPS
(MRS93 Jun 09 Type:
RCC)
TRAFFIC SIGNAL
CONTROLLER (MRS93
Jun 09 Type: RCC)

Page 34 of 58
Annexure C
March 2012

Supply of traffic signal lantern, [LED | QH], [number of aspects] aspect,


[diameter] mm aspect diameter
Supply of pedestrian lantern, [LED | QH]
Supply of target board, [ single | double]
Installation of [overhead mounted | ground mounted] traffic signal lantern,
[number of aspects] aspect, [diameter] mm aspect diameter
Installation of pedestrian lantern
Installation of target board, [ single | double]
Supply and installation of [overhead mounted | ground mounted] traffic signal
lantern, [LED | QH], [number of aspects] aspect, [diameter] mm aspect
diameter, and [single | double] target board
Supply and installation of pedestrian lantern, [LED | QH]

Department of Transport and Main Roads


Project Cost Estimating Manual

Annexure C
Work Breakdown Structure Construction Activities

WORK BREAKDOWN STRUCTURE CONSTRUCTION ACTIVITIES


Level 1

Level 2

Level 3
6671
6672
6673

6675
6676

Supply of traffic signal controller


Installation of traffic signal controller, [description of traffic signal site]
Supply and installation of traffic signal controller, [description of traffic signal
site]
Modification to existing traffic signal controller, [description of traffic signal
site], [location]
Supply and installation of Personality EPROM
Commissioning and testing of Personality EPROM

6681
6682

Removal of traffic signal equipment for salvage, [description]


Removal of traffic signal equipment for disposal, [description]

6701
6702
6703P

Road lighting pole footing, [diameter] mm diameter


Road lighting pole footing in concrete median barrier, [diameter] mm diameter
Road lighting pole footing extension in poor soil, 400 mm long, [diameter] mm
diameter, if ordered (Provisional Quantity)
Excavation in excessively hard material, rate additional to rate for Work Items
6701, 6702 and 6703P (Provisional Quantity)
Construction of retaining wall around footing
Removal of road lighting pole footing

6674

6680

6700

REMOVAL OF EXISTING
EQUIPMENT (MRS93 Jun
09 Type: RCC)

ROAD LIGHTING
FOOTINGS (MRS92 Jun
09 Type: RCC)

6704P
6705
6706
6710

ROAD LIGHTING (MRS94


Jun 09 Type: RCC)
6711

Supply of [fixed base | slip base | impact absorbent] road lighting pole, [height]
mm vertical height
Page 35 of 58
Annexure C
March 2012

Department of Transport and Main Roads


Project Cost Estimating Manual

Annexure C
Work Breakdown Structure Construction Activities

WORK BREAKDOWN STRUCTURE CONSTRUCTION ACTIVITIES


Level 1

Level 2

Level 3
6712
6713
6714
6721
6722
6723
6731
6732
6741
6742
6743
6744
6751
6752
6753
6761
6762
6771

6772

6773
Page 36 of 58
Annexure C
March 2012

Supply of [single | double] road lighting outreach arm, [length] mm long


Supply of road lighting outreach arm extension, 1.5 metres long
Supply of road lighting luminaire headframe, [number of spigots] way
headframe
Supply of pedestrian crossing floodlight bracket, [length] mm long
Supply of underbridge road lighting bracket, [height] mm high
Supply of wall mounted road lighting bracket, [length] mm long
Supply of road lighting luminaire, [name of manufacturer], [type of luminaire]
Supply of pedestrian crossing floodlight, [with | without] louvre, [name of
manufacturer], [type of luminaire]
Installation of [fixed base | slip base | impact absorbent] road lighting pole
Installation of road lighting outreach arm
Installation of road lighting outreach arm extension
Installation of road lighting luminaire headframe
Installation of pedestrian crossing floodlight mounting bracket
Installation of underbridge road lighting bracket
Installation of wall mounted road lighting bracket
Installation of road lighting luminaire
Installation of pedestrian crossing floodlight
Supply and installation of [fixed base | slip base | impact absorbent] road
lighting pole, [height] mm vertical height, [length] mm long [single | double]
outreach arm, [with | without] outreach arm extension, [with aerial supply], [with
loop in loop out cabling].
Supply and installation of [fixed base | slip base | impact absorbent] high mast
road lighting pole, [height] mm vertical height, [number of spigots] way
headframe, [with aerial supply], [with loop in loop out cabling].
Supply and installation of pedestrian crossing floodlight mounting bracket

Department of Transport and Main Roads


Project Cost Estimating Manual

Annexure C
Work Breakdown Structure Construction Activities

WORK BREAKDOWN STRUCTURE CONSTRUCTION ACTIVITIES


Level 1

Level 2

Level 3
6774
6775
6776
6777
6778
6781
6782
6783
6784

6836

SWITCHBOARDS (MRS95
Jun 09 Type: RCC)
6637
6801
6802
6803
6804

6810

Supply and installation of underbridge road lighting bracket, [height] mm high


Supply and installation of wall mounted road lighting bracket, [length] mm long
Supply and installation of road lighting luminaire, [name of manufacturer],
[type of luminaire]
Supply and installation of pedestrian crossing floodlight, [with | without] louvre,
[name of manufacturer], [type of luminaire]
Supply and installation of cabling for luminaire on bridge balustrade with loop
in, loop out supply
Removal of road lighting equipment for salvage, [description]
Removal of road lighting equipment for disposal, [description]
Removal of road lighting luminaire
Removal of pedestrian crossing floodlight

Supply and installation of joint use traffic signal and road lighting pole, [length]
metres long
Supply of URD pillar switchboard and ancillary components, [type]
Supply of pole mounted switchboard and ancillary components, [type]
Installation of URD pillar switchboard and ancillary components, [type]
Installation of pole mounted switchboard and ancillary components, [type]

ELECTRICAL CABLES
(MRS95 Jun 09 Type:
RCC)
6811
6812

Supply of underground road lighting cable, [conductor size], [number of cores]


cores, [core insulation], [sheath insulation], [conductor material]
Supply of aerial road lighting cable, [conductor size], [number of cores] cores,
[core insulation], [sheath insulation], [conductor material]
Page 37 of 58
Annexure C
March 2012

Department of Transport and Main Roads


Project Cost Estimating Manual

Annexure C
Work Breakdown Structure Construction Activities

WORK BREAKDOWN STRUCTURE CONSTRUCTION ACTIVITIES


Level 1

Level 2

Level 3
6813
6814
6815
6816
6817
6818
6819
6821
6822
6823
6824
6825
6826
6827

6830

MAINS CONNECTION
(MRS95 Jun 09 Type:
RCC)
6831

6832

Page 38 of 58
Annexure C
March 2012

Supply of traffic signal cable, [conductor size], [number of cores] cores, [core
insulation], [sheath insulation], [conductor material]
Supply of loop detector cable, [conductor size], [number of cores] cores, [core
insulation], [sheath insulation], [conductor material]
Supply of cable, [usage], [conductor size], [number of cores] cores, [core
insulation], [sheath insulation], [conductor material]
Supply of cable joint, [fused | unfused]
Supply of aerial cable strain clamp
Supply of aerial cable connector, [type]
Supply of right angle strain relief bushing (to suit 26 mm diameter hole)
Installation, jointing and termination of underground road lighting cable,
[cores]
Installation, jointing and termination of traffic signal cable, [cores]
Installation, jointing and termination of loop detector cable, [cores]
Installation, jointing and termination of cable, [usage], [cores]
Installation, jointing and termination of aerial road lighting cable, [cores]
Removal of underground cable
Removal of aerial cable

Supply of mains connection equipment including the supply of mains


connection cable, [length], [usage], [conductor size], [number of cores] cores,
[core insulation], [sheath insulation], [conductor material]
Installation of mains connection including mains connection cable

Department of Transport and Main Roads


Project Cost Estimating Manual

Annexure C
Work Breakdown Structure Construction Activities

WORK BREAKDOWN STRUCTURE CONSTRUCTION ACTIVITIES


Level 1
7000

SUPPLY OF TIMBER
BRIDGE MATERIALS
AND COMPONENTS

Level 2
7000A

Level 3

SUPPLY OF TIMBER
BRIDGE MATERIALS AND
COMPONENTS (MRS87
Jun 09 Type: RCC)
7001
7002
7003
7004
7005
7006
7007
7008
7009
7010
7011
7012

Hardwood kerbs, supply on Site, ([width] mm wide, [thickness] mm thick),


[length] metres long
Plywood kerbs, supply on Site, ([width] mm wide, [thickness] mm thick),
[length] metres long
Hardwood decking, supply on Site, ([thickness] mm thick), [length] metres
long
Plywood deck sheets, supply on Site, ([width] mm wide, [thickness] mm thick),
[length] metres long
Plywood deck sheets including coating, supply on Site, ([width] mm wide,
[thickness] mm thick), [length] metres long
Hardwood spiking planks, supply on Site, ([width] mm wide, [thickness] mm
thick)
Hardwood end spiking plank, supply on Site, ([width] mm wide, [thickness]
mm thick)
Hardwood girders, round, supply on Site, ([diameter] mm diameter), [length]
metres long
Hardwood girders, octagonal, supply on Site, ([width] mm wide), [length]
metres long
Hardwood corbels, round, supply on Site, ([diameter] mm diameter), [length]
metres long
Hardwood corbels, octagonal, supply on Site, ([width] mm wide), [length]
metres long
Hardwood headstocks, supply on Site, ([width] mm wide, [thickness] mm
thick), [length] metres long

Page 39 of 58
Annexure C
March 2012

Department of Transport and Main Roads


Project Cost Estimating Manual

Annexure C
Work Breakdown Structure Construction Activities

WORK BREAKDOWN STRUCTURE CONSTRUCTION ACTIVITIES


Level 1

Level 2

Level 3
7013
7014
7015
7016
7017
7018
7019
7020
7021
7022
7023
7050
7051
7080

Page 40 of 58
Annexure C
March 2012

Hardwood piles, supply on Site, ([diameter] mm diameter), [length] metres


long
Hardwood wales and braces, supply on Site, ([width] mm wide, [thickness]
mm thick)
Hardwood sill, round, supply on Site, ([diameter] mm diameter), [length]
metres long
Hardwood sill, rectangular, supply on Site, ([width] mm wide, [thickness] mm
thick), [length] metres long
Hardwood struts and fenders, round, supply on Site, ([diameter] mm
diameter), [length] metres long
Hardwood struts and fenders, rectangular, supply on Site, ([width] mm wide,
[thickness] mm thick), [length] metres long
Hardwood distributor planks, supply on Site, ([width] mm wide, [thickness] mm
thick)
Hardwood running planks, supply on Site, ([width] mm wide, [thickness] mm
thick)
Hardwood ballast boards, supply on Site, ([width] mm wide, [thickness] mm
thick)
Hardwood cover boards, supply on Site, ([width] mm wide, [thickness] mm
thick)
Hardwood backing slabs, supply on Site, ([width] mm wide, [thickness] mm
thick)
Steel bridge decking, supply on Site, ([depth] mm deep, [thickness] mm thick),
[length] metres long
Steel kerb, supply on Site, ([depth] mm deep, [thickness] mm thick), [length]
metres long
Precast prestressed concrete bridge decking, supply on Site, ([width] mm
wide, [thickness] mm thick), [length] metres long, [clockwise skew
anticlockwise skew square], [degrees] degrees skew

Department of Transport and Main Roads


Project Cost Estimating Manual

Annexure C
Work Breakdown Structure Construction Activities

WORK BREAKDOWN STRUCTURE CONSTRUCTION ACTIVITIES


Level 1

Level 2

Level 3
7101
7102
7103
7104
7105
7106
7107
7108
7109
7110
7111
7112
7113
7114

Hardwood kerbs, transport to Site, ex Works/Stockpile [location], ([width] mm


wide, [thickness] mm thick), [length] metres long
Plywood kerbs, transport to Site, ex Works/Stockpile [location], ([width] mm
wide, [thickness] mm thick), [length] metres long
Hardwood decking, transport to Site, ex Works/Stockpile [location],
([thickness] mm thick), [length] metres long
Plywood deck sheets, transport to Site, ex Works/Stockpile [location], ([width]
mm wide, [thickness] mm thick), [length] metres long
Plywood deck sheets, including coating, transport to Site, ex Works/Stockpile
[location], ([width] mm wide, [thickness] mm thick), [length] metres long
Hardwood spiking planks, transport to Site, ex Works/Stockpile [location],
([width] mm wide, [thickness] mm thick)
Hardwood end spiking planks, transport to Site, ex Works/Stockpile [location],
([width] mm wide, [thickness] mm thick)
Hardwood girders, round, transport to Site, ex Works/Stockpile [location],
([diameter] mm diameter), [length] metres long
Hardwood girders, octagonal, transport to Site, ex Works/Stockpile [location],
([width] mm wide), [length] metres long
Hardwood corbels, round, transport to Site, ex Works/Stockpile [location],
([diameter] mm diameter), [length] metres long
Hardwood corbels, octagonal, transport to Site, ex Works/Stockpile [location],
([width] mm wide), [length] metres long
Hardwood headstocks, transport to Site, ex Works/Stockpile [location], ([width]
mm wide, [thickness] mm thick), [length] metres long
Hardwood piles, transport to Site, ex Works/Stockpile [location], ([diameter]
mm diameter), [length] metres long
Hardwood wales and braces, transport to Site, ex Works/Stockpile [location],
([width] mm wide, [thickness] mm thick)
Page 41 of 58
Annexure C
March 2012

Department of Transport and Main Roads


Project Cost Estimating Manual

Annexure C
Work Breakdown Structure Construction Activities

WORK BREAKDOWN STRUCTURE CONSTRUCTION ACTIVITIES


Level 1

Level 2

Level 3
7115
7116
7117
7118

7119
7120
7121
7122
7123
7150
7151
7180

7190

Page 42 of 58
Annexure C
March 2012

Hardwood sill, round, transport to Site, ex Works/Stockpile [location],


([diameter] mm diameter), [length] metres long
Hardwood sill, rectangular, transport to Site, ex Works/Stockpile [location],
([width] mm wide, [thickness] mm thick), [length] metres long
Hardwood struts and fenders, round, transport to Site, ex Works/Stockpile
[location], ([diameter] mm diameter), [length] metres long
Hardwood struts and fenders, rectangular, transport to Site, ex
Works/Stockpile [location], ([width] mm wide, [thickness] mm thick), [length]
metres long
Hardwood distributor planks, transport to Site, ex Works/Stockpile [location],
([width] mm wide, [thickness] mm thick)
Hardwood running planks, transport to Site, ex Works/Stockpile [location],
([width] mm wide, [thickness] mm thick)
Hardwood ballast boards, transport to Site, ex Works/Stockpile [location],
([width] mm wide, [thickness] mm thick)
Hardwood cover boards, transport to Site, ex Works/Stockpile [location],
([width] mm wide, [thickness] mm thick)
Hardwood backing slabs, transport to Site, ex Works/Stockpile [location],
([width] mm wide, [thickness] mm thick)
Steel bridge decking, transport to Site, ex Works/Stockpile [location], ([depth]
mm deep, [thickness] mm thick), [length] metres long
Steel kerb, transport to Site, ex Works/Stockpile [location], ([depth] mm deep,
[thickness] mm thick), [length] metres long
Precast prestressed concrete bridge decking, transport to Site, ex Works or
Stockpile [location], ([width] mm wide, [thickness] mm thick), [length] metres
long, [clockwise skew anticlockwise skew|square], [degrees] degrees skew
Storage of timber bridge materials and components at Site

Department of Transport and Main Roads


Project Cost Estimating Manual

Annexure C
Work Breakdown Structure Construction Activities

WORK BREAKDOWN STRUCTURE CONSTRUCTION ACTIVITIES


Level 1

Level 2
7300

Level 3

BRIDGE SUBSTRUCTURE
(MRS62 Jun 09 Type:
RCC)
7301
7302
7303

7315
7321

Concrete Class [compressive strength] MPa/20 in pier footing


Concrete Class [compressive strength] MPa/20 in pier pile cap
Concrete Class [compressive strength] MPa/20 in pier above pile cap/cast-inplace pile/footing
Concrete Class [compressive strength] MPa/20 in pier headstock
Concrete Class [compressive strength] MPa/10 in pier pedestal
Concrete Class [compressive strength] MPa/20 in abutment footing
Concrete Class [compressive strength] MPa/20 in abutment pile cap
Concrete Class [compressive strength] MPa/20 in abutment above cast-inplace pile / footing / pile cap excluding parapet terminal
Concrete Class [compressive strength] MPa/20 in abutment headstock
excluding parapet terminal
Concrete Class [compressive strength] MPa/10 in abutment pedestal
Steel reinforcing bar in piers and abutments including parapet terminals

7401
7402
7403P
7404
7405
7406
7407P

Reinforced concrete pipe liners, supply on Site [diameter]


Handling and pitching of reinforced concrete pipe liners
Sinking reinforced concrete pipe liners (Provisional Quantity)
Steel pipe liners, supply on Site [diameter]
Supply and fixing of stiffening bands
Handling and pitching of steel liners
Driving steel liners (Provisional Quantity)

7304
7305
7311
7312
7313
7314

7400

CAST-IN-PLACE PILES
(MRS63 Jun 09 Type:
RCC)

Page 43 of 58
Annexure C
March 2012

Department of Transport and Main Roads


Project Cost Estimating Manual

Annexure C
Work Breakdown Structure Construction Activities

WORK BREAKDOWN STRUCTURE CONSTRUCTION ACTIVITIES


Level 1

Level 2

Level 3
7408P
7411P
7412P
7413
7414P
7415
7421P
7422P
7425P

7400A

CAST-IN-PLACE PILES
FOR NON-BRIDGE
APPLICATIONS (MRS63A
Jun 09 Type: RCC)
7405
7406
7407P
7408P
7411
7412
7415P
7421P
7423P
7425P

Page 44 of 58
Annexure C
March 2012

Extension of steel liners (Provisional Quantity)


Excavation of liners (Provisional Quantity)
Excavation below toes of liners (Provisional Quantity)
Excavation to form bell enlargements below liners
Drilling of test holes (Provisional Quantity)
Certification of pile capacity
Concrete Class [compressive strength] MPa/20 in abutment lined pile
(Provisional Quantity)
Concrete Class [compressive strength] MPa/20 in pier lined pile (Provisional
Quantity)
Steel reinforcing bar in piles (Provisional Quantity)

Supply and fixing of stiffening bands


Handling and pitching of steel liners
Driving steel liners (Provisional Quantity)
Extension of steel liners (Provisional Quantity)
Excavation of liners
Excavation below toes of liners
Excavation for Bored Piles (Provisional Quantity)
Concrete Class [compressive strength] MPa/20 in lined pile (Provisional
Quantity)
Concrete Class [compressive strength] MPa/20 in bored pile (Provisional
Quantity)
Steel reinforcing bar in lined and bored piles (Provisional Quantity)

Department of Transport and Main Roads


Project Cost Estimating Manual

Annexure C
Work Breakdown Structure Construction Activities

WORK BREAKDOWN STRUCTURE CONSTRUCTION ACTIVITIES


Level 1

Level 2
7500

Level 3

PRECAST
PRESTRESSED
CONCRETE PILES
(MRS65 Jun 09 Type:
RCC)
7501

7514P

Prestressed concrete piles, supply on Site, [cross section size] mm [cross


section shape]
Transport to Site and storage of prestressed concrete piles, ex works [location]
Handling and pitching of prestressed concrete piles, [cross section size] mm
[cross section shape]
Driving prestressed concrete piles, [cross section size] mm [cross section
shape] (Provisional Quantity)
Setting up for pre-boring for prestressed concrete piles
Pre-boring for prestressed concrete piles
Setting up for jetting for prestressed concrete piles
Jetting for prestressed concrete piles
Setting up for drilling and firing for prestressed concrete piles
Drilling and firing for prestressed concrete piles
Stripping of prestressed concrete pile head, [cross section size] mm [cross
section shape]
Extension of prestressed concrete piles, [cross section size] mm [cross
section shape] (Provisional Quantity)
Setting up for re-driving of prestressed concrete piles (Provisional Quantity)

7601
7602

Steel piles, supply on Site


Handling and pitching of steel piles

7502
7503
7504P
7505
7506
7507
7508
7509
7511
7512
7513P

7600

DRIVEN STEEL PILES


(MRS66 Jun 09 Type:
RCC)

Page 45 of 58
Annexure C
March 2012

Department of Transport and Main Roads


Project Cost Estimating Manual

Annexure C
Work Breakdown Structure Construction Activities

WORK BREAKDOWN STRUCTURE CONSTRUCTION ACTIVITIES


Level 1

Level 2

7100A

Level 3
7603P
7604
7605
7606
7607

Driving steel piles (Provisional Quantity)


Setting up for pre-boring for steel piles
Pre-boring for steel piles
Setting up for jetting for steel piles
Jetting for steel piles

7116

Hardwood sill, rectangular, transport to Site, ex Works/Stockpile [location],


([width] mm wide, [thickness] mm thick), [length] metres long
Hardwood struts and fenders, round, transport to Site, ex Works/Stockpile
[location], ([diameter] mm diameter), [length] metres long
Hardwood struts and fenders, rectangular, transport to Site, ex
Works/Stockpile [location], ([width] mm wide, [thickness] mm thick), [length]
metres long
Hardwood distributor planks, transport to Site, ex Works/Stockpile [location],
([width] mm wide, [thickness] mm thick)
Hardwood running planks, transport to Site, ex Works/Stockpile [location],
([width] mm wide, [thickness] mm thick)
Hardwood ballast boards, transport to Site, ex Works/Stockpile [location],
([width] mm wide, [thickness] mm thick)
Hardwood cover boards, transport to Site, ex Works/Stockpile [location],
([width] mm wide, [thickness] mm thick)
Hardwood backing slabs, transport to Site, ex Works/Stockpile [location],
([width] mm wide, [thickness] mm thick)
Steel bridge decking, transport to Site, ex Works/Stockpile [location], ([depth]
mm deep, [thickness] mm thick), [length] metres long
Steel kerb, transport to Site, ex Works/Stockpile [location], ([depth] mm deep,
[thickness] mm thick), [length] metres long

DRIVEN STEEL PILES


(MRS66 Jun 09 Type:
RCC)

7117
7118

7119
7120
7121
7122
7123
7150
7151
Page 46 of 58
Annexure C
March 2012

Department of Transport and Main Roads


Project Cost Estimating Manual

Annexure C
Work Breakdown Structure Construction Activities

WORK BREAKDOWN STRUCTURE CONSTRUCTION ACTIVITIES


Level 1

Level 2

Level 3
7180

7190
7300

BRIDGE SUBSTRUCTURE
(MRS62 Jun 09 Type:
RCC)
7301
7302
7303

7315
7321

Concrete Class [compressive strength] MPa/20 in pier footing


Concrete Class [compressive strength] MPa/20 in pier pile cap
Concrete Class [compressive strength] MPa/20 in pier above pile cap/cast-inplace pile/footing
Concrete Class [compressive strength] MPa/20 in pier headstock
Concrete Class [compressive strength] MPa/10 in pier pedestal
Concrete Class [compressive strength] MPa/20 in abutment footing
Concrete Class [compressive strength] MPa/20 in abutment pile cap
Concrete Class [compressive strength] MPa/20 in abutment above cast-inplace pile / footing / pile cap excluding parapet terminal
Concrete Class [compressive strength] MPa/20 in abutment headstock
excluding parapet terminal
Concrete Class [compressive strength] MPa/10 in abutment pedestal
Steel reinforcing bar in piers and abutments including parapet terminals

7401
7402
7403P
7404

Reinforced concrete pipe liners, supply on Site [diameter]


Handling and pitching of reinforced concrete pipe liners
Sinking reinforced concrete pipe liners (Provisional Quantity)
Steel pipe liners, supply on Site [diameter]

7304
7305
7311
7312
7313
7314

7400A

Precast prestressed concrete bridge decking, transport to Site, ex Works or


Stockpile [location], ([width] mm wide, [thickness] mm thick), [length] metres
long, [clockwise skew| anti clockwise skew |square], [degrees] degrees skew
Storage of timber bridge materials and components at Site

CAST-IN-PLACE PILES
(MRS63 Jun 09 Type:
RCC)

Page 47 of 58
Annexure C
March 2012

Department of Transport and Main Roads


Project Cost Estimating Manual

Annexure C
Work Breakdown Structure Construction Activities

WORK BREAKDOWN STRUCTURE CONSTRUCTION ACTIVITIES


Level 1

Level 2

Level 3
7405
7406
7407P
7408P
7411P
7412P
7413
7414P
7415
7421P
7422P
7425P

Supply and fixing of stiffening bands


Handling and pitching of steel liners
Driving steel liners (Provisional Quantity)
Extension of steel liners (Provisional Quantity)
Excavation of liners (Provisional Quantity)
Excavation below toes of liners (Provisional Quantity)
Excavation to form bell enlargements below liners
Drilling of test holes (Provisional Quantity)
Certification of pile capacity
Concrete Class [compressive strength] MPa/20 in abutment lined pile
(Provisional Quantity)
Concrete Class [compressive strength] MPa/20 in pier lined pile (Provisional
Quantity)
Steel reinforcing bar in piles (Provisional Quantity)

CAST-IN-PLACE PILES
FOR NON-BRIDGE
APPLICATIONS (MRS63A
Jun 09 Type: RCC)
7405
7406
7407P
7408P
7411
7412
7415P
7421P
Page 48 of 58
Annexure C
March 2012

Supply and fixing of stiffening bands


Handling and pitching of steel liners
Driving steel liners (Provisional Quantity)
Extension of steel liners (Provisional Quantity)
Excavation of liners
Excavation below toes of liners
Excavation for Bored Piles (Provisional Quantity)
Concrete Class [compressive strength] MPa/20 in lined pile (Provisional
Quantity)

Department of Transport and Main Roads


Project Cost Estimating Manual

Annexure C
Work Breakdown Structure Construction Activities

WORK BREAKDOWN STRUCTURE CONSTRUCTION ACTIVITIES


Level 1

Level 2

Level 3
7423P
7425P

7500

Concrete Class [compressive strength] MPa/20 in bored pile (Provisional


Quantity)
Steel reinforcing bar in lined and bored piles (Provisional Quantity)

PRECAST
PRESTRESSED
CONCRETE PILES
(MRS65 Jun 09 Type:
RCC)
7501
7502
7503
7504P
7505
7506
7507
7508
7509
7511
7512
7513P
7514P

Prestressed concrete piles, supply on Site, [cross section size] mm [cross


section shape]
Transport to Site and storage of prestressed concrete piles, ex works
[location]
Handling and pitching of prestressed concrete piles, [cross section size] mm
[cross section shape]
Driving prestressed concrete piles, [cross section size] mm [cross section
shape] (Provisional Quantity)
Setting up for pre-boring for prestressed concrete piles
Pre-boring for prestressed concrete piles
Setting up for jetting for prestressed concrete piles
Jetting for prestressed concrete piles
Setting up for drilling and firing for prestressed concrete piles
Drilling and firing for prestressed concrete piles
Stripping of prestressed concrete pile head, [cross section size] mm [cross
section shape]
Extension of prestressed concrete piles, [cross section size] mm [cross
section shape] (Provisional Quantity)
Setting up for re-driving of prestressed concrete piles (Provisional Quantity)

Page 49 of 58
Annexure C
March 2012

Department of Transport and Main Roads


Project Cost Estimating Manual

Annexure C
Work Breakdown Structure Construction Activities

WORK BREAKDOWN STRUCTURE CONSTRUCTION ACTIVITIES


Level 1

Level 2
7600

7700

7800

Level 3

DRIVEN STEEL PILES


(MRS66 Jun 09 Type:
RCC)
7601
7602
7603P
7604
7605
7606
7607
7608
7609
7611P
7612
7613P

Steel piles, supply on Site


Handling and pitching of steel piles
Driving steel piles (Provisional Quantity)
Setting up for pre-boring for steel piles
Pre-boring for steel piles
Setting up for jetting for steel piles
Jetting for steel piles
Setting up for drilling and firing for steel piles
Drilling and firing for steel piles
Splicing steel piles (Provisional Quantity)
Trimming of steel pile heads including welding of bond bars
Setting up for re-driving of steel piles (Provisional Quantity)

7701
7702

Bitumen slip layer on PSC piles


Bitumen slip layer on steel piles

7801P

Establishment of equipment on the site for dynamic testing of piles


(Provisional Quantity)
Dynamic testing of pile to determine load capacity (Provisional Quantity)

BITUMEN SLIP LAYER ON


PILES (MRS67 Jun 09
Type: RCC)

DYNAMIC TESTING OF
PILES (MRS68 Jun 09
Type: RCC)

7802P

Page 50 of 58
Annexure C
March 2012

Department of Transport and Main Roads


Project Cost Estimating Manual

Annexure C
Work Breakdown Structure Construction Activities

WORK BREAKDOWN STRUCTURE CONSTRUCTION ACTIVITIES


Level 1

8000

SUPPLY AND
ERECTION OF
PRESTRESSED
CONCRETE DECK
AND KERB UNITS

Level 2

8100

Level 3
7803P

Dynamic testing of pile in difficult conditions to determine final set for


subsequent piles (Provisional Quantity)

8101

Prestressed concrete deck and kerb unit, supply on Site, [depth] mm deep,
[length] metres long
Transverse stressing units, supply on Site
Transport of prestressed concrete deck and kerb units to the Site, [depth] mm
deep, [length] metres long, ex works [location]
Transport of transverse stressing units to the Site, ex works [location]
Single layer elastomeric bearings, [length] x [breadth] x [depth]
Laminated elastomeric bearings, [length] x [breadth] x [depth]
Erection of prestressed concrete deck and kerb units, [depth] mm deep,
[length] metres long
Erection of transverse stressing units
Holding-down bolts for deck and kerb units, [length] mm long
Deck unit dowel bars, [length] mm long
Transverse prestressing of deck

PRESTRESSED
CONCRETE DECK AND
KERB UNITS AND
TRANSVERSE
STRESSING UNITS
(MRS74 Oct 10 Type: RCC

8102
8103
8104
8111
8112
8121
8122
8131
8132
8141
8200

PRESTRESSED
CONCRETE I GIRDERS
(MRS75 Oct 10 Type:
RCC)
8201

Prestressed concrete I girders, supply on Site, [depth] mm deep, [length]


metres long
Page 51 of 58
Annexure C
March 2012

Department of Transport and Main Roads


Project Cost Estimating Manual

Annexure C
Work Breakdown Structure Construction Activities

WORK BREAKDOWN STRUCTURE CONSTRUCTION ACTIVITIES


Level 1

Level 2

Level 3
8202
8203

8210

PRESTRESSED
CONCRETE T GIRDERS
(MRS75 Oct 10 Type:
RCC)
8211
8212
8213

8220

8230

8250

Prestressed concrete T girders, supply on Site, [girder type], [depth] mm


deep, [length] metres long
Transport of prestressed concrete T girders to the Site, [girder type], [depth]
mm deep, [length] metres long, ex works [location]
Erection of prestressed concrete T girders, [girder type], [depth] mm deep,
[length] metres long

BEARINGS (MRS75 Oct 10


Type: RCC)
8221
8222

Laminated elastomeric bearings, [length] x [breadth] x [depth]


Pot-type bearings, [rated load capacity], [fixed / sliding]

8231

Girder restraints

8251

Steel girders, supply on Site, [section] / ([flange width] mm wide, [depth]) mm


deep, [length] metres long
Steel cross bracing, supply on Site
Transport of steel girders to the Site, [section] / ([flange width] mm wide,
[depth]) mm deep, [length] metres long

GIRDER RESTRAINTS
(MRS75 Oct 10 Type:
RCC)
STEEL GIRDERS (MRS76
Jun 09 Type: RCC)

8252
8253
Page 52 of 58
Annexure C
March 2012

Transport of prestressed concrete I girders to the Site, [depth] mm deep,


[length] metres long, ex works [location]
Erection of prestressed concrete I girders, [depth] mm deep, [length] metres
long

Department of Transport and Main Roads


Project Cost Estimating Manual

Annexure C
Work Breakdown Structure Construction Activities

WORK BREAKDOWN STRUCTURE CONSTRUCTION ACTIVITIES


Level 1

Level 2

Level 3
8254
8255
8256
8257

8260

Transport of steel cross bracing to the Site, ex works [location]


Erection of steel girders, [section] / ([flange width] mm wide, [depth]) mm
deep, [length] metres long
Erection of steel cross bracing
Installation of bearings for rolled steel girders

BEARINGS (MRS76 Jun 09


Type: RCC)
8261
8262

8270

GIRDER RESTRAINTS
(MRS76 Jun 09 Type:
RCC)

8300

BRIDGE DECK (MRS77


Jun 09 Type: RCC)

Supply and installation of laminated elastomeric bearings, [length] x [breadth]


x [depth]
Supply and installation of pot-type bearings, [rated load capacity], [fixed /
sliding]

8271

Supply and installation of girder restraints

8301
8302
8303
8304

Concrete Class [compressive strength] MPa/20 in cross girder


Concrete Class [compressive strength] MPa/20 in deck
Concrete Class [compressive strength] MPa/20 in in situ kerb
Concrete Class [compressive strength] MPa/20 in parapet and parapet
terminal
Concrete Class [compressive strength] MPa/20 in median
Concrete Class [compressive strength] MPa/20 in relieving slab
Reinforcing steel in decks, cross girders, kerbs and parapets, excluding
parapet terminals
Reinforcing steel in medians, in situ kerbs and parapets
Reinforcing steel in relieving slabs

8305
8306
8311
8312
8313

Page 53 of 58
Annexure C
March 2012

Department of Transport and Main Roads


Project Cost Estimating Manual

Annexure C
Work Breakdown Structure Construction Activities

WORK BREAKDOWN STRUCTURE CONSTRUCTION ACTIVITIES


Level 1

Level 2

8330

8350

8360

8370

Page 54 of 58
Annexure C
March 2012

Level 3
8314
8315
8316
8321

Bar grip coupler fittings for future widening, [diameter] mm diameter


Bar grip coupler, [diameter] mm diameter
Bar grip coupler for bar extension, [diameter] mm diameter
Evaporative retarding curing compound

8331
8332
8333
8341
8342
8343

Anchors for bridge rail


Anchors for guardrail terminals
Anchors for road lighting brackets
Date plate
Permanent survey mark
PVC scupper and spout, [diameter] mm diameter

8351
8352

Bridging strips, compressible fillers and isolation inserts


Joint sealants

8361
8362

Expansion joint cover plates, stainless steel


Junction box cover plates, stainless steel

8371
8372

Stabilised sand in footway


Precast concrete footway slab

CAST-IN ANCHORS
(MRS77 Jun 09 Type:
RCC)

JOINTS AND FILLERS


(MRS77 Jun 09 Type:
RCC)

STAINLESS STEEL
COVER PLATES (MRS77
Jun 09 Type: RCC)

FOOTWAY (MRS77 Jun 09


Type: RCC)

Department of Transport and Main Roads


Project Cost Estimating Manual

Annexure C
Work Breakdown Structure Construction Activities

WORK BREAKDOWN STRUCTURE CONSTRUCTION ACTIVITIES


Level 1

Level 2
8380

8390

8400

Level 3

ELECTRICAL ITEMS
(MRS77 Jun 09 Type:
RCC)
8381
8382
8383
8384

Electrical conduit in footway, [diameter] mm diameter, [use]


Flexible electrical conduit
Lamp standard brackets
Navigation markers

8391
8392
8393
8394
8395
8396
8397
8398

Concrete Class [compressive strength] MPa/20 in slab deck/superstructure


Anchorages Type [type]
Ducts, [diameter] mm diameter
Strand tendons, [number], [ size] mm diameter
Post-tensioned stressing bar units, [size] mm diameter
Stressing bars/tendons Type [type]
Grouting duct, [diameter] mm diameter
Capping anchorage recesses and anchorage

8401
8402
8403
8404
8405
8406

Supply and fabrication of bridge traffic rail, steel


Supply and fabrication of bridge balustrade, steel
Supply and fabrication of bridge safety rail, steel
Transport and erection of bridge traffic rail, steel
Transport and erection of bridge balustrade, steel
Transport and erection of bridge safety rail, steel

POST-TENSIONED
CONCRETE (MRS89 Jun
09 Type: RCC)

BRIDGE BARRIER, STEEL


(MRS80 Jun 09 Type:
RCC)

Page 55 of 58
Annexure C
March 2012

Department of Transport and Main Roads


Project Cost Estimating Manual

Annexure C
Work Breakdown Structure Construction Activities

WORK BREAKDOWN STRUCTURE CONSTRUCTION ACTIVITIES


Level 1

Level 2
8410

8450

8500

8600

Page 56 of 58
Annexure C
March 2012

Level 3

BRIDGE BARRIER,
ALUMINIUM (MRS80 Jun
09 Type: RCC)
8411
8412
8413
8414
8415
8416

Supply and fabrication of bridge traffic rail, aluminium


Supply and fabrication of bridge balustrade, aluminium
Supply and fabrication of bridge safety rail, aluminium
Transport and erection of bridge traffic rail, aluminium
Transport and erection of bridge balustrade, aluminium
Transport and erection of bridge safety rail, aluminium

8451
8452
8453

Bolted-in aluminium bridge deck expansion joints


Cast-in aluminium bridge deck expansion joints
Fibre reinforced concrete bridge deck expansion joints

8501
8502

Anti-graffiti protection coating, non-sacrificial


Anti-graffiti protection coating, sacrificial

8601
8602
8603
8605

Bituminous waterproof membrane for bridges


Dense graded asphalt corrector course, DG [nominal size] mm mix
Dense graded asphalt surfacing layer, DG [nominal size] mm mix
Open graded asphalt surfacing layer, OG [nominal size] mm mix

BRIDGE DECK
EXPANSION JOINTS
(MRS82 Jun 09 Type:
RCC)

ANTI-GRAFFITI
PROTECTION (MRS83 Jun
09 Type: RCC)

DECK WEARING
SURFACE (MRS84 Jun 09
Type: RCC)

Department of Transport and Main Roads


Project Cost Estimating Manual

Annexure C
Work Breakdown Structure Construction Activities

WORK BREAKDOWN STRUCTURE CONSTRUCTION ACTIVITIES


Level 1

Level 2
8650

8710P

8714P

Level 3
8606

Tack Coat, 0.2 litres/m2 residual bitumen

8651
8652

Survey for removal of Deck Wearing Surface


Removal of Deck Wearing Surface

8711P
8712P

Micaceous iron oxide, full re-coat (Provisional Quantity)


Micaceous iron oxide, top coating (Provisional Quantity)

8715P

Full coating systems on steelwork with 30 year design life (Provisional


Quantity)
Top coat of existing Zinga Liquid Galvanizing with 30 year design life
(Provisional Quantity)
Full coating system on steelwork with 15 year design life (Provisional
Quantity)
Top coat of existing ZingaMetall Acryltop with 15 year design life (Provisional
Quantity)

COLD MILLING BRIDGE


DECK WEARING
SURFACE (MRS84A Jun
09 Type: RCC)

REPAINTING STEEL
BRIDGES (MRS85 Jun 09
Type: RCC)

REPAINTING OF
EXISTING STEEL
BRIDGES AND NEW
STEEL BRIDGES - ZINC
METAL SYSTEM (MRS85A
Jun 09 : Type RCC

8716P
8717P
8718P
8720P

PAINTING NEW WORK


(MRS88 Jun 09 Type:
RCC)
Page 57 of 58
Annexure C
March 2012

Department of Transport and Main Roads


Project Cost Estimating Manual

Annexure C
Work Breakdown Structure Construction Activities

WORK BREAKDOWN STRUCTURE CONSTRUCTION ACTIVITIES


Level 1

Level 2
8800

Page 58 of 58
Annexure C
March 2012

Level 3
8721P

Full paint coating (Provisional Quantity)

8801
8802
8803
8804
8805
8806
8807

Removal of existing bridge rails and posts


Breaking back existing concrete
Removal of existing rubble masonry at abutments
Installation of steel reinforcing bars in existing concrete
Installation of dowel bars
Scabbing concrete faces
Temporary barrier guardrail

PREPARATION FOR
BRIDGE WIDENING
(MRS86 Jun 09 Type:
RCC)