Romfor International Ltd.
Backup Hand
CUT AND SLIP DRILLING LINE
CUT AND SLIP
DRILLING LINE
Romfor International Ltd.
Backup Hand
CUT AND SLIP
DRILLING LINE
Romfor International Ltd.
Backup Hand
CUT AND SLIP DRILLING LINE
BACKUP HAND
DRILLING LINE
STEP
SUB
PROCEDURE
PPE Requirements - Hardhat, Safety Glasses, Full
Face Shield, Work Gloves, Steel Toe Shoes, Back
Support and Fall Protection.
Review rig specific JSAs on cutting and slipping
drilling line and hoisting personnel.
JSAs should be rig specific.
Rig manager is required on the
floor when using bosuns chair.
Inspect Equipment:
Anti-Fall equipment, block hanging line, bosuns
chair, shackles ,block slings, line cutter and hand
tools used for the job.
Use fall protection, 100% tie off
and avoid pinch points.
REMARKS
READY TO HANG BLOCKS
(Assuming drill pipe is in rotary table)
Drill String should be positioned at bottom of last
casing string and well secured.
Operational issues may
change position of drill string.
Ensure that well bore is static.
Assist in setting slips (with drill string at proper height).
Ensure that proper lifting
techniques are used.
After blocks are lowered, stand clear while elevators
are unlatched.
Avoid pinch points and stay out
of Drillers view.
Assist as directed in inspecting drilling line, while
Driller is raising blocks.
Keep hands clear while line is
spooling on drum.
After blocks are raised to proper position, assist in
using air / hydraulic hoist for installing safety valve.
Use full open lifting eye for
hoisting safety valve.
Assist as directed in tightening drill pipe safety valve
to the proper make up torque (do not put tongs on
open / close area of drill pipe safety valve).
Avoid pinch points and ensure
floor is clear of trip hazards.
Ensure safety valve is in the
open position. Stay out of the
red zone (between rig tongs).
Stand clear while blocks are moved to the proper
position for installation of block hanging line.
Ensure brake handle is locked
down after positioning blocks.
Assist Derrickman, in attaching harness / bosuns
chair to air / hydraulic hoist.
Attach directly to shackle.
Romfor International Ltd.
Backup Hand
CUT AND SLIP DRILLING LINE
BACKUP HAND
STEP SUB
DRILLING LINE
PROCEDURE
REMARKS
10
Ensure tag line is attached to bosuns chair.
Ensure tag line is manned by
qualified person.
11
While Derrickman is lifted, use tag line to position
Derrickman properly.
Ensure Derrickmans feet and
hands are clear of catch points.
12
While Derrickman is lowered, use tag line to position
Derrickman properly.
Ensure Derrickmans feet and
hands are clear of catch points.
13
Assist in removing air / hydraulic winch from harness
/ bosuns chair and store for later use.
1
Assist with removal of guards from front of
drawworks.
Avoid pinch points and store
guards in safe position.
Assist with removal of automatic driller / weight
indicator load cells off dead line.
Avoid pinch points; ensure
100% tie off. Use proper hand
tools.
15
Assist with removal of secondary safety clamp and
drilling line anchor clamp.
Avoid pinch points; ensure
100% tie off. Use proper hand
tools.
16
Assist in securing tag line to drilling line, use tag line
to pull initial drilling line from drum.
Avoid pinch points.
17
Assist in taping drilling line area being cut.
Watch for burs / wickers.
18
Assist in placing drilling line in line cutter properly.
Watch for burs / wickers, cover
line cutter.
19
Ensure drilling line is secured prior to cutting, to
avoid any recoil in line.
14
READY TO CUT DRILLING LINE
20
Assist in cutting drilling line, operate cutter from the
proper side (closed/pump side).
Use proper PPE, Full-face
shield and avoid pinch points.
21
Assist in storing cutter properly.
Avoid pinch points.
22
Assist in pulling drilling line off drum and guide line
out V-door / beaver slide.
Watch for burs / wickers and
avoid pinch points. Do not let
drilling line slide through hands.
Romfor International Ltd.
Backup Hand
CUT AND SLIP DRILLING LINE
BACKUP HAND
DRILLING LINE
STEP
SUB
PROCEDURE
REMARKS
23
Assist in attaching air/hydraulic hoist to drilling line
when there is three wraps left on drum.
Watch for burs / wickers and
avoid pinch points.
Assist in pulling remaining drilling line off drum with
air / hydraulic hoist.
Watch for burs / wickers and
avoid pinch points.
24
Assist with proper removal of drilling line clamp and
inspect for wear.
Watch for burs / wickers and
avoid pinch points. Use proper
hand tools to remove clamp.
25
Assist in removing the remainder of drilling line from
drum using air/hydraulic hoist.
Watch for overhead loads.
Watch for burs / wickers and
avoid pinch points. Use tag line.
26
Assist in lowering cut off drilling line down beaverslide / Vdoor and store properly for disposal.
Watch for overhead loads.
Watch for burs / wickers and
avoid pinch points. Use tag line.
27
Assist in Installation of drilling line in drum.
Avoid pinch points and use
proper tools.
28
Stand clear while drum rotates forward to proper
position for installation of drilling line clamp.
29
Assist in installation of drilling line clamp.
Ensure brake handle is locked
down. Watch for burs / wickers
and avoid pinch points. Use
proper hand tools to install
clamp.
30
Assist in attaching snatch block to fast line and raise
with air / hydraulic hoist to keep proper tension on
drilling line while spooling drilling line on drum.
Watch for overhead loads.
Watch for burs / wickers and
avoid pinch points.
31
Assist with removal of snatch block and air / hydraulic hoist.
Watch for overhead loads.
Watch for burs / wickers and
avoid pinch points.
32
Ensure line is slipping through anchor properly.
Have adequate communications from rig floor to
drilling line stand / anchor area (use mechanical
assist to feed line off of drilling line spool).
Watch for overhead loads.
Watch for burs / wickers and
avoid pinch points.
Romfor International Ltd.
Backup Hand
CUT AND SLIP DRILLING LINE
BACKUP HAND
STEP SUB
DRILLING LINE
PROCEDURE
REMARKS
33
Assist in installing drilling line anchor clamp and
secondary anchor safety clamp.
34
Stand clear while blocks are raised to proper height
for removal of block hanging line.
35
Assist Derrickman, in attaching harness / bosuns
chair to air/hydraulic hoist.
Attach directly to shackle.
36
Ensure tag line is attached to bosuns chair.
Ensure tag line is manned by
qualified personnel.
37
While Derrickman is being lifted to proper position,
pay attention to hand signals and verbal direction
from the Derrickman.
Ensure Derrickmans feet and
hands are clear of catch points.
Spool line on air / hydraulic
winch properly to prevent
fouling.
38
Ensure block hanging line is disconnected from top
of the blocks and placed in stored position.
Use verbal communication.
39
Assist in lowering Derrickman to proper position,
paying attention to hand signals and verbal direction.
Ensure Derrickmans feet and
hands are clear of catch points.
40
Assist in removing air / hydraulic winch from harness
/ bosuns chair and store properly.
Store under Rig Managers
control.
41
Assist with removal of drill pipe safety valve. Lift drill
pipe safety valve with air / hydraulic hoist.
Avoid pinch points and ensure
floor is clear of trip hazards.
Ensure safety valve is in the
open position. Stay out of the
red zone (between rig tongs).
Use full open lifting eye for
hoisting safety valve.
42
Assist Driller in checking crown-o-matic for proper
setting on first stand of tubulars.
Inspect all clamping devices on
anchor (brass inserts, anchor
bolts and nuts) tighten to
proper torque in sequence (use
torque wrench). After initial trip
in re-torque anchor clamping
device.
END OF PROCEDURE
Romfor International Ltd.
Derrickman
CUT AND SLIP DRILLING LINE
CUT AND SLIP
DRILLING LINE
Romfor International Ltd.
Derrickman
CUT AND SLIP
DRILLING LINE
Romfor Internatinal Ltd.
Derrickman
CUT AND SLIP DRILLING LINE
DERRICKMAN
STEP
SUB
PROCEDURE
PPE Requirements Hardhat, Safety Glasses, Full
Face Shield, Work Gloves, Steel Toe Shoes, Back
Support and Fall Protection.
Review rig specific JSAs on cutting and slipping
drilling line and hoisting personnel.
JSAs should be rig specific.
Rig manager is required on the
floor when using bosuns chair.
Inspect Equipment:
Anti-Fall equipment, block hanging line, bosuns
chair, shackles ,block slings, line cutter and hand
tools used for the job.
Use fall protection, 100% tie off
and avoid pinch points.
REMARKS
READY TO HANG BLOCKS
(Assuming drill pipe is in rotary table)
Notify Rig Manager that
personnel will be lifted by air/
hydraulic hoist and that drill
line is ready to be cut.
Drill String should be positioned at bottom of last
casing string and well secured.
Operational issues may
change position of drill string.
Assist Driller to ensure that well bore is static.
Assist as directed in inspecting drilling line, while
Driller is raising blocks.
Keep hands clear while line is
spooling on drum.
Prepare to secure hanging line to top of blocks.
Locate proper tools for job.
Tools should be 100% tied off.
Inspect and put on proper size lifting harness /
bosuns chair.
Use proper lifting device. Use
100% tie off (refer to JSA on
lifting personnel with air/
hydraulic hoist).
Attach harness / bosuns chair to air/hydraulic hoist.
Attach directly to shackle.
Ensure tag line is attached to bosuns chair.
Ensure tag line is manned by
qualified person.
Direct hoist operator to lift to proper position, use
hand signals and verbal direction.
Keep feet and hands clear of
catch points.
Disconnect block hanging line from stored position.
DRILLING LINE
Derrickman
Romfor International Ltd.
CUT AND SLIP DRILLING LINE
DERRICKMAN
STEP SUB
DRILLING LINE
PROCEDURE
REMARKS
Attach block-hanging line to top of blocks.
Block hanging line should be
attached at the crown. Use
verbal communication. Do not
use stationary cable and
clamps on block hanging eye.
Direct hoist operator to lower to proper position, use
hand signals and verbal direction.
Keep feet and hands clear of
catch points.
10
Remove harness / bosuns chair and store for later
use.
11
Assist with proper removal of guards from front of
drawworks.
Avoid pinch points and store
guards in safe position.
Assist with proper removal of automatic Driller/
weight indicator load cells off dead line.
Avoid pinch points; ensure
100% tie off. Use proper hand
tools.
Stand clear while blocks are lowered slowly (hanging line takes full weight of blocks).
Ensure blocks slowly rest on
backside of derrick.
Use derrick climber assist to visually inspect the
blocks to ensure that blocks are hung properly.
Ensure tie off line and shackle
is properly aligned and secure.
Use 100% tie off.
13
Assist in securing tag line to drilling line, use tag line
to pull drilling line from drum.
Avoid pinch points.
14
Assist in taping drilling line area being cut.
Watch for burs / wickers.
15
Assist in placing drilling line in line cutter properly.
Watch for burs / wickers, cover
line cutter.
16
Assist in securing drilling line prior to cutting, to
avoid any recoil in line.
12
READY TO CUT DRILLING LINE
Assist in pulling drilling line off drum and guide line
out V-door/beaver slide.
Watch for burs / wickers and
avoid pinch points. Do not let
drilling line slide through hands.
Assist in attaching air/hydraulic hoist to drilling line
when there is three wraps left on drum.
Watch for burs / wickers and
avoid pinch points.
Stand clear while remaining drilling line is pulled off
drum with air / hydraulic hoist.
Watch for burs / wickers and
avoid pinch points.
17
18
Derrickman
Romfor International Ltd.
CUT AND SLIP DRILLING LINE
DERRICKMAN
STEP
SUB
DRILLING LINE
PROCEDURE
REMARKS
19
Inform Driller to stop drum when drilling line clamp is
accessible for removal.
Ensure brake handle is locked
down.
20
Assist with proper removal of drilling line clamp and
inspect for wear.
Watch for burs / wickers and
avoid pinch points. Use proper
hand tools to remove clamp.
21
Assist in pulling remainder of drilling line from drum
using air / hydraulic hoist.
Watch for overhead loads.
Watch for burs / wickers and
avoid pinch points. Use tag line.
22
Assist in slowly lowering cut off drilling line down
beaver-slide / Vdoor and store properly for disposal.
Watch for overhead loads.
Watch for burs / wickers and
avoid pinch points. Use tag line.
23
Assist in positioning drum for drilling line installation.
24
Assist in proper Installation of drilling line in drum.
Ensure brake is locked down.
Watch for pinch points and
watch for burs / wickers.
25
Inform Driller to rotate drum forward to proper
position for installation of drilling line clamp.
Ensure brake handle is locked
down.
26
Assist with proper installation of drilling line clamp.
Watch for burs / wickers and
avoid pinch points. Use proper
hand tools to install clamp.
27
Assist in keeping proper tension on drilling line while
drill line is spooled on drum (for tension attach
snatch block to fast line and raise with air/hydraulic
hoist until proper tension is on line).
Watch for overhead loads.
Watch for burs / wickers and
avoid pinch points.
28
Assist in proper removal of snatch block and air/
hydraulic hoist.
Watch for overhead loads.
Watch for burs / wickers and
avoid pinch points.
29
Inform Driller, when proper amount of drilling line is
on drum according to rig design.
Watch for overhead loads.
Watch for burs / wickers and
avoid pinch points. Ensure
brake is locked down.
Derrickman
Romfor International Ltd.
CUT AND SLIP DRILLING LINE
DERRICKMAN
STEP SUB
DRILLING LINE
PROCEDURE
30
Assist with proper installation of drawworks guards,
load cells, drilling line anchor clamp and secondary
anchor safety clamp.
31
Stand clear while blocks are raised to proper height
for removal of block hanging line.
32
REMARKS
Inspect all clamping devices on
anchor (brass inserts, anchor
bolts and nuts) tighten to
proper torque in sequence (use
torque wrench). After initial trip
in re-torque anchor clamping
device.
Inspect and put on proper size lifting harness /
bosuns chair.
Use proper lifting device. Use
100% tie off (refer to JSA on
lifting personnel with air /
hydraulic hoist).
Attach harness / bosuns chair to air/hydraulic hoist.
Attach directly to shackle.
33
Ensure tag line is attached to bosuns chair.
Ensure tag line is manned by
qualified personnel.
34
Direct hoist operator to lift to proper position, use
hand signals and verbal direction.
Keep feet and hands clear of
catch points.
35
Disconnect block hanging line from top of blocks.
36
Secure block-hanging line in proper position.
37
Direct hoist operator to lower to proper position, use
hand signals and verbal direction.
Keep feet and hands clear of
catch points.
38
Remove harness / bosuns chair and store properly.
Store under Rig Managers
control.
39
Prepare to finish trip.
Review JSA on 100% tie off.
Verbally confirm 100% tied off
with Driller (use radio).
END OF PROCEDURE
Romfor International Ltd.
Driller
CUT AND SLIP DRILLING LINE
CUT AND SLIP
DRILLING LINE
Romfor International Ltd.
Driller
CUT AND SLIP
DRILLING LINE
Romfor International Ltd.
Driller
CUT AND SLIP DRILLING LINE
DRILLER
DRILLING LINE
STEP
SUB
PROCEDURE
PPE Requirements - Hardhat, Safety Glasses, Full
Face Shield, Work Gloves, Steel Toe Shoes, Back
Support and Fall Protection.
Review rig specific JSAs on cutting and slipping drilling
line and hoisting personnel. Notify Rig Manager that
bosuns chair is needed for lifting employees.
JSAs should be rig specific.
Rig manager is required on the
floor when using bosuns chair.
Inspect Equipment:
Anti-Fall equipment, block hanging line, bosuns
chair, shackles, block slings, line cutter and hand
tools used for the job.
Use fall protection, 100% tie off
and avoid pinch points.
READY TO HANG BLOCKS
(Assuming drill pipe is in rotary table)
Notify Rig Manager that
personnel will be lifted by air/
hydraulic hoist and that drill
line is ready to be cut.
Drill String should be positioned at bottom of last
casing string and well secured.
Operational issues may
change position of drill string.
Ensure that well bore is static.
Ensure slips are set (with drill string at proper height).
Lower blocks for unlatching elevators.
Ensure that elevators are unlatched using proper
handles.
REMARKS
Ensure that proper lifting
techniques are used
Avoid pinch points.
Raise blocks to proper position for installing safety
valve in drill pipe, using low drum clutch.
Install safety valve using air/hydraulic lifting hoist.
Use full open lifting eye for
hoisting safety valve.
Ensure drill pipe safety valve is tightened to proper
make up torque.
Avoid pinch points and ensure
floor is clear of trip hazards.
Ensure safety valve is in the
open position.
Raise blocks slowly while inspecting drilling line on
drum for bad spots in the line.
If line damage is found, slip
extra line (as required) before
cutting.
Romfor International Ltd.
Driller
CUT AND SLIP DRILLING LINE
DRILLER
DRILLING LINE
STEP SUB
9
PROCEDURE
Move blocks to proper position for installation of
block hanging line.
Ensure brake handle is locked
down after positioning blocks.
Ensure that Derrickman is raised to the top of the
blocks.
Use proper lifting device. Use
100% tie off. (Refer to JSA on
lifting personnel with air/
hydraulic hoist).
Ensure block-hanging line is properly attached to top
of blocks.
Block hanging line should be
attached at the crown. Use
verbal communication with the
Derrickman. Do not use
stationary cable and clamps on
block hanging eye.
Ensure Derrickman is lowered to floor and is disconnected from hoist line.
Ensure proper removal of guards from front of
drawworks.
Avoid pinch points and store
guards in safe position.
Ensure proper removal of automatic driller / weight
indicator load cells off dead line.
Avoid pinch points; ensure
100% tie off. Use proper hand
tools.
Unlock brake handle and lower blocks slowly until
hanging line takes full weight of blocks.
Ensure blocks slowly rest on
backside of derrick.
Instruct Derrickman to use derrick assist to visually
inspect blocks and ensure that blocks are hung
properly.
Ensure 100% tie off.
Visually inspect brake linkages and brake bands.
Ensure proper removal of secondary safety clamp
and drilling line anchor clamp.
Avoid pinch points; ensure
100% tie off. Use proper hand
tools.
Ensure tag line is secured to drilling line, use tag line
to pull initial drilling line from drum.
Avoid pinch points.
Slowly reverse proper amount of drilling line off the
drawworks drum according to ton mileage program.
Avoid pinch points. If using
drawworks to reverse drilling
line, ensure that drawworks is
in reverse before clutching.
10
11
12
13
14
REMARKS
Romfor International Ltd.
Driller
CUT AND SLIP DRILLING LINE
DRILLER
STEP
DRILLING LINE
SUB
PROCEDURE
REMARKS
15
Tape drilling line area being cut.
Watch for burs / wickers.
16
Ensure drilling line is placed in line cutter properly.
Watch for burs / wickers.
17
Secure drilling line prior to cutting to avoid any recoil
in line.
READY TO CUT DRILLING LINE
18
Instruct motorman to cut drilling line, operating from
the proper side (closed/pump side) of the cutter.
Ensure proper PPE, Full-face
shield and avoid pinch points.
Cover line cutter.
19
Ensure line cutter is released and stored properly.
Avoid pinch points.
20
Reverse drilling line off drum and guide line out Vdoor / beaver slide.
Watch for burs / wickers and
avoid pinch points.
Ensure air/hydraulic hoist is attached to drilling line
when there is three wraps left on drum.
Watch for burs / wickers and
avoid pinch points.
Using air/hydraulic hoist pull remaining drilling line
off drum.
Watch for burs / wickers and
avoid pinch points.
22
Stop drum when drilling line clamp is accessible for
removal. Lock down brake handle.
Ensure brake handle is locked
down.
23
Ensure proper removal of drilling line clamp and
inspect for wear.
Watch for burs / wickers and
avoid pinch points. Use proper
hand tools to remove clamp.
24
Ensure that remainder of drilling line is pulled from
drum using air / hydraulic hoist.
Watch for overhead loads.
Watch for burs / wickers and
avoid pinch points.
25
Slowly lower cut off drilling line down beaver-slide /
Vdoor and store properly for disposal.
Watch for overhead loads.
Watches for burs / wickers and
avoid pinch points. Use tag line.
26
Unlock brake handle and position drum for drilling
line installation.
27
Ensure proper Installation of drilling line in drum.
28
Rotate drum forward to proper position for installation of drilling line clamp. Lock down brake handle.
21
Romfor International Ltd.
Driller
CUT AND SLIP DRILLING LINE
DRILLER
DRILLING LINE
STEP SUB
PROCEDURE
REMARKS
29
Ensure proper installation of drilling line clamp.
Ensure drawworks is shut
down completely. Watch for
burs / wickers and avoid pinch
points. Use proper hand tools
to install clamp.
30
Unlock brake handle. Ensure proper tension is kept on
drilling line while spooling drilling line on drum (for
tension attach snatch block to fast line and raise with
air/hydraulic hoist until proper tension is on line).
Watch for overhead loads.
Watches for burs / wickers and
avoid pinch points.
31
Ensure proper removal of snatch block and air/
hydraulic hoist.
Watch for overhead loads.
Watches for burs / wickers and
avoid pinch points.
32
Spool proper amount of drilling line on drum according to rig design (use mechanical assist to feed line
off of drilling line spool). Drilling line spool should be
equipped with brake.
Watch for overhead loads.
Watches for burs / wickers and
avoid pinch points.
33
Lock brake handle and ensure proper installation of
drawworks guards, load cells, drilling line anchor
clamp and secondary anchor safety clamp.
Inspect all clamping devices on
anchor (brass inserts Anchor
bolts and nuts) tighten to
proper torque in sequence (use
torque wrench). After initial trip
in re-torque anchor clamping
device.
34
Unlock brake handle and raise blocks to proper
height for removal of block hanging line.
35
36
Lock brake handle down. Raise Derrickman to top of
blocks.
Use proper lifting device. Use
100% tie off (refer to JSA on
lifting personnel with air /
hydraulic hoist).
Ensure block-hanging line is properly removed and
secured to derrick.
Watch for overhead loads.
Watches for burs / wickers and
avoid pinch points.
Ensure Derrickman is lowered to floor and is disconnected from hoist line.
Unlock brake handle and raise blocks to proper
position for removal of drill pipe safety valve.
Ensure weight indicator is
working properly.
Romfor International Ltd.
Driller
CUT AND SLIP DRILLING LINE
DRILLER
STEP
DRILLING LINE
SUB
PROCEDURE
REMARKS
37
Ensure proper removal of drill pipe safety valve.
Watch pinch points. Use full
opening lifting eye and air /
hydraulic hoist (store in proper
position).
38
Ensure Derrickman is 100% tied off before raising
blocks, to run first stand of tubulars.
Verbally confirm (with radio)
that Derrickman is 100% tied
off.
39
Check crown-o-matic for proper setting on first stand
of tubulars.
END OF PROCEDURE
Romfor International Ltd.
Lead Tong
CUT AND SLIP DRILLING LINE
CUT AND SLIP
DRILLING LINE
Romfor International Ltd.
Lead Tong
Hand
CUT AND SLIP
DRILLING LINE
Romfor International Ltd.
Lead Tong Hand
CUT AND SLIP DRILLING LINE
LEAD TONG HAND
DRILLING LINE
STEP
SUB
PROCEDURE
PPE Requirements - Hardhat, Safety Glasses, Full
Face Shield, Work Gloves, Steel Toe Shoes, Back
Support and Fall Protection.
Review rig specific JSAs on cutting and slipping
drilling line and hoisting personnel.
JSAs should be rig specific.
Rig manager is required on the
floor when using bosuns chair.
Inspect Equipment:
Anti-Fall equipment, block hanging line, bosuns
chair, shackles ,block slings, line cutter and hand
tools used for the job.
Use fall protection, 100% tie off
and avoid pinch points.
REMARKS
READY TO HANG BLOCKS
(Assuming drill pipe is in rotary table)
Drill String should be positioned at bottom of last
casing string and well secured.
Operational issues may
change position of drill string.
Ensure that well bore is static.
Assist in setting slips (with drill string at proper
height).
Ensure that proper lifting
techniques are used.
After blocks are lowered, stand clear while elevators
are unlatched.
Avoid pinch points and stay out
of Drillers view.
Assist as directed in inspecting drilling line, while
Driller is raising blocks.
Keep hands clear while line is
spooling on drum.
After blocks are raised to proper position, assist in
using air / hydraulic hoist for installing safety valve.
Use full open lifting eye for
hoisting safety valve.
Assist as directed in tightening drill pipe safety valve
to the proper make up torque.
Avoid pinch points and ensure
floor is clear of trip hazards.
Ensure safety valve is in the
open position. Stay out of the
red zone (between rig tongs).
Stand clear while blocks are moved to the proper
position for installation of block hanging line.
Ensure brake handle is locked
down after positioning blocks.
Assist Derrickman, in attaching harness / bosuns
chair to air/hydraulic hoist.
Attach directly to shackle.
Romfor International Ltd.
Lead Tong Hand
CUT AND SLIP DRILLING LINE
LEAD TONG HAND
STEP SUB
DRILLING LINE
PROCEDURE
REMARKS
10
Ensure tag line is attached to bosuns chair.
Ensure tag line is manned by
qualified person.
11
While Derrickman is lifted, use tag line to position
Derrickman properly.
Ensure Derrickmans feet and
hands are clear of catch points.
12
While Derrickman is lowered, use tag line to position
Derrickman properly.
Ensure Derrickmans feet and
hands are clear of catch points.
13
Assist in removing air / hydraulic winch from harness
/ bosuns chair and store for later use.
14
Assist with removal of guards from front of
drawworks.
Avoid pinch points and store
guards in safe position.
Assist with removal of automatic driller / weight
indicator load cells off dead line.
Avoid pinch points; ensure
100% tie off. Use proper hand
tools.
15
Assist with removal of secondary safety clamp and
drilling line anchor clamp.
Avoid pinch points; ensure
100% tie off. Use proper hand
tools.
16
Assist in securing tag line to drilling line, use tag line
to pull initial drilling line from drum.
Avoid pinch points.
17
Assist in taping drilling line area being cut.
Watch for burs / wickers.
18
Assist in placing drilling line in line cutter properly.
Watch for burs / wickers, cover
line cutter.
19
Ensure drilling line is secured prior to cutting, to
avoid any recoil in line.
READY TO CUT DRILLING LINE
20
Assist in cutting drilling line, operate cutter from the
proper side (closed/pump side).
Use proper PPE, Full-face
shield and avoid pinch points.
21
Assist in storing cutter properly.
Avoid pinch points.
22
Assist in pulling drilling line off drum and guide line
out V-door / beaver slide.
Watch for burs / wickers and
avoid pinch points. Do not let
drilling line slide through hands.
Romfor International Ltd.
Lead Tong Hand
CUT AND SLIP DRILLING LINE
LEAD TONG HAND
DRILLING LINE
STEP
SUB
PROCEDURE
REMARKS
23
Assist in attaching air/hydraulic hoist to drilling line
when there is three wraps left on drum.
Watch for burs / wickers and
avoid pinch points.
Assist in pulling remaining drilling line off drum with
air / hydraulic hoist.
Watch for burs / wickers and
avoid pinch points.
24
Assist with proper removal of drilling line clamp and
inspect for wear.
Watch for burs / wickers and
avoid pinch points. Use proper
hand tools to remove clamp.
25
Assist in removing the remainder of drilling line from
drum using air/hydraulic hoist.
Watch for overhead loads.
Watch for burs / wickers and
avoid pinch points. Use tag line.
26
Assist in lowering cut off drilling line down beaverslide / Vdoor and store properly for disposal.
Watch for overhead loads.
Watch for burs / wickers and
avoid pinch points. Use tag line.
27
Assist in Installation of drilling line in drum.
Avoid pinch points and use
proper tools.
28
Stand clear while drum rotates forward to proper
position for installation of drilling line clamp.
29
Assist in installation of drilling line clamp.
Ensure brake handle is locked
down. Watch for burs / wickers
and avoid pinch points. Use
proper hand tools to install
clamp.
30
Assist in attaching snatch block to fast line and raise
with air / hydraulic hoist to keep proper tension on
drilling line while spooling drilling line on drum.
Watch for overhead loads.
Watch for burs / wickers and
avoid pinch points.
31
Assist with removal of snatch block and air / hydraulic
hoist.
Watch for overhead loads.
Watch for burs / wickers and
avoid pinch points.
32
Ensure line is slipping through anchor properly.
Have adequate communications from rig floor to
drilling line stand / anchor area (use mechanical
assist to feed line off of drilling line spool).
Watch for overhead loads.
Watch for burs / wickers and
avoid pinch points.
Romfor
Lead Tong Hand
CUT AND SLIP DRILLING LINE
LEAD TONG HAND
STEP SUB
DRILLING LINE
PROCEDURE
REMARKS
33
Assist in installing drilling line anchor clamp and
secondary anchor safety clamp.
34
Stand clear while blocks are raised to proper height
for removal of block hanging line.
35
Assist Derrickman, in attaching harness / bosuns
chair to air/hydraulic hoist.
Attach directly to shackle.
36
Ensure tag line is attached to bosuns chair.
Ensure tag line is manned by
qualified personnel.
37
While Derrickman is being lifted to proper position,
pay attention to hand signals and verbal direction
from the Derrickman.
Ensure Derrickmans feet and
hands are clear of catch points.
Spool line on air / hydraulic
winch properly to prevent
fouling.
38
Ensure block hanging line is disconnected from top
of the blocks and placed in stored position.
Use verbal communication.
39
Assist in lowering Derrickman to proper position,
paying attention to hand signals and verbal direction.
Ensure Derrickmans feet and
hands are clear of catch points.
40
Assist in removing air / hydraulic winch from harness
/ bosuns chair and store properly.
Store under Rig Managers
control.
41
Assist with removal of drill pipe safety valve (do not
put tongs on open / close area of drill pipe safety
valve). Lift drill pipe safety valve with air / hydraulic
hoist.
Avoid pinch points and ensure
floor is clear of trip hazards.
Ensure safety valve is in the
open position. Stay out of the
red zone (between rig tongs).
Use full open lifting eye for
hoisting safety valve.
42
Assist Driller in checking crown-o-matic for proper
setting on first stand of tubulars.
Inspect all clamping devices on
anchor (brass inserts, anchor
bolts and nuts) tighten to
proper torque in sequence (use
torque wrench). After initial trip
in re-torque anchor clamping
device.
END OF PROCEDURE
Romfor International Ltd.
Motorman
CUT AND SLIP DRILLING LINE
CUT AND SLIP
DRILLING LINE
Romfor International Ltd.
Motorman
CUT AND SLIP
DRILLING LINE
Romfor International Ltd.
Motorman
CUT AND SLIP DRILLING LINE
MOTORMAN
DRILLING LINE
STEP
SUB
PROCEDURE
PPE Requirements - Hardhat, Safety Glasses, Full
Face Shield, Work Gloves, Steel Toe Shoes, Back
Support and Fall Protection.
Review rig specific JSAs on cutting and slipping
drilling line and hoisting personnel.
JSAs should be rig specific.
Rig manager is required on the
floor when using bosuns chair.
Inspect Equipment:
Anti-Fall equipment, block hanging line, bosuns
chair, shackles ,block slings, line cutter and hand
tools used for the job.
Use fall protection, 100% tie off
and avoid pinch points.
REMARKS
READY TO HANG BLOCKS
(Assuming drill pipe is in rotary table)
Drill String should be positioned at bottom of last
casing string and well secured.
Operational issues may
change position of drill string.
Ensure that well bore is static.
Assist in setting slips (with drill string at proper
height).
Ensure that proper lifting
techniques are used.
After blocks are lowered, unlatch elevators using
proper handles.
Avoid pinch points.
After blocks are raised to proper position, use air /
hydraulic hoist for installing safety valve.
Use full open lifting eye for
hoisting safety valve.
Assist as directed in tightening drill pipe safety valve
to the proper make up torque.
Avoid pinch points and ensure
floor is clear of trip hazards.
Ensure safety valve is in the
open position. Stay out of the
red zone (between rig tongs).
Assist as directed in inspecting drilling line, while
Driller is raising blocks.
Keep hands clear while line is
spooling on drum.
Assist Derrickman, in attaching harness / bosuns
chair to air/hydraulic hoist.
Attach directly to shackle.
Ensure tag line is attached to bosuns chair.
Ensure tag line is manned by
qualified person.
Romfor International Ltd.
Motorman
CUT AND SLIP DRILLING LINE
MOTORMAN
STEP SUB
DRILLING LINE
PROCEDURE
REMARKS
10
Operate hoist to lift Derrickman to proper position,
pay attention to hand signals and verbal direction
from the Derrickman.
11
Ensure block hanging line is disconnected from
stored position.
12
Ensure block-hanging line is attached to top of the
blocks.
Block hanging line should be
attached at the crown. Use
verbal communication. Do not
use stationary cable and
clamps on block hanging eye.
13
Lower Derrickman to proper position, pay attention
to hand signals and verbal direction.
Ensure Derrickmans feet and
hands are clear of catch points.
14
Assist in removing air / hydraulic winch from harness
/ bosuns chair and store for later use.
Ensure Derrickmans feet and
hands are clear of catch points.
Spool line on air / hydraulic
winch properly to prevent
fouling.
Assist with removal of guards from front of
drawworks.
Assist Driller in visually inspecting brake linkages
and brake bands.
Assist with removal of automatic driller / weight
indicator load cells off dead line.
Avoid pinch points; ensure
100% tie off. Use proper hand
tools.
16
Assist with removal of secondary safety clamp and
drilling line anchor clamp.
Avoid pinch points; ensure
100% tie off. Use proper hand
tools.
17
Assist in securing tag line to drilling line, use tag line
to pull initial drilling line from drum.
Avoid pinch points.
18
Tape drilling line area being cut.
Watch for burs / wickers.
19
Assist in placing drilling line in line cutter properly.
Watch for burs / wickers, cover
line cutter.
20
Ensure drilling line is secured prior to cutting, to
avoid any recoil in line.
15
Avoid pinch points and store
guards in safe position.
Romfmor International Ltd.
Motorman
CUT AND SLIP DRILLING LINE
MOTORMAN
STEP
SUB
DRILLING LINE
PROCEDURE
REMARKS
READY TO CUT DRILLING LINE
21
Cut drilling line, operating from the proper side
(closed/pump side) of the cutter.
Use proper PPE, Full-face
shield and avoid pinch points.
22
Release line cutter and store properly.
Avoid pinch points.
23
Assist in pulling drilling line off drum and guide line
out V-door / beaver slide.
Watch for burs / wickers avoid
pinch points. Do not let drilling
line slide through hands.
Assist in attaching air/hydraulic hoist to drilling line
when there is three wraps left on drum.
Watch for burs / wickers and
avoid pinch points.
Operate air / hydraulic hoist to pull remaining drilling
line off drum.
Watch for burs / wickers avoid
pinch points.
25
Assist with proper removal of drilling line clamp and
inspect for wear.
Watch for burs / wickers and
avoid pinch points. Use proper
hand tools to remove clamp.
26
Remove the remainder of drilling line from drum
using air/hydraulic hoist.
Watch for overhead loads.
Watch for burs / wickers and
avoid pinch points. Use tag line.
27
Slowly lower cut off drilling line down beaver-slide /
Vdoor and store properly for disposal.
Watch for overhead loads.
Watch for burs / wickers and
avoid pinch points. Use tag line.
28
Assist in Installation of drilling line in drum.
Avoid pinch points and use
proper tools.
29
Stand clear while drum rotates forward to proper
position for installation of drilling line clamp.
30
Assist in installation of drilling line clamp.
Ensure brake handle is locked
down. Watch for burs / wickers
and avoid pinch points. Use
proper hand tools to install
clamp.
31
Attach snatch block to fast line and raise with air /
hydraulic hoist to keep proper tension on drilling line
while spooling drilling line on drum.
Watch for overhead loads.
Watch for burs / wickers and
avoid pinch points.
24
Romfor International Ltd.
Motorman
CUT AND SLIP DRILLING LINE
MOTORMAN
STEP SUB
DRILLING LINE
PROCEDURE
REMARKS
32
Assist with removal of snatch block and air / hydraulic
hoist.
Watch for overhead loads.
Watch for burs / wickers and
avoid pinch points.
33
Have enough excess drill line available for slipping
onto drum according to JSA and rig design.
Watch for burs / wickers and
avoid pinch points.
34
Ensure line is slipping through anchor properly.
Have adequate communications from rig floor to
drilling line stand / anchor area (use mechanical
assist to feed line off of drilling line spool).
Watch for overhead loads.
Watch for burs / wickers and
avoid pinch points.
35
Install drilling line anchor clamp and secondary
anchor safety clamp.
Inspect all clamping devices on
anchor (brass inserts, anchor
bolts and nuts) tighten to
proper torque in sequence (use
torque wrench). After initial trip
in re-torque anchor clamping
device.
36
Stand clear while blocks are raised to proper height
for removal of block hanging line.
37
Assist Derrickman, in attaching harness / bosuns
chair to air/hydraulic hoist.
Attach directly to shackle.
38
Ensure tag line is attached to back D ring of
harness / bosuns chair.
Ensure tag line is manned by
qualified personnel.
39
Operate hoist to lift Derrickman to proper position,
pay attention to hand signals and verbal direction
from the Derrickman.
Ensure Derrickmans feet and
hands are clear of catch points.
Spool line on air / hydraulic
winch properly to prevent
fouling.
40
Ensure block hanging line is disconnected from top
of the blocks and placed in stored position.
Use verbal communication. Do
not use stationary cable and
clamps on block hanging eye.
41
Lower Derrickman to proper position, pay attention
to hand signals and verbal direction.
Ensure Derrickmans feet and
hands are clear of catch points.
42
Assist in removing air / hydraulic winch from harness
/ bosuns chair and store properly.
Store under Rig Managers
control.
Romfor International Ltd.
Motorman
CUT AND SLIP DRILLING LINE
MOTORMAN
STEP
SUB
DRILLING LINE
PROCEDURE
43
Assist with removal of drill pipe safety valve. Lift drill
pipe safety valve with air / hydraulic hoist.
44
Assist Driller in checking crown-o-matic for proper
setting on first stand of tubulars.
REMARKS
Avoid pinch points and ensure
floor is clear of trip hazards.
Ensure safety valve is in the
open position. Stay out of the
red zone (between rig tongs).
Use full open lifting eye for
hoisting safety valve.
END OF PROCEDURE