General Information
General Information
Country:
City/Locality:
Notice/Contract
Number:
Publication Date:
Deadline
Buyer:
Original Language:
Contact information
Address:
Philippines
Philippines
phl:809384
Feb 24, 2009
Apr 4, 2009
NATIONAL IRRIGATION ADMINISTRATION
English
Carlos P Pasion
Sr. Data Encoder-Controller
EDSA
Quezon City, Metro Manila
Philippines
Telephone
63-2-9213906
Fax:
63-2-9213906
Email:
Click here
Goods, Works and Services
Dam construction work
Original Text
1. The National Irrigation Administration has received a loan from the Asian
Development Bank (ADB) towards the cost of Southern Philippines Irrigation
Sector Project. Part of this loan will be used for payments under the contract
named above. Bidding is open to bidders from eligible source countries of the
ADB.
2. The National Irrigation Administration invites sealed bids from eligible
bidders for the construction and completion of Binalawan Concrete Buttress
Dam and Appurtenant Facilities that involves the construction of 16-meter high
reinforced concrete buttress dam, with 81 meter long slightly curved crest, the
ogee type midsection serving as spillway and 1.20 meter x 0.60 meter
orifice/sluiceway including a 0.60 meter diameter by 40 meters long steel pipe
outlet works. The volumes of excavation for the dam foundations are estimated
to be about 28,000 m3 and 23,000 m3 for the common and rock excavations,
respectively, while the volume of structural grade concrete will be about 15,000
m3.
3. Only eligible bidders with the following key qualifications should participate
in this bidding:
Participation as contractor, subcontractor, management contractor, in at least
one (1) contract on construction of reservoir dam within the last five (5) years,
each with a value of at least One Million Six Hundred Thousand US Dollar
Note:
Interested Suppliers must download the attached document. Here's the
procedure on how to download the attached document.
1. To order the Associated Component of this bid notice, please click the
"Order" link.
2. Upon clicking the Order link, the Order Basket page will be displayed. To
proceed the ordering of the document in the Order Basket page, click the
"Continue" button.
3. The system will display the Order Confirmation page. To confirm the order,
click the "Submit" button.
4. The Order Summary page will be displayed. To view or download the
Associated Documents (attached document), click the Document Hyperlink
under the Item column.
5. To return to the Bid Notice Abstract page, click the "Done" button. Approved
budget: PHP 150,000,000.00 Delivery period: 540 Day/s Original notice:
http://www.philgeps.net/GEPS/Tender/PrintableBidNoticeAbstractUI.aspx?refid
=809384