QCS 2010 Section 17 Part 1 General PDF
QCS 2010 Section 17 Part 1 General PDF
QCS 2010 Section 17 Part 1 General PDF
Section 17
Part 1
General
Page 1
1.
GENERAL ...................................................................................................................2
1.1
INTRODUCTION .......................................................................................................2
1.1.1
1.1.2
Scope
References
1.2
SUBMITTALS.............................................................................................................3
1.2.1
1.2.2
1.2.3
1.2.4
1.2.5
1.2.6
1.2.7
1.2.8
1.2.9
Samples
Protection Materials
Mock-ups
Engineering Calculations
Test Reports
Inspection and Production Testing Programs
Shop Drawings
Maintenance Manual
As-Built Drawings
QCS 2010
2
2
3
3
3
3
4
4
4
4
4
QCS 2010
Section 17
Part 1
General
Page 2
1.
GENERAL
1.1
INTRODUCTION
1.1.1
Scope
This Part provides the specification for preparation of shop drawings, engineering, testing,
fabrication, delivery erection and installation of steel doors, roller shutters, aluminium doors,
windows and fly screens, aluminium support and cladding systems and architectural metal
work.
Concrete
Roofing
Thermal Insulation of Buildings
Structural Steelworks
Carpentry, Joinery and Ironmongery
Glass and Glazing
Painting and Decorating
1.1.2
References
QCS 2010
QCS 2010
Section 17
BS 6497
BS 6510
BS 7036
BS 7773
BS EN 288
BS EN 485
BS EN 10142
BS EN 10143
BS EN 10152
Part 1
General
Page 3
and for the finish on aluminium alloy extrusions, sheet and pre-formed
sections coated with organic coatings
Powder organic coatings for application and storing to ho-dip galvanized hotrolled steel Section and steel sheet for windows and associated external
architectural purposes, and for the finish on galvanized steel Section and
sheet coated with organic coatings.
Steel windows, bills, window boards, and doors
Code of practice for provision and installation of safety devices for automatic
power operated pedestrian door systems
Code for practice for cleaning and preparation of metal surfaces
Approval of welding procedures for metallic materials
Aluminium and aluminium alloys sheet, strip and plate
Continuously hot-dip zinc coated low carbon steel sheet and strip for cold
forming: technical delivery conditions.
Continuously hot-dip metal coated steel sheet and strip Tolerances on
dimensions and shape
Electrolytically zinc coated cold rolled steel flat products Technical delivery
conditions
1.2
SUBMITTALS
1.2.1
Samples
The Contractor shall submit samples and mock-ups in accordance with the relevant
provisions of Section 1, General, and as follows:
(a)
(b)
(c)
1.2.2
Protection Materials
The Contractor shall provide information or direction for application and removal procedures
for all protection materials used on or for samples during shipping, storage, and installation.
1.2.3
Mock-ups
The Contractor shall provide test mock-ups as indicated in the Project Documentation, and
as required for tests
The Contractor shall provide visual mock-up as indicated in the Project Documentation.
1.2.4
Engineering Calculations
QCS 2010
QCS 2010
Section 17
Part 1
General
Page 4
1.2.5
Test Reports
The Contractor shall submit test reports for all tests specified herein. Test reports shall be
submitted in a timely manner and prior to execution of any Works.
Product test reports: a qualified independent testing agency approved by the Engineer shall
be used to indicate and interpret test results on tests on components and assemblies relative
to compliance with the requirements of the Project Documentation.
Reconstruction test reports: a qualified independent testing agency approved by the Engineer
shall be used to indicate and interpret test results on test mock-ups relative to compliance
with the requirements of the Project Documentation.
Field test reports: a qualified independent inspecting and testing agency approved by the
Engineer shall be used to indicate and interpret field test results relative to compliance with
the requirements of the Project Documentation.
1.2.6
The Contractor shall submit to the Engineer a detailed description of inspection and
production testing programmes and inspection reports for all types of coating of aluminium or
aluminium alloy.
1.2.7
Shop Drawings
Shop Drawings, shall be prepared in accordance with the relevant provisions of Section 1,
General. Shop Drawings shall be prepared and approved by the Engineer prior to the
fabrication of any off-site item.
1.2.8
Maintenance Manual
A maintenance manual describing the various materials, equipment, and procedures for
cleaning and maintaining the parts of the Works included in this Section shall be submitted to
the Engineer for approval upon completion of the Project.
1.2.9
As-Built Drawings
As-Built Drawings, prepared in accordance with the relevant provisions of Section 1, General,
shall be submitted to the Engineer for approval upon completion of the Project.
END OF PART
QCS 2010