Office :
Jl. Pulo Raya IV No.26
Kebayoran Baru, Jakarta Selatan
Tlp : 021-70993909
e-mail :
[email protected]Contact Person : Dian Budi Dharma
(Bussiness Development Manager)
Mobile +6287889197484
Introduction
PT. Tri Panji Puring (known as TPP) is a multidisciplinary
engineering company. Its range of services encompasses
projects in the oil and gas industry at both onshore and
offshore locations. TPP provides cost effective engineering
design, procurement and construction services specifically
tailored for our clients needs.
The companys capabilities range from feasibility studies,
Feed, As-built Survey, detail design engineering,
Independent Appraisal/ Asseessment and operational
documentation.
TPP is Jakarta-based and
employs highly efficient &
dedicated
national
engineers. All of which have
great graduate and undergraduate backgrounds from
reputable universities. In
TPP, we emphasize on
quality and client satisfaction
Companys Capabilities
Detailed Engineering
and Drawing Services
TPP
Equipment and
Facility Assessment
As Built Survey
Companys Particulars
Company Name
PT. TRI PANJI PURING
Office Adrress
Jl. Pulo Raya IV No. 26, Kebayoran
Baru, Selatan
Telephone
021-70993909
Facsimile
021-70993909
Email Address
[email protected]
Notaries Document
No. 03
Company Registration Number
AHU-24155.AH.01.01.Tahun 2009
Tax Registration Number (PKP)
PEM-00634/WPJ.06/KP.0603/2011
Tax Number / NPWP
02.836.578.1-024.000
Director
IR. LISBETH
Assessment Proposal
The purpose of this proposal is to
provide assessment work for
equipment and the whole installation
which no identification or no
supporting documentation that need
to be SKPI Migas Certified.
Scope
The assessment will be applied for installation
and equipments such as pressure vessel, rotating
equipment, electrical equipment, process, piping
and instrument system that have been placed on
FSO Gagak Rimang
The assessment activity are to asses and
evaluate the integrity of equipment based on
actual condition which is no supporting
documentation to fulfill the minimum
requirement of International Code, Standard,
Owner/User specification, and MIGAS Regulation.
SKPI ELEMENT HIERARCHY
KEY REGULATION
SUPPORTING DECREE
Ministry of Mines & Energy Regulation
No. 06P/0746/M.PE/1991
Decree of Director General of Oil and Natural Gas
No. 84.K/38/DJM/1998
SAFETY WORTHINESS FOR INSTALLATION (SKPI)
DESIGN
PFD and P&ID
Equipment Layout
Hazardous Area Classification
One Line Diagram
Grounding Layout
Cause & Effect Diagram/
SAFE Chart
Civil Works
Piping System
Instrumentation System
Safety Devices
Fire Prevention & Control System
Measuring & Metering Devices
Process, Utilities & Waste
Treatment
Environmental Pollution
Prevention System
Operating Procedure
Emergency Evacuation Procedure
SKPP
Pressure Vessel
Pressure Safety Valve
Pump & Compressor
Generator
Switchgear
Transformer
Motor Control Center
Crane
Tank
Pipeline
SAFETY
HAZID/HAZOP
Safety Integrated Level (SIL)
Safety Management System
(SMS)
NON SKPP
Piping System
Instrumentation & Control
System
Civil Works
Electrical System
Mechanical System
Safety Protection System
Environmental Protection System
ENVIRONMENTAL
AMDAL/RKL/RPL Certificate
AMDAL/RPL/RKL Document
PRE--COMM/COMM
PRE
Loop/Sequence Test
Pressure/Leak Test
Calibration
Megger Test
Continuity Test
Motor Sequence Test
Alignment Test
Tank Water Filling Test
Function Test
OTHER PERMITS
Steam Boiler/Generator
Helipad
Metering/Tank Calibration
Explosive
Combo Dock/Jetty
Methodologhy
Process Safety and Risk Assessment FSO
Managed by
Classification society
(e.g. ABS, BKI, BV etc.)
Managed by risk
assessment
Methodologhy
Preliminary study, document collection,
preliminary discussion with Client/Migas
Migas rule:
Kepmen,Kepdirjen
,Kepdir
Adopted
Codes,Recommended
Practices, Standards
Assessment, calculation & Site Verification
Code satisfied, Rule
satisfied, safe?
NOT
OK
Clarifications & discussion
with Client
Revise
Submit Report
Code satisfied, Rule
satisfied, safe?
OK
Final Report to Client
NOT
Clarification &
Discussion with Client
Revise
Assessment
PRESSURE VESSEL
General condition check by visual inspection
Conduct thickness verification and
measurement
Verify as-built drawing as per the dimensional
check result, wall thickness gauging, material
identification and parts completion check.
Determine minimum thickness required are
used the actual thickness.
Mechanical integrity evaluation for pressure
vessel
Assessment
ROTATING EQUIPMENT
General condition check by visual inspection
Determine the design parameter (suction
pressure & temperature, discharge pressure &
temperature, flow rate) and operation
parameter of pump
Determine the specification, design parameter
and operation parameter of prime mover
Mechanical integrity evaluation for rotating
equipment
Assessment
ELECTRICAL EQUIPMENT
General condition check by visual inspection
Determine the design parameter and operation
parameter of electrical equipment (MCC,
Switchgear, Generator, Transformer)
Determine the specification, design parameter
and operation parameter of prime mover
Mechanical integrity evaluation for electrical
equipment
Assessment
PROCESS & PIPING SYSTEM
Evaluate Process Flow Diagram
Evaluate piping & instrument diagram
Evaluate pressure piping calculation
based on actual wall thickness
Assessment
SAFETY AND ENVIRONMENT PROTECTION
Determine Hazardous area classification
Evaluate fire fighting and protection system
Evaluate equipment for preventing and
controlling the environment pollution
Evaluate protection device to avoid hazard of
static electricity and other electricity
Risk assessment cover process hazard
analysis, operational and occupational risk,
safety distance calculation, consequence
analysis for oil spill, pool fire or explosion
Communication Plan
Project Manager
Client and Certification Third Party
JANTER NS
QHSE
BENNY
ASS. Project Manager
DIAN BUDI DHARMA
Doc. Control & Admin
Lead Engineer
RANTINO
RONI
Mech. (Static) Engineer
Mech. (Rotating)Engineer
Maintenance and Facility Eng.
Electrical & Instrument Eng.
Process Safety Engineer
Drafter
Selected Experiences
Assessment Equipment and Facilities
Pertamina UBEP Adera
(Assessment Rotating and Electrical
Equipment at Sumatera Field ; 2011)
ConocoPhillips Indonesia Ltd
(Assessment Pressure Vessel, Rotating,
Electrical at Belida, Intan FSO Offshore
Natuna ; 2012)
Selected Experiences
Assessment Equipment and Facilities ; 2012
PT. Tawu Inti Bati
(Assessment Rotating,Electrical, Pressure Vessel,
Storage Tank, Piping, Process and Intrumentation
System for Refining Waste Lube Oil Plan at
Kerawang West Java Indonesia)
Selected Experiences
Risk Assessment Analyses
ConocoPhillips Indonesia Ltd.
Independent Appraisal and Analyses
3 Offshore Platforms (2012)
Selected Experiences
Feed and Capex Independent Appraisal 2012
Calculate project cost (CAPEX) based on FEED deliverables provided by Worley
Provide guideline to PLN about project cost can be absorbed by current market
Assist PLN proceed contracting strategy during execution stage
THANK YOU
Office :
Jl. Pulo Raya IV No.26
Kebayoran Baru, Jakarta Selatan
Tlp : 021-70993909
e-mail : [email protected]
Contact Person : Dian Budi Dharma
(Bussiness Development Manager)
Mobile +6287889197484