ZONE-2
Lahore, Gujranwala, Sialkot, Jhang, Faisalabad, Hafizabad, Sheikhupura,
Nankana sahib, Narowal, Toba Tek Singh, Bhakkar, Sahiwal, Okara,
Pakpattan and Kasur
RATES DIRECTORATE
COORDINATION & MONITORING DIVISION (WATER)
WAPDA HOUSE, LAHORE (Pakistan)
January, 2013
Rs 1000/WAPDA
WCSR-2013 (Zone-2)
WAPDA
WCSR-2013 (Zone-2)
SECTION 1
CARRIAGE OF MATERIAL,
LOADING AND UNLOADING
WAPDA
WCSR-2013 (Zone-2)
SECTION 2
EARTHWORK
(EXCAVATION AND EMBANKMENT)
WAPDA
WCSR-2013 (Zone-2)
SECTION 3
DISMANTLING (DEMOLITION)
WAPDA
WCSR-2013 (Zone-2)
SECTION 4
M O R T A R
WAPDA
WCSR-2013 (Zone-2)
SECTION 5
C O N C R E T E
WAPDA
WCSR-2013 (Zone-2)
SECTION 6
BRICK WORK
WAPDA
WCSR-2013 (Zone-2)
SECTION 7
STONE MASONRY
WAPDA
WCSR-2013 (Zone-2)
SECTION 8
R O O F I N G
WAPDA
WCSR-2013 (Zone-2)
SECTION 9
F L O O R I N G
WAPDA
WCSR-2013 (Zone-2)
SECTION 10
SURFACE RENDERING
WAPDA
WCSR-2013 (Zone-2)
SECTION 11
WOOD WORK
WAPDA
WCSR-2013 (Zone-2)
SECTION 12
PAINTING AND VARNISHING
WAPDA
WCSR-2013 (Zone-2)
SECTION 13
WATER SUPPLY AND SANITATION WORKS
WAPDA
WCSR-2013 (Zone-2)
SECTION 14
ROADS AND ROAD STRUCTURES
WAPDA
WCSR-2013 (Zone-2)
SECTION 15
LINING OF CANALS
WAPDA
WCSR-2013 (Zone-2)
SECTION 16
SHEET PILING
WAPDA
WCSR-2013 (Zone-2)
SECTION 17
RIVER TRAINING AND DIVERSION WORK
WAPDA
WCSR-2013 (Zone-2)
SECTION 18
O U T L E T S
WAPDA
WCSR-2013 (Zone-2)
SECTION 19
SINKING OF WELLS
WAPDA
WCSR-2013 (Zone-2)
SECTION 20
MISCELLANEOUS
WAPDA
WCSR-2013 (Zone-2)
SECTION 21
ELECTRIFICATION
WAPDA
WCSR-2013 (Zone-2)
SECTION 22
BASIC RATES OF MATERIAL
FOR CIVIL WORKS
WAPDA
WCSR-2013 (Zone-2)
SECTION 23
BASIC RATES OF MATERIAL
FOR ELECTRIC WORKS
WAPDA
WCSR-2013 (Zone-2)
SECTION 24
BASIC RATES OF LABOUR
WAPDA
WCSR-2013 (Zone-2)
SECTION 25
BASIC RATES OF MACHINERY USAGE
WAPDA
WCSR-2013 (Zone-2)
CONTENTS
Section
1.
Title
Pages
Preface
to
iii
iv
to
Conversion Factors.
vi
to
viii
1-1
to
1-13
A)
Carriage of Material
1-1
to
1-10
B)
1-11
to
1-13
2.
2-1
to
2-8
3.
DISMANTLING (DEMOLITION)
3-1
to
3-4
4.
MORTAR
4-1
5.
CONCRETE.
5-1
to
5-5
6.
BRICK WORK..
6-1
to
6-5
7.
STONE MASONRY
7-1
to
7-5
8.
ROOFING.
8-1
to
8-5
9.
FLOORING.
9-1
to
9-6
10.
SURFACE RENDERING
10-1
to
10-3
11.
WOOD WORK.
11-1
to
11-7
12.
12-1
to
12-5
13.
13-1
to
13-24
14.
14-1
to
14-5
15.
LINING OF CANALS...
15-1
to
15-2
16.
SHEET PILING
16-1
17.
17-1
to
17-3
18.
OUTLETS.
18-1
to
18-3
19.
SINKING OF WELLS..
19-1
20.
MISCELLANEOUS.
20-1
to
20-24
WAPDA
WCSR-2013 (Zone-2)
Section
Title
21.
ELECTRIFICATION
Pages
21-1
to
21-45
21-1
to
21-40
1. Point Wiring.
21-1
to
21-5
2. Miscellaneous.
21-5
21-6
to
21-22
4. Electrical accessories
21-23
to
21-26
5. Boards.
21-26
to
21-27
21-27
to
21-28
7. Fans.
21-28
to
21-30
8. Switch Gears..
21-30
to
21-36
21-37
to
21-45
21-41
to
21-44
22.
22-1
to
22-18
23.
23-1
to
23-14
24.
24-1
to
24-2
25.
25-1
to
25-3
A-I
A-II
B)
WAPDA
WCSR-2013 (Zone-2)
PREFACE
1. The cost of a project directly depends on rates and prices of different items and inputs
of a contract, therefore the rates and prices of goods, works and services comprising
composite rates set out in the estimate of a contract must be realistic, updated and
workable in the country. Since one of the major cost overrun factors is use of
incorrect/inappropriate methods of cost estimation; therefore, it is of utmost importance
to prepare proper cost estimates on the basis of WAPDA Composite Schedule of
Rates (WCSR) or otherwise on the basis of authentic market rates, where WCSR does
not fulfil the intended purpose for WAPDA projects.
2. The first WCSR was issued by WAPDA in 1979, subsequently revised during 1985-86,
1990, 1998, 2005 and 2008 considering the changes in price, working methodology
and technology.
3. As per instructions of the Authority during 2008, separate Schedule of Rates prepared
for ten different areas. These areas termed as zones comprised districts/cities having
almost similar range of rates/prices considering remote, hard, hilly terrain, plain and
easily accessible areas.
4. The previous WCSR has now been updated in eleven (11) zones keeping in view of
fluctuation and unstable costs and prices of materials, high cost of services and
machinery. This WCSR-2013 is specifically meant for Zone-2, consists of the following
districts/cities:
ZONE - 2 Lahore, Gujranwala, Sialkot, Jhang, Faisalabad, Hafizabad, Sheikhupura,
Nankana sahib, Narowal, Toba Tek Singh, Bhakkar, Sahiwal, Okara, Pakpattan
and Kasur
Sargodha, Khushab, Mianwali and Mir Pur, Kotli & Bhimber (A.J.K).
ZONE - 4 Sukkur, Nawab Shah, Khairpur, Larkana, Jacobabad, Shikarpur, Ghotki, Kambar
ZONE - 5 Karachi, Hyderabad, Dadu, Jamshoro, Mirpur Khas, Tharparkar, Tando Alah
Yar, Tando Muhammad Khan, Umar Kot, Sanghar, Thatta and Badin
ZONE - 6 Peshawar, Mardan, Charsada, Swabi, Buner, Haripur, D.I. Khan, Kark,Tank,
ZONE - 7 Swat, Lower Dir, Upper Dir, Shangla, Malakand and Bajour, Mohmand, Khyber,
ZONE - 8 Quetta, Loralai, Zhob, Musa Khel, Qila Abdullah, Pishin, Bhag, Gandava,
Mustang, Sibbi, Kohlu, Dera Bughti, Nasirabad, Bolan, Jhal Magsi, Ziarat,
Jaffarabad, Qila Saifullah, Barkhan.
ZONE - 9 Khuzdar, Turbat, Kalat, Kharan, Washuk, Chagai, Nushki, Panjgor, Awaran,
WAPDA
(i)
WCSR-2013 (Zone-2)
6. WCSR-2013 has been revised by incorporating basic rates of material, labour and
machinery usage for the month of November-December 2012, mostly from a subsidiary
of Pakistan Engineering Council (PEC), being reliable single source of cost data in the
construction industry. Price inflation factor has also been considered where costs of
some inputs were not available in order to bring the Schedule rates at prevailing
market level.
7. Twenty percent (20%) profit and overhead charges have been included in Rate
Analysis of composite rates, whereas three percent (3%) sundry charges have been
added only to the labour component of Rate Analysis. These factors have been worked
out considering an average rated Contractor registered/licensed with PEC.
8. The cost estimate valued on the basis of above factors, if comes out to be more than
Rs 1000 million, the same shall be adjusted by applying a premium of ten percent
(10%) on composite rates, in order to cater head office/establishment charges for
significantly big Contractors and accordingly to have a trustworthy cost estimate.
9. The Composite Items of Rates for each Zone constitute full compensation for the
completed items of works in that Zone. In cases where composite items of works do
not exist in this Schedule, the special governing conditions like distance from source of
supply to the nearest District/City Head Quarter, site of works and cost of availability of
water etc. including Contractors overhead and profit, shall be considered, in order to
prepare realistic composite rates for cost estimates.
10. The rates for items of works not covered by this Schedule shall be prepared and
approved by the respective Chief Engineers as non-scheduled items.
11. The general order/arrangement of listing of items has been kept on lines of previous
Schedule. Some improvements in different sections have been made in WCSR-2013,
whereas some obsolete Items of works have been deleted.
12. The Composite rates and the basic material, labour and machinery usage rates listed
in this Schedule are for the purpose of preparation of cost estimates for WAPDA
Projects. Therefore, neither the Contractor shall use these rates for making claim nor
shall be used for hiring labour on daily wages, under a specific preference of choice.
13. During 1998, the Authority for the guidance of its different formations published
"WAPDA Standard Specifications" of material and execution of works and "WAPDA
Drafting Standards" for material, labour and machinery usage.
14. The applicability of this Schedule is based on WAPDA Standard Specifications for
material and execution of works, 1998 (3 volumes). In case WAPDA Standard
Specifications of any work are not given in the WCSR-2013, Standard Specifications
issued by Punjab Highway and Building Departments, Public Health Engineering
Department, National Highway Authority and C. E. (Design) NTDC may be followed.
15. In case of any question regarding applicability of any particular rate, omission and
error, the matter immediately be referred to the Director (Rates), C&M, Water, WAPDA,
527- WAPDA House, Lahore for clarification. The Steering Committee (WCSR) or
Director (Rates) cannot accept any legal responsibility or liability for any error or
omission that may have been made while preparing the cost data.
16. This Schedule of Rates will be effective from January 1st 2013 and all orders,
instructions and circulars issued by the Authority or any agency there under from time
to time on this issue, shall stand repealed.
WAPDA
( ii )
WCSR-2013 (Zone-2)
17. The assignment is completed by the Rates Directorate, C&M Division, Water under the
technical support of Steering Committee, which comprises the following:
Engr: Muhammad Ali Shah
Ex-General Manager (C&M) Water
Convener
Member
Member
Member
Secretary
18. Following officers were also involved in the preparation of WCSR-2013 and assisted
the Steering Committee:
Engr: A.Z.K. Durrani,
Manager (Civil), NTDC
Engr: Riaz Ali Shah
Director , CCC, WAPDA
Engr: Safadar Ali Khan
Dy. Director Design (CDO) Water
Engr: Muhammad Jaffer,
Dy. Director (Rates) C&M Water
Engr; Javed Iqbal Cheema
SDO (Electrical), Building Circle, WAPDA
Engr: Umer Farooq
Jr. Engineer (Rates) C&M Water
19. The General Manager (C&M) Water would like to acknowledge with gratitude to
Mr. Muhammad Hanif, General Manager CCC WAPDA for providing valuable guidance
in the preparation of Schedule of Rates and appreciations are placed on record for the
work, dedicatedly carried out by Mr. Jawaid Akhtar Latif, Director (Contracts) C&M for
updating WCSR-2013.
20. Any suggestion for improvement in the Schedule of Rates would be welcomed.
(Sherin Khan)
General Manager (C&M) Water
Convenor Steering Committee (WCSR)
WAPDA
( iii )
WCSR-2013 (Zone-2)
Description
AASHTO
AC
Asbestos Cement
AC
Alternate Current
ACI
ACSR Conductor
APM
APM
ASTM
B WG
BC Batten
BCP
BG
Broad Gauge
cc
Cubic Centimetre
CDO
CI
Cast Iron
CP
Chromium Plated/Painted
cum
Cubic metre
DMO
DPC
DW Board
DW Board
ECC
EI Shade
ETA type
FICO
GI
Galvanised Iron
gm
Grams
HP
Horse Power
HT wire
kg
Kilogram
KGO
km
Kilometre
KM Stone
L&T Section
WAPDA
( iv )
WCSR-2013 (Zone-2)
Abbreviation
& Symbol
Description
LT wire
ltr
Litre
Metre
MG
Metre Gauge
mm
Milimetre
Mpa
Maga Pascal
MS
Mild Steel
NG
Narrow Gauge
No
Number
OF
Open Flume
oz
Ounce
Pa
Pascal
P.Trap
PB
PC Pole
PCC
PE
Polyethylene
PP
Polypropylene
psi
PVC
Polyvinyl Chloride
RB
Reinforced Brick
RCC
RCC
rpm
S.Trap
sqm
Square Metre
SW Board
SW Board
SW Board
Switcher Board
SWG
SWO
UPVC
WC
Water Course
WC
Water Closet
WI
Wrought Iron
Diametre
WAPDA
(v)
WCSR-2013 (Zone-2)
CONVERSION FACTORS
TO CONVERT
INTO
MULTIPLY BY
LENGTH
Inch
Millimetre
25.400
Millimetre
Inch
0.039
Foot
Metre
0.305
Metre
Foot
3.281
Yard
Metre
0.914
Metre
Yard
1.094
Mile
Kilometre
1.609
Kilometre
Mile
0.621
Kilometre
1.524
Kilometre
Canal Mile
0.656
Metre
1,852.000
Metre
1,853.180
Kilogram
0.454
Kilogram
Pound
2.205
Ounce
Gram
28.350
Gram
Ounce
0.035
Quintal
Kilogram
100.000
Hundred Weight
Kilogram
50.802
Tonne
Hundred Weight
19.684
Ton
Kilogram
Ton
Tonne
1.016
Tonne
Ton
0.984
Tonne
0.907
1,016.046
AREA
Square Inch
Square Millimetre
Square Millimetre
Square Inch
0.002
Square Foot
Square Metre
0.093
Square Metre
Square Foot
10.764
Square Yard
Square Metre
0.836
Square Metre
Square Yard
1.196
Acre
Square Metre
Acre
Hectare
0.405
Hectare
Acre
2.471
Hectare
Square Metre
Square Mile
Square Kilometre
WAPDA
( vi )
645.160
4,046.856
10,000.000
2.590
WCSR-2013 (Zone-2)
TO CONVERT
INTO
MULTIPLY BY
Square Kilometre
Square Mile
0.386
Square Mile
Hectare
Hectare
Square Mile
0.004
Gallon (Imperial)
Litre
4.546
Cubic Foot
Litre
28.317
Cubic Metre
Litre
1,000.000
Litre
Cubic Foot
Cubic Inch
Millilitre
16.387
Millilitre
28.413
Litre
Gallon (Imperial)
0.220
Cubic Inch
Cubic Millimetre
16,387.100
Cubic Foot
Cubic Metre
0.028
Cubic Metre
Cubic Foot
35.315
Cubic Yard
Cubic Metre
0.765
Cubic Metre
Cubic Yard
1.308
Acre Foot
Hectare Metre
0.123
0.305
0.005
1.097
0.911
0.477
0.621
1.609
Kilogram Force
Newton
9.807
Newton
4.448
Ton Force
Kilo Newton
9.964
Newton
Pound Force
0.225
Kilo Newton
Ton Force
0.100
258.999
0.035
VELOCITY/SPEED
FORCE
14.594
PRESSURE (l Pa = I N/m)
Pound Force Per Square Foot
Pascals
47.8803
Kilo Pascals
6.89476
Kilo Pascals
107.252
Kilo Pascals
20.8354
WAPDA
( vii )
WCSR-2013 (Zone-2)
TO CONVERT
INTO
MULTIPLY BY
Mega Pascals
15.4443
Mega Pascals
145.038
1.488
0.672
0.631
392.298
4.882
0.205
16.019
16.019
0.062
0.062
0.028
28.317
0.076
0.069
0.007
2.825
0.354
Radian
0.017
VOLUME/RATE OF FLOW
FUEL CONSUMPTION
PLANE ANGLE
Degree
WORK, ENERGY, POWER (1J = 1Ws)
Kilowatt Hour
Kilo Joule
Joule
1.356
Horse Power
Kilowatt
0.746
Horse Power
WAPDA
( viii )
3,600.000
76.040
WCSR-2013 (Zone-2)
SECTION-1
Unit
50 m
111.79
50 m to 500 m
50 m
15.82
500 m to 1 km
50 m
11.65
km
353.27
nd
km
64.31
rd
3 km
4th km
km
km
56.86
51.84
5th km
2 km
km
47.22
th
km
45.01
th
km
42.01
6 km
7 and subsequent kms.
2.
Rate
(Rs)
4
Specification
Remark
1.1 (30 m
lead is
converted
into 50 m)
Cement in bags
not
considered
under this item.
-do-
50 m
90.33
50 m to 500 m
500 m to 1 km
50 m
50 m
13.22
9.77
1st km
2nd km
km
km
285.96
52.05
3rd km
km
46.02
th
km
42.01
th
km
38.19
th
km
36.37
th
km
33.97
4 km
5 km
6 km
7 and subsequent kms.
3.
WAPDA
-do50 m
56.27
1-1
WCSR-2013 (Zone-2)
Sr.
No.
1
Description
2
50 m to 500 m
3
50 m
500 m to 1 km
Over one km;
50 m
1st km
148.31
2 km
3rd km
km
km
26.92
23.91
4th km
km
21.71
th
km
19.90
th
km
km
18.89
17.68
5 km
6 km
7th and subsequent kms.
50 m
1.27
50 m to 500 m
50 m
0.18
500 m to 1 km
Over one km;
50 m
0.13
km
3.61
nd
km
0.61
rd
km
0.61
2 km
3 and subsequent kms
5.
-do-
1.1
Carriage of cement in
bags (50 kgs).
Upto 50 m
1st km
Remark
5.07
km
nd
4.
Rate
Specification
(Rs)
4
5
6.87
Unit
50 m
50 m
1.36
0.61
1st km
2nd to 6th km
km
km
11.46
4.83
km
2.21
Measured in the
shape of compact
round
bundles
and of the size
specified for work.
6.
WAPDA
-do-
50 m
19.82
50 m to 500 m
50 m
3.19
500 m to 1 km
Over one km;
50 m
2.36
1st km
2nd km
3rd to 6th km
km
km
km
59.69
9.85
8.84
km
4.43
1-2
WCSR-2013 (Zone-2)
Sr.
Description
No.
1
2
7. Carriage
of
light
machinery weighing upto
1000 kg.
Upto 50 m
50 m
155.24
50 m
10.43
km
km
298.62
3 km
4th km
km
km
46.02
34.96
5th km
50 m to 1 km
Over one km;
1st km
nd
2 km
rd
km
34.96
km
24.12
th
km
16.48
Specification
Remark
5
1.1
For machines
weighing 1000 to
1500 kgs rate be
increased by 50%
and for machines,
weighing 1500 to
3000 kgs rate
be increased by
100%.
46.02
th
6 km
8.
Rate
(Rs)
4
Unit
-do-
Carriage
of
small
consignment
weighing
upto 250 kg (job rates)
Upto 50 m
50 m
20.06
50 m to 1 km
50 m
1.68
km
km
46.02
7.64
2 km
rd
3
10.
For consignments
weighing 250 to
500 kgs rate be
increased by 50%
and for
consignments,
weighing 500 to
1000 kgs rate
be increased by
100%.
-dokm
49.23
km
18.69
km
12.05
Carriage of Asbestos
Cement pipes BSS Class
'B' with cement joints and
rubber ring, including
loading unloading and
stacking (Rate per 30 m
pipes).
1.1 to 1.2
which ever is
applicable
i) 75 mm
Upto 50 m
50 m
4.83
50 m to 500 m
50 m
0.83
500 m to 1 km
50 m
0.61
km
14.75
km
km
1.60
1.60
2 km
3rd km
WAPDA
1-3
WCSR-2013 (Zone-2)
Sr.
No.
1
Rate
Specification
(Rs)
4
5
1.20
1.20
Description
Unit
2
4 km
5th km
3
km
km
6th km
km
1.20
km
0.61
Upto 50 m
50 m to 500 m
50 m
50 m
5.90
0.96
500 m to 1 km
50 m
0.71
1st km
2nd km
km
km
17.22
2.21
3rd km
th
th
Remark
6
ii) 100 mm
km
1.60
th
km
1.60
th
km
1.60
th
km
1.60
th
km
0.63
Upto 50 m
50 m to 500 m
50 m
50 m
8.30
1.49
500 m to 1 km
50 m
1.09
4 km
5 km
6 km
7 and subsequent kms.
iii) 150 mm
km
26.22
nd
km
5.42
rd
3 km
4th km
km
km
2.81
2.21
5th km
2 km
km
2.21
th
km
2.21
th
km
1.20
Upto 50 m
50 m
14.86
50 m to 500 m
50 m
2.50
500 m to 1 km
50 m
1.85
km
44.86
2 km
3rd km
km
km
5.02
5.02
4th km
6 km
7 and subsequent kms.
iv) 200 mm
km
3.82
th
km
3.82
th
km
km
3.21
1.60
5 km
6 km
7th and subsequent kms.
WAPDA
1-4
WCSR-2013 (Zone-2)
Sr.
No.
1
Description
2
v) 250 mm
Unit
Rate
(Rs)
4
Upto 50 m
50 m
23.14
50 m to 500 m
500 m to 1 km
50 m
50 m
3.93
2.90
1st km
2nd km
km
km
70.31
8.23
3rd km
Specification
Remark
km
7.03
th
km
6.63
th
5 km
6th km
km
km
5.42
5.42
km
2.81
Upto 50 m
50 m to 500 m
50 m
50 m
31.43
5.33
500 m to 1 km
50 m
3.93
1st km
2nd km
km
km
95.07
10.85
3rd km
4 km
vi) 300 mm
km
9.85
th
km
8.84
th
5 km
6th km
km
km
7.64
7.03
km
7.03
Upto 50 m
50 m
60.70
50 m to 500 m
50 m
10.30
500 m to 1 km
50 m
7.59
4 km
vii) 400 mm
km
183.56
nd
km
21.31
rd
km
19.09
th
4 km
5th km
km
km
16.48
14.87
6th km
km
14.26
km
7.64
2 km
3 km
th
WAPDA
Upto 50 m
50 m
103.49
50 m to 500 m
50 m
17.59
500 m to 1 km
50 m
12.95
1-5
WCSR-2013 (Zone-2)
Sr.
No.
1
Description
2
Over one km;
1st km
Rate
(Rs)
4
Unit
3
km
312.96
nd
km
36.17
rd
km
32.75
th
4 km
5th km
km
km
28.53
25.72
6th km
km
24.12
km
13.06
Upto 50 m
50 m
113.95
50 m to 500 m
50 m
19.37
500 m to 1 km
Over one km;
50 m
14.25
2 km
3 km
th
Specification
Remark
ix) 508 mm
1st km
km
323.13
nd
km
39.67
rd
3 km
4th km
km
km
35.92
31.30
5th km
2 km
km
28.22
th
km
26.46
th
km
14.33
Upto 50 m
50 m
129.05
50 m to 500 m
50 m
21.93
500 m to 1 km
Over one km;
50 m
16.14
6 km
7 and subsequent kms.
x) 600 mm
1st km
km
366.07
nd
km
44.81
rd
3 km
4th km
km
km
40.39
35.57
5th km
2 km
km
31.75
th
km
29.54
th
km
16.48
6 km
7 and subsequent kms.
11.
WAPDA
1.1 to 1.2
which ever is
applicable
50 m
50 m
50 m
11.40
1.93
1.42
1-6
WCSR-2013 (Zone-2)
Sr.
No.
1
Description
2
Over one km;
1st km
Rate
(Rs)
4
Unit
3
km
32.28
nd
km
3.98
rd
km
3.62
th
4 km
5th km
km
km
3.62
2.66
6th km
km
2.66
km
1.33
Upto 50 m
50 m
18.86
50 m to 500 m
50 m
3.20
500 m to 1 km
Over one km;
50 m
2.36
2 km
3 km
th
Specification
Remark
ii) 63 mm
1st km
km
53.48
nd
km
6.51
rd
3 km
4th km
km
km
5.91
5.30
5th km
2 km
km
4.58
th
km
4.22
th
km
2.29
Upto 50 m
50 m
27.50
50 m to 500 m
50 m
4.67
500 m to 1 km
Over one km;
50 m
3.44
6 km
7 and subsequent kms.
iii) 75 mm
1st km
km
78.01
nd
km
9.52
rd
3 km
4th km
km
km
8.56
7.60
5th km
2 km
km
6.87
th
km
6.27
th
km
3.62
Upto 50 m
50 m
38.91
50 m to 500 m
50 m
6.61
500 m to 1 km
50 m
4.87
6 km
7 and subsequent kms.
iv) 100 mm
2 km
WAPDA
km
110.37
km
13.51
1-7
WCSR-2013 (Zone-2)
Sr.
No.
1
Rate
Specification
(Rs)
4
5
12.18
10.49
Description
Unit
2
3 km
4th km
3
km
km
5th km
km
9.52
km
km
8.92
4.94
Upto 50 m
50 m
68.78
50 m to 500 m
500 m to 1 km
50 m
50 m
11.69
8.61
km
195.08
2 km
3rd km
km
km
23.99
21.70
4th km
rd
th
6 km
7th and subsequent kms.
Remark
6
v) 125 mm
km
17.12
th
km
15.80
th
km
km
14.95
12.05
Upto 50 m
50 m
101.67
50 m to 500 m
500 m to 1 km
50 m
50 m
17.28
12.73
km
288.39
2 km
3rd km
km
km
35.45
32.19
4th km
km
27.98
5 km
6th km
km
km
24.95
23.27
km
12.78
Upto 50 m
50 m to 500 m
50 m
50 m
161.57
27.46
500 m to 1 km
50 m
20.22
1st km
2nd km
km
km
458.24
56.04
3rd km
5 km
6 km
7th and subsequent kms.
vi) 150 mm
th
vii) 200 mm
km
50.92
th
km
44.29
th
km
39.88
th
km
37.08
4 km
5 km
6 km
WAPDA
1-8
WCSR-2013 (Zone-2)
Sr.
No.
1
Description
Unit
2
7 and subsequent kms.
3
km
th
Rate
Specification
(Rs)
4
5
20.23
Remark
6
viii) 250 mm
Upto 50 m
50 m
255.11
50 m to 500 m
50 m
43.37
500 m to 1 km
50 m
31.93
km
723.62
2 km
3rd km
km
km
88.48
80.41
4th km
km
69.99
th
km
62.79
th
km
km
58.81
32.76
Upto 50 m
50 m to 500 m
50 m
50 m
363.07
61.70
500 m to 1 km
50 m
45.43
5 km
6 km
7th and subsequent kms.
ix) 300 mm
km
km
1029.76
125.92
3rd km
km
114.43
th
km
99.54
th
5 km
6th km
km
km
89.61
83.33
km
45.45
Upto 50 m
50 m to 500 m
50 m
50 m
462.71
78.66
500 m to 1 km
50 m
57.92
4 km
x) 350 mm
km
km
1312.48
160.48
3rd km
km
145.85
4 km
5th km
km
km
126.94
113.88
6th km
km
106.67
km
59.41
th
th
WAPDA
1-9
WCSR-2013 (Zone-2)
Note:
1
The rates for items not in this Schedule can be deduced from these basic rates on the following
assumption;
Quantities of different materials equivalent to 1000 No. bricks 225x113x75 mm size,
3.0 cu.m. or 5 ton weight with almost similar amount of labour involved in loading,
unloading and stacking shall have rates equivalent to these basic rates. Fluctuation if any
shall be proportionate to the increase or decrease in the weight, volume or labour
involved.
The rates are applicable to carriage of materials on pacca roads only. For kacha roads an
allowance of extra 25% shall be allowed for 2nd and subsequent Kilometre rates. Rates upto
1st Kilometre is however common to both kacha and pacca roads.
For hilly areas, 25% above the rates in the plain areas shall be allowed for total Kilometres
covered.
In case of articles longer than 4.50 m carried in trucks, the following rates shall be allowed as
under:
a) Above 4.50 to 7.50 m :- Total rate to be paid for 4.50 m to 7.50 m length will be
1.5 times the rates given in the Composite Schedule of Rates.
b) Above 7.50 m :- The total rates to be paid for above 7.50 m length will be 2 times of
the rate given in Composite Schedule of Rates.
The rate included loading and unloading of material and conveyance and staking as directed.
WAPDA
1-10
WCSR-2013 (Zone-2)
(B)
Sr.
Description
No.
1
2
1. Loading or unloading earth,
sand, silt, Shingle, surkhi,
ashes, kankar, brick ballast,
coal, and lime etc. laid/piled
and stacked lead within
30m.
2.
Unit
3
cum
Rate
(Rs)
4
100.88
Loading
or
unloading
bricks/tiles properly laid and
stacked lead within 30 m.
Specification
Remark
5
1.2
-do-
a) 225 mm or larger.
1000 no
378.39
1000 no
302.63
3.
Loading
or
unloading
cement in bags and stacking
within 30 m.
100 bags
378.39
-do-
4.
100 bags
36.37
-do-
5.
1000 kg
60.89
-do-
6.
Loading
or
unloading
structural steel, steel joist
and other steel items.
1000 kg
181.66
-do-
7.
Loading or unloading up to
225 litres drum full, lead upto
30 m.
each
24.31
-do-
8.
Loading
or
unloading
packages or stocks all sorts
upto 50 kg (except cement,
jute or paper bags).
each
12.05
-do-
9.
1000 kg
85.41
-do-
10.
Loading
or
unloading
bhoosa lead upto 45 m.
100 kg
24.31
-do-
11.
1000 kg
151.32
-do-
12.
Loading
or
unloading
pitching stone or spawl of
any gauge (clear distance
1.50m).
cum
226.98
1.2
WAPDA
1-11
WCSR-2013 (Zone-2)
Sr.
Description
No.
1
2
13. Loading
or
unloading
building
stone
(clear
distance 1.50m).
14.
3
cum
Rate
(Rs)
4
302.64
84.00
1000 litre
84.00
cum
1000 kg
33.13
138.45
100 no
190.70
100 no
380.80
Specification
Remark
5
-do-
-do1000 litre
15.
Unit
-docum
53.45
1000 no
438.87
1000 kg
229.98
d) Broad gauge
sleepers.
wooden
100 no
2421.65
100 no
1383.34
f)
crossing
100 no
808.23
16.
1000 kg
193.71
-do-
17.
1000 kg
96.86
-do-
18.
Loading
wooden
broad
gauge sleepers including
lead 30 m and stacking.
100 no
605.47
-do-
19.
100 no
302.63
1.2
WAPDA
Bridge
timber.
and
1-12
WCSR-2013 (Zone-2)
Sr.
Description
No.
1
2
20. Loading wooden metre/
narrow
gauge
sleepers
including lead upto 30 m and
stacking.
3
100 no
Rate
(Rs)
4
332.97
Unit
Specification
Remark
5
-do-
21.
100 no
160.36
-do-
22.
cum
100.88
-do-
23.
Unloading
bridge
and
crossing timber including
lead upto 30m and excluding
stacking.
cum
53.45
-do-
WAPDA
1-13
WCSR-2013 (Zone-2)
SECTION-2
Description
Unit
Earthwork
excavation
undressed lead of a
single throw of shovel.
a) In ashes, sand, soft
soil or silt clearance
b) In ordinary soil.
2.
Earthwork excavation in
ashes, sand and soft soil
or
silt
clearance,
undressed lead upto
30 m.
3.
4.
5.
Excavation in shingle or
gravel formation and rock
not requiring blasting
undressed lead upto
50 m.
a) Dry
WAPDA
cum
78.31
cum
94.33
cum
115.10
cum
cum
2.1 to
2.8
which
ever is
applica
ble
Remark
7
.
-do-
146.54
180.36
-do-
398.09
b) Wet
cum
460.98
c) In flowing water
cum
586.75
Earthwork excavation in
irrigation channels, drains
etc., dressed to designed
section
grades
and
profiles,
excavated
material disposed off and
dressed within lead of
30 m.
a) Ordinary soil
Specifi
cation
6
-do-
cum
-do-
cum
171.80
b) Hard soil
cum
205.62
cum
cum
241.22
449.34
Rate (Rs)
Labour Composite
4
5
Excavation
in
rock
dressed to designed
section,
grades
and
profiles,
excavated
material disposed off
within lead of 50 m and
lift upto 1.5 m.
-do-
2-1
WCSR-2013 (Zone-2)
Sr.
No.
1
7.
Description
Unit
2
a) Soft rock slate, shale
schist or laterite work
with pick and crow
bar.
b) Medium hard rock
requiring occasional
blasting.
3
cum
Grade-I
Grade-II
Grade-III
Grade-IV
Grade-V
Grade-VI
8.
9.
11.
WAPDA
639.02
cum
cum
cum
cum
cum
cum
369.40
400.96
479.71
535.47
592.56
639.05
cum
cum
3.56
cum
4.15
Re-handling of earthwork
a) Lead
upto
single
throw of shovel.
cum
52.21
b) Upto a lead of 30 m.
cum
73.57
Re-handling of gravel
work or excavated rock
lead upto 30 m.
cum
209.43
2-2
Specifi
cation
6
Remark
7
661.15
10.
cum
Rate (Rs)
Labour Composite
4
5
524.65
2.1 to
2.8
which
ever is
applica
ble
Reduce the
rate by 10% if
the excavated
section is not
dressed or
leveled to
designed
section.
-do-
Add 100% to
the rate as
applicable in
item 7.
-do-
Carriage
of
material will
be paid for
lead
more
than 1 km.
391.53
437.92
523.97
587.03
651.65
705.44
-do-
-do-
WCSR-2013 (Zone-2)
Sr.
Description
No.
1
2
12. Dressing and leveling of
earthwork to designed
section complete.
Unit
3
Rate (Rs)
Labour Composite
4
5
Specifi
cation
6
2.1 to
2.8
which
ever is
applica
ble
cum
7.43
cum
15.37
cum
29.77
13.
cum
192.82
-do-
14.
8.87
-do-
15.
Earthwork
compaction
(soft, ordinary or hard soil)
a) Laying
earth
in
150 mm layers /
leveling dressing and
watering
for
compaction
etc.
complete.
-docum
27.67
36.85
As per ASTMD698 /
AASHTO-T99
or as specified
by the
Engineer.
b) Compaction by roller.
i) Soft or sandy soil
cum
35.94
40.71
cum
42.44
47.21
cum
47.19
51.96
iv) Admixture of
shingle
cum
53.68
58.45
c) Ramming earthwork
(all type of soil)
cum
31.44
d) Ramming earthwork
behind retaining wall.
cum
42.12
16.
Excavation in puddling
slush
including
dewatering
through
mechanical means and
arrangements.
cum
167.90
17.
Earthwork excavation in
open cutting upto 1.5 m
depth for storm water
channels, drains, salluge
WAPDA
Remark
196.04
-do-
-do-
2-3
WCSR-2013 (Zone-2)
Sr.
No.
1
18.
Unit
2
drains in open areas,
roads, streets, lanes
including under pinning of
walls and shoring to
protect existing works,
shuttering and timbering
to trenches, dressing
sides to true alignment,
shape, dimensions and
level to correct limit and
grade, removal of surface
water from trenches,
back filling and surplus
excavated
material
disposed off and dressed
within 30 m.
i) In ordinary soil
cum
184.34
cum
198.02
cum
287.17
Excavation
in
open
cutting for sewer and
manholes as shown in
drawing,
dressing
to
correct
section
and
dimension according to
template and levels and
removing surface water
in all types of soil shingle,
gravel and rock.
i) 0 2.0 m
ii) 2.0 - 4.5 m
iii) above 4.5 m
19.
20.
WAPDA
Rate (Rs)
Labour Composite
4
5
Description
Excavation of trenches
for water supply pipe
lines in all kinds of soil,
hard, average or soft
Upto 1.5 m depth from
ground level, including
trimming, dressing sides,
leveling the bed of trench
Specifi
cation
6
2.1 to
2.8
which
ever is
applica
ble
Remark
7
-do-
cum
cum
183.17
251.55
cum
335.20
-do-
sqm
39.45
194.05
sqm
sqm
49.84
56.06
255.29
312.38
cum
188.66
2-4
-do-
WCSR-2013 (Zone-2)
Sr.
No.
1
Description
Unit
21.
22.
Excavation in foundation
of buildings, bridges and
other structures including
dibbling dressing, refilling
around structure with
excavated earth, watering
and ramming lead upto
30 m and lift upto 1.5 m.
a) In sand, ashes or
loose soil.
b) In ordinary soil.
Rate (Rs)
Labour Composite
4
5
1.78
Specifi
cation
6
2.1 to
2.8
which
ever is
applica
ble
193.16
cum
226.92
cum
254.18
23.
cum
1538.69
1724.66
-do-
24.
Extra
for
excavation
requiring shoring.
cum
28.77
63.74
-do-
25.
Filling
watering
and
ramming earth under
floors with surplus earth
from foundation.
cum
102.59
-do-
26.
Filling
watering
and
ramming earth under
floors with new earth
(excavation from outside)
lead upto 30 m and lift
upto 1.5 m.
cum
173.51
-do-
27.
cum
229.54
-do-
28.
Dressing of banks
ground surface.
sqm
9.38
-do-
29.
km
1325.99
-do-
WAPDA
-do-
cum
or
Remark
2-5
WCSR-2013 (Zone-2)
Sr.
No.
1
30.
31.
32.
Description
Unit
2
Turfing slopes of banks or
lawns with grass sods
including plugging, laying,
setting and watering (turf
got from within a distance
of
10kms
and
maintenance
for
15
days).
3
sqm
Berm cutting
a) Lead upto a single
throw of shovel.
b) Upto 30 m.
Both sides Berm trimming
including channel 1.0 m
wide:
a) Upto 1.0 m depth
b) From 1.0 - 1.5 m
depth
c) From 1.5 - 2.5 m
depth
Rate (Rs)
Labour Composite
4
5
255.70
cum
94.33
cum
146.54
Specifi
cation
6
2.1 to
2.8
which
ever is
applica
ble
Remark
7
-do-
-dokm
km
5321.32
7059.36
km
11194.9
8
33.
-do-
34.
-do-
Extra Rs.15
may be paid
for ploughed
land.
-do-
For ordinary
soil.
36.
WAPDA
Earthwork by boat.
a) Digging and loading
into boat upto 15 m.
31.85
43.40
cum
157.22
cum
63.07
cum
4.16
cum
73.57
Unloading
trucks.
cum
62.89
earth
from
2-6
-do-
WCSR-2013 (Zone-2)
Sr.
No.
1
37.
Description
Unit
2
Termite proofing with
approved chemicals.
i) Pre Construction:
ii)
Post Construction:
Rate (Rs)
Labour Composite
4
5
sqm
46.87
130.49
Per
hole
51.62
118.52
Specifi
cation
6
2.1 to
2.8
which
ever is
applica
ble
Remark
7
Drilling depth
450-600 mm
EARTHWORK BY
MECHANICAL MEANS
38.
39.
Borrow area
to be
approved by
the Engineer/
Employer.
i)
Dry
cum
68.86
ii)
cum
73.92
cum
82.95
ii)
cum
86.72
iii) Slush
cum
90.81
cum
114.59
40.
cum
6.21
41.
WAPDA
Carriage of
material will
be paid for
lead more
than 1 km.
As per ASTMD1557 /
AASHTO-T180
or as specified
by the
Engineer.
2-7
WCSR-2013 (Zone-2)
Sr.
No.
1
Description
Unit
Rate (Rs)
Labour Composite
4
5
2
complete in all respects.
cum
42.44
89.30
cum
42.44
85.47
Specifi
cation
6
Remark
7
CONVERSION TABLE
In the case of earthwork measurement where extra lead is to be paid for lift the method will be as
follows:
The lift will be measured from the centre of gravity of the excavated earth to that of placed earth. This
will constitute the mean lift for the section.
When earth has to be carried over a spoil bank and dumped beyond it the mean lift would be the
difference in level between the centre of gravity of the excavated earth and the top of the spoil bank
omitting the dowel.
The equivalent leads for various means lifts are given below:
Lift in Meters
0.5
1.0
1.5
2.0
Conversion
factor
8
10
Equivalent Horizontal
lead in Meters
4
8
15
20
25
36
3.5
47
4.0
4.5
5.0
5.5
6.0
6.5
7.0
2.5
3.0
60
75
92
110
130
152
175
7.5
8.0
200
216
8.5
230
9.0
27
243
9.5
257
10.0
270
Note:
These conversion factors also incorporate allowance for extra lead due to cross lead with a view
to ensuring a uniform system. The equivalent lead will be added to the horizontal lead to get the
total lead to be paid. The exact site or R.D.s between which extra lead is to be given must be
recorded in the first column of detailed measurements in the Measurement Book.
WAPDA
2-8
WCSR-2013 (Zone-2)
SECTION- 3
DISMANTLING (DEMOLITION)
1.
Composite rate for all finished works include the removal of surplus debris, unused
material and by products.
2.
The composite rates constitute full compensation for the completed items of the works
as per drawings, specifications and instructions of Engineer Incharge including all
labour and material/equipment required for the finished work.
Sr.
No.
1
1.
Rate (Rs)
Labour Composite
4
5
Specifi
cation
6
Description
Unit
STONE WORK
Dismantling dry stone
masonry.
cum
177.98
3.1 to
3.3
stone
cement
cum
625.23
-do-
2.
Dismantling
masonry
in
mortar.
3.
Dismantling dry
spall pitching.
stone
cum
314.44
-do-
4.
Dismantling stone or
spall pitching and apron
in silted condition.
cum
521.32
-do-
5.
Dismantling
stone
pitching cement grouted.
cum
834.24
-do-
6.
7.
-do-
a) Wooden crates.
cum
416.82
b) Wire crates
cum
521.32
cum
421.29
-do-
Remark
7
Add extra
15%, 30% &
50% on
labour rate
only for 2nd,
3rd, 4th and
subsequent
floors
respectively
against
items No.3,
10, 11, 12,
14, 15, 18,
19, 24, 25,
33, 39, 40
and 41.
BRICK WORK
8.
Dismantling
masonry.
dry
brick
cum
177.12
-do-
9.
cum
886.19
-do-
10.
Dismantling
wall.
cum
208.41
-do-
-do-
perforated
CONCRETE
11.
Dismantling
concrete
cement
cum
573.28
12.
Dismantling
cement
concrete block masonry.
cum
781.69
WAPDA
3-1
WCSR-2013 (Zone-2)
Sr.
No.
1
Rate (Rs)
Labour Composite
4
5
Specifi
cation
6
Description
Unit
Dismantling
cement
concrete under water.
cum
2189.20
3.1 to
3.3
cum
1146.56
-do-
b) Dismantling cement
concrete plain 1:3:6.
cum
1876.29
-do-
c) Dismantling cement
concrete plain 1:2:4
cum
2293.70
-do-
d) Dismantling cement
concrete with brick
aggregate
cum
625.23
-do-
e) Dismantling D.P.C. of
cement
concrete
40mm
thick
and
clearing the site etc
cum
312.91
-do-
Dismantling
cement
concrete
reinforced
separating reinforcement
from concrete cleaning
and straightening the
same.
cum
3753.17
-do-
sqm
38.38
-do-
13.
15.
16.
ROOFING
Dismantling G.I. sheet
roofing.
17.
Dismantling
roof
of
wooden
planks
and
battens.
sqm
45.09
-do-
18.
Dismantling
asbestos
sheets and ridge coping.
sqm
53.60
-do-
19.
Dismantling
roofing.
tile
sqm
95.05
-do-
20.
Dismantling
wooden
ceiling above 6m height
in
difficult
position,
including lifting with care
and special scaffolding
along live electric wires
and
with
machines
underneath.
sqm
172.94
-do-
21.
sqm
127.56
-do-
WAPDA
brick
3-2
Remark
7
WCSR-2013 (Zone-2)
Sr.
No.
1
22.
Rate (Rs)
Labour Composite
4
5
Specifi
cation
6
Description
Unit
sqm
107.83
3.1 to
3.3
sqm
74.46
-do-
sqm
53.99
-do-
sqm
80.09
-do-
Remark
7
FLOORING
23.
Dismantling
brick
concrete flooring.
or
24.
25.
-do-
a) 150 to 300 mm
24.32
b) 300 to 600 mm
33.82
c) 600 to 900 mm
43.90
d) Above 900 mm
42.52
26. a) Removing
door,
window and frame.
no
272.91
-do-
c) Removing Windows
and sky light with
frame.
no
196.77
-do-
27.
no
98.39
-do-
28.
a) Dismantling wooden
beams upto 3.5m in
length
no
148.32
-do-
b) Dismantling wooden
beams from 3.5m to
7.0 m length
no
296.64
-do-
29.
Dismantling
wooden
partition jaffery work.
sqm
37.38
-do-
30.
Dismantling
trusses.
wooden
kg.
10.33
-do-
31.
Dismantling
wooden
palisade fencing.
97.89
-do-
WOODWORK
WAPDA
3-3
WCSR-2013 (Zone-2)
Sr.
No.
1
Description
Unit
Rate (Rs)
Labour Composite
4
5
Specifi
cation
6
Remark
7
IRON WORK
32.
kg.
10.48
3.1 to
3.2
33.
kg.
4.75
-do-
34.
each
45.94
-do-
35.
17.21
-do-
sqm
25.51
-do-
36.
MISCELLANEOUS
Dismantling wire netting
of tennis courts and
frame work.
37.
sqm
48.06
-do-
38.
cum
418.86
-do-
39.
sqm
25.51
-do-
a) Whitewash or colour
wash.
sqm
16.02
-do-
b) Ordinary distemper,
oil bound distemper,
or paint on wall
sqm
48.06
-do-
41.
Dismantling glazed
encaustic tiles etc.
sqm
169.25
-do-
42.
Scraping boulders.
cum
733.29
-do-
43.
cum
366.65
-do-
SCRAPING
40.
WAPDA
or
3-4
WCSR-2013 (Zone-2)
SECTION 4 MORTAR
SECTION- 4
M O R T A R
Dry material required for 1.00 cum Wet (including wastage) mortar.
Cement
(50 kg bag)
Quantity
Sand
(cum)
Cement Sand
1:2
13.64
0.97
1:3
10.23
1.09
1:4
1:5
8.19
6.80
1.16
1.21
1:6
5.85
1.24
1:7
5.12
1.27
1:8
4.55
1.29
1:1:3
7.802
0.415
0.829
1:2:4
1:3:6
6.130
4.290
0.434
0.456
0.869
0.912
1:4:8
3.300
0.468
0.935
1:5:10
2.682
0.475
0.950
Sr. No
Ratio of Mortar
1.
2.
Aggregate
(cum)
Cement Concrete
Mix
1.
2.
Quantity
0.250 cum (25%)
Note:
WAPDA
1)
Cement
2)
Sand
3)
Aggregate
4-1
WCSR-2013 (Zone-2)
SECTION 5 CONCRETE
SECTION- 5
C O N C R E T E
1.
Composite rate for all finished works include the removal of surplus debris, unused
material and by products.
2.
The composite rates constitute full compensation for the completed items of the works
as per drawings, specifications and instructions of Engineer Incharge including all
labour and material/equipment required for the finished work.
Sr.
Description
No.
1
2
1. Cement concrete with
brick or stone ballast 40 to
50mm
size
in
foundation and plinth.
Ratio:
a) 1:3:6
b) 1:4:8
2.
3.
Unit
3
Rate (Rs)
Labour Composite
4
5
cum
1234.54
4800.51
cum
1234.54
4091.72
Specifi
cation
6
5.6
Remark
7
-do-
cum
1690.27
7628.62
b) 1:2:4
cum
1690.27
6748.05
c) 1:3:6
d) 1:4:8
cum
cum
1690.27
1690.27
6010.45
5280.98
Reinforced
cement
concrete
work
using
coarse sand except the
cost
of
steel
reinforcement and its
labour for bending and
binding. This rate also
includes all kinds of
forms
moulds;
lifting
shuttering,
curing,
rendering and finishing
the exposed surface
(including screening and
washing of shingle).
5.6 &
5.10
5-1
WCSR-2013 (Zone-2)
SECTION 5 CONCRETE
Sr.
No.
1
Rate (Rs)
Labour Composite
4
5
Description
Unit
i) 1:2:4
cum
7207.32
13503.95
ii) 1:1:3
cum
7207.32
14375.58
Specifi
cation
6
Remark
7
Ratio:
b) Precast in columns
beams, slab, lintel,
staircases, shelves,
etc.
Ratio:
4.
5.
WAPDA
i) 1:2:4
cum
6840.23
13979.39
ii) 1:1:3
cum
6840.23
13418.42
cum
2004.12
2468.06
cum
838.30
3103.84
6298.81
ii)
4036.28
8483.51
iii) 900 mm
iv) 1200 mm
m
m
5941.70
5993.31
14415.24
18001.29
v)
1600 mm
9458.27
28220.80
vi) 1700 mm
11375.7
5
32092.47
44.50
332.93
600 mm
If plaster is
done to
smoothen
the surface it
should not
be paid for
extra.
5.6 to
5.9
5-2
Crushing
strength of
152x152x
152mm cube
at 28 days of
4000 psi or
compressive
strength of
3600 psi for
15x30 cm
test cylinder.
5.7
WCSR-2013 (Zone-2)
SECTION 5 CONCRETE
Sr.
Description
No.
1
2
6. Supplying and fabrication
of Intermediate grade
deformed reinforcement
for R.C.C. in slabs,
beams, columns and pile
caps, including cutting,
bending laying in position
including cost of binding
wire;
a. 40,000 psi (276 MPa)
yield
b. 60,000 psi (420 MPa)
yield
7.
Unit
3
Rate (Rs)
Labour Composite
4
5
kg
14.34
110.48
kg
14.34
118.16
25.72
144.49
kg
25.72
152.17
8.
Providing
and
fixing
R.C.C.
pre-stressed
battens 60mm x 150mm
x 2 m)
no
105.01
773.10
9.
Construction of precast
cement concrete solid or
face blocks masonry
(1:4:8) including cost of
template in mortar 1:6.
10.
11.
WAPDA
Remark
7
-do-
Specifi
cation
6
5.8
8.1,2.1
5.10
cum
cum
1710.90
2084.84
4854.84
6913.66
Construction of precast
cement concrete solid or
face blocks masonry
(1:3:6) including cost of
template in mortar 1:6.
-do-
cum
cum
1433.87
1754.64
5348.40
5669.16
cum
1651.43
7359.85
5-3
-do-
WCSR-2013 (Zone-2)
SECTION 5 CONCRETE
Sr.
No.
1
Description
Unit
construction
thereof.
of
walls
Rate (Rs)
Labour Composite
4
5
Specifi
cation
6
12.
cum
3624.90
7058.15
5.10
13.
Providing
and
fixing
ornamental cement jalli
50mm
thick
(1:2:4)
without steel.
sqm
409.62
835.04
-do-
14.
cum
838.30
cum
209.43
cum
209.43
16.
Reinforced
cement
concrete spout including
fixing in position (150 x
125 x 800 mm).
each
380.69
17.
Making
holes
upto
450mm deep in cement
concrete or in stone
masonry
walls
and
repairing. (75mm )
per
hole
1065.93
5.5
18.
Skipping
concrete
including mixing.
cum
2947.43
5.6 &
19.3 K
19.
sqm
50.19
20.
41.11
66.21
19.80
WAPDA
Horizontal floor
Glacis and crest
Inverted filters
5.1 &
5.6
15.
a)
b)
c)
Remark
5-4
-do-
742.95
5.6,
5.10
&8.9
5.6.3
WCSR-2013 (Zone-2)
SECTION 5 CONCRETE
Sr.
Description
No.
1
2
21. Erection and removal of
centering for R.C.C. or
plain cement concrete
work:
i) Horizontal
ii) Vertical
Unit
3
Rate (Rs)
Labour Composite
4
5
sqm
sqm
427.77
491.85
485.08
549.16
24.37
173.27
Specifi
cation
6
5.6.2 &
5.6.17
22.
23.
Grouting
cement
concrete between the
grooves
of
gates
including shuttering.
cum
2443.52
20.8
24.
sqm
25.10
-do-
25.
cum
506.12
6140.97
26.
sqm
802.39
1497.22
27.
Concrete,
1:2:4
by
Batching Plant, including
production, haulage and
Placing without formwork.
cum
28.
Roller
Compacted
Concrete
containing
typical, bedding mixtures
of 360 to 460 kg/cum of
cement 170 to 220
kg/cum of fly ash and
4.75 to 50 mm size of
aggregate (ACI 207.5R89)
cum
WAPDA
Remark
7
5.7
12574.95
Composite
rate would
be 25% to
50% less
than rate of
normal
conventional
concrete.
5-5
WCSR-2013 (Zone-2)
SECTION- 6
BRICK WORK
1.
Composite rate for all finished works include the removal of surplus debris, unused
material and by products.
2.
The composite rates constitute full compensation for the completed items of the works
as per drawings, specifications and instructions of Engineer Incharge including all
labour and material/equipment required for the finished work.
Sr.
Description
No.
1
2
1. Bricks work in foundation
and plinth in Cement
sand mortar. Ratio:
1:2
1:3
2.
3.
4.
5.
WAPDA
Unit
3
Rate (Rs)
Labour Composite
4
5
cum
cum
1511.12
1511.12
7132.69
6774.29
1:4
cum
1511.12
6559.05
1:5
cum
1511.12
6404.17
1:6
cum
1511.12
6315.38
cum
1957.55
7579.11
1:3
cum
1957.55
7235.37
1:4
cum
1957.55
7005.47
1:5
1:6
cum
cum
1957.55
1957.55
6862.32
6761.81
Specification
6
6.1 to
6.5
-do-
cum
291.22
Second floor
cum
665.17
Third floor
cum
1038.18
cum
1681.65
Remark
7
Only first
class bricks
shall be
used against
respective
Items of this
section.
Standard
size of bricks
225 x 113 x
75 mm (9 x
4 x 3).
-do-
-do-
cum
cum
1764.04
1764.04
7385.60
7027.21
1:4
cum
1764.04
6811.96
1:5
cum
1764.04
6668.82
1:6
cum
1764.04
6568.30
cum
291.22
6-1
-do-
WCSR-2013 (Zone-2)
Sr.
No.
1
Rate (Rs)
Labour Composite
4
5
Specifi
cation
6
Description
Unit
6.
94.19
211.15
-do-
7.
18.71
113.71
-do-
8.
cum
746.96
9.
cum
409.90
10.
cum
537.53
11.
373.94
642.54
12.
cum
4874.69
13.
Dressing or chamfering
of bricks
WAPDA
6.6
620.15
-do-
6.7
-do-
i) From 3 to 6 m height
ii) Above 6 m height
14.
Remark
10153.24
6.1 to
6.5
-do-
a) Special architectural
shape.
no
30.85
no
21.56
6.14
WCSR-2013 (Zone-2)
Sr.
No.
1
Description
Unit
1:2
1:3
1:4
1:5
1:6
sqm
sqm
sqm
sqm
sqm
Ratio:
15.
18.
WAPDA
sqm
sqm
sqm
sqm
6.1& 6.5
sqm
sqm
sqm
sqm
sqm
447.02
447.02
447.02
447.02
447.02
1306.28
1251.55
1218.97
1196.83
1181.57
-do-
sqm
sqm
66.65
202.84
Third floor
sqm
357.29
sqm
512.08
44.12
101.25
157.79
256.04
First floor
Second floor
subsequent
Remark
6.14
4th
and
floors
Specifi
cation
6
729.22
701.86
685.53
675.02
667.68
17.
304.06
304.06
304.06
304.06
304.06
16.
Rate (Rs)
Labour Composite
4
5
6.8
sqm
202.38
838.30
sqm
202.38
837.42
sqm
158.30
593.87
sqm
161.66
596.35
6-3
WCSR-2013 (Zone-2)
Sr.
No.
1
21.
Description
Unit
2
Eaves
brick
molded
weathered and throated
with back bricks or drip
course cornice in 1:3
cement sand mortar.
i) 75 mm
ii) 115 mm
22.
Laying
dressed
or
molded brick cornice in
1:6 cement sand mortar,
plastering or pointing
complete.
i) One brick
ii) Two bricks
iii) Three bricks
iv) Four bricks
m
m
Rate (Rs)
Labour Composite
4
5
91.54
105.25
m
m
m
m
105.25
153.98
206.01
259.22
Scraping or cleaning
bricks dismantled from
masonry.
no.
0.93
24.
cum
67.67
25.
196.06
256.62
161.47
309.47
485.84
662.72
6.1 to
6.5
712.62
9.6.4/
19.4(L)
20.8
sqm
sqm
sqm
208.00
208.00
217.79
505.86
560.27
739.05
26.
Vertical
damp
proof
course of 20 mm thick
cement plaster 1:2 with
bitumen at 1 kg per
sqm.
sqm
193.77
404.99
-do-
27.
cum
2001.05
7576.89
20.8
WAPDA
Remark
6.9
23.
a) 40 mm
b) 50 mm
c) 75 mm
Specifi
cation
6
6.1 to
6.5
6-4
WCSR-2013 (Zone-2)
Sr.
No.
1
Description
Unit
Drawing No.
301-5-B/63
Rate (Rs)
Labour Composite
4
5
Specifi
cation
6
CDO(W)
28.
cum
1512.05
6775.75
20.8
29.
cum
2048.32
7312.02
-do-
WAPDA
Remark
6-5
WCSR-2013 (Zone-2)
SECTION- 7
STONE MASONRY
1.
Composite rate for all finished works include the removal of surplus debris, unused
material and by products.
2.
The composite rates constitute full compensation for the completed items of the works
as per drawings, specifications and instructions of Engineer Incharge including all
labour and material/equipment required for the finished work.
Sr.
No.
1
Description
Unit
Rate (Rs)
Labour Composite
4
5
Specifi
cation
6
Remark
7
cum
1284.49
3179.51
1:3
cum
2466.09
6238.53
ii) 1:4
iii) 1:6
cum
cum
2466.09
2466.09
5915.90
5546.47
iv) 1:8
cum
2466.09
5342.26
b) In
cement
mortar, Ratio:
i)
2.
7.3 &
7.4
sand
Coursed
Rubble,
masonry
including
hammer dressing.
a) Dry
7.3 &
7.11
cum
1612.59
3507.61
b) In
cement
mortar, Ratio:
i) 1:3
cum
2466.09
6238.53
ii) 1:4
cum
2466.09
5915.90
iii) 1:6
cum
2466.09
5546.47
iv) 1:8
cum
2466.09
5342.26
sand
SUPER STRUCTURE
(Ground floor or 6.0m
height of uncovered wall)
3.
cum
1449.01
3344.02
b) In
cement
mortar, Ratio:
i) 1:3
ii) 1:4
cum
cum
2681.88
2681.88
6454.33
6131.69
iii) 1:6
cum
2681.88
5762.26
iv) 1:8
cum
2681.88
5558.05
cum
414.05
sand
7.3 &
7.4
7-1
WCSR-2013 (Zone-2)
Sr.
No.
1
4.
2
Second floor
Third floor
3
cum
cum
Rate (Rs)
Labour Composite
4
5
938.73
1284.49
cum
2354.87
cum
373.94
Description
Unit
Coursed
Rubble,
masonry
including
hammer dressing.
a) Dry
1882.12
3777.14
i) 1:3
ii) 1:4
cum
cum
3114.40
3114.40
6810.63
6523.81
iii) 1:6
cum
3114.40
6195.36
iv) 1:8
cum
3114.40
6020.21
cum
cum
414.05
938.73
cum
1284.49
cum
2354.87
cum
373.94
Third floor
4th and subsequent
floors
d) Extra labour for every
1.5m
additional
height of uncovered
wall.
Ashlar block in course or
scabbled
Masonry
including dressing etc.,
a) In
cement
mortar, Ratio:
i)
sand
5.
Remark
7.3 &
7.11
cum
b) In
cement
mortar, Ratio:
Specifi
cation
6
7.3 &
7.6
sand
1:3
cum
8356.56
13177.04
ii) 1:4
iii) 1:6
cum
cum
8356.56
8356.56
12961.79
12718.13
First floor
Second floor
cum
cum
414.05
938.73
Third floor
cum
cum
1473.15
2354.87
WAPDA
7-2
WCSR-2013 (Zone-2)
Sr.
Description
No.
1
2
6. Ashlar
fine
masonry
including dressing etc.
a) In
cement
sand
mortar, Ratio:
Unit
3
Rate (Rs)
Labour Composite
4
5
i) 1:3
ii) 1:4
cum
cum
15723.39
15723.39
20862.20
20754.81
iii) 1:6
cum
15723.39
20634.27
cum
414.05
Second floor
Third floor
cum
cum
938.73
1473.15
cum
2354.87
cum
1075.06
Specifi
cation
6
7.3 &
7.7
Remark
7
MISCELLANEOUS
DRESSING STONES ETC
7.
8.
9.
7.3 &
7.5
cum
5908.65
cum
5908.65
Dressing stone:
a) Hammer dressed
b) Rough tooled dressed
c) Chisel dressed
d) Fine dressed
7.3 &
7.12
sqm
sqm
sqm
sqm
659.65
1255.82
1520.06
3120.61
8160.55
7.5 &
7.10
10.
sqm
89.17
178.29
7.14
11.
sqm
257.57
639.37
7.14 &
7.15
12.
sqm
89.17
245.53
7.3 &
7.14
13.
cum
291.22
634.87
-do-
WAPDA
7-3
WCSR-2013 (Zone-2)
Sr.
No.
1
Unit
Rate (Rs)
Labour Composite
4
5
Specifi
cation
6
14.
cum
537.53
1739.00
7.3 &
7.14
15.
cum
261.64
873.89
-do-
16.
7.3
cum
cum
cum
cum
cum
733.29
838.30
942.72
1257.16
2094.87
17.
Breaking
stone
into
spawls and stacking.
cum
314.44
-do-
18.
cum
209.43
-do-
19.
Washing ballast,
shingle etc.
bajri
cum
209.43
-do-
cum
628.28
-do-
21.
Stone
pitching
with
hammer dressed stones
on surface laid in courses
including
carriage
of
material within 100 m.
cum
1786.66
3848.53
7.3 &
7.15
22.
Stone
pitching
hand
packed
with
surface
levelled off to the correct
section with hammer
dressed stone and voids
filled in 1:8 cement
mortar in floors of bridges
and along banks and in
aprons etc. including
100 m lead.
cum
2077.88
6191.18
-do-
23.
cum
792.80
792.80
-do-
cum
418.86
418.86
-do-
WAPDA
Remark
7-4
WCSR-2013 (Zone-2)
Sr.
No.
1
25.
26.
Description
Unit
any other
100 m.
site,
within
Rate (Rs)
Labour Composite
4
5
Specifi
cation
6
7.3 &
7.15
a) On slope
cum
1206.34
3268.21
b) On horizontal level
cum
1058.02
3119.89
Top layer
mean
350mm to
450mm thick
stone
pitching
layer.
-do-
a) On slope
cum
291.22
2181.27
b) On horizontal level
cum
239.01
2129.06
27.
Providing
and
fixing
150mm thick dressed
stone pavement on walk
way properly dressed set
in cement mortar 1:4
curing etc. complete.
sqm
420.08
941.81
7.3 &
7.14
28.
cum
105.11
2145.95
-do-
WAPDA
Remark
7-5
WCSR-2013 (Zone-2)
SECTION 8 ROOFING
SECTION- 8
R O O F I N G
1.
Rates for all finished works shall include the removal of surplus debris, unused
material and by products.
2.
The composite rates shall constitute compensation for the completed items of works
as per drawings, specifications and instructions of Engineer Incharge including all
labour and material/equipment required for the finished works.
Sr.
Description
No.
1
2
1. Brick tiles 300 x 150 x
50mm roofing consisting
of 13 mm thick cement
plaster 1:6 with 1.75 kg.
of hot bitumen coating
sand blinded provided
over tiles laid in 1:6
cement mortar including
1:2
cement
pointing
under-neath
of
tiles
complete including curing
etc.
2.
3.
WAPDA
Unit
3
sqm
sqm
Rate (Rs)
Labour Composite
4
5
633.29
1094.25
253.03
718.82
Specifi
cation
6
8.1 &
8.2
888.00
8-1
8.11
8.3, 8.4
& 8.5
sqm
Remark
For steel
part & its
erection etc,
items under
Iron work Misc. of the
Composite
Schedule of
Rates be
referred.
2282.56
WCSR-2013 (Zone-2)
SECTION 8 ROOFING
Sr.
No.
1
4.
Description
Unit
Rate (Rs)
Labour Composite
4
5
sqm
717.19
Specifi
cation
6
8.3, 8.4
& 8.5
sqm
153.93
6.
sqm
742.70
1218.96
-do-
7.
sqm
64.07
110.66
8.11
8.
Corrugated
galvanized
iron sheets fixed with G.I.
bolts, nuts limpets and
bitumen washer, windties
complete in all respects
without valleys & ridges:
WAPDA
7
For steel
part & its
erection etc,
items under
Iron work Misc. of the
Composite
Schedule of
Rates be
referred
2047.36
5.
a) 20 S.W.G
b) 22 S.W.G
c) 24 S.W.G
Remark
-do-
8.7
sqm
154.85
1874.02
sqm
sqm
154.85
154.85
1650.85
1399.68
8-2
WCSR-2013 (Zone-2)
SECTION 8 ROOFING
Sr.
Description
No.
1
2
9. Plain galvanized iron
sheets of 22 S.W.G. rain
water
down
pipe
including clamps and
fixed in place:
a) 100 mm
b) 125 mm
10.
11.
12.
Unit
3
Rate (Rs)
Labour Composite
4
5
m
m
236.32
236.32
1173.33
1465.80
sqm
960.72
1620.17
Specifi
cation
6
8.10
-do-
169.19
2229.10
169.19
1864.56
-do-
each
each
208.94
208.94
767.29
671.02
each
69.60
910.62
8.1
14.
each
236.32
347.78
8.9 &
8.10
15.
13mm
thick
deodar
ceiling complete including
sawing planning and
fixing.
sqm
405.32
3129.08
8.12
16.
WAPDA
Asbestos
cement
corrugated sheet roofing
including necessary over
laps & G.I. hook, bolts,
nuts, screws, washers &
-do-
13.
17.
Remark
8.8
sqm
sqm
392.16
392.16
1066.99
992.71
sqm
181.10
1404.94
8-3
-do-
WCSR-2013 (Zone-2)
SECTION 8 ROOFING
Sr.
No.
1
Description
Unit
bitumen washers,
(excluding valleys
ridges etc.).
Rate (Rs)
Labour Composite
4
5
Specifi
cation
6
etc.
and
18.
sqm
40.82
19.
63.45
20.
8.8
394.19
-do-
8.7
252.28
1970.97
252.28
2048.73
252.28
2261.28
21.
143.38
494.27
22.
Making
ventilators.
masonry
each
1522.75
2111.08
23.
Earthen ware
ventilators.
syphon
each
169.03
206.23
24.
sqm
71.79
532.49
8.1 &
8.11
25.
sqm
75.35
821.97
-do-
WAPDA
Remark
8-4
8.1
WCSR-2013 (Zone-2)
SECTION 8 ROOFING
Sr.
Description
No.
1
2
26. Polythine sheet 0.2 mm
thick laid over two coats
of bitumen using 1.66 kg.
bitumen hot per sqm over
floors & DPC etc.
Unit
3
sqm
Rate (Rs)
Labour Composite
4
5
71.79
284.81
Specifi
cation
6
8.1&
8.11
27.
sqm
75.35
536.05
-do-
28.
sqm
39.21
575.01
8.1, 8.8
& 11.1
29.
sqm
81.68
1327.93
8.1 &
11.1
30.
sqm
98.02
1065.31
-do-
31.
sqm
98.02
974.10
-do-
32.
False
ceiling
frame
comprising partal wood
50 x 75mm including
termite proofing.
sqm
110.91
1355.86
8.1, 8.8
& 11.1
33.
sqm
114.08
770.85
WAPDA
8-5
Remark
7
WCSR-2013 (Zone-2)
SECTION 9 FLOORING
SECTION - 9
F L O O R I N G
1.
Rates for all finished works shall include the removal of surplus debris, unused
material and by products.
2.
The composite rates shall constitute compensation for the completed items of works
as per drawings, specifications and instructions of Engineer Incharge including all
labour and material/equipment required for the finished works.
Sr.
No.
1
Rate (Rs)
Labour Composite
4
5
Specifi
cation
6
Description
Unit
1.
sqm
273.86
506.72
9.1 &
9.3
2.
sqm
114.27
162.63
9.5
3.
sqm
202.84
596.47
9.4 &
9.5
4.
sqm
202.84
385.72
9.7
5.
sqm
227.94
505.27
-do-
6.
sqm
298.56
1741.73
-do-
7.
WAPDA
Remark
7
Bricks used
in this
Section shall
are of first
class.
-do-
sqm
298.56
9-1
775.55
WCSR-2013 (Zone-2)
SECTION 9 FLOORING
Sr.
No.
1
Description
Unit
Rate (Rs)
Labour Composite
4
5
b) 225 x 225 x 20 mm
sqm
298.56
850.46
c) 200 x 200 x 20 mm
sqm
298.56
970.31
d) 150 x 150 x 20 mm
sqm
298.56
1309.91
sqm
298.56
1741.73
8.
9.
Topping
of
cement
concrete (1:2:4) including
surface
finishing
&
dividing into panels:
a) 25 mm
sqm
162.97
280.07
b) 40 mm
sqm
197.98
370.75
c) 50 mm
sqm
229.42
463.16
d) 75 mm
sqm
267.98
611.96
246.53
sqm
82.23
11.
sqm
75.94
12.
WAPDA
Remark
7
9.7
9.8
10.
13.
Specifi
cation
6
Cost of glass
strip for
paneling is
not included
in rates.
-do-
-do-
9.1
a) 50 mm
sqm
454.64
861.57
b) 75 mm
sqm
454.64
874.96
9.13
a) 6 mm
sqm
103.90
320.07
b) 13 mm
sqm
149.29
579.94
c) 25 mm
sqm
176.68
1042.69
9-2
WCSR-2013 (Zone-2)
SECTION 9 FLOORING
Sr.
No.
1
14.
15.
16.
Description
Unit
Mosaic
flooring
consisting of mosaic
topping of one part of
cement to two parts of
marble chips laid over
25mm thick flooring of
1:2:4 cement concrete
including
rubbing
&
polishing complete:
sqm
710.65
1065.58
b) 13 mm (with grey
cement)
sqm
729.64
1138.53
c) 10 mm (with white
cement)
sqm
710.65
1116.71
d) 13 mm (with white
cement)
sqm
729.64
1197.34
Flooring comprising of
mosaic marble chips
cement tiles of approved
shade laid in cement
mortar
1:2
including
finishing complete:
sqm
369.51
830.02
b) White
sqm
369.51
768.78
Flooring comprising of
glazed tiles 6mm thick
laid in white cement
mortar 1:2 over 20mm
thick cement mortar 1:2
complete:
sqm
292.70
1210.58
b) Coloured
sqm
292.70
1347.79
sqm
72.06
85.31
7
Cost of glass
strip for
paneling is
not included
in rates.
-do-
a) White
18.
Remark
9.7
a) Grey
Specifi
cation
6
9.9
a) 10 mm (with grey
cement)
17.
WAPDA
Rate (Rs)
Labour Composite
4
5
9.14
9.7
a) 20mm
sqm
947.39
4571.12
b) 25mm
sqm
947.39
4975.46
9-3
WCSR-2013 (Zone-2)
SECTION 9 FLOORING
Sr.
No.
1
19.
Description
Unit
Rate (Rs)
Labour Composite
4
5
Specifi
cation
6
sqm
1276.74
5827.67
b) Deodar
sqm
958.15
7983.28
20.
sqm
1276.74
7374.16
-do-
21.
sqm
958.15
5237.63
-do-
22.
sqm
1276.74
5181.45
9.11
23.
WAPDA
9.11
a) Shisham
24.
Remark
-do-
a) Shisham
sqm
388.12
3008.96
b) Kikar
sqm
388.12
1820.09
9.7
a) Cement
sqm
330.60
1122.32
b) Mosaic
sqm
375.45
2005.85
9-4
WCSR-2013 (Zone-2)
SECTION 9 FLOORING
Sr.
Description
No.
1
2
25. Grey cement skirting or
dado
10mm
thick
including rounding of
corners and straightening
of top edge finished to
smooth surface after
plastering:
26.
Rate (Rs)
Labour Composite
4
5
a) 1:2 mix
sqm
366.90
444.57
c) 1:3 mix
sqm
366.90
431.48
d) Extra if skirting or
dado is finished with
pigment
of
any
colour.
sqm
43.13
45.64
White
b) Coloured
27.
Unit
Remark
7
9.7
sqm
601.25
2050.77
sqm
601.25
2137.88
9.9
a) 10 mm (with grey
cement)
sqm
656.31
934.48
b) 13 mm (with grey
cement)
sqm
656.31
1009.93
c) 10 mm (with white
cement)
sqm
656.31
981.78
d) 13 mm (with white
cement)
sqm
656.31
1078.90
28.
sqm
146.64
715.98
29.
Flooring comprising of
first class Granite glazed
tiles with 13 mm thick
white bond cement.
sqm
376.21
1896.79
WAPDA
Specifi
cation
6
9.8
9-5
9.12
WCSR-2013 (Zone-2)
SECTION 9 FLOORING
Sr.
No.
1
Description
Unit
30.
sqm
31.
WAPDA
Rate (Rs)
Labour Composite
4
5
62.47
Specifi
cation
6
Remark
7
683.04
9.9
a) 25 mm
64.16
76.32
b) 40 mm
64.16
78.31
c) 50 mm
64.16
80.70
d) 75 mm
64.16
82.30
9-6
WCSR-2013 (Zone-2)
SECTION - 10
SURFACE RENDERING
Sr.
No.
1
1.
Rates for all finished works shall include the removal of surplus debris, unused
material and by products.
The composite rates shall constitute compensation for the completed items of works
as per drawings, specifications and instructions of Engineer Incharge including all
labour and material/equipment required for the finished work.
Description
Unit
2
Cement neru plaster 1:2
(cement & sand).
Rate (Rs)
Labour Composite
4
5
a) 6 mm
b) 13 mm
sqm
sqm
155.38
155.38
223.99
244.83
2.
sqm
375.07
653.64
3.
4.
5.
sqm
sqm
sqm
155.38
155.38
196.49
215.55
233.05
316.25
6.
7.
sqm
sqm
sqm
155.38
155.38
196.49
7
Add extra
10%, 30% &
50% above
labour rates
only or 5%,
15% & 20%
on the
composite
rates for
2nd, 3rd, 4th
and
subsequent
floors
respectively.
198.12
212.56
282.55
-do-
sqm
sqm
sqm
155.38
155.38
196.49
193.42
204.10
272.51
sqm
97.83
121.08
-do-do-
a) 1:2
b) 1:3
sqm
sqm
155.38
155.38
200.06
190.07
8.
sqm
114.27
158.94
9.
WAPDA
Remark
-do-
-do-
-do-
Specifi
cation
6
10.1,
10.2 &
10.6
-do-do-
sqm
180.48
10 - 1
225.15
WCSR-2013 (Zone-2)
Sr.
No.
1
10.
b) 1:3
Description
Unit
3
sqm
Rate (Rs)
Labour Composite
4
5
180.48
215.17
Specifi
cation
6
sqm
148.44
183.13
sqm
279.93
314.62
13.
sqm
86.27
10.1 &
10.2
14.
sqm
43.13
-do-
15.
Priming coat of
under distemper.
sqm
15.23
16.
Distempering:
17.
18.
16.76
sqm
41.11
57.86
sqm
60.91
82.00
sqm
12.78
16.40
sqm
21.57
27.77
White washing
10.1,
10.2 &
10.9
10.1 &
10.2
10.1,
10.2 &
10.8
10.1,
10.2 &
10.7
a) One coat
b) Two coat
c) Three coat
sqm
sqm
sqm
7.99
23.44
29.37
14.11
32.76
41.82
19.
sqm
12.78
18.86
10.1 &
10.2
20.
sqm
155.38
183.44
-do-
WAPDA
-do-
chalk
Remark
10 - 2
WCSR-2013 (Zone-2)
Sr.
Description
No.
1
2
21. Rough
grey
cement
machine spray 1:1 (grey
cement and white marble
powder) laid uniform upto
6.0mm
thickness
minimum.
Unit
3
sqm
Rate (Rs)
Labour Composite
4
5
155.38
228.81
Specifi
cation
6
10.1,
10.2 &
10.6
22.
sqm
155.38
270.90
-do-
23.
sqm
8.81
29.89
20.8
24.
sqm
60.91
213.92
25.
sqm
24.36
72.97
WAPDA
10 - 3
Remark
7
WCSR-2013 (Zone-2)
SECTION - 11
W O O D
W O R K
1.
No extra rates to be paid for sawing as the rate are inclusive of such contingencies.
2.
Rates for all finished works shall include the removal of surplus debris, unused
material and by products.
3.
The composite rates shall constitute compensation for the completed items of works
as per drawings, specifications and instructions of Engineer Incharge including all
labour and material/equipment required for the finished works.
Sr.
No.
1
1.
2.
3.
4.
Description
Unit
Specifi
cation
6
Remark
7
11.1
a) Deodar
cum
22679.31
220756.24
b) Shisham
cum
31509.99
123626.94
-do-
a) Deodar
cum
17339.79
212306.19
b) Shisham
cum
26341.34
115347.74
Teak
wood
wrought
framed & fixed in place
including chowkats hold
fasts,
tower
bolts,
chocks, cleats, handles,
cord with hooks & cost of
nails and screws, etc.
panelled or panelled &
glazed or full glazed:
a) 50 mm
sqm
2477.24
21370.95
b) 45 mm
sqm
2461.22
19803.67
Teak
wood
wrought
joinery
doors
and
windows with frames and
22 SWG galvanized wire
gauze 12x12 to 25x25
sqmm meshes including
brass fittings complete:
a) Framing 44mm thick
with ordinary hinges
and fixed in position.
WAPDA
Rate (Rs)
Labour Composite
4
5
sqm
1543.42
11 - 1
11.1,
11.2 ,
11.3 &
11.12
Size 1.22 m
x 2.10 m
(4' x 6.75')
11.1&
11.8
Size 1.22 m
x 2.10 m
(4' x 6.75')
10782.02
WCSR-2013 (Zone-2)
Sr.
No.
1
Description
Unit
Rate (Rs)
Labour Composite
4
5
1525.03
9212.37
2
b) Ditto 40 mm thick
3
sqm
sqm
544.63
2911.74
sqm
878.94
7628.22
5.
sqm
544.63
3176.07
6.
7.
8.
WAPDA
a) 50 mm
sqm
1525.92
15185.70
b) 45 mm
sqm
1343.48
13138.36
c) 40 mm
sqm
1251.82
12707.62
Specifi
cation
6
Remark
7
11.1 &
11.9
11.1
Size 1.22 m
x 0.6 m
(4' x 2')
11.1 ,
11.2 ,
11.3 &
11.12
Size 1.22 m
x 2.10 m
(4' x 6.75')
11.1 &
11.4
sqm
1803.27
15442.74
Size 0.91 m
x 2.13 m
(3 x 7)
sqm
1400.73
12778.13
Size 0.91 m
x 1.98 m
(3 x 6.5)
Deodar
25mm
thick
battended
doors
&
windows fixed in position
complete with iron fittings
without chowkats.
sqm
1052.48
9439.05
11 - 2
11.1,
11.4 &
11.5
Size 0.91 m
x 2.13 m
(3 x 7)
WCSR-2013 (Zone-2)
Sr.
Description
No.
1
2
9. Deodar 25mm battened
ledged & braced, 55mm
& 30mm fixed in position
complete with iron fittings
with chowkats.
10.
11.
Unit
3
sqm
sqm
Rate (Rs)
Labour Composite
4
5
1559.44
15532.24
723.21
6560.42
Specifi
cation
6
11.1,
11.4 &
11.5
Remark
7
Size 0.91 m
x 1.98 m
(3 x 6.5)
-do-
Size 2.44 m
x 2.44 m
(8 x 8)
-do-
Size 1.22 m
x 2.10 m
(4' x 6.75')
sqm
1304.62
8123.71
11.1 &
11.8
sqm
1292.76
7246.74
-do-
sqm
850.47
6135.26
11.1 &
11.9
sqm
540.48
1844.76
11.1 &
11.10
12.
sqm
1219.19
8007.28
11.1
Size 0.76 m
x 2.13 m
(2.5' x 7')
13.
sqm
846.31
9804.41
-do-
Size 1.22 m
x 2.10 m
(4' x 6.75')
14.
Per
sqm
15.36
398.30
11.1 &
11.2
15.
Each
74.16
244.32
-do-
WAPDA
11 - 3
WCSR-2013 (Zone-2)
Sr.
Description
No.
1
2
16. Proving and fixing sliding
bolt to doors:
17.
Unit
3
Rate (Rs)
Labour Composite
4
5
a) 305 mm Iron
each
74.46
257.83
b) 255 mm Iron
each
74.46
227.83
c) 305 mm Brass
each
74.46
1157.61
d) 255 mm Brass
each
74.46
953.61
Specifi
cation
6
11.1 &
11.2
Remark
7
-do-
sqm
22.25
sqm
17.80
18.
each
213.58
752.70
-do-
19.
Providing
&
fixing
approved quality mortice
lock.
each
213.58
694.94
-do-
20.
sqm
286.85
3197.10
11.1
Size 1.22 m
x 0.6 m
(4' x 2')
21.
sqm
820.80
6814.65
-do-
Size 1.22 m
x 0.91 m
(4' x 3')
22.
Providing
and
fixing
almirah as per standard
design
of
WAPDA
residences.
sqm
1464.51
6800.05
-do-
23.
Providing
&
fixing
wardrobe
as
per
standard,
design
of
WAPDA residences.
sqm
2065.50
4419.03
-do-
24.
WAPDA
11.1 &
11.2
11 - 4
Size 1.22 m
x 2.10 m
(4' x 6.75')
WCSR-2013 (Zone-2)
Sr.
No.
1
25.
26.
Rate (Rs)
Labour Composite
4
5
514.08
5612.55
Description
Unit
3
sqm
b) Deodar
sqm
288.04
4034.46
c) Shisham
sqm
423.01
2240.96
a) Teak
Specifi
cation
6
sqm
487.38
5477.97
b) 20 mm
sqm
487.38
4291.22
c) 13 mm
sqm
487.38
2934.93
-do-
a) 50 mm
sqm
487.38
10390.63
b) 40 mm
sqm
487.38
7847.59
c) 25 mm
sqm
487.38
5474.08
27.
each
60.81
249.04
11.1 &
11.2
28.
each
60.81
78.81
-do-
29.
520.68
2464.08
b) Shisham
520.68
1247.66
274.71
1373.98
31.
WAPDA
11.1
a) Teak
11.1
a) 25 mm
30.
Remark
-do-
-dosqm
183.32
11 - 5
WCSR-2013 (Zone-2)
Sr.
No.
1
32.
Description
Unit
2
b) Hard wood (shisham,
kikar teak or sal).
3
sqm
Sawing
machines:
wood
Rate (Rs)
Labour Composite
4
5
367.79
by
Specifi
cation
6
Remark
7
11.1
a) Soft
sqm
65.26
147.76
b) Hard
sqm
131.11
296.86
33.
sqm
582.90
6695.75
-do-
Size 1.52 m
x 0.30 m
(5' x 1')
34.
sqm
679.90
2364.42
-do-
Size 1.88 m
x 0.91 m
(6' x 3')
35.
sqm
177.98
1466.93
-do-
Size 3.66 m
x 4.88 m
(12' x 16')
36.
sqm
177.98
1253.32
-do-
Size 3.66 m
x 4.88 m
(12' x 16')
37.
81.58
38.
Making
and
fixing
wooden
stair
case
complete 600 mm to
915mm wide, from 40mm
thick plank of deodar
wood, including hand
rails.
924.33
39.
each
219.51
40.
WAPDA
-do12299.00
-do-
11.1 &
11.2
11.12
sqm
218.62
887.70
(16 oz to 18
oz)
sqm
218.62
1226.77
(16 oz to 18
oz)
sqm
218.62
1361.82
(24 oz to 26
oz)
11 - 6
WCSR-2013 (Zone-2)
Sr.
Description
No.
1
2
41. Glazing with plate glass
6mm thick using PVC
gasket.
42.
43.
Providing
&
Fixing
deodar beading tapering
from 18mm to 6mm;
Unit
3
sqm
sqm
Rate (Rs)
Labour Composite
4
5
323.38
1247.85
584.74
3656.09
Specifi
cation
6
11.12
Remark
7
20.8
11.17
16.36
125.35
17.85
219.63
44.
Providing
&
fixing
laminated
board
for
Cupboard upto 600mm
deep complete in all
respect.
sqm
216.25
5516.90
Size:
2.287m x
1.982m
(7 x 6)
45.
Providing
&
fixing
laminated
board
for
Wardrobe
shutter
complete in all respect.
sqm
205.27
2560.85
Size:
1.60m x
2.896m
(5 x 9)
WAPDA
11 - 7
WCSR-2013 (Zone-2)
SECTION - 12
No extra rates to be paid for sawing as the rate are inclusive of such contingencies.
2.
Rates for all finished works shall include the removal of surplus debris, unused
material and by products.
3.
The composite rates shall constitute compensation for the completed items of works
as per drawings, specifications and instructions of Engineer Incharge including all
labour and material/equipment required for the finished works.
Sr.
Description
No.
1
2
1. Cleaning & oiling wood
work:
Unit
3
Rate (Rs)
Labour Composite
4
5
Specifi
cation
6
12.1
sqm
17.57
42.53
sqm
17.57
52.61
2.
sqm
26.70
-do-
3.
sqm
127.56
-do-
4.
-do-
a) Painting
corrugated
surfaces,
patent
roofing, etc. with oil
paint:
12.4
i) First coat
sqm
49.84
108.35
sqm
37.38
83.35
12.2
i) First coat
sqm
30.46
63.35
sqm
24.92
52.06
-do-
i) First coat
sqm
49.84
108.35
sqm
37.38
83.35
Remark
12.4
12 - 1
WCSR-2013 (Zone-2)
Sr.
No.
1
Description
2
gratings,
railing
(including
standard
braces
etc.)
and
similar open work:
Unit
3
Rate (Rs)
Labour Composite
4
5
i) First coat
sqm
30.46
63.35
sqm
24.92
52.06
e) Painting
fillets,
framing,
skirting,
pipes, gutters and
similar linear works
not exceeding 152 mm
girth:
m
8.31
17.30
5.54
12.16
Painting
small
detached articles not
exceeding 0.10 sqm of
painted surface:
i) First coat
no.
9.69
19.97
no.
8.11
14.73
-do-
i) First coat
no.
18.79
38.24
no.
10.88
22.49
12.1
12.3
12.4
i) Priming coat
ii) Each subsequent coat
sqm
50.43
134.05
sqm
26.70
98.29
12.2
12.4
g) Painting
small
detached
articles
exceeding 0.10 sqm
and not exceeding
0.30 sqm of painted
surface
5.
Remark
12.4
i) First coat
f)
Specifi
cation
6
12.3
sqm
32.04
12 - 2
84.28
WCSR-2013 (Zone-2)
Sr.
No.
1
Description
Unit
2
ii) Each subsequent coat
3
sqm
Rate (Rs)
Labour Composite
4
5
18.00
61.35
sqm
50.43
134.05
sqm
26.70
98.29
12.4
i) Priming coat
sqm
32.04
79.66
sqm
18.00
56.73
-do-
i) Priming coat
8.31
20.44
4.15
13.67
f) Painting
small
detached articles not
exceeding 0.10 sqm
of painted surface:
12.2
12.4
i) First coat
no.
11.07
26.00
no.
4.94
17.26
g) Painting
small
detached
articles
exceeding 0.10 sqm
and not exceeding
0.30 sqm of painted
surface
WAPDA
Remark
12.3
i) First coat
Specifi
cation
6
-do-
no.
20.17
49.27
no.
9.29
31.08
Sqm
4.75
21.05
12 - 3
12.3
WCSR-2013 (Zone-2)
Sr.
Description
No.
1
2
6. Providing,
preparing
surface
&
applying
3 coats of approved type
of plastic emulsion paint
to plastered surface as
per
manufacturer's
specifications.
7.
8.
9.
sqm
37.38
54.56
sqm
29.47
43.09
French
complete on;
polishing
sqm
418.22
515.17
sqm
221.39
272.13
30.46
112.52
sqm
15.23
77.84
sqm
15.23
66.16
sqm
32.04
107.27
14.
WAPDA
sqm
28.76
55.30
sqm
17.57
39.86
painting
12.9
sqm
28.48
49.01
sqm
42.72
72.08
-do-
sqm
28.48
49.01
sqm
42.72
72.08
45.68
53.53
12.8
-do-
i) First coat
Solignum
applied hot:
12.5
i) First coat
Remark
12.7
i) new work
11.
Specifi
cation
6
12.11
12.4 &
12.6
i) First coat
Bitumen
coatings
to
plastered
or
cement
concrete surface using
0.60 kg / sqm.
13.
3
sqm
Rate (Rs)
Labour Composite
4
5
149.51
339.54
10
12.
Unit
12 - 4
12.4
WCSR-2013 (Zone-2)
Sr.
Description
No.
1
2
15. Painting sounding rods &
other gauges, reading to
10th of 300 mm.
16.
17.
Unit
3
m
Rate (Rs)
Labour Composite
4
5
22.15
23.72
Specifi
cation
6
12.4
713.52
748.03
12.9
per no.
13.84
15.70
12.1 &
12.11
18.
each
no.
69.22
140.23
-do-
19.
each
no.
42.91
63.46
-do-
20.
each
no.
346.08
511.46
-do-
21.
each
no.
456.83
622.21
-do-
22.
Painting
letters
with
shade (25 mm height)
per
letter
22.15
23.48
-do-
23.
sqm
85.64
128.09
-do-
24.
sqm
32.04
38.52
-do-
25.
Removing
paint
varnish from walls.
sqm
64.07
26.
or
-do-do-
i) Khanki paint
sqm
7.71
27.40
sqm
16.02
35.70
27.
sqm
95.52
106.37
-do-
28.
sqm
95.52
104.22
-do-
29.
sqm
64.07
66.26
-do-
30.
sqm
32.04
50.56
-do-
WAPDA
Remark
12 - 5
WCSR-2013 (Zone-2)
WAPDA
12 - 6
WCSR-2013 (Zone-2)
SECTION-13
Rates for all finished works shall include the removal of surplus debris, unused
material and by products.
2.
The composite rates shall constitute compensation for the completed items of works
as per drawings, specifications and instructions of Engineer Incharge including all
labour and material/equipment required for the finished works.
Sr.
No.
1
Description
Unit
Rate (Rs)
Labour Composite
4
5
Specifi
cation
6
Remark
7
TUBEWELLS
1.
2.
WAPDA
13.1.2
a) 75 mm
361.44
394.10
b) 100 mm
481.29
519.22
c) 125 mm
d) 150 mm
m
m
997.71
1658.83
1060.47
1782.74
e) 200 mm
4369.69
4567.60
f) 250 mm
5365.74
5648.88
g) 300 mm
5365.74
5680.99
h) 375 mm
8342.22
8739.49
i) 450 mm
8342.22
8765.98
j) 550 mm
8342.22
8813.35
-do-
a) 100 mm
b) 125 mm
m
m
885.58
1845.63
944.87
1959.28
c) 150 mm
2538.48
2703.99
d) 200 mm
5525.58
5725.70
e) 250 mm
6364.27
6633.87
f) 300 mm
6783.62
7076.69
g) 375 mm
9692.16
10025.72
h) 450 mm
9692.16
10071.80
i) 550 mm
9692.16
10106.42
13 - 1
WCSR-2013 (Zone-2)
Sr.
No.
1
3.
4.
5.
WAPDA
Description
Unit
2
Boring for tubewells in all
water bearing soils from
60m depth below ground
level to 90m depth
including sinking & withdrawing of casing pipe
with internal diameter.
Rate (Rs)
Labour Composite
4
5
a) 100 mm
1181.39
1251.31
b) 125 mm
2572.65
2715.30
c) 150 mm
d) 200 mm
m
m
3921.81
6652.90
4125.61
6904.06
e) 250 mm
8172.93
8509.41
f) 300 mm
8172.93
8541.52
g) 375 mm
10352.5
1
10803.13
h) 450 mm
10352.5
1
10829.62
i) 550 mm
10352.5
1
10876.99
Specifica
tion
6
13.1.2
Remark
7
-do-
a) 200 mm
7779.42
8057.29
b) 250 mm
c) 300 mm
m
m
9561.44
9561.44
9924.55
9956.67
d) 375 mm
11702.46
12179.71
e) 450 mm
11700.06
12203.80
f) 550 mm
11700.06
12251.17
-do-
a) 200 mm
b) 250 mm
m
m
8905.93
10949.95
9210.44
11339.70
c) 300 mm
10949.95
11371.81
d) 375 mm
13324.49
13828.37
e) 450 mm
13322.09
13852.46
13 - 2
WCSR-2013 (Zone-2)
Sr.
No.
1
Rate (Rs)
Labour Composite
4
5
Specifica
tion
6
Description
Unit
6.
Providing
strong
substantially built wooden
locked box size 600 x
600 x 230mm with
compartments
for
preserving 1.0kg samples
of strata obtained from
the bore hole and taking
preserving in box 1.0kg
samples
of
strata
obtained from the bore
hole.
Job
1414.72
8518.85
13.1.2.3
13.1.2.4
7.
Furnishing samples of
water from bore hole
including
necessary
pumping
or
boiling,
providing
sampling
bottles and filling water
samples in to it.
Job
92.70
121.50
13.1.2.4
8.
9.
WAPDA
Remark
7
13.1.3
a) 40 mm
62.91
973.74
b) 50 mm
108.64
1245.97
c) 75 mm
108.64
1545.13
d) 100 mm
134.98
2566.28
e) 125 mm
200.48
4085.83
f) 150 mm
g) 175 mm
m
m
287.54
287.54
4030.91
4439.17
h) 200 mm
442.73
5211.00
i) 225 mm
442.73
5899.16
j) 250 mm
k) 300 mm
m
m
552.16
662.95
6637.98
9143.50
l) 375 mm
793.95
13985.86
-do-
a) 75 mm
103.55
480.75
b) 100 mm
112.96
665.42
c) 125 mm
112.96
896.60
d) 150 mm
128.65
1236.49
e) 200 mm
167.90
1869.04
13 - 3
WCSR-2013 (Zone-2)
Sr.
No.
1
10.
11.
12.
WAPDA
Description
Unit
2
f) 250 mm
g) 300 mm
3
m
m
h) 350 mm
Rate (Rs)
Labour Composite
4
5
167.90
3495.10
207.41
4799.81
207.41
Specifica
tion
6
Remark
7
6063.65
13.1.3
a) 32 mm
58.47
194.14
b) 40 mm
58.47
238.82
c) 50 mm
d) 63 mm
m
m
63.15
63.15
336.97
491.03
e) 75 mm
103.55
685.47
f) 100 mm
112.96
1084.68
g) 125 mm
h) 150 mm
m
m
112.96
128.65
1561.99
2232.60
-do-
a) 150 mm
128.65
6515.60
b) 200 mm
c) 250 mm
m
m
167.90
167.90
8272.22
10486.37
d) 300 mm
207.41
13002.38
e) 450 mm
207.41
19434.08
-do-
a) 50, 3
108.64
868.83
b) 75, 3
108.64
1733.20
c) 100, 3
d) 125, 5
m
m
134.98
200.48
2505.52
3566.87
e) 150, 5
287.54
4829.78
f) 175, 5
287.54
6382.43
g) 200, 5
h) 225, 5
m
m
442.73
442.73
8090.27
9819.32
13 - 4
WCSR-2013 (Zone-2)
Sr.
No.
1
13.
14.
15.
WAPDA
Description
Unit
2
i) 250, 6
j) 300, 6
3
m
m
k) 375, 6
Rate (Rs)
Labour Composite
4
5
552.16
11657.80
662.95
14816.44
793.95
Specifica
tion
6
Remark
7
20863.28
13.1.3
a) 75 mm
103.55
529.11
b) 100 mm
112.96
756.92
c) 125 mm
d) 150 mm
m
m
112.96
128.65
990.63
1371.28
e) 200 mm
167.90
2080.45
f) 250 mm
167.90
3906.85
g) 300 mm
h) 350 mm
m
m
207.41
207.41
5774.11
7600.51
-do-
a) 32 mm
58.47
210.28
b) 40 mm
c) 50 mm
m
m
58.47
63.15
270.74
343.01
d) 63 mm
63.15
502.37
e) 75 mm
103.55
702.11
f) 100 mm
g) 125 mm
m
m
112.96
112.96
1112.72
1603.63
h) 150 mm
128.65
2292.08
-do-
a) 150 mm
128.65
5330.92
b) 200 mm
167.90
6737.68
c) 250 mm
d) 300 mm
m
m
193.19
207.41
8575.87
10864.03
e) 450 mm
207.41
15599.82
13 - 5
WCSR-2013 (Zone-2)
Sr.
No.
1
16.
17.
18.
Description
Unit
2
Shrouding
&
filling
around strainer/blind pipe
graded bajri (3mm to
10mm)
into
space
between the bore wall
and strainer/blind pipe
with internal diameter:
Rate (Rs)
Labour Composite
4
5
a) 75 mm
392.99
486.87
b) 100 mm
589.48
703.77
c) 125 mm
589.48
722.14
d) 150 mm
785.98
928.84
e) 175 mm
785.98
947.20
f) 200 mm
785.98
965.57
g) 225 mm
982.47
1182.47
h) 250 mm
i) 300 mm
m
m
982.47
982.47
1190.64
1229.41
j) 375 mm
1178.96
1529.99
Specifica
tion
6
13.1.4
Remark
7
13.1.5
a) 75 mm
b) 100 mm
m
m
39.14
59.11
506.87
621.24
c) 125 mm
59.11
715.11
d) 150 mm
e) 175 mm
m
m
78.28
78.28
780.96
874.24
f) 200 mm
78.28
968.65
g) 225 mm
118.22
1102.46
h) 250 mm
i) 300 mm
m
m
118.22
157.36
1149.13
1374.90
j) 375 mm
157.36
1889.89
13.1.6
each
14514.36
84214.55
each
24190.60
163590.97
b) Development &
Testing by pumping
WAPDA
13 - 6
WCSR-2013 (Zone-2)
Sr.
No.
1
19.
20.
21.
22.
WAPDA
Description
Unit
2
(Raw Hiding) Method
i) Discharge upto
0.0425 cumec (1.50
cusecs).
ii) Discharge above
0.0425 cumec
(1.50 cusecs).
Rate (Rs)
Labour Composite
4
5
each
18848.93
71997.30
each
18848.93
85237.30
PIPE LINES
Providing, lowering &
laying
into
trenches,
jointing & testing A.C.
class B pipe line with
internal diameter.
Specifica
tion
6
Remark
7
13.2.2.15
13.2.4
to
13.2.9
a) 75 mm
97.28
491.64
b) 100 mm
111.18
705.03
c) 150 mm
161.40
1302.72
d) 200 mm
224.55
2050.19
e) 250 mm
285.29
3231.38
f) 300 mm
373.24
4316.82
g) 400 mm
373.24
6868.54
-do-
a) 75 mm
65.52
617.80
b) 100 mm
97.28
933.49
c) 150 mm
130.44
1744.23
d) 200 mm
162.80
2646.66
e) 250 mm
f) 300 mm
m
m
195.15
228.31
5053.34
7462.17
g) 375 mm
260.08
9868.26
-do-
a) 50 mm
49.04
412.18
b) 75 mm
65.52
842.70
c) 100 mm
d) 150 mm
m
m
97.28
130.44
1396.03
2941.27
Lowering,
laying
in
trenches and jointing
RCC plain or glazed
13.3.2.1.3
13.3.3
to
13 - 7
WCSR-2013 (Zone-2)
Sr.
No.
1
23.
Description
Unit
2
earthen
ware
pipes,
specials in 1:1:5 cement,
sand mortar and finishing
the dowel to angle of 45
with 1:1 cement sand
mortar including cost of
yarn, cutting & chipping
where
required
with
internal diameter:
a) 100 mm
b) 150 mm
c) 175 mm
d) 200 mm
e) 225 mm
f) 250 mm
g) 300 mm
h) 375 mm
i) 450 mm
j) 525 mm
k) 600 mm
l) 675 mm
m)750 mm
m
m
m
m
m
m
m
m
m
m
m
m
m
WAPDA
59.74
59.74
59.74
89.45
89.45
106.38
130.70
158.64
193.09
220.11
249.18
294.05
337.99
Specifica
tion
6
13.3.5
13.3.9
Remark
7
71.56
72.14
75.96
108.06
109.17
128.27
156.11
186.23
223.13
255.02
286.85
336.35
385.16
24.
Rate (Rs)
Labour Composite
4
5
13.3.2.1.3
13.3.3.
to
13.3.6
13.3.9
m
m
m
m
m
m
m
m
m
m
m
m
m
59.74
59.74
59.74
89.45
89.45
106.38
130.70
158.64
193.09
220.11
249.18
294.05
337.99
246.93
529.46
759.96
834.00
848.26
995.70
1177.55
1489.60
1783.90
2091.27
2398.59
3082.18
3737.46
13.3.2.1.1
13.3.3.
to
13.3.6
13 - 8
WCSR-2013 (Zone-2)
Sr.
No.
1
Description
Gradients
diameter:
2
with
internal
a) 50 mm
b) 63 mm
c) 75 mm
d) 100 mm
e) 125 mm
f) 150 mm
g) 175 mm
h) 200 mm
i) 225 mm
j) 250 mm
k) 300 mm
l) 375 mm
25.
26.
m
m
m
m
m
m
m
m
m
m
m
m
Rate (Rs)
Labour Composite
4
5
a)
75 mm
b)
c)
d)
e)
100 mm
125 mm
150 mm
175 mm
Remark
7
13.2.4.6
13.3.6.5
Per
joint
-do-do-do-do-
278.41
780.76
318.35
358.28
417.61
457.55
942.30
1163.72
1301.09
1537.65
b) 63 mm
c) 75 mm
d) 100 mm
e) 125 mm
f) 150 mm
g) 175 mm
h) 200 mm
i) 225 mm
j) 250 mm
k) 300 mm
l) 375 mm
Specifica
tion
6
13.3.9
25.97
33.91
41.85
46.60
59.13
63.87
75.01
82.95
100.98
110.47
133.24
175.59
a) 50 mm
WAPDA
Unit
-do-
Per
joint
-do-do-do-do-do-do-do-do-do-do-do-
174.00
397.25
174.00
174.00
217.16
260.31
303.46
348.01
391.16
434.32
522.01
608.32
696.02
469.25
472.44
519.66
634.81
752.86
872.89
992.68
1111.31
1271.01
1508.86
1828.21
13 - 9
WCSR-2013 (Zone-2)
Sr.
No.
1
27.
Description
Unit
2
Providing and fixing G.I.
flanges including bolts,
nuts, gasket etc and
cutting threads to pipes &
specials with internal
diameter:.
a) 50 mm
Per
joint
-do-do-do-do-do-do-do-do-do-do-do-
b) 63 mm
c) 75 mm
d) 100 mm
e) 125 mm
f) 150 mm
g) 175 mm
h) 200 mm
i) 225 mm
j) 250 mm
k) 300 mm
l) 375 mm
28.
29.
WAPDA
217.16
1280.41
217.16
217.16
260.31
348.01
389.77
434.32
477.47
563.77
651.47
737.78
825.48
1544.41
1775.60
2062.81
3026.51
3479.17
3935.19
4390.99
4888.77
5384.47
5958.32
6613.67
Specifica
tion
6
13.2.4.6.3
Remark
7
13.2.2.5
13.2.4.9
a)
each
119.81
1418.06
b)
each
99.84
747.92
c)
each
79.88
388.63
30.
Rate (Rs)
Labour Composite
4
5
13.2.2.6
132.4.10
each
each
each
119.81
175.73
263.59
282.26
385.43
547.54
13.2.4.2
13 - 10
WCSR-2013 (Zone-2)
Sr.
No.
1
Description
Unit
2
a) 50 mm
3
each
cut
-do-do-do-do-do-do-do-do-do-do-
b) 63 mm
c) 75 mm
d) 100 mm
e) 125 mm
f) 150 mm
g) 175 mm
h) 200 mm
i) 225 mm
j) 250 mm
k) 300 mm
31.
b) 63 mm
c) 75 mm
d) 100 mm
e) 125 mm
f) 150 mm
g) 175 mm
h) 200 mm
i) 225 mm
j) 250 mm
k) 300 mm
32.
Construction of sluice
valve or fire hydrant
chamber
610x610mm
minimum size, 230mm
thick brick work 1:5
cement sand mortar,
114mm
thick
1:4:8
cement
concrete
in
foundation 50mm thick
1:2:4 cement concrete in
bed, 75mm 1:2:4 RCC
slab on top and 13mm
thick 1:3 cement sand
plaster inside.
33.
Providing
&
fixing
socketed
or
flanged
sluice valve complete in
all respects with internal
Specifica
tion
6
Remark
7
247.61
335.48
399.38
407.37
439.32
455.29
495.23
559.13
654.98
766.81
Providing
&
fixing
temporary
wooden
tapered plugs of hard
wood to ends of pipe
lines
with
internal
diameter:
a) 50 mm
WAPDA
Rate (Rs)
Labour Composite
4
5
231.64
13.2.4.1
each
plug
-do-do-do-do-do-do-do-do-do-do-
11.98
27.43
11.98
17.57
29.55
39.94
43.93
53.52
57.51
60.71
67.10
90.26
14.95
54.21
85.99
122.12
155.82
200.06
266.43
346.86
413.65
671.48
per
job
5219.99
11405.73
13.2.4.8
13.2.2.2
13.2.4.8
13 - 11
WCSR-2013 (Zone-2)
Sr.
No.
1
34.
Description
Unit
a) 50 mm
b) 63 mm
c) 75 mm
d) 100 mm
e) 125 mm
f) 150 mm
g) 175 mm
h) 200 mm
i) 225 mm
j) 250 mm
k) 300 mm
l) 375 mm
each
each
each
each
each
each
each
each
each
each
each
each
diameter:
WAPDA
Remark
7
13.2.2.3
13.2.4.9
each
each
303.53
303.53
2004.61
2410.56
13.2.2.1.3
13.2.4.6
to
13.2.9
m
m
m
m
m
m
m
m
m
m
m
65.52
78.30
91.87
110.86
123.64
133.73
156.00
175.58
221.51
286.44
312.79
Specifica
tion
6
2224.81
2250.56
20733.46
31803.48
44453.79
7246.70
10302.98
13357.46
14445.96
15620.36
25909.81
36177.96
36.
348.01
348.01
348.01
434.32
520.62
606.93
696.02
782.32
868.63
1044.03
1216.64
1216.64
35.
Rate (Rs)
Labour Composite
4
5
-do-
m
m
m
65.52
78.30
91.87
13 - 12
232.13
308.39
416.41
WCSR-2013 (Zone-2)
Sr.
No.
1
37.
Description
Unit
2
d) 32 mm
e) 40 mm
f) 50 mm
g) 63 mm
h) 75 mm
i) 100 mm
j) 125 mm
k) 150 mm
3
m
m
m
m
m
m
m
m
38.
WAPDA
Specifica
tion
6
Remark
7
13.2.4.6
Per
joint
-do-do-do-do-do-do-do-do-
129.46
572.19
129.46
129.46
129.46
174.00
174.00
174.00
174.00
217.16
627.86
674.26
726.10
1244.44
1305.31
1497.31
1726.76
2011.71
Dismantling, disjointing,
removing & cleaning of
external surface of G.I. or
W.I. pipe line with
specials,
valves
and
fittings and removal of
holder bates and stacking
all material at site of work
for internal diameter:
a) 13 mm
b) 20 mm
c) 25 mm
d) 32 mm
e) 40 mm
f) 50 mm
g) 63 mm
h) 75 mm
i) 100 mm
39.
Rate (Rs)
Labour Composite
4
5
110.86
525.81
123.64
656.01
133.73
801.06
156.00
1060.33
175.58
1231.62
221.51
1705.06
286.44
2453.13
312.79
2954.81
13.5.13
m
m
m
m
m
m
m
m
m
32.36
55.43
78.30
110.86
133.73
156.00
179.66
201.94
225.01
Refixing,
cleaning
threads and rejointing
dismantled G.I. or W.I.
pipes, specials, valves
and fittings etc. complete
13.2.4
13 - 13
WCSR-2013 (Zone-2)
Sr.
No.
1
Description
2
in all respects
internal diameter:
Unit
with
a) 13 mm
b) 20 mm
c) 25 mm
d) 32 mm
e) 40 mm
f) 50 mm
g) 63 mm
h) 75 mm
i) 100 mm
40.
m
m
m
m
m
m
m
m
m
Rate (Rs)
Labour Composite
4
5
Specifica
tion
6
13.4.7
each
380.69
428.71
each
502.51
599.13
41.
Cutting
holes
upto
230mm square for pipes
in floors and roofs of
bricks or tiles with base
concrete and making
good to original condition
upto 300mm thickness.
each
190.34
204.41
-do-
42.
Cutting
holes
upto
230mm square for pipes
in floors and roofs of
cement,
reinforced
cement
concrete
or
reinforced brick work &
making good to original
condition
150mm
thickness.
each
284.75
327.15
-do-
43.
499.46
684.67
-do-
44.
WAPDA
45.94
78.30
101.37
133.73
149.61
166.08
189.15
211.43
235.09
a) 13 mm
b) 20 mm
Remark
13.5.8
each
each
55.77
55.77
13 - 14
91.85
97.51
WCSR-2013 (Zone-2)
Sr.
No.
1
45.
46.
WAPDA
Rate (Rs)
Labour Composite
4
5
74.36
135.91
74.36
141.57
Description
Unit
2
c) 25 mm
d) 32 mm
3
each
each
e) 40 mm
each
92.95
176.44
f) 50 mm
each
92.95
465.54
g) 63 mm
h) 75 mm
each
each
111.54
130.13
498.95
532.36
i) 100 mm
each
139.42
651.09
j) 125 mm
k) 150 mm
each
each
148.72
167.30
860.59
1079.38
Providing
&
fixing
galvanized malleable iron
holder bats or hold fasts
to pipe lines fixed on
walls
and
ceilings
including cutting walls or
ceiling & making good to
original condition with
internal diameter;
Specifica
tion
6
Remark
7
13.5.7
a) 13 mm
each
15.98
21.19
b) 20 mm
each
30.62
37.03
c) 25 mm
d) 32 mm
each
each
36.19
44.55
45.80
57.07
e) 40 mm
each
55.68
75.17
f) 50 mm
each
61.25
93.26
g) 63 mm
h) 75 mm
each
each
66.82
72.39
105.79
116.93
i) 100 mm
each
86.31
119.91
13.5.4
a) 13 mm
each
334.09
445.44
b) 20 mm
each
403.69
563.75
c) 25 mm
each
473.29
709.91
d) 32 mm
e) 40 mm
each
each
542.89
598.58
893.18
1099.64
f) 50 mm
each
1224.99
1930.20
g) 63 mm
each
1461.64
2742.14
h) 75 mm
each
1851.41
3521.63
i) 100 mm
each
2046.29
4927.43
13 - 15
WCSR-2013 (Zone-2)
Sr.
No.
1
47.
48.
49.
50.
Description
2
Providing
and
75mm dia G.I.
(China)
Unit
fixing
Union
3
each
Rate (Rs)
Labour Composite
4
5
174.00
1407.60
Specifica
tion
6
13.2
13.5
Remark
7
-do-
a) 13 mm
each
b) 20 mm
c) 25 mm
each
each
107.83
133.39
149.37
167.11
224.48
318.52
13.5.5
a) 13 mm
b) 20 mm
each
each
107.83
133.39
226.14
234.60
c) 25 mm
each
149.37
288.16
13.5.4
a) 50 mm
each
174.00
3594.00
b) 75 mm
each
348.01
9948.01
51.
each
348.01
1308.39
13.5.4.2
52.
each
99.84
341.10
13.2.2.5
53.
Construction
of
peet
valves or stop cock
masonry chamber of size
230mm x 230mm.
each
539.57
1514.52
13.2.4.8
SURFACE DRAINS
54.
WAPDA
Making
house
outlet
connection
including
cutting
and
forming
parnalas and making
khuras:
13.7.1
13 - 16
WCSR-2013 (Zone-2)
Sr.
No.
1
55.
a) 300mm x 300mm
each
Description
Unit
2
b) 300mm x 150mm
3
each
c) 230mm x 150mm
each
291.93
416.16
Rate (Rs)
Labour Composite
4
5
273.40
344.48
277.79
131.78
b) 115 mm
66.86
191.19
56.
sqm
217.26
616.20
57.
WAPDA
13.7.1
59.
Remark
337.24
a) 75 mm
58.
Specifica
tion
6
-do-
-do-
a) 1:5
sqm
309.24
922.47
b) 1:6
sqm
309.24
905.03
-do-
a) 1:5
sqm
202.76
611.69
b) 1:6
sqm
202.76
758.73
13.7.2
a) 1:5
sqm
259.98
873.21
b) 1:6
sqm
259.98
855.77
13 - 17
WCSR-2013 (Zone-2)
Sr.
No.
1
60.
Description
Unit
Rate (Rs)
Labour Composite
4
5
Constructing
Punjab
Standard
drains
consisting
of
drain
cunette
of
cement
concrete 1:2:5 over
cement concrete 1:6:18
in foundation complete
laying to lines grades,
slopes and shapes:
Specifica
tion
6
Remark
7
13.7.1
a) Type - I
226.40
789.79
b) Type - II
324.11
1100.93
c) Type - III
d) Type - IV
m
m
377.80
441.04
1178.45
1434.00
e) Type - V
561.58
1774.03
f) Type - VI
591.38
1822.78
g) Type - VII
h) Type - VIII
m
m
666.83
835.73
2095.42
2649.73
i) Type - IX
1119.64
3554.65
j) Type - X
1218.50
3856.08
k) Type - XI
l) Type - XII
m
m
1286.75
1412.96
4129.61
4470.17
each
370.80
2542.88
13.4.6.4
62.
each
370.80
1646.66
-do-
63.
each
370.80
1510.80
-do-
64.
WAPDA
13.4.6.1
a) 65 cm
b) 55 /56 cm
each
each
370.80
370.80
1267.17
1093.68
c) 45 cm
each
370.80
925.97
13 - 18
WCSR-2013 (Zone-2)
Sr.
No.
1
Rate (Rs)
Labour Composite
4
5
Specifica
tion
6
Description
Unit
65.
each
370.80
1205.91
13.4.6.1
66.
each
370.80
3154.50
13.4.6.3
67.
68.
69.
70.
71.
low
level
flushing
cistern13.5 litres capacity
best quality:
a) White glazed
earthen ware
b) Plastic
3989.61
4407.17
each
556.20
1546.20
each
each
1038.24
1038.24
6048.90
9389.35
13.4.6.4
each
370.80
1723.18
each
370.80
1723.18
-do1901.84
each
370.80
1674.50
each
370.80
5978.25
each
74.16
1445.45
b) Chromium plated
each
74.16
2125.04
c) Plastic
each
74.16
765.84
c) Plastic
13.4.6.5
13.4.6.10
a) Glazed earthenware
13.4.6.7
13.4.6.9
370.80
Soap dishes:
WAPDA
370.80
370.80
each
73.
74.
each
each
-do-
72.
Remark
13.4.6.6
each
each
74.16
74.16
953.92
1809.52
each
74.16
526.12
13 - 19
WCSR-2013 (Zone-2)
Sr.
No.
1
75.
76.
77.
78.
79.
Description
Unit
2
Tooth brush holder with
tooth paste dish:
each
74.16
1591.04
b) Chromium plated
each
74.16
2343.44
c) Plastic
each
74.16
462.44
Tumblers holders
81.
82.
83.
84.
WAPDA
Specifica
tion
6
13.4.6.10
Remark
7
-do-
a) Glazed earthenware
each
74.16
350.69
b) Chromium plated
c) Plastic
each
each
74.16
74.16
267.18
141.92
13.4.6.2
a) Pak made
each
74.16
693.07
each
74.16
1143.07
13.4.6.10
each
74.16
2893.57
each
each
74.16
74.16
2326.64
1774.64
80.
Rate (Rs)
Labour Composite
4
5
13.4.6.12
each
each
74.16
74.16
325.05
255.45
each
53.40
494.15
b) 20 mm
each
53.40
656.53
13.4.6.3
13.5.5
13.5.5.
a) 13 mm
each
53.40
470.95
b) 20 mm
each
53.40
554.46
-do-
a) 13 mm
each
53.40
475.59
b) 20 mm
each
53.40
624.05
each
53.40
192.58
13.5.5.
13.4.6.3
a) 32 mm
each
53.40
290.01
b) 40 mm
each
53.40
498.79
13 - 20
WCSR-2013 (Zone-2)
Sr.
No.
1
85.
Description
2
Rubber plug with Chain:
Unit
3
Rate (Rs)
Labour Composite
4
5
Specifica
tion
6
13.4.6.1
a) 32 mm
each
26.70
68.45
b) 40 mm
each
26.70
110.21
86.
each
53.40
95.15
13.4.6.4
87.
each
53.40
76.59
-do-
88.
89.
a) PVC
each
53.40
95.15
b) Nickle
c) C.P. brass
each
each
53.40
53.40
401.36
691.33
-doeach
53.40
150.82
b) Nickle
each
53.40
429.19
c) C.P. brass
each
53.40
758.60
90.
each
222.48
1196.78
91.
C.I. brackets:
a) For wash basins
each
111.24
222.59
b) For sinks
each
111.24
264.34
Connections 13 mm
a) PVC
b) BCP
93.
94.
WAPDA
-do-
a) PVC
92.
Remark
-do13.4.6.1
13.4.6.3
13.4
each
each
111.24
111.24
166.91
208.67
13.4.6.4
a) 13 mm
each
53.40
290.01
b) 20 mm
each
53.40
387.44
c) 25 mm
each
53.40
554.46
d) 32 mm
each
53.40
1013.77
e) 40 mm
each
53.40
1473.08
f) 75 mm
each
53.40
1974.15
13.5.5
a) 13 mm
each
111.24
459.20
b) 20 mm
each
111.24
500.96
13 - 21
WCSR-2013 (Zone-2)
Sr.
No.
1
95.
96.
Description
Unit
2
13mm x 100mm C.P.
shower rose.
3
each
Rate (Rs)
Labour Composite
4
5
111.24
352.49
Telephonic shower:
Specifica
tion
6
13.4.6.8
each
222.48
3006.18
each
53.40
821.23
97.
each
370.80
3186.98
-do-
98.
each
1503.09
13.5.5
99.
Chromium
plated
or
oxidised gas cock 6 mm.
111.24
13.5.1.3
a) Single way
each
55.18
398.50
b) Two way
each
77.42
504.26
c) Three way
each
116.58
613.01
100.
each
39.16
66.99
-do-
101.
Copper pipe 6 mm to
10 mm diameter.
17.80
203.38
-do-
102.
Chromium
plated
or
oxidized
swan
neck
cocks 13 mm diameter:
104.
each
each
55.18
111.24
542.32
1196.88
c) Three way
each
166.42
1377.33
WAPDA
13.4.6.4
each
each
111.24
111.24
974.19
1294.31
105.
-do-
a) Single way
b) Two way
a) 32 mm
b) 40 mm
-do-
103.
Remark
-doeach
each
111.24
111.24
904.60
1224.72
-do-
a) 32 mm
each
111.24
974.19
b) 40 mm
each
111.24
1322.15
13 - 22
WCSR-2013 (Zone-2)
Sr.
No.
1
106.
Description
2
S. Trap C.P. diameter:
Rate (Rs)
Labour Composite
4
5
Unit
3
a) 32 mm
each
111.24
974.19
b) 40 mm
each
111.24
1322.15
107.
each
185.40
282.83
108.
Specifica
tion
6
13.4.6.4
-do-
13.4.5
each
143.14
444.49
each
143.14
458.40
109.
Gully
trap
100mm
diameter
of
cement
concrete
(including
305mm
x
305mm
masonry chamber and
C.I. grating 150mm x
150mm)
each
855.26
2104.92
-do-
110.
Gully
trap
100mm
diameter of cast iron
(including
305mm
x
305mm
masonry
chamber)
each
855.26
2651.02
-do-
111.
Seat
&
cover
for
European type water
closet (Pakistan made)
a) Bakelite
b) PVC
Remark
13.4.6.4
each
each
56.06
56.06
668.48
515.38
PROVIDING AND
FIXING SOIL PIPES &
FITTINGS
112.
113.
WAPDA
13.3.2.1
13.3.6.5
a) 50 mm
87.81
1400.00
b) 100 mm
112.13
1952.38
-do-
a) 50 mm
Special
148.32
423.07
b) 100 mm
Special
222.48
659.15
13 - 23
WCSR-2013 (Zone-2)
Sr.
No.
1
114.
Description
Unit
115.
WAPDA
m
m
60.81
81.58
Remark
7
1082.31
1615.05
-do-
Special
Special
148.32
222.48
372.74
562.91
C.I.
manhole
covers
having following diameter
with frames:
a) 300 mm
b) 450 mm
Specifica
tion
6
13.3.6.5
116.
Rate (Rs)
Labour Composite
4
5
13.3.7
each
each
152.28
198.75
13 - 24
569.83
1033.86
WCSR-2013 (Zone-2)
SECTION- 14
Rates for all finished works shall include the removal of surplus debris, unused
material and by products.
2.
The composite rates shall constitute compensation for the completed items of works
as per drawings, specifications and instructions of Engineer Incharge including all
labour and material/equipment required for the finished works.
Sr.
No.
Description
Unit
Rate (Rs)
Labour Composite
4
Specifi
cation
Remark
EARTH WORK
1.
cum
167.67
2.
cum
31.44
-do-
3.
cum
42.12
-do-
4.
extra
cum
10.68
-do-
5.
Excavation in foundation
of buildings, bridges &
other structures including
dag belling, dressing,
refilling with excavated
earth including watering
and ramming lead upto
30 metres and lift upto
1.5 metres.
cum
226.92
-do-
6.
Earthwork excavation in
all types of soils dressed
to designed sections
grades & profiles and
cum
154.28
14.1
to
14.6
WAPDA
14 - 1
605.42
14.1
to
14.6
&
14.20
WCSR-2013 (Zone-2)
Sr.
No.
1
Description
Unit
2
excavated
material
disposed off & dressed
lead upto 15 metres.
Rate (Rs)
Labour Composite
4
5
Specifi
cation
6
&
14.20
Remark
7
SUB-BASE COURSE
7.
Sub-base
course
of
bricks on edge 115 mm
'thick'.
cum
552.92
4848.42
14.8
8.
Sub-base
course
of
bricks ballast including
compaction to required
camber & grade
cum
341.19
1480.62
-do-
9.
cum
339.04
2997.40
14.7
BASE COURSE
10.
cum
509.70
2486.66
14.9
to
14.10
11.
cum
339.04
2938.92
-do-
SURFACING
12.
Surface treatment:
14.14
a) First coat
Sqm
13.10
284.78
b) Second coat
sqm
7.75
138.41
c) Third coat
Sqm
6.67
157.17
13.
Resurfacing of existing
roads.
Sqm
12.44
226.09
-do-
14.
sqm
12.76
82.37
14.12
WAPDA
14 - 2
WCSR-2013 (Zone-2)
Sr.
Description
No.
1
2
15. Tack coat using 0.7 kg. of
bitumen per sqm.
16.
17.
Unit
3
sqm
Rate (Rs)
Labour Composite
4
5
12.76
87.51
Specifi
cation
6
14.13
Remark
7
14.15
to
14.17
a) 25 mm thick
sqm
185.12
680.95
b) 40 mm thick
sqm
288.24
1075.06
c) 50 mm thick
sqm
357.09
1263.73
Scarifying
old
road
surface including removal
of
debris
within
30 m.
cum
177.98
DISTANCE MARKS
ETC.
18.
19.
9.73
83.40
14.17
14.33
a) K.M. stone
each
1721.06
4166.05
b) Intermediate post
each
425.61
1217.19
c) Boundary pillars
each
468.22
1462.05
d) Sign post
each
1356.73
5761.13
CONCRETE
20.
5.6
&
14.21
21. Reinforced
cement
concrete works, refer
Section-5
of
this
Schedule.
-do-
22. Fabrication
of
steel
reinforcement for cement
concrete, refer Section-5
of this Schedule.
-do-
BRICK WORK
23.
WAPDA
Brick
works,
Section-6
of
Schedule.
refer
this
6.1
to
6.5
14 - 3
WCSR-2013 (Zone-2)
Sr.
No.
1
Description
Unit
Rate (Rs)
Labour Composite
4
5
Specifi
cation
6
Remark
7
STONE WORK
25.
7.32
7.11
26.
7.0
27.
7.3
SURFACE RENDERING
28.
10.1 to
10.6
PRESTRESSED
BRIDGES
29.
Rubber bearing
30.
Steel bearing
31.
1.44
each
set of
1 end
3028.00
708.00
47.00
8.00
kg.
58.00
e) Assemble, place
attach 12 / 0.276"
cable.
156.25
172.25
per
cable
234.53
889.18
13.84
48.50
per
cable
278.41
313.06
14.23
-do-
-doper set
f)
WAPDA
cum
14 - 4
WCSR-2013 (Zone-2)
Sr.
No.
1
2
Make good
recesses each end
of the beam with
type 'A' concrete
and cure.
3
each
Rate (Rs)
Labour Composite
4
5
696.02
956.32
each
14614.48
26744.65
456.59
754.71
14.24
each
651.18
1376.46
14.28
1361.54
2086.58
14.30
to
14.32
Description
i)
j)
32.
Expansion joints.
33.
35.
R.C.C. railing.
WAPDA
Unit
14 - 5
Specifi
cation
6
Remark
7
WCSR-2013 (Zone-2)
SECTION- 15
LINING OF CANALS
1.
Composite rate for all finished works include the removal of surplus debris, unused
material and by products.
2.
The composite rates constitute full compensation for the completed items of the works
as per drawings, specifications and instructions of Engineer Incharge including all
labour and material/equipment required for the finished work.
Sr.
No.
1
1.
Description
Unit
74.04
b) side slope
sqm
103.05
sqm
177.75
Stabilized
layer
of
cement sand ratio 1:30,
50mm thick on slope.
3.
Cement plaster
thick ratio 1:3
10mm
129.57
189.92
b) side slope
sqm
162.32
222.67
13mm
6.
7.
WAPDA
Cement plaster
thick ratio 1:6
-do-
-dosqm
sqm
b) side slope
Remark
-dosqm
a) bed
5.
238.53
a) bed
Cement plaster
thick ratio 1:5
Specifi
cation
6
15.1
a) bed
2.
4.
Rate (Rs)
Labour Composite
4
5
129.57
162.32
185.45
218.20
40mm
-do-
a) bed
sqm
162.32
272.20
b) side slope
sqm
202.84
312.72
-do-
a) bed
cum
2025.68
5767.53
b) side slope
cum
2316.90
6058.75
-do-
a) bed
cum
2025.68
6226.47
b) side slope
cum
2316.90
6517.69
15 - 1
WCSR-2013 (Zone-2)
Sr.
Description
No.
1
2
8. Brick, lining (230 x 115 x
75mm) in 1:5 cement
sand mortar:
a) bed
b) side slope
9.
11.
WAPDA
cum
cum
Rate (Rs)
Labour Composite
4
5
2025.68
2316.90
Specifi
cation
6
15.1
Remark
7
7099.57
7390.79
10.
Unit
-do-
cum
cum
2025.68
2316.90
7558.48
7849.70
-do-
a) bed
cum
1690.27
5810.79
b) side slope
cum
1981.50
6102.01
-do-
a) bed
cum
1938.17
6993.99
b) side slope
cum
2261.49
7317.31
15 - 2
WCSR-2013 (Zone-2)
SECTION- 16
SHEET PILING
1.
Composite rate for all finished works include the removal of surplus debris, unused
material and by products.
2.
The composite rates constitute full compensation for the completed items of the works
as per drawings, specifications and instructions of Engineer Incharge including all
labour and equipment required for the finished work.
Sr.
No.
1
Description
Unit
1.
Cutting
Larson
piles.
2.
3.
Specific
ation
6
per cut
210.12
per cut
310.98
sqm
480.95
4.
sqm
473.99
-do-
5.
sqm
346.19
-do-
6.
Dollying piles.
each
264.39
-do-
7.
each
27.74
-do-
8.
Raising and
machine.
10360.69
-do-
9.
Turning machine 90
job
4929.14
-do-
10
job
6207.15
-do-
11.
job
8434.41
-do-
12.
415.45
-do-
13.
1000
kg
256.89
-do-
14.
Dismantling
machine.
each
15529.45
-do-
15.
each
18379.42
-do-
16.
Carriage
of
piling
machine under different
conditions.
172.27
-do-
WAPDA
Ransom and,
or equivalent
Rate (Rs)
Labour
Composite
4
5
lowering
piling
16 - 1
Remark
7
16.1
to
16.8
which
ever
applies
WCSR-2013 (Zone-2)
SECTION- 17
Composite rate for all finished works include the removal of surplus debris, unused
material and by products.
2.
The composite rates constitute full compensation for the completed items of the works
as per drawings, specifications and instructions of Engineer Incharge including all
labour and material/equipment required for the finished work.
Sr.
Rate (Rs)
Labour Composite
4
5
Specifi
cation
6
Description
Unit
1.
cum
398.09
17.1
to
17.6
2.
Weaving mattresses
sqm
230.19
-do-
No.
3.
4.
5.
WAPDA
Remark
7
Extra
carriage
would be
admissible
beyond one
km.
a)
each
bag
23.73
35.33
-do-
b)
each
bag
35.60
47.20
-do-
-do-
a)
each
bag
83.06
145.69
-do-
-do-
b)
each
bag
88.99
151.63
-do-
-do-
Carriage of cotton /
gunny / polythene bags
50kg capacity filled with
Rates don't
include
royalty and
carriage of
material to
be filled in
the bags.
-do-
17 - 1
WCSR-2013 (Zone-2)
Sr.
No
.
1
Description
Unit
Rate (Rs)
Labour Composite
4
Specifi
cation
Remark
sand or earth:
6.
7.
a) upto 30m
100 no
148.32
b) 30m to 125m
100 no
106.79
100 no
12.46
Carriage of cotton /
gunny / polythene bags
200 to 250kg capacity
filled with sand or earth:
17.1
to
17.6
a) upto 30m
100 no
593.28
b) 30m to 125m
100 no
444.96
c) Subsequent 30m
beyond 125m.
100 no
71.19
Rolling mattresses to
river edge and floating
after unrolling:
-do-
a) Area of mattress
upto 185 sqm.
sqm
70.01
b)
Area of mattress
185 to 230 sqm.
sqm
111.54
c) Area of mattress
over 230 sqm.
sqm
134.08
100 no
860.26
8.
Sewing empty
bags in sheets.
9.
cum
408.77
-do-
10.
cum
251.55
-do-
11.
12.
WAPDA
cement
929.85
-do-
-do-
cum
758.21
cum
507.25
cum
601.59
-do-
a) 150 mm mesh
sqm
116.13
181.05
b) 100 mm mesh
sqm
154.85
252.22
17 - 2
If different
wire is used
the cost of
wire can be
changed
accordingly.
WCSR-2013 (Zone-2)
Sr.
14.
cum
452.67
Specifi
cation
6
17.1
to
17.6
-do-
15.
Filling stone
crates.
wire
cum
628.28
-do-
16.
cum
209.43
-do-
17.
cum
366.65
-do-
18.
cum
628.88
-do-
19.
cum
42.12
-do-
20.
cum
418.86
-do-
21.
Providing
Pilchi
revetment
including
carriage upto one km.
sqm
64.07
159.04
-do-
22.
Surface protection by
providing
pilchi
mattresses carriage upto
one km.
sqm
185.10
260.10
-do-
23.
sqm
127.56
1435.76
-do-
24.
Constructing
groynes
made of wooden vertical
stakes 175mm to 300mm
dia.,
300mm
apart,
average lead one km.
No.
1
13.
WAPDA
Description
Filling
crates.
2
bricks-bats
in
Unit
in
3
cum
Rate (Rs)
Labour Composite
4
5
224.26
Remark
7
17.7
sqm
150.34
200.61
sqm
256.15
311.41
17 - 3
WCSR-2013 (Zone-2)
SECTION 18 OUTLETS
SECTION- 18
O U T L E T S
1.
Composite rate for all finished works include the removal of surplus debris, unused
material and by products.
2.
The composite rates constitute full compensation for the completed items of the works
as per drawings, specifications and instructions of Engineer Incharge including all
labour and material/equipment required for the finished work.
Sr.
No.
1
1.
2.
Description
Unit
Rate (Rs)
Labour Composite
4
5
job
1483.20
job
1957.82
job
2966.40
job
4004.64
e) over 10 cumecs.
job
5932.80
Dismantling Outlets:
Specifi
cation
6
Includes
consolidation
of earth after
refilling.
3.1
to
3.3
These rates
are for
dismantling
and removal
of material
and does not
include
earthwork for
which rates
are given in
item No. 1
above.
each
1483.20
each
2224.80
each
2966.40
each
3708.00
each
2224.80
f)
each
2966.40
each
3708.00
3.
Constructing temporary
A.P.M. bricks block and
fixing at site.
each
502.51
4.
each
1290.38
3.2
5.
each
1290.38
3.1 to
3.3
WAPDA
18 - 1
2.1
to
2.5
821.34
Remark
6.1 to
6.5
WCSR-2013 (Zone-2)
SECTION 18 OUTLETS
Sr.
No.
1
6.
Description
Unit
2
Constructing, watching &
removing bund for outlet
built in running water
depth:
Rate (Rs)
Labour
Composit
e
4
5
a) Upto 915 mm
each
2966.40
b) Above 915 mm
each
4004.64
Specifi
cation
6
6.1 to
6.5
7.
each
816.75
1293.35
3.1 to
3.3,
6.1 to
6.5 &
18
8.
Adjusting of an A.P.M.
outlet
including
dismantling
and
rebuilding.
each
1587.02
2331.18
-do-
9.
1522.75
1657.64
each
1142.06
1276.95
each
913.65
1048.54
each
761.38
869.84
each
609.10
691.15
10.
Repairing
damaged
reducing collar of Hume
Pipe Outlets.
each
502.51
711.92
11.
Laying iron
outlets.
2999.82
20.5
12.
each
571.53
5.9.4
13.
Fixing
pipe
outlets
including back filling of
earth and pudding for the
portion:
WAPDA
of
-do-
a) 1.5m
pipes
Remark
5.9 &
18
20.5
a) Under bank
389.51
426.91
175.71
213.12
18 - 2
The rates do
not include
cost of pipe.
WCSR-2013 (Zone-2)
SECTION 18 OUTLETS
Sr.
No.
1
14.
15.
WAPDA
Description
Unit
Rate (Rs)
Labour Composite
4
5
Specifi
cation
6
Remark
7
2.1 to
2.5 &
a) Under bank
326.30
124.59
3.1 to
3.3
552.66
590.07
238.00
275.41
18 - 3
2.1 to
2.5
&
3.1 to
3.3
&
20.5
The rates do
not include
cost of pipe.
WCSR-2013 (Zone-2)
SECTION- 19
SINKING OF WELLS
1.
Composite rate for all finished works include the removal of surplus debris, unused
material and by products.
2.
The composite rates constitute full compensation for the completed items of the works
as per drawings, specifications and instructions of Engineer Incharge including all
labour and material/equipment required for the finished work.
3.
4.
If plant is available and is supplied by the authority at site of work hire charges will be
recoverable from the contractor.
5.
The wages of crew if supplied by the authority to work the plant will also be recovered
from the contractor in addition to above charges.
6.
The stores if supplied will be recovered at actual cost plus supervision and storage
charges, etc.
Sr.
Description
No.
1
2
1. Excavation of well in dry
upto 6.0 metres below
ground level and disposal
of soil within 30 metres.
Unit
3
Rate (Rs)
Labour Composite
4
5
Cum
123.41
-do-
127.18
-do-
146.02
-do-
169.57
-do-
150.73
-do-
155.44
-do-
174.28
-do-
193.12
Specifi
cation
6
2.1 to
2.8
which
ever is
applica
ble
Remark
7
b) In hard soil
WAPDA
19 - 1
WCSR-2013 (Zone-2)
SECTION 20 MISCELLANEOUS
SECTION - 20
MISCELLANEOUS
1.
Composite rate for all finished works include the removal of surplus debris, unused
material and by products.
2.
The composite rates constitute full compensation for the completed items of the works
as per drawings, specifications and instructions of Engineer Incharge including all
labour and material/equipment required for the finished work.
Sr.
No.
1
Description
Unit
Rate (Rs)
Labour
Composite
4
5
Specific
ation
6
Remark
7
JUNGLE CLEARANCE
1.
20.2.1
to
20.2.2
a) Upto 750mm
each
964.29
each
1607.15
2.
each
1186.56
3.
Jungle
clearance
removing with 30m.
and
-do-
-do-
a) Light
100 sqm
89.77
b) Thick
100 sqm
208.95
IRON &
STEEL/ALUMINUM
WORK
4.
kg
70.25
20.3.1 to
20.3.17
5.
kg
32.78
-do-
6.
kg
22.27
-do-
WAPDA
20 - 1
WCSR-2013 (Zone-2)
SECTION 20 MISCELLANEOUS
Sr.
No.
1
Rate (Rs)
Labour
Composite
4
5
Specific
ation
6
Description
Unit
7.
sqm
140.97
20.3.1 to
20.3.17
8.
kg
11.42
-do-
9.
kg
6.53
-do-
10.
Erecting
rolled
steel
beams or rail section for
posts, etc. (other than in
roof).
kg
2.97
-do-
11.
kg
44.64
12.
143.64
-do-
-do-
Per cut
115.54
steel
Per
bend
199.06
Per cut
13.
14.
Bending
rolled
beams or rails.
15.
Fixing handles
hammers.
iron
each
61.97
-do-
16.
each
53.33
-do-
17.
each
26.13
-do-
18.
Riveting 3mm
each
6.96
-do-
19.
each
22.37
-do-
20.
33.50
21.
Per bar
42.29
-do-
22.
each cut
27.16
-do-
23.
WAPDA
of
-do232.47
348.01
to
Remark
-do-
512.69
67.65
-do-
-do-
545.87
Per
notch
20 - 2
WCSR-2013 (Zone-2)
SECTION 20 MISCELLANEOUS
Sr.
No.
1
24.
Rate (Rs)
Labour
Composite
Specific
ation
6
20.3.1 to
20.3.17
Description
Unit
2
Hoop iron netted trellis
work fixing with nails.
3
sqm
4
490.13
25.
sqm
156.83
26.
sqm
1927.94
10627.16
-do-
Size:
2.134m x
1.220m
(7 x 4)
27.
sqm
2088.06
12174.56
-do-
Size:
2.134m x
1.220m
(7 x 4)
28.
sqm
1125.16
7138.42
-do-
Size:
1.524m x
2.439m
(5 x 8)
29.
sqm
1919.39
9264.56
-do-
Size:
2.134m x
1.220m
(7 x 4)
30.
sqm
1406.72
7062.43
-do-
Size:
2.134m x
1.220m
(7 x 4)
31.
sqm
867.77
10679.61
-do-
Size:
2.439m x
2.744m
(8 x 9)
32.
sqm
717.37
5090.71
-do-
Size:
1.829m x
1.220m
(6 x 4)
33.
sqm
736.02
6498.14
-do-
WAPDA
20 - 3
Remark
7
-do-
-do-
WCSR-2013 (Zone-2)
SECTION 20 MISCELLANEOUS
Sr.
No.
1
Rate (Rs)
Labour
Composite
Specific
Remark
ation
5
6
7
20.3.1 to
20.3.17
which
ever is
applicab
4778.26
Size:
-le
1.829m x
1.220m
(6 x 4)
Description
Unit
34.
Providing
and
fixing
window grill with angle iron
frame with 10mm sq. iron
bars at 75mm centre to
centre as per approved
design of the Engineer
Incharge.
sqm
465.65
35.
sqm
629.47
1013.94
-do-
Size:
915mm x
1.524m
(3 x 5)
36.
sqm
1261.35
3885.23
-do-
Size:
1.829m x
1.220m
(6 x 4)
37.
sqm
927.23
4214.59
-do-
Size:
1.829m x
1.220m
(6 x 4)
38.
Providing
and
fixing
window grills without angle
iron frame with 10mm sq.
iron bars at 75mm centre
to centre as per approved
design of Engineer.
sqm
869.59
3705.55
-do-
Size:
1.829m x
1.220m
(6 x 4)
39.
sqm
803.15
3096.68
-do-
40.
sqm
822.44
1646.47
-do-
41.
sqm
1097.82
4259.05
-do-
WAPDA
20 - 4
WCSR-2013 (Zone-2)
SECTION 20 MISCELLANEOUS
Sr.
No.
1
Rate (Rs)
Labour
Composite
4
5
Specific
ation
6
20.3.1
to
20.3.17
which
ever is
applicable
Description
Unit
2
strap
50x30x3mm
at
750mm c/c as per drawing
No. CDO(W) 301-5B/93.
42.
24.98
27.28
43.
no
50.71
5920.38
44.
no
50.71
3963.82
45.
159.56
880.90
46.
Providing
and
fixing
aluminum natural anodized
openable hinged windows
without glazing.
sqm
767.61
5482.90
-do-
47.
Providing
and
fixing
aluminum natural anodized
openable hingd doors
without glazed.
sqm
1151.57
5903.90
-do-
-do-
48.
Providing
and
fixing
aluminum natural anodized
fly screen shutters.
sqm
246.02
1939.44
-do-
-do-
49.
Providing
and
fixing
aluminum natural anodized
openable double leaf door
hinged without glazing.
sqm
1151.37
6820.64
-do-
-do-
50.
Providing
and
fixing
aluminum natural anodized
fixed panel without glazing.
sqm
669.72
3830.78
-do-
-do-
51.
Providing
and
fixing
aluminum natural anodized
louvers.
sqm
613.45
8036.65
-do-
-do-
52.
each
319.50
2639.25
-do-
53.
Providing
and
aluminum
door
(single
action)
anodized.
each
199.69
4201.26
-do-
WAPDA
fixing
closer
natural
20 - 5
Remark
7
Analysis:
one (1)
sqm.
WCSR-2013 (Zone-2)
SECTION 20 MISCELLANEOUS
Sr.
No.
1
Rate (Rs)
Labour
Composite
4
5
Specific
ation
6
Description
Unit
54.
Providing
and
fixing
aluminum window (sliding)
with
fly
shutter
18SWG/1.2mm
section
shampean or any other
colour and green or blind
glass 5mm thick.
sqm
246.57
7066.78
7
Analysis:
one (1)
sqm.
55.
Providing
and
fixing
aluminum door (sliding)
shampean or any other
colour and green or blind
glass 5mm thick.
sqm
188.04
5981.05
-do-
56.
each
399.38
14433.88
57.
Providing
and
fixing
fabricated Iron entrance
Gate as per Drawing No.
CDO(W)/501/5A/36.
each
25937.36
79334.64
58.
each
334.21
1359.45
-do-
59.
each
334.21
1016.45
-do-
60.
29.07
108.54
-do-
61.
1238.21
4292.90
-do-
62.
533.14
1701.17
-do-
63.
each
165.43
215.20
-do-
WAPDA
20 - 6
Remark
20.3.1
to
20.3.17
which
ever is
applicable
WCSR-2013 (Zone-2)
SECTION 20 MISCELLANEOUS
Sr.
No.
1
Rate (Rs)
Labour
Composite
4
5
Specific
ation
6
20.3.1
to
20.3.17
which
ever is
applicable
Description
Unit
64.
each
152.28
192.84
65.
each
378.01
1100.08
66.
each
1192.35
2646.54
-do-
67.
39.16
193.53
-do-
68.
Providing
and
fixing
aluminum joint cover (gole)
75mm size on expansion
joint.
35.94
214.02
20.3.2
69.
51.92
122.97
-do-
70.
51.92
113.32
-do-
71.
each
51.92
258.52
-do-
72.
Providing
and
fixing
platform of 40 x 5mm GI
strap flat and batton or GI
tee iron 50 x 100 x 5mm,
1.75m long fixed in
position complete in all
respects as per drawing
No.PDW/TB-626.
sqm
14111.70
20121.67
-do-
WAPDA
20 - 7
Remark
7
WCSR-2013 (Zone-2)
SECTION 20 MISCELLANEOUS
Sr.
No.
1
73.
Rate (Rs)
Labour
Composite
4
5
2692.92
5751.98
Specific
ation
6
20.3.2
Description
Unit
2
Providing / erection of MS
plate 14 SWG size 600m
(trench cover) including
welded with MS angle iron
25 x 25 x 3mm fixed in
position as per drawing
No.PDW/TB-625 complete
in all respects.
3
sqm
74.
each
789.43
1046.45
-do-
75.
Fixing in position of
foundation
bolts
duly
assembled in template
which will be provided by
the Contractor including
welding the bolts with steel
caps as per drawing
No.PDW TC-263.
each
108.91
236.23
20.3
76.
each
76.14
292.29
20.3.7
77.
103.84
573.93
-do-
78.
13 x 13mm MS Square
bar, pipe railing having
pipe 40mm welded with
MS flat 40 x 5mm.
2718.06
4866.02
-do-
79.
Providing
and
fixing
WAPDA monogram on the
main
entry
gate
of
G/station prepared from 16
gauge MS sheet.
each
731.92
1531.15
-do-
Remark
7
FENCING
80.
WAPDA
Providing
and
fixing
barbed wire fencing with 4
horizontal and 2 cross
wires with RCC 1:2:4 posts
1700 x 150 x 300mm
(2.5m center to center)
reinforced with 4 Nos
10mm vertical bars and
3mm stirrups 300 mm
center to center complete
in all respects.
-do-
20 - 8
WCSR-2013 (Zone-2)
SECTION 20 MISCELLANEOUS
Sr.
No.
1
Rate (Rs)
Labour
Composite
4
5
178.22
644.25
Specific
ation
6
Description
Unit
2
a) Without
cement
concrete base.
3
m
b) In cement
base 1:4:8.
concrete
255.98
905.49
81.
97.15
212.56
20.3.7
82.
111.60
314.06
-do-
83.
each
95.76
112.57
20.3.2
84.
27.27
85.
each
202.09
449.62
20.3.2
86.
each
161.11
584.32
20.4
87.
each
27.84
115.85
-do-
WAPDA
20 - 9
Remark
7
20.3.7
WCSR-2013 (Zone-2)
SECTION 20 MISCELLANEOUS
Sr.
No.
1
88.
Description
Unit
2
Providing and fixing of
boundary fencing barbed
wire 14 SWG, 2ply, 4 point
(8 rows horizontal + 2
diagonal) complete in all
respects as per Dwg No.
0-3-GS-5.
3
m
Rate (Rs)
Labour
Composite
4
5
72.30
255.74
Specific
ation
6
20.4
Remark
7
SURVEYING
89.
Supplying
bamboo
bundles 3m to 3.75m with
iron shoes and flags
375mm square.
each
31.73
187.08
90.
each
3.96
12.08
91.
each
7.92
30.30
92.
20.5
20.5.1
a)
b)
c)
d)
93.
WAPDA
Upto 600 mm
600 to 915 mm
915 to 1.25 m
Above 1.25 m
each
each
each
each
23.24
30.22
37.82
71.87
20.5.2
No
8.52
No
7.99
per
30 m
of
1 row
47.17
20 - 10
11.30
66.35
WCSR-2013 (Zone-2)
SECTION 20 MISCELLANEOUS
Sr.
No.
1
Description
Unit
2
iv) Cutting and supplying
brush wood from canal
plantation or private
owner lead within 1.5km
and wattling between
stake and interwining
(Thickness of wattle
brush wood 300 mm
average).
3
-do-
B
i) Cutting and supplying
sharpened pegs 1.0m
long 75-150mm from
canal plantation lead
within 1.6km
ii) Driving pegs 1.0m long
75-150mm (Driven
375mm
below
the
available bed or ground
(Average)
Iii) Tying pegs with Munj,
patha, ban (one line
including tying around
the pegs).
iii) Cutting and supplying
brush wood from canal
plantation or private
source (lead within
1.5km) and wattling
between stakes and
interwining (Thickness
of wattled brush wood
300mm) (Average)
C
i) Cutting and supplying
sharpened pegs 1.0m
long 75-150mm from
canal plantation lead
within 1.5km (Average)
ii) Driving pegs 1.5 m long
75-150mm (Driven
450mm
below
the
available bed or ground
(Average)
iii) Tying pegs with Munj,
patha, ban (one line
including tying around
the pegs).
iv) Cutting and supplying
brush wood from canal
plantation or private
source
(lead
within1.5km)
and
wattling
between
stakes and interwining
WAPDA
Rate (Rs)
Labour
Composite
4
5
879.22
1133.11
No
9.65
No
12.44
per
30 m
of
1 row
per
30 m
of
1 row
47.17
66.35
1055.97
1335.26
No
12.37
15.74
No
13.92
per
30 m
of
1 row
-do-
47.17
66.35
1163.44
1469.39
20 - 11
Specific
ation
6
Remark
7
12.67
WCSR-2013 (Zone-2)
SECTION 20 MISCELLANEOUS
Sr.
No.
1
Description
2
(Thickness of wattled
brush wood 305mm)
(Average)
D
i) Cutting and supplying
sharpened pegs 1.75m
long 75-150mm from
canal plantation lead
within 1.5km (Average)
ii) Driving pegs 1.75m
long
75-150mm
WAPDA
Rate (Rs)
Labour
Composite
4
5
Unit
3
No
13.12
No
15.40
per
30 m
of
1 row
per
30 m
of
1 row
47.17
66.35
1280.66
1612.64
No
15.10
19.27
No
16.89
per
30 m
of
1 row
per
30 m
of
1 row
47.17
66.35
1500.46
1858.47
20 - 12
Specific
ation
6
Remark
7
16.83
WCSR-2013 (Zone-2)
SECTION 20 MISCELLANEOUS
Sr.
No.
1
94.
Description
2
Staking with bamboo from
market and brushing from
canal plantation or private
source (Royalty of brush
wood to be paid to Forest
Department or cost to
private owners if and when
required.
A
i) Supplying bamboo 2.53.0m long 65-125mm .
ii) Sharpening one end of
2.5-3.0m long bamboo
65-125mm
iii) Driving bamboo 2.53.0m long 65-125mm
(Driven 750mm below
the available bed or
ground) (Average).
iv) Tying bamboos 65125mm with munj,
patha, ban (two lines
including tying around
the bamboos).
v) Cutting and supplying
brush wood from canal
plantation or private
source
(lead
within
1.5km) and wattling
between stakes and
interwining) (Thickness
of wattled brush wood
300mm) (Average)
B
i) Supplying bamboo 3.03.75m long 65-125mm
.
ii) Sharpening one end of
3.0-3.75m
long
65125mm .
iii) Driving bamboo 3.03.75m long 65-125mm
(Driven 825mm below
the available bed or
ground) (Average).
iv) Tying bamboos 64127mm with BSWG
No.10 wire two (lines
including tying around
the bamboos and third
tie around the top end
only).
WAPDA
Rate (Rs)
Labour
Composite
4
5
Unit
3
Specific
ation
6
20.5.3
Remark
7
20.5.3
No
186.00
No
7.33
No
13.92
per
30 m
of
1 row
79.88
103.26
per
30 m
of
1 row
2332.37
2722.56
No
218.40
No
8.37
No
15.40
per
30 m
of
1 row
208.81
20 - 13
-do-
1144.81
WCSR-2013 (Zone-2)
SECTION 20 MISCELLANEOUS
Sr.
No.
1
Description
Unit
2
v) Cutting and supplying
brush wood from canal
plantation or private
source
(lead
within
1.5km) and wattling
between stakes and
intertwining (Thickness
of wattled brush wood
300mm) (Average)
3
per
30 m
of
1 row
C
i) Supplying
bamboo
No
3.75-4.25m long 65125mm
ii) Sharpening one end
No
of 3.75-4.25m long 65125mm
iii) Driving bamboo 3.75No
4.25m long 65-125mm
(Driven 1.0m below
the available bed or
ground) (Average).
iv) Tying bamboos 65per
125mm with BSWG 30m of
No.10 wire two (lines 1 row
including tying around
the bamboos and third
tie around the top end
only).
v) Cutting and supplying
per
brush wood from canal 30m of
plantation or private 1 row
source (lead within
1.5km) and wattling
between stakes and
interwining) (Thickness
of wattled brush wood
305mm) (Average)
D
i) Supplying
bamboo
4.25-5.0m long 65125mm
ii) Sharpening one end of
4.25-5.0m long 65125mm
iii) Driving bamboo 4.255.0m long 65-125mm
(Driven 1.25m below
the available bed or
ground) (Average).
iv) Tying bamboos 65125mm with BSWG
No.10 wire two (lines
including tying around
the bamboos and third
tie around the top end
only).
WAPDA
Rate (Rs)
Labour
Composite
4
5
2541.71
2969.93
Specific
ation
6
Remark
7
20.5.3
258.00
8.87
17.40
208.81
1144.81
2709.94
3179.46
No
294.00
No
9.67
No
18.88
per
30 m
of 1
row
208.81
20 - 14
20.5.3
1144.81
WCSR-2013 (Zone-2)
SECTION 20 MISCELLANEOUS
Sr.
No.
1
Description
Unit
2
v) Cutting and supplying
brush wood from canal
plantation or private
source
(lead
within1.5km)
and
wattling
between
stakes
and
interwening)
(Thickness of wattled
brush wood 300mm)
(Average)
3
per
30 m
of 1
row
E
i) Supplying bamboo 5.0No
6.0m long 65-125mm
ii) Sharpening one end of
No
5.0-6.0m
long
65125mm
iii) Driving bamboo 5.0No
6.0m long 65-125mm
(Driven 1.25m below
the available bed or
ground) (Average).
iv) Tying bamboos 64per
127mm with BSWG 30m of
No.10 wire two (lines 1 row
including tying around
the bamboos and third
tie around the top end
only).
v) Cutting and supplying
per
brush wood from canal 30m of
plantation or private 1 row
source (lead within
1.5km) and wattling
between stakes and
interwining) (Thickness
of wattled brush wood
305mm) (Average)
Rate (Rs)
Labour
Composite
4
5
2988.35
3501.48
11.71
20.88
208.81
1144.81
3275.24
3866.31
513.86
cum
421.07
96.
cum
209.52
97.
WAPDA
Remark
20.5.3
366.00
95.
a. 150 - 300 mm
b. 300 - 600 mm
c) 600 - 915 mm
Specific
ation
6
20.5.4
m
m
m
212.49
318.73
375.91
20 - 15
358.24
515.96
667.42
WCSR-2013 (Zone-2)
SECTION 20 MISCELLANEOUS
Sr.
No.
1
98.
Rate (Rs)
Labour
Composite
4
5
208.16
214.63
Specific
ation
6
20.5.5
Description
Unit
2
Fixing
enamelled
iron
gauges flush with masonry
including cost of hooks.
3
m
99.
each
60.91
100.
each
141.07
101.
23.36
20.5.8
sqm
415.09
20.5.9
sqm
351.23
Per
cut
57.35
20.6
Per
cut
110.62
-do-
each
77.25
-do-
55.40
-do-
Remark
7
20.5.6
308.45
20.5.7
105.
106.
Assembling
40mm
pressure pipe.
107.
m
m
m
m
314.44
606.12
898.09
108.
131.79
-do-
109.
Fixing
hand
(Machine only).
each
319.50
-do-
WAPDA
pump
-do-
20 - 16
WCSR-2013 (Zone-2)
SECTION 20 MISCELLANEOUS
Sr.
No.
1
Description
Unit
2
REST HOUSE
FURNITURE AND FUEL
ETC
Rate (Rs)
Labour
Composite
4
5
Specific
ation
6
110.
per
bed
345.06
361.10
2.7
111.
Washing Durries.
sqm
85.98
89.97
-do-
112.
a: Recaning
Chairs
(Cane)
i) Office chairs, single,
caning seat only
ii) Office chairs, double
caning seat only
iii) Office chairs, single
caning back only
iv) Office chair, double
caning back only
v) Easy chairs, single
caning seat only
vi) Easy chairs, double
caning seat
vii) Easy chair, single
caning back and seat
in one piece only
viii) Easy chairs, double
caning back and seat
in one piece or
couches with caned
area about 1.50 sqm.
ii)
iii)
iv)
v)
vi)
each
272.69
357.79
each
359.95
474.09
each
234.51
277.09
each
359.95
445.05
each
409.03
523.17
each
545.38
772.65
each
1090.75
1431.17
each
1363.44
2272.55
-doeach
272.69
292.71
each
447.21
486.01
each
299.96
316.48
each
359.95
382.48
each
479.93
512.47
each
654.45
712.02
each
222.48
747.56
-do-
113.
114.
Weaving cot
each
599.07
872.80
-do-
115.
Sweeping chimneys
each
148.32
152.67
-do-
116.
186.86
543.13
-do-
WAPDA
Hat
-do-
Remark
20 - 17
WCSR-2013 (Zone-2)
SECTION 20 MISCELLANEOUS
Sr.
No.
1
117.
Rate (Rs)
Labour
Composite
4
5
556.81
612.49
Specific
ation
6
20.7
Description
Unit
2
Flapping G.I. pipes for
bathroom drains.
3
each
118.
Tonne
144.50
-do-
119.
Tonne
317.91
-do-
120.
Tonne
6607.19
-do-
121.
cum
576.17
-do-
122.
Ploughing 3 times.
Hectare
4379.88
-do-
123.
Levelling dressing
making lawns.
and
sqm
36.77
-do-
sqm
29.35
-do-
125.
sqm
122.40
126.
77.86
127.
each
119.81
128.
Washing:
i) Table cloth
ii) Napkins, dusters etc.
129.
5689.80
-do-do-
136.52
-do-do-
each
each
49.92
30.35
56.88
Error! Not a
valid link.
Remark
-do-
each
well
each
well
6927.75
13855.49
SUI GAS
130.
Providing,
laying
and
testing M.S. pipe 100mm
(dia) having 5mm wall
thickness.
273.80
2361.80
20.9
131.
Providing,
laying
and
testing M.S. pipe 50mm
having
4mm
wall
thickness.
194.00
920.00
-do-
WAPDA
20 - 18
WCSR-2013 (Zone-2)
SECTION 20 MISCELLANEOUS
Sr.
No.
1
132.
Rate (Rs)
Labour
Composite
4
5
181.54
394.96
Specific
ation
6
20.9
Description
Unit
2
Providing,
laying
and
testing M.S. pipe 25mm
having
3.25mm
wall
thickness.
3
m
133.
Providing,
laying
and
testing M.S. pipe 19mm
having
3.25mm
wall
thickness.
181.54
353.21
-do-
134.
Providing,
laying
and
jointing reducing elbow
100 x 50mm at 90.
each
144.17
1257.65
-do-
135.
each
144.17
840.09
-do-
136.
each
144.17
3067.05
-do-
137.
each
99.37
1908.78
-do-
138.
each
99.37
1011.04
-do-
139.
each
99.37
291.91
-do-
140.
Providing
and
fixing
peeable regulator for sui
gas network.
each
213.58
658.97
-do-
141.
each
427.16
900.39
-do-
142.
each
427.16
1331.86
-do-
143.
Providing
and
fixing
cooking range 3 burners /
oven.
each
1281.48
17519.75
-do-
144.
each
854.32
15014.32
-do-
145.
each
854.32
11293.21
-do-
WAPDA
20 - 19
Remark
7
WCSR-2013 (Zone-2)
SECTION 20 MISCELLANEOUS
Sr.
No.
1
146.
147.
Rate (Rs)
Labour
Composite
4
5
854.32
7117.65
Description
Unit
2
Providing and fixing sui
gas metre for WAPDA
residences.
3
each
each
422.71
14582.71
1882.66
Specific
ation
6
20.9
Remark
7
-do-
OTHER
MISCELLANEOUS ITEMS
148.
each
1688.68
149.
Hoisting
and
placing
sleepers for centering
including carriage within
30 m.
each
62.41
20.8
150.
Shift
2966.40
-do-
151.
Repairing
corners
building structures.
of
each
185.89
-do-
152.
sqm
655.63
-do-
153.
each
236.32
-do-
154.
Replacing
bricks.
deteriorated
each
24.52
-do-
155.
a) Unwatering by hand
b) Bailing out water by
pump.
cum
cum
78.57
6.19
-do-
156
Repairing
corners
of
bridges
and
other
hydraulic masonry works.
each
380.69
-do-
157.
Breaking
brick
ballast
screening and stacking of
ring size:
a) 50 mm
b) 40 mm
c) 25 mm
d) 20 mm
WAPDA
-do-
cum
cum
cum
cum
628.55
733.30
838.06
942.82
20 - 20
WCSR-2013 (Zone-2)
SECTION 20 MISCELLANEOUS
Sr.
No.
1
158.
Rate (Rs)
Labour
Composite
4
5
97.32
Specific
ation
6
20.8
Description
Unit
2
Fixing broken glasses on
court yard walls, with
cement concrete coping
1:3:6.
3
m
159.
100.63
-do-
160.
Drilling
trough.
R.C.
each
143.38
-do-
161.
each
389.59
-do-
162.
each
450.00
-do-
163.
each
50.71
-do-
164.
holes
in
a) 1.5 - 1.75 m
b) 1.75 - 2.0 m
c) 2.0 - 2.5 m
d) 2.5 - 2.75 m
e) above 2.75 m
165.
-doeach
each
each
each
each
45.09
67.73
90.28
108.37
135.47
-do-
a) Upto 3 m
b) 3.0 - 3.3 m
c) 3.3 - 3.7 m
d) 3.7 - 4.0 m
e) 4.0 - 4.3 m
f) 4.3 - 4.6 m
g) 4.6 - 4.9 m
h) 4.9 - 5.2 m
i) 5.2 - 5.5 m
j) 5.5 - 5.8 m
k) 5.8 - 6.1 m
each
each
each
each
each
each
each
each
each
each
each
135.47
180.56
225.84
246.30
270.93
301.04
338.66
387.43
451.55
492.35
541.86
166.
each
84.86
-do-
167.
each
338.66
-do-
WAPDA
Remark
20 - 21
WCSR-2013 (Zone-2)
SECTION 20 MISCELLANEOUS
Sr.
No.
1
168.
Description
Unit
2
Hoisting and placing in
position
R.C.
inverted
battens:
Rate (Rs)
Labour
Composite
4
5
Specific
ation
6
20.8
a) Upto 3m
b) 3.0 - 3.7m
c) 3.7 - 4.0m
d) 4.0 - 4.3m
e) 4.3 - 4.6m
f) 4.6 - 4.9m
g) 4.9 - 5.5m
h) 5.5 - 6.1m
each
each
each
each
each
each
each
each
110.09
220.17
275.22
330.26
367.37
412.82
551.53
825.65
169.
Reinforced
cement
concrete spout including
fixing in position with top
and bottom finishes.
each
609.10
759.92
-do-
170.
sqm
155.67
353.19
-do-
171.
Per
hole
304.55
-do-
172.
380.69
-do-
173.
Per
blank
253.79
-do-
174.
Per
hole
74.16
-do-
175.
cum
838.06
-do-
176.
each
397.06
608.11
-do-
177.
each
285.52
369.08
-do-
178.
each
142.76
182.58
-do-
WAPDA
20 - 22
Remark
7
WCSR-2013 (Zone-2)
SECTION 20 MISCELLANEOUS
Sr.
No.
1
179.
2
Petty repairs to verandah.
3
each
Rate (Rs)
Labour
Composite
4
5
285.52
369.08
180.
Constructing
range as per
design
of
residences
No.120-I/3B
cooking
standard
WAPDA
drawing
each
4484.02
13279.11
-do-
181.
each
2025.30
3884.54
-do-
182.
Kg
139.19
-do-
183.
Providing
and
thermopore sheet
Description
Unit
laying
Remark
7
-do-
a) 25 mm thick
b) 40 mm thick
sqm
sqm
145.81
145.81
549.92
725.93
184.
each
118.66
311.20
185.
each
2745.63
125228.51
186.
219.32
772.22
187.
sqm
103.12
5538.67
WAPDA
Specific
ation
6
20.8
20 - 23
-do-
Analysis
for 4.0m x
2.75m
divided
into 9 Nos
equal size
WCSR-2013 (Zone-2)
SECTION 20 MISCELLANEOUS
Sr.
No.
1
188.
WAPDA
Description
Unit
2
bracing for sheet with MS
flat 25 x 3 mm and
100 mm 16 gauge
vertical post complete in all
respect.
sqm
Rate (Rs)
Labour
Composite
4
5
95.00
20 - 24
3968.36
Specific
ation
6
Remark
7
panels
and of
2.45m
clear
height.
Analysis
for 4.0m x
2.75m
divided
into 9 Nos
equal size
panels
and of
2.45m
clear
height.
WCSR-2013 (Zone-2)
SECTION 21 ELECTRIFICATION
SECTION - 21
ELECTRIFICATION
1.
Rates for all finished works shall include the removal of surplus debris, unused
material and by products.
2.
The composite rates shall constitute compensation for the completed items of works
as per drawings, specifications and instructions of Engineer Incharge including all
labour and material/equipment required for the finished works.
Description
Unit
Rate (Rs)
Specification
5
Remark
6
1 - POINT WIRING
A)
per
point
1662.48
21.3
per
point
2648.31
-do-
per
point
4570.11
-do-
per
point
3727.11
-do-
per
point
4530.94
-do-
per
point
5406.48
-do-
per
point
6499.29
-do-
WAPDA
21 - 1
WCSR-2013 (Zone-2)
SECTION 21 ELECTRIFICATION
Sr.
No.
1
8
Description
Unit
Rate (Rs)
2
Wiring 3/5 pin 5 Amps. Wall socket
point with 1/1.13 (3/.029) PVC
insulated conductor and 2.5 mm
PVC insulated earthing wire in M.S.
Conduit 19.1 mm dia 16 S.W.G.
(1.62 mm) on surface complete with
switch
socket
combined
(concealed).
3
per
point
4
1930.62
Specification
5
21.3
per
point
184.07
-do-
10
per
point
2239.22
-do-
B)
11
per
point
1732.18
-do-
12
per
point
2365.62
-do-
13
per
point
2591.54
-do-
14
per
point
3469.71
-do-
WAPDA
Remark
21 - 2
WCSR-2013 (Zone-2)
SECTION 21 ELECTRIFICATION
Sr.
No.
1
15
Description
Unit
Rate (Rs)
2
As above but 4 Nos. lighting outlet
will be controlled with one switch.
3
per
point
4
4130.32
Specification
5
21.3
16
per
point
4619.00
-do-
17
per
point
5717.84
-do-
18
per
point
184.07
-do-
19
per
point
2015.69
-do-
20
per
point
1921.12
-do-
C)
21
per
point
1248.27
-do-
22
per
point
1841.51
-do-
23
per
point
184.07
-do-
24
per
point
1274.66
-do-
WAPDA
Remark
21 - 3
WCSR-2013 (Zone-2)
SECTION 21 ELECTRIFICATION
Sr.
No.
1
25
D)
Specification
5
Description
Unit
Rate (Rs)
2
conduit 19.1mm 1.50 mm thick
fixed on surface complete with
switch socket etc.
per
point
1472.10
21.3
26
per
point
1315.67
-do-
27
per
point
1727.12
-do-
28
per
point
184.07
-do-
29
per
point
1642.02
-do-
30
per
point
2191.34
-do-
31
per
point
2464.77
-do-
32
per
point
3003.44
-do-
3288.74
-do-
33
Remark
WCSR-2013 (Zone-2)
SECTION 21 ELECTRIFICATION
Sr.
No.
1
34
Specification
5
Description
Unit
Rate (Rs)
per
point
1241.74
21.3
Remark
6
2- MISCELLANEOUS
A)
per
point
1847.00
-do-
per
point
2046.04
-do-
170.06
-do-
179.93
-do-
202.81
-do-
WAPDA
21 - 5
WCSR-2013 (Zone-2)
SECTION 21 ELECTRIFICATION
Sr.
No.
1
4
Description
Unit
2
Wiring main with 2-1/7/0.85 (7/.036)
PVC insulated wire in 19.1 mm 16
SWG (1.62 mm) thick steel conduit
fitted
on
surface
including
accessories.
3
m
4
232.45
Specification
5
21.3
271.95
-do-
363.86
-do-
452.92
-do-
571.42
-do-
405.32
-do-
10
552.93
-do-
B)
Rate (Rs)
11
158.35
-do-
12
168.22
-do-
WAPDA
Remark
21 - 6
WCSR-2013 (Zone-2)
SECTION 21 ELECTRIFICATION
Sr.
No.
1
13
Description
Unit
2
Wiring mains with 2-1/1.78(7.029)
PVC insulated wire in 19.1 mm
16 SWG (1.62 mm) gauge steel
conduit recessed in wall as required
including all accessories.
3
m
4
183.03
Specification
5
21.3
14
227.46
-do-
15
252.15
-do-
16
285.33
-do-
17
437.15
-do-
18
555.65
-do-
19
531.05
-do-
20
631.92
-do-
179.96
-do-
C)
21
WAPDA
Rate (Rs)
Remark
6
WCSR-2013 (Zone-2)
SECTION 21 ELECTRIFICATION
Sr.
No.
1
22
Description
Unit
2
Wiring mains with 3-1/1.38(3/.036)
PVC insulated wire 660 volts grade
in 19.1 mm 16 SWG (1.62 mm)
gauge steel conduit on surface as
required including all accessories.
3
m
4
197.36
Specification
5
21.3
23
203.90
-do-
24
236.54
-do-
25
302.61
-do-
26
376.44
-do-
27
576.81
-do-
28
618.16
-do-
29
712.05
-do-
30
861.66
-do-
WAPDA
21 - 8
Rate (Rs)
Remark
6
WCSR-2013 (Zone-2)
SECTION 21 ELECTRIFICATION
Sr.
No.
1
31
D)
Specification
5
Description
Unit
Rate (Rs)
2
on surface as required including all
accessories.
1171.80
21.3
32
166.95
-do-
33
184.44
-do-
34
207.74
-do-
35
257.14
-do-
36
281.42
-do-
37
366.71
-do-
38
553.51
-do-
WAPDA
Remark
21 - 9
WCSR-2013 (Zone-2)
SECTION 21 ELECTRIFICATION
Sr.
No.
1
Specification
5
Description
Unit
Rate (Rs)
2
gauge steel conduit recessed in the
wall as required including all
accessories.
39
602.85
21.3
40
664.21
-do-
41
833.52
-do-
42
1136.14
-do-
E)
43
211.28.
-do-
44
234.31
-do-
45
248.40
-do-
291.65
-do-
46
Remark
WCSR-2013 (Zone-2)
SECTION 21 ELECTRIFICATION
Sr.
No.
1
47
Description
Unit
2
Wiring mains with 4-1/7/1/04
(7/.044) PVC insulated wire 660
volts grade in 25.4 mm 16 SWG
gauge steel conduit on surface as
required including all accessories.
3
m
4
344.31
Specification
5
21.3
48
525.87
-do-
49
687.39
-do-
50
745.12
-do-
51
847.89
-do-
52
1145.96
-do-
F)
Rate (Rs)
53
189.40
-do-
54
280.55
-do-
55
225.55
-do-
WAPDA
Remark
21 - 11
WCSR-2013 (Zone-2)
SECTION 21 ELECTRIFICATION
Sr.
No.
1
Specification
5
Description
Unit
Rate (Rs)
2
conduit recessed in wall as required
including all accessories.
56
271.47
21.3
57
321.47
-do-
58
509.21
-do-
59
666.73
-do-
60
727.52
-do-
61
818.13
-do-
62
1109.85
-do-
G)
63
281.06
-do-
64
297.59
-do-
WAPDA
Remark
21 - 12
WCSR-2013 (Zone-2)
SECTION 21 ELECTRIFICATION
Sr.
No.
1
Specification
5
Description
Unit
Rate (Rs)
2
in 19.1 mm G.I. Pipe on surface
including all accessories.
65
370.63
21.3
66
404.60
-do-
67
472.31
-do-
68
609.77
-do-
69
728.95
-do-
70
772.02
-do-
71
910.65
-do-
72
1075.69
-do-
H)
73
296.27
-do-
74
320.44
-do-
75
389.26
-do-
WAPDA
Remark
21 - 13
WCSR-2013 (Zone-2)
SECTION 21 ELECTRIFICATION
Sr.
No.
1
76
Description
Unit
2
Wiring mains with 4-1/7/0.85
(7/.036) PVC insulated wire 660
volts grade in 25 mm G.I. Pipe on
surface.
3
m
4
429.71
Specification
5
21.3
77
479.85
-do-
78
670.74
-do-
79
917.22
-do-
80
976.64
-do-
81
1040.60
-do-
82
1885.68
-do-
I)
Rate (Rs)
83
83.31
-do-
84
102.69
-do-
85
110.09
-do-
86
147.54
-do-
WAPDA
Remark
21 - 14
WCSR-2013 (Zone-2)
SECTION 21 ELECTRIFICATION
Sr.
No.
1
87
Description
Unit
2
Wiring mains with 2-1/7/1.04
(7/.044) PVC insulated wire 660
volts grade in 25 mm PVC conduit
fitted on surface.
3
m
4
178.23
Specification
5
-do-
88
214.56
-do-
89
292.84
-do-
90
327.43
-do-
91
396.70
-do-
92
497.42
-do-
J)
Rate (Rs)
93
85.87
-do-
94
96.95
-do-
95
104.36
-do-
96
145.95
-do-
97
176.61
-do-
WAPDA
Remark
21 - 15
WCSR-2013 (Zone-2)
SECTION 21 ELECTRIFICATION
Sr.
No.
1
98
Description
Unit
2
Wiring mains with 2-1/7/1.35
(7/.052) PVC insulated wire in
25 mm PVC Conduit recessed in
the wall as required.
3
m
4
212.90
Specification
5
21.3
99
286.01
-do-
100
322.54
-do-
101
378.91
-do-
102
447.92
-do-
K)
103
104.69
-do-
104
117.19
-do-
105
140.91
-do-
106
173.63
-do-
107
210.10
-do-
108
295.38
-do-
WAPDA
21 - 16
Rate (Rs)
Remark
6
WCSR-2013 (Zone-2)
SECTION 21 ELECTRIFICATION
Sr.
No.
1
109
Description
Unit
2
Wiring mains with 3-1/7/1.70
(7/.064) PVC insulated wire in
31.7 mm PVC Conduit on surface
on the wall as required.
3
m
4
423.80
Specification
5
21.3
110
453.33
-do-
111
531.85
-do-
112
675.73
-do-
L)
113
98.49
-do-
114
115.99
-do-
115
137.89
-do-
116
170.59
-do-
117
207.06
-do-
118
291.45
-do-
WAPDA
21 - 17
Rate (Rs)
Remark
6
WCSR-2013 (Zone-2)
SECTION 21 ELECTRIFICATION
Sr.
No.
1
119
Description
Unit
2
Wiring mains with 3-1/7/1.70
(7/.064) PVC insulated wire 660
volts grade in 31.7 mm PVC conduit
recessed in the wall as required.
3
m
4
423.14
Specification
5
21.3
120
512.63
-do-
121
755.73
-do-
122
1081.58
-do-
M)
123
146.56
-do-
124
165.84
-do-
188.52
-do-
126
212.55
-do-
127
304.12
-do-
128
490.49
-do-
129
683.27
-do-
125
WAPDA
21 - 18
Rate (Rs)
Remark
6
WCSR-2013 (Zone-2)
SECTION 21 ELECTRIFICATION
Sr.
No.
1
130
Description
Unit
2
Wiring mains with 4-1/19/.044
PVC insulated wire 660 volts grade
in 38.2 mm PVC conduit on
surface.
3
m
4
996.52
Specification
5
21.3
131
901.76
-do-
N)
132
136.85
-do-
133
156.12
-do-
134
189.78
-do-
135
218.39
-do-
136
647.42
-do-
137
480.70
-do-
138
673.42
-do-
139
973.61
-do-
WAPDA
21 - 19
Rate (Rs)
Remark
6
WCSR-2013 (Zone-2)
SECTION 21 ELECTRIFICATION
Sr.
No.
1
140
Description
Unit
2
Wiring mains with 4-1/7/2.14
(19.052) PVC insulated wire 660
volts grade in 38.2 mm PVC
Conduit recessed in wall as
required.
3
m
4
1020.62
Specification
5
21.3
Rate (Rs)
O)
141
647.42
-do-
142
785.89
-do-
143
1357.95
-do-
144
2172.73
-do-
145
2245.62
-do-
146
2921.53
-do-
147
3547.58
-do-
P)
148
1145.90
-do-
WAPDA
21 - 20
Remark
6
WCSR-2013 (Zone-2)
SECTION 21 ELECTRIFICATION
Sr.
No.
1
149
Description
Unit
2
Supply and erection of PVC
insulated PVC Sheathed 4 core
copper cable size 19/.064(19/1.53
mm) 4 core on wooden cleats with
angle iron base size 38 mm x 3 mm
60 mm long.
3
m
4
1731.49
Specification
5
21.3
150
2843.87
-do-
151
768.84
-do-
152
1311.94
-do-
153
2428.73
-do-
Q)
E.C.C.
154
10.28
-do-
155
13.80
-do-
156
22.91
-do-
157
27.53
-do-
WAPDA
21 - 21
Rate (Rs)
Remark
6
WCSR-2013 (Zone-2)
SECTION 21 ELECTRIFICATION
Sr.
No.
1
158
Description
Unit
2
Providing & fixing hard drawn bare
copper wire 13 mm2 (8 S.W.G) as
earth continuity conductor with any
given mains or sub-main in all
system of wiring including metallic
electrical accessories.
3
m
4
32.81
Specification
5
21.3
159
53.98
-do-
160
54.86
-do-
161
74.42
-do-
162
89.42
-do-
163
125.73
-do-
164
174.22
-do-
165
230.49
-do-
166
386.95
-do-
WAPDA
21 - 22
Rate (Rs)
Remark
6
WCSR-2013 (Zone-2)
SECTION 21 ELECTRIFICATION
Sr.
No.
1
Description
Unit
Rate (Rs)
Specification
5
Remark
6
4 - ELECTRICAL ACCESSORIES
A)
each
53.80
21.3
each
55.97
-do-
each
73.10
-do-
B)
each
56.66
-do-
each
63.70
-do-
each
69.27
-do-
each
85.73
-do-
each
63.70
-do-
each
73.97
-do-
C)
8
D)
9
WAPDA
21 - 23
WCSR-2013 (Zone-2)
SECTION 21 ELECTRIFICATION
Sr.
No.
1
10
11.
E)
Description
Unit
Rate (Rs)
2
Providing and fixing A.C. one way 5
Amps 250 volts, switch in weather
proof cast iron case complete with
switch & C.I. Case.
3
each
4
265.42
Specification
5
21.3
each
406.49
-do-
each
51.42
-do-
13.
each
101.45
-do-
14.
each
50.08
-do-
15.
each
81.56
-do-
16.
each
61.32
-do-
17.
each
241.53
-do-
18.
each
73.94
-do-
19.
each
168.30
-do-
WAPDA
12.
F)
Remark
21 - 24
WCSR-2013 (Zone-2)
SECTION 21 ELECTRIFICATION
Sr.
No.
1
G)
Description
Unit
Rate (Rs)
2
3 Pin, 15 Amps Plug Socket:
Specification
5
20.
each
108.35
21.3
21
each
291.00
-do-
22
each
174.43
-do-
23
each
255.04
-do-
H)
each
147.90
-do-
25
each
191.61
-do-
26
each
412.57
-do-
27
each
615.21
-do-
Electric Bells:
28
each
130.19
-do-
29
each
79.71
-do-
WAPDA
24
I)
Remark
21 - 25
WCSR-2013 (Zone-2)
SECTION 21 ELECTRIFICATION
Sr.
No.
1
30
J)
Description
Unit
Rate (Rs)
2
Providing and fixing A.C. weather
proof iron case electric bell 200/250
volts 100 mm Gong.
3
each
4
719.10
Specification
5
21.3
each
55.47
-do-
32
each
126.90
-do-
33
each
81.08
-do-
34
each
770.54
-do-
35
each
1154.00
-do-
36
each
1934.79
-do-
37
each
1588.96
-do-
38
each
3838.21
-do-
sqm
4563.03
-do-
6712.43
-do-
A)
1
31
K)
Remark
Board:
5 - BOARDS
Providing
and
fixing
double
D.W.Board to accommodate mains
or submain control switches and for
other similar jobs on surface 50 mm
deep with upper & bottom planks
13 mm thick
WCSR-2013 (Zone-2)
SECTION 21 ELECTRIFICATION
Sr.
No.
1
3
Description
Unit
Rate (Rs)
2
Providing and fixing metal board to
accommodate mains or sub-mains
control switches and for other
similar jobs on surface.
3
sqm
4
13134.44
Specification
5
21.3
sqm
11568.64
-do-
sqm
10832.44
-do-
Remark
6
each
138.04
-do-
each
178.01
-do-
each
156.84
-do-
each
196.81
-do-
WAPDA
21 - 27
WCSR-2013 (Zone-2)
SECTION 21 ELECTRIFICATION
Sr.
No.
1
B)
Description
2
Bracket Light Fittings:
Unit
Rate (Rs)
Specification
5
each
271.28
21.3
each
231.31
-do-
each
252.47
-do-
each
212.42
-do-
C)
each
119.17
-do-
10
each
78.99
-do-
11
each
130.94
-do-
12
each
90.98
-do-
13
each
67.84
-do-
14
each
94.25
-do-
15
each
195.29
-do-
each
237.58
-do-
Fixing
A.C.
Ceiling
fan
each
regulator/dimmer on S.W. board on
surface as replacement.
WAPDA
21 - 28
216.74
-do-
16
Remark
7 - FANS
A)
1
WCSR-2013 (Zone-2)
SECTION 21 ELECTRIFICATION
Sr.
No.
1
2
B)
Description
Unit
Rate (Rs)
2
Fixing
A.C.
Ceiling
fan
regulator/dimmer on metal board
recessed in the walls/columns and
covered with sheet.
3
each
4
254.61
Specification
5
21.3
each
155.40
-do-
each
450.24
-do-
each
450.24
-do-
each
276.27
-do-
each
309.26
-do-
399.30
-do-
425.63
-do-
10
359.86
-do-
11
WAPDA
Fan Clamps:
C)
Remark
S/Erection of Fans
Supply and erection of ceiling fan
best quality including wiring of
21 - 29
-doWCSR-2013 (Zone-2)
SECTION 21 ELECTRIFICATION
Sr.
No.
1
Description
Unit
Rate (Rs)
2
down rod with 1/1.13 mm (3/.029)
PVC wire, fixing of regulator, blade,
canopy etc
a) 915 mm (36) sweep
b) 1219 mm (48) sweep
c) 1422 mm (56) sweep
each
each
each
3316.77
3669.55
3787.10
Specification
5
12
each
2957.56
-do-
13
each
121.09
-do-
14
each
121.09
-do-
D)
Remark
6
Butterfly Shutters:
15
each
133.38
-do-
16
each
155.73
-do-
17
each
166.31
-do-
18
each
183.94
-do-
7154.41
-do-
8 - SWITCH GEARS
A)
Circuit Breaker
Providing and fixing distribution
board comprising incoming and
outgoing circuit breaker, neutral link
and auxiliary wiring completely
housed in M.S. Box of 1.62 mm
thick sheet having detachable inner
cover and outer hinged type
lockable door, duly painted inside
and
outside
with
Deco
spray/powdered paint.
WCSR-2013 (Zone-2)
SECTION 21 ELECTRIFICATION
Sr.
No.
1
Specification
5
Description
Unit
Rate (Rs)
2
breaker 30 Amps. D.P. 4-Nos. outgoing 6-15 Amps. Single pole circuit
breaker with N link on prepared
board.
each
7700.11
21.3
each
9612.25
-do-
each
15501.50
-do-
each
20740.61
-do-
each
24752.23
-do-
each
27695.36
-do-
29436.34
-do-
Remark
6
WCSR-2013 (Zone-2)
SECTION 21 ELECTRIFICATION
Sr.
No.
1
Specification
5
Description
Unit
Rate (Rs)
2
400 volts & outgoing breaker S.P.
6.30 Amps. complete with volt
metre, selector switch, & phase
indication lights and N link on a
given board.
each
34222.05
21.3
10
each
39314.57
-do-
11
each
52490.24
-do-
12
each
58008.29
-do-
13
each
67544.42
-do-
7489.08
-do-
14
Remark
6
WCSR-2013 (Zone-2)
SECTION 21 ELECTRIFICATION
Sr.
No.
1
Specification
5
Description
Unit
Rate (Rs)
2
One No. circuit breaker 30/60
Amps. D.P.& 4-Nos. outgoing circuit
breakers 6.30 Amps. & N link fixed
in M.S. Box of suitable size
recessed in wall.
15
each
8873.17
21.3
16
each
10878.92
-do-
17
each
15013.75
-do-
18
each
20977.58
-do-
19
each
27950.07
-do-
20
each
29729.87
-do-
34469.72
-do-
21
Remark
6
WCSR-2013 (Zone-2)
SECTION 21 ELECTRIFICATION
Sr.
No.
1
Specification
5
Description
Unit
Rate (Rs)
2
I/C circuit breaker 100 Amps. T.P.
and outgoing
breaker
6-30
Amps. complete with N link
recessed in wall.
22
each
36472.87
21.3
23
each
52681.48
-do-
24
each
53168.16
-do-
25
each
72583.68
-do-
D)
Change-over Switches:
26
Providing
and
fixing
D.P.I/C
change-over switch 500 volts,
15 Amps, on a prepared board
each
865.69
-do-
27
Providing
and
fixing
D.P.I/C
change-over switch 500 volts,
30 Amps, on a prepared board
each
1269.79
-do-
28
Providing
and
fixing
D.P.I/C
change-over switch 500 volts,
60 Amps, on a prepared board.
each
1727.41
-do-
WAPDA
Remark
21 - 34
WCSR-2013 (Zone-2)
SECTION 21 ELECTRIFICATION
Sr.
No.
1
29
Description
Unit
Rate (Rs)
2
Providing
and
fixing
T.P.I/C
change-over switch 500 volts,
15 Amps, on a prepared board
3
each
4
1586.34
Specification
5
21.3
30
Providing
and
fixing
T.P.I/C
change-over switch 500 volts,
30 Amps, on a prepared board
each
2151.63
-do-
31
Providing
and
fixing
T.P.I/C
change-over switch 500 volts,
60 Amps, on a prepared board
each
2505.75
-do-
E)
Junction Boxes:
32
each
4773.35
-do-
33
each
4303.13
21.3
34
each
7595.41
-do-
35
each
11119.90
-do-
36
each
16265.63
-do-
37
each
8325.31
-do-
WAPDA
Remark
21 - 35
WCSR-2013 (Zone-2)
SECTION 21 ELECTRIFICATION
Sr.
No.
1
38
Description
Unit
Rate (Rs)
2
Providing and fixing on a prepared
board iron-clad bus bar with
4 copper strips of 200 Amps in
31.7mm x 6.3mm section with
chamber of overall size 914 mm x
419 mm.
3
each
4
12439.75
Specification
5
21.3
39
each
17206.06
-do-
40
each
39547.55
-do-
41
each
26525.60
-do-
42
each
52630.05
-do-
WAPDA
21 - 36
Remark
6
WCSR-2013 (Zone-2)
SECTION 21 ELECTRIFICATION
Description
Unit
Rate (Rs)
Remark
6
138.97
280.37
420.45
609.02
847.54
1254.80
B)
34.12
67.70
100.65
145.61
10
Specification
5
WCSR-2013 (Zone-2)
SECTION 21 ELECTRIFICATION
Sr.
No.
1
Description
Unit
Rate (Rs)
2
(7/.044) in existing PVC Duct / MS
channel.
11
199.33
12
296.45
C)
44.99
14
58.29
15
80.93
16
129.28
17
184.97
18
263.72
79.86
90.56
WAPDA
Remark
13
D)
Specification
5
21 - 38
WCSR-2013 (Zone-2)
SECTION 21 ELECTRIFICATION
Sr.
No.
1
Description
Unit
2
Providing & fixing of PVC Ducts
16mm x 38mm on surface
3
m
4
120.51
146.18
201.79
227.11
m.
445.66
no
2995.70
no
1993.51
E)
Rate (Rs)
Remark
6
no
2258.73
no
1880.47
no
2076.12
no
2258.73
WAPDA
Specification
5
21 - 39
WCSR-2013 (Zone-2)
SECTION 21 ELECTRIFICATION
Sr.
No.
1
Description
Unit
2
Providing and fixing of Exhaust fan
405mm (16) dia Metal body best
quality (i.e. Royal GFC, Pak etc)
3
no
4
3341.36
no
3503.32
no
3907.68
no
4325.08
F)
Rate (Rs)
no
1635.90
10
no
1988.08
11
no
6734.81
12
no
2262.00
Bracket Fans:
13
no
2379.39
14
no
2901.14
15
no
2966.36
16
no
3044.62
4453.34
17
Remark
G)
Specification
5
WCSR-2013 (Zone-2)
SECTION 21 ELECTRIFICATION
Sr.
No.
1
18
H)
Description
Unit
Rate (Rs)
2
Providing and fixing of Bracket fan
355mm (14) Louver Type best
quality (i.e. Royal, GFC, Pak etc)
3
no
4
2914.18
Remark
6
no
640.23
no
3801.15
no
1520.68
no
2544.61
no
2466.35
no
3164.19
I)
Specification
5
Cable Tray:
7
1579.42
1058.89
WAPDA
21 - 41
WCSR-2013 (Zone-2)
SECTION 21 ELECTRIFICATION
Description
Unit
Rate (Rs)
Specification
5
Remark
6
Erecting Structures/Poles
1 Collection from designated stores,
construction of foundation &
erection of given H.T. structures 36'
with complete foundation size
610x610x1981 mm as per WAPDA
Specification & backfilling.
each
7033.26
P-34
(1967)
each
3014.25
P-5
(1967)
each
2210.45
-do-
each
401.90
each
301.43
each
401.90
each
1004.75
each
4014.99
B)
WAPDA
21 - 42
P-34
(1967)
WCSR-2013 (Zone-2)
SECTION 21 ELECTRIFICATION
Sr.
No.
1
Description
Unit
Rate (Rs)
Specification
5
each
1205.70
each
502.38
each
150.71
P-1:76
(1967)
each
301.43
-do-
each
301.43
-do-
each
301.43
-do-
each
30.15
P-24:82
P-6 (1967)
30.15
C)
D)
Remark
6
WCSR-2013 (Zone-2)
SECTION 21 ELECTRIFICATION
Sr.
No.
1
Description
Unit
Rate (Rs)
2
arms as per Wapda spec. No.DDS-12.
Specification
5
P-24:82
P-6 (1967)
each
100.48
P-7:66
(1967)
per km
8038.01
per km
8038.01
per km
8038.01
per km
10047.51
per km
10047.51
per km
10047.51
per km
11052.26
per km
13061.76
per km
16076.01
E)
Remark
6
Stringing of Conductors:
WAPDA
21 - 44
WCSR-2013 (Zone-2)
SECTION 21 ELECTRIFICATION
Sr.
No.
1
Description
Unit
Rate (Rs)
Specification
5
per km
28133.02
per km
28133.02
each
502.38
each
140.67
each
200.95
each
200.95
F)
Remark
6
Stay Set
1 Collection from designated stores &
installation and fixing of stay set
complete.
G)
Street Lights
WAPDA
21 - 45
WCSR-2013 (Zone-2)
SECTION-22
Name of Article
Unit
Rate ( Rs.)
3
m
m
1,479
4
5
m
m
2,386
3,194
5,261
319
8
9
Acid carbolic
Acoustic Tile false ceiling (300X300X20mm)
litre
sqm
2,210
185
10
Adhesive
litre
451
11
kg
113
12
94
13
118
14
No.
11,368
15
16
No.
m
3,241
141
17
sqm
4,510
18
sqm
2,499
19
20
sqm
sqm
1,372
3,758
21
sqm
6,013
22
Aluminium Window
sqm
3,750
23
24
kg
Set
81
1,330
25
Andrine
kg
2,954
26
No.
155
27
28
No.
No.
182
215
29
No.
245
30
No.
305
31
32
No.
No.
94
68
33
Barbed wire
kg.
112
34
No.
No.
45
35
4,059
36
No.
6,765
37
No.
79
38
No.
No.
4,500
39
WAPDA
22-1
481
925
3,000
WCSR-2013 (Zone-2)
Sr.
No.
Name of Article
Unit
Rate ( Rs.)
1
Bewelled Nuts
Bhoosa
No.
kg.
43
No.
No.
96
132
44
No.
180
45
46
Bidet Complete
Binder (required during road surfacing)
No.
kg
4,538
23
47
Binding Wire
kg.
105
48
Bitumen
49
50
Bitumen washers
Black Japan Paint
No.
litre
2
94
51
kg.
60
52
No.
60
53
54
kg.
No.
60
9
55
Bond Cement
cum
550
56
Bowl Valve
No.
135
57
No.
58
No.
192
271
59
No.
406
60
No.
778
61
62
No.
No.
1,150
1,556
63
No.
113
64
No.
94
65
Brass Hook
66
67
Packet
(100 Nos.)
No.
No.
68
No.
699
69
No.
981
70
Packet
(100 Nos.)
400
71
Packet
(100 Nos.)
500
72
No.
730
73
No.
m
900
74
1,954
75
3,129
76
3,007
77
78
3,335
3,833
40
41
42
WAPDA
M. Ton
22-2
85,000
4,000
699
958
WCSR-2013 (Zone-2)
Sr.
No.
Name of Article
Unit
Rate ( Rs.)
m
m
4,388
82
m
m
6,832
10,645
83
658
84
85
m
m
911
1,146
86
Brick 230x115x75mm
87
88
1
79
80
81
4,895
100 Nos.
700
cum
788
89
100 Nos.
cum
1,100
788
90
1000 Nos.
700
91
100 Nos.
600
92
93
100 Nos.
cum
900
621
94
No.
243
95
No.
175
96
sqm
97
cum
136
1,291
98
Burnt Bricks
100 Nos.
700
99
100 Nos.
400
100
101
100 Nos.
kg
600
2
102
pair
90
103
pair
124
104
105
No.
No.
1,240
1,056
106
No.
338
107
No.
108
No.
676
32
109
No.
28
110
No.
208
111
No.
112
334
1,398
113
1,274
114
851
115
116
m
m
7,723
9,467
117
96
118
11,211
119
1,018
WAPDA
22-3
WCSR-2013 (Zone-2)
Sr.
No.
Name of Article
Unit
Rate ( Rs.)
1
C.I. Pipe 2.5" (65 mm)
C.I. Pipe 20mm (3/4")
m
m
1,059
123
m
m
163
1,099
124
1,099
125
126
m
m
179
1,398
127
128
222
129
130
m
m
1,945
2,492
4,236
131
5,980
132
each.
133
134
No.
No.
135
No.
136
No.
137
No.
138
No.
139
No.
140
No.
141
142
No.
No.
143
No.
144
C.P. Knob
No.
145
146
No.
No.
147
No.
148
C.P. Rod
149
No.
150
No.
151
No.
152
No.
153
No.
154
No.
155
Cane Bamboo
kg.
156
157
Cane Plastic
Carbon (Low) Steel
kg.
kg
158
Catcher
No.
159
Caustic Soda
kg.
160
Cement
bag
120
121
122
WAPDA
22-4
111
520
263
180
517
571
192
361
376
342
462
789
39
15
1,127
357
489
15
1,033
195
338
282
406
316
698
235
78
25
100
440
WCSR-2013 (Zone-2)
Sr.
No.
Name of Article
Unit
Rate ( Rs.)
4
100 Nos.
100 Nos.
1,500
164
100 Nos.
100 Nos.
1,800
2,300
165
Cement White
bag
678
166
167
Centring shuttering
Ceramic tile light color glazed finish (150X150mm)
cum
sqm
940
690
168
sqm
630
169
sqm
643
170
171
sqm
sqm
893
725
172
sqm
710
173
sqm
636
174
175
sqm
kg
690
13
176
Charcoal
kg.
12
177
Chisel
No.
56
178
sqm
179
sqm
302
341
180
Cinder
cum
312
181
No.
28
182
183
No.
m
65
23
184
Coirban
kg
113
185
Colchisin
kg
2,193
186
187
100 Nos.
100 Nos.
3,100
2,600
188
Colouring material
kg
113
189
Concure 90
litre
190
Conmix SP4
litre
55
90
191
No.
13,153
192
193
161
162
163
1,600
150
sqm
194
pair
531
106
195
No.
51
196
No.
197
198
Cotton Waste
Cow dung
kg
cum
38
3,251
199
Creosote Paint
litre
105
200
93
201
Dampo
kg
103
WAPDA
22-5
WCSR-2013 (Zone-2)
Sr.
No.
Name of Article
Unit
Rate ( Rs.)
4
Dawan
Diluted Termite Proofing Solution
kg
litre
1,115
205
Deodar Wood
Dhajji
cum
kg
141,280
9
206
Diesel Oil
litre
110
207
208
Distemper
Door Handle
kg
No.
45
125
209
No.
1,879
210
Door Stop
No.
11
211
212
pair
pair
1,000
250
213
No.
733
214
Drawer Lock
No.
49
215
216
Drawer Railing
Dressed Stone
No.
cum
160
1,483
217
cum
399
218
Earth (ordinary)
cum
399
219
No.
220
Electrode
Packet
564
338
221
Emulsion
litre
251
222
Enamel Synthetic
litre
480
223
224
sqm
No.
364
30
225
No.
96
226
No.
132
227
228
No.
m
199
3,461
229
4,038
230
231
4,976
6,552
232
9,858
233
4,395
234
235
5,252
6,509
236
8,247
237
12,909
238
239
sqm
sqm
969
1,500
240
Filler Dust
cum
526
241
Fine grit
cum
1,381
242
cum
394
202
203
204
WAPDA
22-6
75
WCSR-2013 (Zone-2)
Sr.
No.
Name of Article
Unit
1
243
244
Fire brick
Fire hydrant 50mm (2") (Pak made)
100 Nos.
No.
246
No.
kg
247
No.
248
249
No.
sqm
250
No.
251
No.
252
253
French Polish
Fuel wood
litre
kg
254
255
256
257
m
m
258
259
260
261
262
263
264
265
m
kg.
266
267
kg.
268
269
pair
pair
270
pair
271
pair
272
pair
273
pair
274
pair
275
pair
276
pair
277
pair
278
pair
279
280
pair
pair
281
pair
282
pair
283
pair
245
WAPDA
22-7
Rate ( Rs.)
4
2200
911
1,240
366
45
188
2,488
54
32
209
6
656
1,086
1,609
112
1,979
161
229
301
381
477
769
110
23
108
1,250
1,920
124
2,200
2,480
2,760
169
3,040
3,320
207
3,600
248
3,880
650
700
860
WCSR-2013 (Zone-2)
Sr.
No.
Name of Article
Unit
Rate ( Rs.)
1
G.I. Flanges 75mm (3")
G.I. Wire No. 15
pair
kg
1,050
287
No.
No.
278
402
288
No.
346
289
290
No.
kg
11,800
122
291
No.
2,850
292
No.
8,000
293
294
No.
sqm
1,028
475
295
sqm
564
296
No.
169
297
No.
113
298
299
m
m
13
10
300
11
301
13
302
303
Glue
kg.
14
90
304
Sqm
1,200
305
Grip Handle
No.
306
307
No.
No.
643
169
308
Gum, indigo
kg
150
309
No.
169
310
311
Gypsum
Gypsum board
kg
Sqm
124
120
312
kg
109
313
314
No.
each
38
128
315
each
57
316
each
85
317
Hanger Chock
No.
318
Hard Board
sqm
9
346
319
Hard Murum
cum
179
320
doz.
406
321
322
Hemp
Helical core for 12/0.276" cable
kg
m
26
15
323
doz.
3,072
324
doz.
84
284
285
286
WAPDA
22-8
138
WCSR-2013 (Zone-2)
Sr.
No.
Name of Article
Unit
Rate ( Rs.)
1
Hinges 4" (100 mm)
Hinges 5" (125 mm)
doz.
doz.
192
328
doz.
doz.
768
1,536
329
Hold Fast
kg.
83
330
331
No.
No.
676
28
332
No.
333
No.
334
335
No.
No.
7
10
336
No.
16
337
No.
26
338
339
No.
No.
32
36
340
No.
341
sqm
4,510
342
Iron Shoe
No.
343
Jointing Solution
kg
28
366
344
Jute
kg.
170
345
Jute Bag
No.
62
346
347
cum
litre
48,565
97
348
Kiker Wood
cum
29,139
325
326
327
396
No.
99,215
Sqm
467
352
Sqm
kg.
252
147
353
Lead wool
kg
90
354
40 kg.
560
355
Lime Unslaked
40 kg.
356
Limpet washers
No.
369
7
357
Linseed Oil
litre
596
358
No.
66
359
Long Hinges
15
360
No.
852
No.
1,299
litre
221
26
349
350
351
362
363
361
WAPDA
m
22-9
WCSR-2013 (Zone-2)
Sr.
No.
Name of Article
Unit
Rate ( Rs.)
Molding Plain 20 mm
M.S. (Plain bars) 40 Grade(Tensile Strength 276 MPa)
m
M. Ton
75,000
367
M. Ton
M. Ton
80,000
81,000
368
M. Ton
76,000
369
370
M. Ton
kg
82,000
81
371
173
372
442
373
374
m
m
98
139
375
1,740
376
2,290
377
378
m
M. Ton
2,990
118,000
379
M. Ton
106,000
380
1,740
381
382
2,290
2,990
383
4,004
384
5,018
385
386
m
m
6,179
7,340
387
9,600
388
14,250
389
390
m
m
18,900
605
391
1,194
392
No.
393
Manila Rope
kg
1,082
78
394
Manure
cum
291
395
Marble chips
bag
97
396
sqm
397
sqm
1,820
1,688
398
Marble Powder
399
sqm
545
400
401
sqm
sqm
696
1,245
402
Mineral Oil
403
404
364
365
366
WAPDA
kg
16
kg
38
each
500
each
875
22-10
WCSR-2013 (Zone-2)
Sr.
No.
Name of Article
Unit
Rate ( Rs.)
litre
cum
5,602
408
100 Nos.
100 Nos.
409
100 Nos.
1,900
2,400
410
411
Motrice Lock
MS 18 gauge Square tube 32x32mm (1 x 1)
each
m
412
No.
413
No.
414
415
No.
No.
416
No.
417
No.
418
No.
No.
1,052
419
420
No.
421
No.
1,240
422
No.
423
No.
424
No.
425
MS bars (square)
kg
426
427
MS Eye Hook
MS Iron Hook
No.
No.
428
MS sheet 2 mm thick
kg
429
MS Sheet 22 SWG
kg
430
431
MS strap
MS Tee
kg
kg
432
MS Tubular Pipe
433
No.
434
No.
435
No.
436
kg
437
Neoprene Gasket
kg
438
No.
439
No.
440
Nipple\bush
No.
441
442
kg.
litre
443
No.
444
No.
445
Packing Material
kg
405
406
407
WAPDA
22-11
381
1,700
516
156
460
564
780
836
883
977
1,127
122
1,644
301
526
79
6
26
92
106
79
79
237
156
738
1,466
53
695
282
304
23
372
152
643
902
94
WCSR-2013 (Zone-2)
Sr.
No.
Name of Article
Unit
Rate ( Rs.)
1
Paint
Partal Wood
litre
cum
42,384
449
No.
No.
676
361
450
No.
2,334
451
452
No.
No.
90
130
453
No.
192
454
No.
284
455
456
No.
No.
406
571
457
No.
1,037
458
No.
1,353
459
460
Peg (wooden)
Petrol
No.
litre
15
103
461
kg.
95
462
kg.
175
463
Pilchi
cum
464
cum
996
1,691
465
No.
864
466
sqm
551
467
468
No.
No.
48
47
469
No.
51
470
No.
43
471
472
No.
No.
44
33
473
litre
325
474
475
sqm
47
349
476
sqm
403
477
kg.
255
478
kg
479
Putty
kg
2
94
480
534
481
728
482
483
m
m
1,031
1,587
484
3,109
485
4,631
486
6,153
446
447
448
WAPDA
22-12
436
WCSR-2013 (Zone-2)
Sr.
No.
Name of Article
Unit
Rate ( Rs.)
m
m
352
490
m
m
650
919
491
1,411
492
493
m
m
2,766
3,819
494
4,872
495
312
496
497
m
m
831
1,239
498
1,798
499
125
500
501
m
m
175
231
502
364
503
496
504
505
807
1,204
506
1,749
507
112
508
509
m
m
148
226
510
354
511
482
512
513
No.
No.
45
34
514
No.
19
515
PVC Gasket
kg
516
each
47
38
517
each
74
518
each
153
519
each
520
each
233
379
521
each
447
522
each
517
523
524
each
each
618
24
525
each
62
526
each
94
527
each
237
487
488
489
WAPDA
22-13
458
WCSR-2013 (Zone-2)
Sr.
No.
Name of Article
Unit
Rate ( Rs.)
each
sqm
250
531
No.
No.
34
79
532
357
533
534
m
m
146
723
535
851
536
1,086
537
538
m
m
1,301
1,530
539
1,760
540
2,288
541
542
m
m
2,793
381
543
570
544
605
545
546
Rawl Plug
No.
616
2
547
kg
11
548
No.
541
549
550
Red Oxide
Reducer 100mm (4")
kg
No.
62
217
551
No.
424
552
No.
630
553
554
No.
No.
837
1,043
555
No.
1,250
556
No.
557
No.
1,456
1,663
558
No.
1,869
559
No.
2,076
560
No.
561
No.
85
121
562
No.
902
563
No.
778
564
565
litre
each
40
631
566
each
591
567
Rolling Spring
No.
19
568
cu cm
528
529
530
WAPDA
22-14
540
WCSR-2013 (Zone-2)
Sr.
No.
Name of Article
Unit
Rate ( Rs.)
No.
No.
34
572
m
litre
113
88
573
RW 043 Regulator
No.
1,804
574
575
No.
No.
79
699
576
No.
981
577
Sand (Coarse)
cum
869
578
579
Sand (Fine)
Sand Paper
cum
No.
489
14
580
Saw Dust
kg
20
581
kg
141
582
583
Scrap Wood
Screws
kg
100 Nos.
12
500
584
No.
496
585
No.
372
586
587
sqm
88
475
588
Shutter (MS)
160
589
Simple Burner
No.
180
590
591
No.
No.
383
2,931
592
No.
3,270
593
No.
2,255
594
595
No.
each
596
No.
25,650
597
No.
598
No.
36,000
4,800
599
No.
7,150
600
No.
9,500
601
No.
602
No.
10,213
10,925
603
No.
19,110
604
No.
27,295
605
606
No.
No.
1,165
1,100
607
No.
16,500
608
pack
1,344
609
No.
1,699
569
570
571
WAPDA
22-15
68
150
125
WCSR-2013 (Zone-2)
Sr.
No.
Name of Article
Unit
Rate ( Rs.)
No.
No.
1,133
613
No.
No.
696
1,529
614
No.
2,361
615
616
No.
No.
3,194
4,026
617
No.
4,859
618
No.
5,691
619
620
No.
No.
6,524
7,356
621
No.
8,189
622
No.
148
623
624
No.
sqm
475
654
625
Solignum Paint
litre
105
626
cum
394
627
Solvent
litre
628
No.
156
94
629
kg.
142
630
Sprit
litre
78
631
632
Spun Yarn
Stack
kg
No.
45
9
633
Staple (heavy)
kg
338
634
Stead Handles
No.
19
635
636
Steam Coal
Steel Bearing for Prestressed Bridges
kg
each
13
5,690
637
cum
1,291
638
cum
639
cum
1,432
1,291
640
Stone Dust
cum
996
641
No.
156
642
sqm
643
149
1,700
644
No.
77
645
No.
118
646
647
No.
No.
220
23
648
No.
5,073
649
bag
451
650
No.
195
610
611
612
WAPDA
22-16
100 Nos.
566
WCSR-2013 (Zone-2)
Sr.
No.
Name of Article
Unit
Rate ( Rs.)
1
Surface Box ( 230x150mm)
Surface Box (230x230mm)
No.
No.
457
654
Surkhi
Sutlee
cum
kg
322
56
655
kg
94
656
657
No.
No.
395
981
658
No.
879
659
SWG18/1.2mm
sqm
750
660
661
T. Hinges
Teak Wood
doz.
cum
780
215,452
662
No.
2,255
663
No.
622
664
665
No.
litre
361
1,115
666
Terpantine Oil
litre
147
667
No.
193
668
kg
669
Thermosole
sqm
340
267
670
Trough Stone
No
17
671
Timber (Shisham)
cum
61,810
672
673
No.
No.
1,426
713
674
No.
357
675
No.
1,881
No.
1,254
No.
314
651
652
653
970
677
678
No.
1,867
679
No.
680
No.
2,334
1,407
681
doz.
216
682
doz.
348
683
684
doz.
Sqm
384
485
685
No.
147
686
687
No.
No.
214
45
688
litre
36
689
litre
690
No.
45
825
676
WAPDA
22-17
WCSR-2013 (Zone-2)
Sr.
No.
Name of Article
Unit
Rate ( Rs.)
4
No.
Litre
2,368
694
Wash Basin 45 cm
Wash Basin 55/56 cm
No.
No.
1,150
1,400
695
Wash Basin 65 cm
No.
1,600
696
697
Washing Powder
Washing Soap
kg
No.
68
30
698
No.
1,800
699
No.
8,456
700
701
No.
kg
11,800
156
702
litre
435
703
cum
470
704
705
Welding rod
White Glazed Tiles (6"x6"x1/4")(150mmx150mmx6mm)
kg.
100 Nos.
122
114
706
No.
23
691
692
693
405
No.
1,033
708
litre
225
709
Wire 10 SWG
kg
710
120
28
711
Wire Brush
No.
79
712
sqm
126
713
714
sqm
m
291
75,163
715
Wooden Plugs
No.
716
Zinc
kg
94
707
WAPDA
22-18
WCSR-2013 (Zone-2)
SECTION-23
Description
Unit
Rate
(Rs.)
4
PVC WIRES
1.
12
16
22
33
49
75
99
162
f)
2.
i)
262
j)
298
12
20
26
39
53
79
114
37
41
37
f)
3.
WAPDA
23-1
WCSR-2013 (Zone-2)
Sr.
No.
1
4.
5.
Rate
(Rs.)
4
Description
Unit
41
59
87
128
173
250
124
185
260
359
520
847
1,149
2,197
3,795
75
79
132
142
225
doz
355
doz
426
doz
709
doz
1,182
doz
1,490
i)
6.
7.
WAPDA
23-2
WCSR-2013 (Zone-2)
Sr.
No.
1
8.
9.
10.
11.
12.
13.
14.
WAPDA
Description
Unit
Rate
(Rs.)
4
doz
335
doz
404
doz
1,044
doz
1,458
doz
296
doz
355
doz
384
doz
1,064
doz
1,230
doz
189
doz
207
doz
355
doz
434
doz
788
doz
296
doz
443
doz
906
i)
doz
1,143
doz
142
doz
197
doz
307
doz
520
doz
757
doz
189
doz
284
doz
315
doz
414
doz
709
doz
128
doz
136
doz
217
doz
256
doz
370
doz
71
doz
83
doz
130
doz
162
23-3
WCSR-2013 (Zone-2)
Sr.
No.
1
15.
16.
17.
18.
Description
Unit
3
doz
Rate
(Rs.)
4
284
doz
256
doz
315
doz
709
doz
1,281
doz
167
doz
189
doz
276
doz
367
doz
473
doz
213
doz
284
doz
355
doz
426
doz
532
doz
59
doz
71
doz
106
doz
122
doz
148
97
136
185
240
296
f)
386
603
945
doz
422
doz
611
doz
709
doz
828
doz
985
doz
1,419
f)
doz
4,729
doz
5,675
doz
8,536
i)
20.
WAPDA
23-4
WCSR-2013 (Zone-2)
Sr.
No.
1
21.
22.
23.
24.
WAPDA
Description
Unit
Rate
(Rs.)
4
doz
118
doz
142
doz
213
doz
307
doz
378
f)
doz
757
doz
1,419
doz
2,128
i)
doz
2,483
doz
520
doz
589
doz
875
doz
1,277
doz
1,655
f)
doz
2,365
doz
2,463
doz
5,557
i)
doz
11,350
doz
631
doz
780
doz
1,182
doz
1,557
doz
1,892
f)
doz
2,838
doz
3,389
doz
7,094
doz
10,877
doz
166
doz
236
doz
402
doz
520
doz
709
f)
doz
1,088
doz
1,951
doz
2,128
i)
doz
4,769
doz
doz
260
23-5
339
WCSR-2013 (Zone-2)
Sr.
No.
1
25.
26.
Description
Unit
Rate
(Rs.)
4
doz
355
doz
394
doz
709
doz
828
doz
1,971
f)
doz
2,975
doz
4,020
doz
69
doz
85
doz
128
doz
146
doz
181
f)
doz
246
doz
382
doz
414
i)
doz
473
24
30
32
39
no
10
no
12
no
16
no
19
no
10
no
12
no
16
no
19
no
no
no
10
no
12
no
10
no
12
no
16
no
20
27.
28.
29.
30.
31.
WAPDA
23-6
WCSR-2013 (Zone-2)
Sr.
No.
1
32.
Description
Unit
Jointing solution
Rate
(Rs.)
4
kg.
410
16
20
24
f)
41
49
57
i)
68
j)
96
113
l)
130
151
each
20
each
24
each
30
each
16
each
22
each
30
each
18
each
20
each
30
each
24
each
28
each
30
each
26
39.
each
24
each
each
24
40.
ELECTRICAL ACCESSORIES
Surface Type Switches
34.
Ceiling Rose
37.
WAPDA
23-7
14
WCSR-2013 (Zone-2)
Sr.
No.
1
Description
Unit
Rate
(Rs.)
4
41.
each
13
42.
each
53
43.
each
20
44.
each
65
each
138
each
167
each
276
each
197
each
276
each
118
each
167
each
177
each
548
each
887
each
1,192
each
1,163
each
1,537
each
1,833
each
6,680
each
11,823
f)
each
14,404
each
1,783
b) 100 amps bus bar chamber 1.37 m (4.5 ft) long 2 strips
each
3,310
each
5,636
each
3,153
e) 100 amps bus bar chamber 1.37 m (4.5 ft) long 3 strips
each
6,660
f)
each
7,685
each
3,547
h) 100 amps bus bar chamber 1.37 m (4.5 ft) long 4 strips
each
7,685
i)
each
11,429
48.
WAPDA
WCSR-2013 (Zone-2)
Sr.
No.
1
50.
51.
52.
53.
WAPDA
Description
Unit
Rate
(Rs.)
4
each
2,759
each
5,636
each
11,271
each
5,123
each
7,685
f)
each
15,370
each
5,912
each
8,769
i)
200 amps bus bar chamber 1.37 m (4.5 ft) long 4 strips
each
13,005
j)
200 amps bus bar chamber 1.82 m (6.5 ft) long 4 strips
each
17,341
each
3,251
l)
each
8,079
each
6,503
each
9,951
o) 300 amps bus bar chamber 1.37 m (4.5 ft) long 4 strips
each
13,794
each
1,986
each
7,685
r) 500 amps bus bar chamber 1.37 m (4.5 ft) long 2 strips
each
16,365
each
27,587
t)
each
10,247
u) 500 amps bus bar chamber 1.37 m (4.5 ft) long 3 strips
each
26,602
each
43,351
each
15,764
each
2,168
each
32,513
each
83
b) Buzzer (Electric)
each
41
each
577
each
867
BUSH BUTTONS
a) Piano type wall push button
each
24
each
24
each
26
EXHUAST FANS
a) ACS P Exhaust fan Plastic body 6
each
1,015
each
1,379
each
1,419
WCSR-2013 (Zone-2)
Sr.
No.
1
Unit
each
1,892
each
2,404
each
4,138
each
1,596
each
1,695
each
1,911
each
2,365
each
49
each
55
each
89
f)
54.
Rate
(Rs.)
4
Description
WOODEN MATERIAL
55.
Rawal plug
each
56.
Wooden/Rubber bush
each
each
0.51
each
0.59
each
0.69
each
1.18
each
f)
each
each
100 nos
10
100 nos
11
100 nos
12
100 nos
13
100 nos
14
each
12
each
16
each
18
each
22
each
28
TINNED SCREWS
57.
WAPDA
23-10
WCSR-2013 (Zone-2)
Sr.
No.
1
Description
Unit
Rate
(Rs.)
4
SHEETS
60.
a) Masonite sheet
sqm
1,596
b) Plastic sheet
sqm
1,438
c) Tufnol sheet
sqm
2,522
d) Delaron sheet
sqm
3,153
i.
355
ii.
512
i.
71
ii.
158
75
118
83
71
130
256
296
each
each
18
each
16
each
51
each
26
each
26
each
20
each
26
68.
each
32
69.
Robin Reel
each
16
70.
each
18
each
51
each
63
each
43
71.
each
3,251
72.
each
24
73.
G.I. Thimble
each
30
74.
71
81
62.
63.
64.
65.
66.
67.
WAPDA
23-11
WCSR-2013 (Zone-2)
Sr.
No.
7
75.
76.
77.
Description
Unit
Rate
(Rs.)
4
91
3,941
2,365
each
187
each
each
512
each
167
each
217
39
47
55
148
386
404
122
each
217
each
246
512
79.
80.
roll
217
83.
Tin ingot
roll
1,025
84.
Kointing ferruls
set
138
85.
Cable compound
kg
128
kgs
296
each
69
87.
kgs.
12
88.
Charcoal dust
kgs.
20
89.
kgs.
116
90.
each
30
91.
0.91 m (3 ft.) lighting copper rod with 5 spikes and ball etc.
complete
each
1,971
92.
93.
Earthing
86.
WAPDA
23-12
kg.
276
each
39
WCSR-2013 (Zone-2)
Sr.
No.
1
Description
Unit
Rate
(Rs.)
4
WATER PUMPS
94.
a) M.S. bolts with nuts 228 mm long with steel base plate
each
118
each
414
c) M.S. bolts with nuts 457 mm long x (18) long with steel
base plate
each
532
each
640
each
828
each
1,409
each
3,035
each
5,320
each
7,291
each
2,207
each
828
each
2,562
each
2,857
each
2,956
each
2,365
each
195
each
152
Pkt of 25
pieces
281
b) Tube holder
doz.
197
pair
59
102.
each
59
103.
each
158
each
177
104.
each
591
105.
each
236
106.
each
99
107.
each
1,084
108.
each
985
109.
each
236
110.
each
1,094
95.
96.
97.
Bracket Fan
99.
100.
101.
WAPDA
23-13
WCSR-2013 (Zone-2)
Sr.
No.
1
Description
Unit
Rate
(Rs.)
4
each
1,025
each
680
each
729
111.
each
128
112.
each
522
113.
kg
729
kg.
788
114.
doz
189
115.
kg.
473
kg.
528
116.
V.D. Paper
kg.
985
117.
Varnish (Insulations)SAMAKA
litre
79
118.
no.
177
119.
no.
118
120.
no.
414
no.
335
doz.
154
each
218
each
522
each
35
each
47
each
57
each
69
each
91
f)
each
150
each
30
each
30
each
49
121.
122.
123.
WAPDA
23-14
WCSR-2013 (Zone-2)
SECTION-24
WAPDA
Sr.
No.
Trade
Unit
Rate (Rs.)
1
2
Armature Winder
Belcha man
No
No
441
Belder
No
401
4
5
Bellows man
Blacksmith
No
No
401
Boatman
No
481
Boiler Foreman
No
562
8
9
Bullockman
Bullockman 1/2 pair
No
No
441
401
10
Cable Jointer
No
562
11
Caner
No
441
12
13
No
No
401
14
Carrier
No
401
15
No
642
16
17
Chakriman
Chiseller
No
No
401
646
18
Chowkidar
No
401
19
Cleaner
No
401
20
21
Compressor operator
Concrete Lining Machine Operator
No
No
646
802
22
Crane Driver/Operator
No
562
23
No
562
24
25
No
No
646
401
26
Digger
No
401
27
28
No
No
562
29
Dolley man
No
401
30
Dozer Operator
No
562
31
32
Dresser
Driller
No
No
584
562
33
No
661
34
No
661
35
Driver (Tractor)
No
36
Electrician
No
646
640
37
Fitter
No
646
38
Fitter (Electrical)
No
481
39
Foreman (Civil)
No
720
24-1
401
680
720
441
WCSR-2013 (Zone-2)
Sr.
No.
Trade
Unit
Rate (Rs.)
40
41
Foreman (Electrical)
Glazier
No
No
680
42
43
Greaser
Gutti Man
No
No
441
401
44
Hammer Man
No
646
45
No
646
46
47
Helper
Light Duty Driver
No
No
440
646
48
Lineman
No
646
49
Machine Mistry
No
521
50
51
Mali
Mason
No
No
441
752
52
Mate
No
481
53
Mechanic
No
521
54
55
Meter Reader
Operator (well sinking)
No
No
441
481
56
Painter
No
640
57
Plumber
No
720
58
59
Polisher
Quarry man
No
No
592
441
60
Rammer
No
401
61
62
Sawyer
Skilled Labour
No
No
441
646
63
Smithy cooly
No
441
64
Spray Man
No
441
65
66
Sprayman Helper
Supervisor
No
No
401
562
67
Surveyor
No
481
68
Switchboard Attendant
No
481
69
70
Tailor
Tiles Layer
No
No
481
71
Trailer Driver
No
562
72
Unskilled Labour/Cooly
No
480
73
74
Water man
Welder Grade-I
No
No
480
640
75
Welder Grade-II
No
441
76
Well Borer
No
441
77
Wireman
No
78
Work Mistry
No
441
481
441
481
Note:
These Rates are hiring charges of Man-power/Labour, per day and one working day is based
on eight (8) hours
WAPDA
24-2
WCSR-2013 (Zone-2)
SECTION-25
Machinery
Unit
Rate (Rs.)
hour
10,019
hour
11,363
3.
job
9,900
4.
Beading Machine
hour
364
5.
hour
463
6.
Bull Dozer 90 HP
hour
1,450
7.
hour
1,865
8.
9.
job
319
hour
650
10.
hour
3,450
11.
hour
5,750
12.
hour
2,277
13.
hour
390
14.
hour
515
15.
hour
2,190
16.
hour
1,913
17.
hour
2,318
18.
hour
342
19.
job
51,615
20.
job
284
21.
hour
341
22.
hour
6,750
23.
job
24.
job
25.
job
26.
job
27.
job
28.
job
29.
hour
875
30.
hour
1,540
31.
hour
1,775
32.
Educator Pipe
hour
38
WAPDA
25-1
2,742
3,200
3,279
1,385
1,584
2,513
WCSR-2013 (Zone-2)
Sr.
No.
Machinery
Unit
Rate (Rs.)
33.
hour
1,780
34.
hour
2,117
35.
hour
1,805
36.
hour
2,400
37.
hour
2,813
38.
hour
3,900
39.
Grader 140 HP
hour
1,955
40.
Grader 165 HP
hour
2,811
41.
job
22,772
42.
hour
2,250
43.
job
4,554
44.
job
154,846
45.
job
103,231
46.
hour
375
47.
hour
835
48.
hour
815
49.
hour
1,491
50.
Molding machine
hour
825
51.
hour
45
52.
hour
1,903
53.
hour
2,270
54.
hour
260
55.
job
56.
hour
1,988
57.
hour
425
58.
hour
865
59.
hour
1,160
60.
hour
1,645
61.
hour
625
62.
hour
868
63.
hour
85
64.
hour
75
65.
hour
55
66.
67.
Tar Boiler
hour
911
68.
Tractor 50 HP Capacity
hour
400
69.
hour
442
70.
hour
170
71.
WAPDA
job
job
25-2
531,335
206,462
75,905
WCSR-2013 (Zone-2)
Sr.
No.
Machinery
Unit
Rate (Rs.)
72.
hour
700
73.
hour
1,555
74.
Turbine pump
hour
455
75.
hour
509
76.
hour
482
77.
Water sprinkler
hour
531
78.
hour
284
79.
hour
1,214
80.
Wheel barrow
hour
228
81.
WAPDA
25-3
job
2,277