Bscb-Mbts Installation Documentation
Bscb-Mbts Installation Documentation
Bscb-Mbts Installation Documentation
Hardware Installation
Documentation
Prepared by,
S.Selvapriyan,
Installation Document 1
Telecom Engineer,
Tamilnadu Circle,
Mob: +91 – 9842706562
Email: [email protected]
INDEX
3. SERVER RACK
5. GROUNDING SYSTEM
Installation Document 2
8. GPS ANTENNA INSTALLATION
9. MBTS – INTRODUCTION
15. RJ 45 CONNECTOR
Installation Document 3
1. BSCB Z7 MODEL IN HUBLI
2.Cabinet Mount:
Installation Document 4
Installation Document 5
Installation Document 6
3.Server Cabinet :
MCBs OF SERVER:
Installation Document 7
This is the power module of BSCB Server. It consists of two sets of MCBs. Each set
having ten MCBs. The rating of the first MCBs on either side is 32 amps. The rating
of the remaining MCBs are 10 amps.
Power cables from server cabinet to AC distribution cabinet are 3-core fire-resistant
cables.
Three cores are brown, blue and black respectively with a cross-sectional area of 4 mm2
each.
Installation Document 8
4.2 CONNECTION OF DC POWER CABLE TO BSCB:
1. For easy connection of power cable and grounding cable, designing of each BSC
cabinet is -48 V leading-in box, installed at top of cabinet.
3. Supply -48 V from DC power cabinet to power distribution plug-in box through filter
at top of cabinet. Power module processes it and supplies to each plug-in box through
busbar. -48 V DC power cable is available in 25 and 16 mm2 versions.
4. Use 25 mm2 cable Appearance of power cable is be either blue or black. Connect blue
one to -48 V DC, and black one to -48 V GND.
Installation Document 9
TTSL DCDB:
Installation Document 10
5. GROUNDING SYSTEM:
1. BSC Grounding
Connect grounding terminal (PE) at top of cabinet to grounding busbar using 35 mm2
stranded copper wire.
Installation Document 11
The grounding cable from BSCB is connected to Indoor Grounding Busbar (IGB).
Optical fiber is used as Media Stream for connecting all the resource shelves.
Installation Document 12
GLIQV- UIMU CONNECTIONS:
Installation Document 13
UIMU – GLIQV CONNECTION
RX RX TX TX
TX TX RX RX
RX RX SD1 SD1
TX TX TX TX
RX RX
SD2 SD2
Installation Document 14
6.2 REAR BOARD CONNECTION:
The system clock cable provides the connection of clock signals (8 K, 16 M and PP2S)
from the Clock Generator (CLKG) board to the Universal Interface Module (UIM)
board, to implement system clock distribution. Each system clock cable distributes
the clock signals to six UIM boards in three resource plug-in boxes.
END A END B
BOARD NAME RCLKG RUIM1, RUIM2, RUIM3
PORT NAME CLKOUT CLKIN
CONNECTOR NAME DB 44 DB9
Installation Document 15
CLKOUT from RCLKG towards
CLKIN in all the Rear board UIMU &
UIMC.
Installation Document 16
ENDA ENDB
BOARD NAME REAR BOARD OF OMP UIMU
(RMPB)
PORT NAME RCHUB FE C1/2((MASTER &
SLAVE)
RCHUB CONNECTOR:
Installation Document 17
Label End B1
Label End B2
Label End B3
Label End B4
Label
Label End B5
Label End B6
End A
Label End B7
Label
End B8
The GPS 8 K clock cable sends the 8 K reference clock signals of GPS module to the
CLKG for phase locking.
The cable is a 4-core single-strand round wire. Both ends of cable are 8P8C straight
cable crimping shielding connectors.
ENDA ENDB
BOARD NAME REAR BOARD OF GCM RCLKG1
PORT NAME GCM 8K 8K IN2
The GPS PP2S and 16CHIP clock cable of GCM connects the PP2S and 16CHIP clock
signals of CLKG. The cable is a 4-core single-strand round wire. Both ends of cable
are 8P8C straight cable crimping shielding connectors.
End A is plugging to the position mark with GCMCLK0 or GCMCLK1 on the GCM and
End B is plugging to the position marked with PP2S/16CHIP on the RCKG2.
ENDA ENDB
BOARD NAME REAR BOARD OF GCM RCLKG1
PORT NAME GCM CLK0 (OR) GCM PP2S/16 CHIP
Installation Document 18
CLK1
The line 8 K clock cable sends the 8 K reference clock signals extracting from the line
to the CLKG for phase locking
The cable is a 4-core single-strand round wire. Both ends of cable are 8P8C straight
cable crimping shielding connectors, that is, RJ45 connector.
END A ENDB
BOARD NAME RDTB (OR) RMNIC RCLKG1
PORT NAME 8KOUT/DEBUG-232 (OR) 8KIN1
8KOUT/ARM-232
This cable connects the OMP board to the PWRD 485, in order to monitor the
environment of cabinet.
Both ends of the cable are 8P8C straight crimping shielded connectors.
End A is plugging to the position mark with P D 4 8 5 on the Rear Board of MP (RMPB)
board, and End B is plugging to the position mark with R S 4 8 5 on the back of power
distribution plug-in box.
ENDA ENDB
BOARD NAME RMPB (REAR BOARD OF POWER MODULE
OMP)
PORT NAME PD 485 RS 485
Installation Document 19
GPS 485 cable
GPS 485 cable connects the OMP to GPS module.
Both ends of cable are 8P8C straight crimping shield connectors.
End A is plugging to the position mark with G P S 4 8 5 on the Rear Board of MP
(RMPB) board, and End B is plugging to the position mark with R S 4 8 5 on the
backplane of GCM plug-in box.
ENDA ENDB
BOARD NAME RMPB (REAR BOARD OF REAR BOARD OF GCM
OMP)
PORT NAME GPS 485 RS 485
Open the back door of cabinet, Top of cabinet is PWRDB connector board. The board
has two PWRD 485 interfaces for connecting various cabinets.
Installation Document 20
RS485 RS485 RS485
X2 X2 X2
Rack1 Rack2 Rackn
X4 X4 X4
OMP
NOTE:
Installation Document 21
7. ZTE DDF:
Installation Document 22
7.2 DDF MOUNTING: BACK VIEW
Before installing the feeder, cut a cable of appropriate length according to the site condition and make its
connectors.
0 Stripping
Strip GPS feeder to expose 16.7 mm of shielding layer and then strip shielding
layer to expose 6.2 mm of core.
6. 2
16. 7
Unit: mm
Installation Document 23
Installation Document 24
Put nut, crimping tube, and bush of GPS feeder connector on the cable, and then place
pins of connector vertically on crimper.
Installation Document 25
3. Welding core:
Put solder wires into the pin and melt the solder wires with an electronic iron. Then,
insert cable cores into the welded solder wires, to finish welding of pins and cable
cores. Shielding layer of cable opened and covered on the bush.
1 2 3 4 5 6 7 8 9
Installation Document 26
Installation Document 27
8.2 GPS ANTENNA REQUIREMENTS
Install GPS antenna in open sky with wide view, to ensure that it can trace as many
satellites as possible. Do not install GPS antenna under microwave antenna, high-
voltage lines, and television-transmitting tower or within the radiation range of the
main lobe of a mobile system antenna.
Install GPS antenna in lightning protection area at 45º on the lower part of tower, no
more than five meters above ground. Fix pole of GPS antenna at horizontal distance of 30
cm from tower.
Installation Document 28
8.4 LIGHTNING ARRESTER REQUIREMENTS
Install lightening arrester between the GPS antenna and BSC cabinet. Lightening
arrester consists of Two-ends.
One end is calls device and other ends antenna. The device end is connecting to the
N-type double-male conversion connector through BSC cabinet.
The GPS grounding kit is connecting to the outdoor grounding copper busbar with the
grounding cable of six mm2.
Installation Document 29
9. MBTS:
9.1 INTRODUCTION:
In remote regions that need wide coverage and only have a small number of users, the
application of high-capacity macro BTS cannot put the equipment into full play, and
furthermore, the equipment room environment in remote regions can hardly meet the
requirements of macro BTS. To satisfy the market needs, ZTE CORPORATION develops
ZXCBTS CDMA micro base transceiver station and remote station products.
MBTS:
Installation Document 30
9.2 Specification of the MBTS:
1. Dimensions of a single cabinet: The dimensions of the integrated equipment (height ×
width × depth): 630mm × 400mm × 285mm.
5. The grounding resistance of the shelf should be less than or equal to five ohms.
10. RBTS:
1. A ZXCBTS CDMA remote station does not have the TFS and BDS. To form a
ZXCBTS CDMA remote station, just replace the BDM with an RFM.
Clock for RBTS:
The clock of a remote station is optically transmitted to the RFM board of the remote
station via an OIM sub-board inserted on the BDM. The RFM board needs a phase lock
loop to convert the 16CHIP digital clock transmitted via fiber to the 12M analog signal,
in order to provide the RF part with a local oscillation signal.
Installation Document 31
Grounding terminal No. Color of Core Power Polarity
1 Blue -48V
2 Red -48V
3 Black -48VGND
4 Yellowish green -48VGND
Power cables should be arranged in order. If the power cables are distributed in parallel
with E1 signal lines, a horizontal space of 200mm is required between them.
Power supply
Installation Document 32
GROUNDING FOR MBTS:
The PGND cable of the micro-BTS adopts the olivine or yellow copper-core cable with
the cross-section area of 16 mm2, which is connected to the indoor PGND copper
busbar reliably.
Installation Document 33
12. CONNECTION BETWEEN MBTS AND RBTS:
OIM BOARD
One end of the fiber cable is connected to OIM Board in MBTS and another
end is connected to RFM Board in RBTS.
Installation Document 34
RFS BOARD OF RBTS
RFM BOARD
13.BALUN CIRCUIT:
The Impedance of the MBTS is 75 ohm. The Impedance of the BSCB is 120
ohm.
Balun circuit is used to convert 75 ohm into 120 ohm. End A is connected to MBTS. End
B (RJ 45connector) is connected to ZTE DDF.
Towards DDF
Towards MBTS
Installation Document 35
E1 Cable:
We are using the RJ 45 Connector to connect the E1 cable from MBTS to DDF through
BALUN circuit. In RJ 45 connector,
1,2 - TX
4,5 - Rx
Set the PATH ID by setting the DIPswitch on the BDM based on the E1 cable connections
with the CDSU of the BSC. Please refer the following diagram for setting the DIP switch.
ON
OFF
4 PATH_ID3
3 PATH_ID2
2 PATH_ID1
1 PATH_ID0
ON
When PATH_ID=1, the DIP switch is set as:
OFF
ON
When PATH_ID=5, the DIP switch is set as: OFF
INDICATOR:
Installation Document 36
15.ZTE ODF:
Installation Document 37
FC connector
AT BSCB end
SC connector
AT ODF end
CCONNCO
Installation Document 38