ISC HydroCom Comparison
ISC HydroCom Comparison
26 October 2009
Copyright 2009
Any person allowing themselves to directly or indirectly receive the information contained in
this presentation (the "Receiver") agrees that this presentation and all information contained
herein and/or in any way distributed to the Receiver with respect to the same (verbal or
otherwise) is the confidential and proprietary property of Dresser-Rand Company and is being
provided to and received by the Receiver in confidence. Receiver agrees not to divulge the
contents hereof to any third party without the prior written approval of Dresser-Rands duly
authorized representative. Receiver shall advise any permitted recipient of the confidential
information of the nature of the same and obtain their agreement to be bound to these terms
before such confidential information is disclosed to them. Receiver on behalf of its principal,
representatives, employees and themselves individually to hereby unconditionally agree to the
terms hereof and agree to defend, indemnify, and hold Dresser-Rand harmless from and
against any and all damages that result from Receivers failure to strictly comply with these
terms. Receiver further agrees that failure to comply with these terms will cause Dresser-Rand
to suffer irreparable harm. Your decision to remain and receive the information about to be
presented to you shall constitute your unconditional acceptance to the foregoing.
2
Copyright 2009
Engineering Overview
Unloader Hardware
Copyright 2009
Outline
Copyright 2009
ISC Background
90
ISC turndown
Assuming 10% Base Clearance
and 10% Minmum Discharge
Volumetric Efficiency
80
70
50
40
30
20
10
0
1.00
1.50
2.00
2.50
3.00
3.50
Copyright 2009
FLOW %
60
4.00
RATIO
Capacity Control
Background
Market Assessment
Need for capacity control
Copyright 2009
Capacity Control
Background
Typical Energy Costs
Electricity Cost $/Kwh
$/Hp/Year
Compressor
%
Power (HP) Recycle
10000
10%
5000
10%
1000
10%
500
10%
10000
15%
5000
15%
1000
15%
500
15%
10000
20%
5000
20%
1000
20%
500
20%
0.06
$
392
Savings Per
Year
$ 391,940
$ 195,970
$
39,194
$
19,597
$ 587,910
$ 293,955
$
58,791
$
29,395
$ 783,880
$ 391,940
$
78,388
$
39,194
0.1
0.15
$
653
Savings Per
Year
$
653,233
$
326,617
$
65,323
$
32,662
$
979,850
$
489,925
$
97,985
$
48,992
$ 1,306,466
$
653,233
$
130,647
$
65,323
$
980
Savings Per
Year
$
979,850
$
489,925
$
97,985
$
48,992
$ 1,469,775
$
734,887
$
146,977
$
73,489
$ 1,959,700
$
979,850
$
195,970
$
97,985
Copyright 2009
Capacity Control
Value & Payback Calculation
Problem:
7,000 HP Unit
$392hp/yr lost
Solution:
oil buildup
8
Copyright 2009
ISC Benefits
Motor KW
Engineering Overview
Offered with every ISC
10
Copyright 2009
Full Load
11
Hydraulic Pressure to
Unload
ISC
UNLOADER
Hydraulic Pressure
to Load
Copyright 2009
12
Copyright 2009
13
14
Gas Seals
Copyright 2009
Torque Motor
15
Copyright 2009
16
17
PLC ladder-logic
software
Universal software
package, proprietary to
D-R is configurable for
all types of ISC
installations
Communicates with
most DCS
Copyright 2009
18
ISC Controller
Electronic Controller - HMI Screens
19
No electronics
Provides limpability
Full instrumentation included- not just a sight glass on the side of oil tank!
Fully turnkey
Copyright 2009
20
ISC
HydroCOM
Copyright 2009
DR vs Hoerbiger
21
www.dresser-rand.com
Copyright 2009