INTRODUCTION
Nepal, one of the richest country in the world in water resources has
huge hydropower potential from the Himalayan Rivers. Due to the
fact that the efforts from the government only will not be sufficient,
an open and free policy has been adopted for expediting hydropower
development with private sector investment. In this context, Mathillo
Mailun Khola Jalvidhydyut Limited (MMKHL) is going to construct
and operate 14.3 MW Mathillo Mailun Khola Hydropower Project
which is situated at Rasuwa District, Bagmati zone, Central
Development region.
The project area lies in between Dadagaun and Haku VDC of
Rasuwa District. The power generated from the project will be
evacuated at Upper Trishuli 3B Hydropower Project Hub.
VISION
Public Private Participation (PPP) model will be augmented to build
the hydropower projects in Nepal using the maximum local
manpower, materials and money to generate Hydropower to benefit
the local people as well as the Nation at large.
PROJECT OVERVIEW
Mailun Khola is a snow-fed river originated from the Ganesh himal
with the dependable low flows and manageable high flood and less
flow variation. Approximately 7 km long access road has to be
constructed to reach upto the powerhouse site. Most of the land
required for the project is bushy and barren with few cultivated land
for the access road. Sufficient area is available for the construction of
headworks. Weir with crest elevation 2050.5 amsl will be 20m long
and an undersluice of 2m width will be provided. The design of
Intake will be of 4 cumecs capacity using 2 openings each 2m wide.
The connecting canal of length 26m having, 2m width and 2m height
will be constructed. The canal includes 4 m long Gravel Trap of size
2m width and 2m height. The design discharge passes through 55m
long desilting basin of 5.5 m width and 4.5 m deep. The 12m long
Headpond of the size 8m wide and 4 m deep to protect the air going
through the siphon and headrace tunnel will be provided. The clear
PPA
: completed
Generation license
DoED
Construction starts from
: September, 2012
Completion date
: July, 2015
Grace Period
: 6 months
SALIENT FEATURE
Type of Project
: run-of-river
Installed capacity
: 14.3 MW
Head
: 495 m
Design Discharge
: 3.53 cumecs
: 79.6 GWH
: 8.40/kw
Wet season Rs
: 4.80/kw
Increment
: Rs 2 billion
: Rs 1.4 Lakh
: Rs 42 Crores
ACCESIBILITY
:50 Km
: 25Km
: 26 km
Total Length
: 101 Km
FINANCIAL PARAMETERS
: 285 km
STATUS OF PROJECT
: 30:70
Feasibility study
: completed
IRR
: 19.73%
IEE
: completed
B/C Ratio
: 1.17
: completed
Royalty
(14.3 MW)
Annual Revenue
2012
APPLICATION PROCEDURE
The applicant should fill up the form with necessary documents and
deposit 20% of demanded share amount within the time period
mentioned in installment schedule.
The application form can be obtained from Companys office, 539/61
Subarna Shamsher Marg, Baluwatar, Kathmandu, Nepal. Tel.
4436027.
PAYMENT SCHEDULE
Installment
Year 2069
Percentage
First
Bhadra
20%
Second
Ashwin
20%
Third
Karthik
10%
Fourth
Mangsir
10%
Fifth
Poush
10%
Sixth
Magh
10%
Seventh
Falgun
10%
Eighth
Chaitra
10%
Total
100%
Rasuwa, Nepal
August, 2012
Note