HT TP: //qpa Pe R.W But .Ac .In: 2010-11 Production Planning & Materials Management
HT TP: //qpa Pe R.W But .Ac .In: 2010-11 Production Planning & Materials Management
/q
p:/
htt
CS/M.Tech (IEM)/SEM-1/IEM-104/2010-11
2010-11
PRODUCTION PLANNING &
MATERIALS MANAGEMENT
Full Marks : 70
pap
a)
Explain
the
ABC-VED
matrix
of
classification
wb
er.
1.
5 14 = 70
of
4+3
600
per
units.
or
order
and
Estimate
the
in
a c.
ut .
quantity is 2001
the
annual
optimal
demand
order
is
quantity
a)
40903
Smoothing
method
of
forecasting
of
2+3
[ Turn over
CS/M.Tech (IEM)/SEM-1/IEM-104/2010-11
b)
/q
p:/
htt
52, 48, 58, 64, 75, 70, 76 and 72 ( all figures are in
thousands. Based on the values of MSE, which of the
following two methods give a better result for forecasting
the demand value for 2010 ?
i)
ii)
3.
a)
models
for
pap
and
inventory
control
firm.
When
do
we
usually
allow
2+3+2
wb
er.
a)
function
the
in
benefits
Materials
of
variety
Management
reduction
manufacturing firm.
b)
in
3+3
in
a c.
ut .
2+6
CS/M.Tech (IEM)/SEM-1/IEM-104/2010-11
5.
27
/q
p:/
htt
6.
a)
MRP - II
b)
c)
Inventory costs
d)
Synchronous manufacturing.
a)
ii)
pap
i)
6+3
months are :
wb
er.
15, 20, 25, 30, 33, 22, 16, 14, 18, 28, 30 and 17
Maximum regular time production per month = 23 units
Maximum overtime production per month = 5 units
in
a c.
ut .
b)
40903
[ Turn over
CS/M.Tech (IEM)/SEM-1/IEM-104/2010-11
7.
a)
/q
p:/
htt
pap
8.
a)
wb
er.
b)
b)
40903
in
a c.
ut .