Pilnew Resume
Pilnew Resume
Pilnew Resume
PROFESSIONAL PROLOGUE
Presently working with PRAKASH INDUSTRIES LTD. (GROUP OF SURYA ROSHNI LTD),
CHAMPA, DIST-JANJGIR (CHATTISGARH) As a Sr. Engineer Mechanical Maintenance
& Planning. (5x500 TPD DRI PLANT).
A keen learner with a flair for adopting emerging trends and addressing industry requirements
to achieve organizational objectives.
An excellent performer with fabrication, Erection, alignments & Maintenance works (i.e. kiln
Area, Cooler Area, RMP Area, CHP, Turbine & Boiler). Demonstrated troubleshooting aptitude
in managing maintenance and breakdown of various equipments and machineries in DRI
plant.
AREAS OF EXPERTISE
Mechanical Maintenance & Planning:-
building, FD Cooler, Bag filter, Feed bunker, Injection coal bunker, Intermediate Bin, Hopper, Wall
Plate, All DRI conveyors, Trestles, All DRI Chutes, four Poll & two poll etc.
ABC Building:-ABC Dust chute, ABC Back flow chute, ABC Circular duct, ABC Chimney(bottom,
middle & top parts), ABC Fan & ABC power pack etc.
ESP:-Supporting structures, External under girder, middle under girder & fixed foot, Edge girder, Wall
(side, intermediate, lower), knee bracing, Precipitator ceiling, Inlet & outlet cone, Baffle plate in
casing, Hopper baffle, Purging air duct, connection for hot roof plate, ESP Staircase, Assembly details
of Insulator house, Details of monorail structure, ID Fan, Collecting electrode, Discharge electrode,
RALV, Rapping gear motor, ESP Chimney, Pent house etc..
2)Project Work:- Erection & Alignment of all Structural parts, Kiln base frame, Cooler base
frame, Support Roller, Thrust Roller, Erection Platform, Kiln shell (Tyre to Tyre), Inlet & outlet
Cone, Kiln hood, Cooler hood, Transfer chutes, Drive base frame kiln & Cooler, Pinion, Girth gear,
Heat exchanger, kiln & cooler segment, Cooler Grizzly & Flange Ring, DSC Hood with Slip ring,
Belt conveyors, Vibrating Screen, Weigh Feeder, Primary double roll Crusher, Fans/Blowers
(Sealing air fan, shell fan, nose cooling fan & fans for ABC), HSD Oil Injection pump, kiln feed
tube, Coal throw pipe, Air tubes, Swirlers, Thermo wells Submerged nozzle plates, kiln main gear
box, Auxiliary gear box, Curved tooth gear coupling, Hydraulic thruster brake, Brake drum flexible
coupling, Pin bush coupling, Motors, Pull chord, Idlers (Return, Carrying, Impact & roller brackets),
Hydraulic & Pneumatic systems, Emerging cap power pack, kiln & Cooler hydro thrust, Motorized
Grease pump kiln & cooler, Lobe compressor, Screw compressor & Wet Scraper ETC
ABC Building:-ABC Dust chute, ABC Back flow chute, ABC Circular duct, ABC Chimney(bottom,
middle & top parts) & ABC power pack etc.
ESP:-Supporting structures, External under girder, middle under girder & fixed foot, Edge girder,
Wall (side, intermediate, lower), knee bracing, Precipitator ceiling, Inlet & outlet cone, Baffle plate
in casing, Hopper baffle, Purging air duct, connection for hot roof plate, ESP Staircase, Assembly
details of Insulator house, Details of monorail structure, ID Fan, Collecting electrode, Discharge
electrode, Insulator, RALV, Rapping gear motor, ESP Chimney, Pent house etc..
EMPLOYMENT DETAIL
Since Feb.2012 to till date with M/s Prakash Industries Limited. Champa, Dist- Janjgir (C.G)
Sr. Engineer (Mechanical Maintenance & Planning).
Present Salary: - 3.80 lac per annum (CTC)
Job Responsibility:Kiln maintenance, cooler maintenance, ESP, BAG Filter, BAG House & ID Fan.
Internal works:- Bearing, coupling, Gearbox, motors, pulley, idler, roller, shell air fan, ID Fan, Nose
cooling fan, shelling air fan, ABC Fan, Impeller, Thermo coal, Air tube, Feed tube, shaft, key, nozzle,
lubrication work, conveying system of ESP, Hydraulic system, Pneumatic system, air compressor, lobe
compressor, screw compressor, segment, slip seal etc.
Since Jan 2010 to Feb 2012 with M/S Nilachal Iron & Power Ltd.(Jai Balaji Group) Ratanpur,
Kandra Chowka Road, Jamshedpur, Jharkhand
Officer (Project & Mechanical Maintenance)
Present salary: - 2.8 lacks
Cross checking of contractor Bill and the same forwarded to accounts dept.
May 2009-Dec 2009 with M/S Scaw Industries Pvt Limited, Dhenkanal Orissa, AS a Trainee (GET)
Project (Mechanical Engineer)
A 25 MW CPP Project located at Dhenkanal, Orissa
Job Responsibility
Project work like boiler, turbine all pipe line works, economizer, cooling tower, blades etc.
Ensuring timely completion of Job
Proper Utilization of available manpower, Machines and Materials
TRAININGS UNDERGONE
SCHOLASTICS
Examination passed
MBA in industrial
Management(Distance)
Board/University
Year of passing
% of
Division/Class
marks
2005-2009
64
1st
Intermediate
U.P Board
2004
58
2nd
High Schcool
U.P Board
2001
63.81
1st
Name of Institute where Passed B.Tech: Synergy Institute of Engineering & Technology,
Dhenkanal, Orissa.
IT SKILLS
PERSONAL DOSSIER
Date of Birth
Fathers name
Umashankar Pandey
Mothers name
Gangotri Pandey
Sex
Male
Marital Status
Married
Cast
Gen.
Language Known
Permanent Address :
DECLARATION
I hereby declare that the above-mentioned information is correct up to my
knowledge and I bear the responsibility for the correctness of the abovementioned particulars.
CHAMPA (C.G)