Cost Estimation
Cost Estimation
01.
02.
03.
04.
05.
06.
07.
08.
09.
10.
11.
ESTIMATION/QUOTATION
-------------------------------------------------DESCRIPTIONS OF ITEMS
QUANTITY
Earth work excavation for leveling and lowering the
ground (other than foundation work) and removing the
excavated earth to a distance not exceeding 50 mtr and
spreading , leveling etc.. complete wherever necessary
in ordinary soil
up to 50level Above 50 to 80 level Earth work filling to Foundations and Basement with
available approved earth including watering and
compaction in layers of 15 cm thick up 50mt lead.
Providing and laying Plain cement concrete for
Foundation and Plinth slab of 1:4:8 granite, basalt or
trap jelly concrete using 40mm and down size laid in
100mm thick layers and well compacted including
curing etc.. complete.
Providing and constructing Size stone masonry for
basement Retaining wall and Foundation, below
and above Ground level up to Plinth beam bottom, in
CM 1:6 not less than 200mm high with bond stones
2mt apart in each course including pointing for exposed
surface, curing etc.. complete. For Foundation work :
Providing and laying Cement concrete 1:1.5:3 using
20mm and down size granite, basalt or trap jelly for
Column Footings, Main and Secondary Beams,
Pedestals in foundation , basement and step footings
laid in 150mm thick layers and well compacting,
vibrating , curing and steel or plank centering or
Plastering in CM 1:6 to mud susface wherever
necessary etc.. complete. (Excluding the cost of steel
and fabrication charges. )
Providing and laying Cement concrete 1:1.5:3 for
Columns using 20mm and down size granite, basalt,
or trap jelly with steel, plywood or plank centering
including mixing, compacting, vibrating and curing
etc.. complete. (Excluding the cost of steel and
fabrication work)
Providing and laying Cement concrete 1:1.5:3 for
Plinth beams (Other specification is same as item
No-06
Providing and laying Cement concrete 1:2:4 for Lintel.
(Other specification is same as item No 06)
Providing and laying Cement concrete 1:1.5:3 for Roof
beams, Flat and Slope roof Slabs. (Other
specification is same as item No 06)
Providing and laying Cement concrete 1:1.5:3 for
Staircase. (Other specification is same as item No -06)
Providing and laying Cement concrete1:2:4 for
Window Sill
UNIT
RATE
4200.00
1500.00
Cft
Cft
8.00
10.00
33,600.00
15,000.00
1000.00
Cft
5.00
5,000.00
440.00
Cft
120.00
52,800.00
1160.00
Cft
130.00
1,50,800.00
610 .00
Cft
230.00
1,40,300.00
285.00
Cft
260.00
74,100.00
Cft
260.00
31,200.00
110.00
Cft
220.00
24,200.00
1753.00
Cft
260.00
4,55,780.00
90.00
Cft
265.00
23,850.00
20.00
Cft
100.00
2,000.00
120.00
AMOUNT
12.
13.
14.
15.
16.
17.
18.
230.00
Sft
110.00
25,300.00
2259.00
Cft
140.00
3,16,260.00
1063.00
Sft
85.00
90,355.00
52.25
Sft
1300.00
67,925.00
158.00
Sft
650.00
1,02,700.00
333.00
Sft
750.00
2,49,750.00
2745.00
Sft
32.00
87,840.00
19.
20.
21.
22.
23.
24.
25.
26.
27.
6270.00
Sft
28.00
1,75,560.00
4460.00
Sft
32.00
1,42,720.00
RO
RO
RO
Sft
Sft
Sft
145.00
145.00
155.00
RO
RO
RO
Rft
Rft
Rft
110.00
110.00
110.00
1193.00
Sft
120.00
1,43,160.00
4340
Rft
88.00
38,192.00
100.00
633.00
Sft
Sft
90.00
100.00
9,000.00
63,300.00
39.00
Sft
450.00
17,550.00
240.00
Sft
230.00
55,200.00
28.
29.
30.
31.
32.
210.00
Sft
250.00
52,500.00
9015.00
RO
RO
RO
Sft
Sft
Sft
Sft
16.00
20.00
24.00
30.00
1,44,240.00
5280.00
RO
Sft
Sft
14.00
20.00
73,920.00
1800
Rft
160.00
28,800.00
10.50
MT
57,000.00
5,98,500.00
A.
B.
C.
D.
33.
34.
35.
36.
Rs -
34,91,402.00
Rs -
1,60,000.00
Rs -
1,80,000.00
38,31,402.00
MISCELLANEOUS ITEMS :
Providing and Constructing BBM Sump Tank
including excavation as per technical specification
Providing and Making Water proofing for the Toilet
Sunken floor by applying 2 coats of water proofing
compound to top surface by laying R.C.C 1:2:4 and
finished by cement mortar 1:4 by giving the finish with
proper slope etc.. complete as per specification.
Providing and fixing M.S. Safety Grills with Grill
Door at Main/Utility area by using 9mm MS Square
rod @ 4/ 6c/c horizontal and Vertical bars and
1x1/4 angels for the frame in position including
enamel painting as per design & details.
Providing and Laying Ultra Pre cast Step tiles at
External Steps and Car Entrance Sit Out area as
per technical specification. ( Basic rate of Ecocrete
tile Rs- 40/Sft)
Providing and fixing MS Gate of 46 height
including Enamel Painting as per specification.
6000.00
Ltr
9.00
54,000.00
990.00
Sft
40.00
39,600.00
RO
Sft
160.00
100.00
Sft
110.00
11,000.00
64.00
Sft
280.00
17,920.00
37.
38.
700.00
RO
39.
40.
41.
Sft
30.00
21,000.00
115.00
PENDING
PENDING
100.00
Rft
500.00
GRAND TOTAL :
STILT + GROUND + FIRST + SECOND STAIR ROOM + MISCELLANEOUS ITEMS -
50,000.00
1,93,520.00
40,24,922.00
( Rupees Forty Lakhs, Twenty Four Thousand, Nine Hundred Twenty Two Only)
RATE PER SQUR CALCULATION TOTAL AREA CONSIDERED : STILT FLOOR+GROUND FLOOR+FIRST FLOOR+SECOND FLOOR
STAIR ROOM -2430.00 Sft
TOTAL COST CONSIDERED : STILT FLOOR+GROUND FLOOR+FIRST FLOOR+SECOND FLOOR
STAIR ROOM Rs-38,31,402.00
38,31,402.00
------------------ X 100 = Rs-1,57,670.86 / Squr
2430.00