Technical applications of the GPTR ( 3 Phase Grid Programmable Generator and Load Simulator) for testing control parts of equipment to be connected to a Grid

Uploaded by

jslr
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
76 views7 pages

Applications of The GPTR

Technical applications of the GPTR ( 3 Phase Grid Programmable Generator and Load Simulator) for testing control parts of equipment to be connected to a Grid

Uploaded by

jslr
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

AUTOMATED COMPUTING MACHINERY S.L.

www.acmsl.com

ApplicationsoftheGPTR

Contents
TheGPTRinanAutomaticTestEquipmentorSimulationenvironment..................................2
HowtheGPTRchangesvaluesforvoltagesandcurrents?.......................................................4
WhytheGPTRincludesaGridAnalyzer?..................................................................................4
UseofGPTRforcheckingGridAnalyzers..................................................................................5
HowtocontroltheGPTR?.........................................................................................................6

AUTOMATED COMPUTING MACHINERY S.L.


www.acmsl.com

TheGPTRinanAutomaticTestEquipmentorSimulation
environment
TheGPTRisalaboratoryprogramable3phasegridgeneratorwhereyoucancontrolthe
frequency(common),theamplitudeofeachphaseandthephaseangleofeachphase(2nd
and3rdrespecttothefirst).Atthesametimeitprovides3currentgenerators,synchronous
withthevoltagegeneratorsforeachphase,intherangeof0to5amps,whereyoucan
controltheamplitudeofeachcurrentgeneratorandthephaseanglerespecttothefirst
voltagegenerator.Thepurposeofthese3currentgeneratorscanbebetterunderstood
consideringtheapplicationsoftheGPTR.
OriginallytheGPTRwasdevelopedforthecreationofareal3phasegridwhoseparameters
couldeasilybechangedthroughprogramming.Considerasimplifiedconnectionofagenerator
ormotororconvertertothegrid,asinnextfigure.
GRID

Electromechanicaloperational
devices
(Contactors,switches,protection
relays,etc)

Generator
Or
Motor

ElectronicControlDevices
(PLCs,embeddedcomputers,etc)

Thatdiagram,typically,canbesplittedasinnextfigure.

Fig2Realenvironment

AUTOMATED COMPUTING MACHINERY S.L.


www.acmsl.com

WhereanElectronicControlpartreceivesthestatusoftheelementsinthepowerwires
(contactors,IGBTs,etc),andgeneratesignalstocontrolthem,whilemonitoringtheoverall
installationthroughmeasuringthevoltagesineachphaseofthegridaswellasthecurrent
flowingthroughthepowerwires.
Thatschematicappliestoanymoderninstallationgoverningamotororageneratorora
powerconverter.Havingthisinmind,nextfigureshowswheretheGPTRfitsin.

Voltages
Currents

Status
lines

Control
lines

ElectronicControl
(PLCs,embeddedcomputers,etc)

Fig3Test,debuggingandvalidationenvironment
TypicallytheElectronicControl,whetherimplementedusingaPLC,anembeddedcomputer,
wiredlogic,etc,performssophisticateddecisionsbasedofalgorithmsembeddedonit.Actual
testsofthesealgorithmscanbequitecumbersomeattimes,aswellaselectricaltestingofthe
signalsgoingoutofthisControl.Ontopofthat,theseinstallationsaretypicallyhighpowerand
highvoltage,sotheactualtestsinarealsituationisfurthercomplicatedduetohuman
securityissues,flexibilityinthesettingofspecifictestsituations,etc.
ThesignalsenteringtheElectronicControlcorrespondingtothegridvoltageshavelow
consumption(justformeasuring),sometimesusingstepdowntransformers(inmedium

AUTOMATED COMPUTING MACHINERY S.L.


www.acmsl.com

voltageinstallations).Thecurrentsflowingthrougheachphasearenormallystepdownto1A
or5Arangeusingcurrenttransformers.
Soasolutionforthetestingofalgorithmsanditsparameters,aswellasforfunctionaltestof
theElectronicControlintheseinstallationscanbeimplementedwithatestjigsimilartothe
describedintheformerfigure,wheretheactualgridisreplacedbytheGPTR.Thissolutionhas
anumberofadvantages:
1. Itisverysavedenvironment,asallthelineswithhighvoltageareprotectedbytripping
circuitsforhighcurrents.
2. Itisveryeasytoproduceconditionsandsequencesofconditionsdifficulttogenerate
otherwise.
Intherealcase,thecurrentsinthepowerlinesaresuppliedbythegridandcorrespondto
theresponseoftheconnectedpowerdevice(generator,motor,etc):i.e.,foragivenvoltage
thecurrentinthatlinewilldependsonthecharacteristicsofthegenerator,motor,etc.
Instead,withtheGPTRthecurrentsactuallysuppliedtotheElectronicControlarecontrolled
independentlyofthevoltagesandareseparatedofthem,whatmeansthattheGPTRcan
presenttotheElectronicControlanarbitraryloadorgeneration(fourquadrants).

HowtheGPTRchangesvaluesforvoltagesandcurrents?
Therearetwokeyconceptstoremember:
a) Allchangesareproducedwhenthecorrespondinglinecross0V.Thisistominimize
thetransienteffectsofswitchinginthetransformerassociatedtoeachgeneratorin
theGPTR.
b) Thereisaslopeofchangeparameterspecificforeachgenerator,bothrisingand
falling.
Similarlywhenthesetvalueislowerthantheactual,thesamealgorithmisused,butusingthe
valuesoftheslopeofdownchangeparameter.

WhytheGPTRincludesaGridAnalyzer?
Tobeabletocalibratethevaluesofthegeneratorsatanymoment,aftersettingthese
values.Seenextfigurethatshowsadetailedblockdiagram.

AUTOMATED COMPUTING MACHINERY S.L.


www.acmsl.com

Fig4GPTRblockdiagram
CalibrationoftheGPTRgeneratorsisdonewiththecommandCalibrationatanymoment.In
practiceyoushouldexecutethiscommandonlywhentherehasbeenachangeintheloadof
anygenerator,eithervoltageorcurrent.

UseofGPTRforcheckingGridAnalyzers
OneapplicationfortheGPTRisthecalibrationorcheckingofcalibrationofanexternalGrid
Analyzer.(Seenextfigure).

AUTOMATED COMPUTING MACHINERY S.L.


www.acmsl.com

GridAnalyzer
Under
Test

HowtocontroltheGPTR?
Thisisdonebyprogramming(thereisnomanualbuttonsintheGPTR),throughASCII
commandsthataresenttotheGPTRviaaRS485line.
Toeasethatprogramming,theGPTRissuppliedwithaVisualBasiccompatibleDLL,hence
usablewithanyVBAprogrammingenvironment,suchasExcel.AlsoincludedisanExcel
Workbook,withthesourcecode,thatcanconstitutesaverygoodstartingpointforthe
developmentofaATE(AutomaticTestEquipment)thatusetheGPTRand,potentially,any
othercontrollingsoftwareforthecontrolofadditionalhardwarethatmaybeneeded.Youcan
downloadthisExcelWorkBookdocumentationhere(http://www.acm
sl.com/ingenieria/instrumentation/3phasegridsubsystems/gptr3phasegridgeneratorand
loadsimulator/ExcelGPTR_Commandv1.pdf).NextfigureshowsthestartingUIforthis
application.

AUTOMATED COMPUTING MACHINERY S.L.


www.acmsl.com

ThisExcelapplicationcomputesandpresentsadditionalinformationaboutpowers,power
factors,statusofthecommunicationschannelandstatusoftheloadsconnectedtotheGPTR.
I.e.ifacurrentgeneratorisdisconnectedfromitsload,thecorrespondingcellinthe
worksheetwillchangecolor.
Ofcourse,theusercanuseallthecomputingandstoragecapabilitiesofExceltodevelop:

Specificsequencesforeachgenerator(voltageorcurrent)

Graphicalrepresentationoftheresultsofthosesequences.

Storageoftestpatternsandtheirresultsforfurtherstudy.