0% found this document useful (0 votes)
216 views7 pages

Installation of Sacrificial Magnesium Anode

Installation of Sacrificial Magnesium Anode
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
216 views7 pages

Installation of Sacrificial Magnesium Anode

Installation of Sacrificial Magnesium Anode
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 7
So “ORRTECH DHABHAN THASRA PIPELINE PROJECT WorleyParsons CLIENT : GUJARAT STATE PETRONET LIMITED. CONSULTANT : WORLEY PARSONS SEA INDIA PVT LTD Peer TPIA : CERTIFICATION ENGINEERS INTERNATIONAL LIMITED CONTRACTOR : CORRTECH INTERNATIONAL PVT LTD WORK PROCEDURE =| tress i. ores INSTALLATION OF SACRIFICI al ml * MAGNESIUM ANODE —— : oo | esosaa | ForReview a ‘Approval ae : 7 NAME ROHIT CHAUHAN HANDAN Mas = | REV | DATE cIPL CEIL WPSIPL/GSPL DESCRIPTION prepareDBy | cHEcKEDByY | —REVIEWEDEY APPROVED BY INSTALLATION OF SACRIFICIL | DOCUMENTING, Re payee || MAGNESIUM ANODE | GSPL/OTPL/ERI/IP/08 00 aa ‘ORRTECH DHABHAN THASRA PIPELINE PROJECT WorleyParsons sources 2 eo CLIENT : GUIARAT STATE PETRONET LIMITED CONSULTANT : WORLEY PARSONS SEA INDIA PVT LTD TPIA : CERTIFICATION ENGINEERS INTERNATIONAL LIMITED CONTRACTOR : CORRTECH INTERNATIONAL PVT LTD NTENTS 1.0 PURPOSE, 2.0 REFERENCE. 3.0 RESPOSIBILITY 4.0 SCOPE 5.0 MATERIALS & EQUIPMENTS.. 6.0 PROCEDURI 7.0 PRECAUTION... 8.0 HEALTH, SAFETY & ENVIRONMENT. 9.0 QUALITY ASSURANCE & QUALITY CONTROL 10.0 Test Reports... 44.0 FORMAT / APPENDICES, INSTALLATION OF SACRIFICIAL MAGNESIUM ANODE DOCUMENT NO. GSPL/DTPL/E8I/JP/0B Page 2 0f 5 DHABHAN THASRA PIPELINE PROJECT CLIENT +: GUJARAT STATE PETRONET LIMITED WorleyParsons CONSULTANT : WORLEY PARSONS SEA INDIA PVT LTD reoae bey TPIA + CERTIFICATION ENGINEERS INTERNATIONAL LIMITED CONTRACTOR = CORRTECH INTERNATIONAL PVT LTD 4.0. PURPOSE To describe the procedure for installation of Sacrificial Magnesium Anode to ensuring its best result in protecting pipeline under Temporary Cathodic Protection and provide adequate quality assurance / control of workmanship and inspection at site. 2.0 REFERENCE Drawing No +: GSPL/DTPL/CP/DRG-14 3.0 RESPOSIBILITY It is the responsibility of the site engineer to ensure that the Sacrificial Magnesium Anode correctly installed and check voltage. ‘4.0 SCOPE This procedure covers the installation of Sacrificial Magnesium Anode related to Temporary Cathodic Protection System as per standard drawing indicated below. 5.0 MATERIALS & EQUIPMENTS Equipments: Caliorated portable multi meter, Standard Copper-Conper Sulphate Reference Cell Reference Cell and Too kit etc. Material : Pre packed Magnesium Anode, Epoxy & Hardener, M-Seal, PVC Funnel/Pipe, Cables, Cable Lugs, Measuring tape and tool kit, etc. 6.0 PROCEDURE 4 Measure 5 m distance from pipeline on the Right of use and mark anode loca Bel + Excavate the pit up to 1.5 m or pipeline bottom depth whichever is higher evignas requires vertical or horizontal * ‘Anodes shall be placed in a cotton bag as per design and approved drawings. The cotton bag shall be filled with the low resistivity chemical backfill mixture of Gypsum (75%), Bentonite (20%) and Sodium Sulphate (5%). 4 The prepackaged anode shall be kept in clean Wat for minimum 2 hours a and backfilling the trench, see (fy Ei GEER of & P| i ON iS “ S WALT’ Sena? INSTALLATION OF SACRIFICIAL BOCUMENTNO. REV Page 3 of 5 MAGNESIUM ANODE GSPL/DTPL/E&I/JP/08 00 e

You might also like