IREEED RE Policy
IREEED RE Policy
IREEED RE Policy
Eligible Technologies
Title
Central
Wind
Central
Solar PV
Wind
Central
Central
Central
Central
Solar PV
Solar PV
Solar PV
Central
Central
Central
Central
Central
Central
Solar PV
Central
Biofuel
Central
Off-grid
Small Solar
Solar PV
Central
Off-grid
Central
Central
Off-grid
Small Solar
Solar PV
Andhra Pradesh
Andhra Pradesh
Wind
Andhra Pradesh
Solar PV
Arunachal Pradesh
Assam
Bihar
Bagasse/Biomass
Bihar Policy for promotion of New
Non-Fossil Fuel Based Cogeneration and Renewable Energy Sources 2011
Small Hydro Power
Solar
Solar PV
Power Project
Chhattisgarh State Solar Energy
Policy 2012
Chattisgarh
Chattisgarh
Chattisgarh
Bagasse/Biomass
Small Hydro Power
Solar Power Project
Wind
Wind
Gujarat
Solar PV
Solar Thermal
Gujarat
Wind
Haryana
Small Solar
Solar Power Project
Solar PV
Haryana
Small Solar
Solar Power Project
Solar PV
Haryana
Himachal Pradesh
Himachal Pradesh
Karnataka
Karnataka
Karnataka
Small Solar
Solar Power Project
Solar PV
Solar
Wind Thermal
Kerala
Kerala
Kerala
Kerala
Madhya Pradesh
Madhya Pradesh
Madhya Pradesh
Madhya Pradesh
Wind
Maharashtra
Bagasse/Biomass
Small Hydro Power
Solar Power Project
Solar
Small PV
Hydro Power
Manipur
Meghalaya
Orissa
Rajasthan
Wind
Rajasthan
Maharashtra
Punjab
Rajasthan
Tamil Nadu
Small Solar
Solar PV
Tamil Nadu
Uttar Pradesh
Uttar Pradesh
Uttar Pradesh
Small Solar
Solar PV
Uttarakhand
Uttarakhand
Bagasse/Biomass
Municipal Solid Waste
Non-Fossil Fuel Based Cogeneration
Small
Hydro Power
Bagasse/Biomass
West Bengal
Nodal Agency
Issue Date
04 sept 2013
28 February 2014
Energy
State Nodal Agencies
25 October 2013
23 January 2014
27 March 2014
05 March 2014
24 January 2014
17 January 2014
24 January 2014
Superseeded date
July 2, 2014
September 22,2014
31 December 2017
24/01/2008
01 March 2007
14 June 2011
24 June 2016
2012 31/03/2017
07.08.2006
January 06,2009
March 31,2014
September 3,2014
29/03/2010
31 March 2016
2011
2009
22 May 2014
2014
31 March 2021
2011
2012
30 January 2012
14 October 2008
09 September2005
13 April 2013
03 December 2005
July 08,2012
October 08,2014
03 December 2015
2012
01January 2008
05 June 2012
Vision
Objectives
Generation
1. To broaden the investor base2. To
incentivize actual generation with
the help of a generation/outcome
based
incentive.3.
entry
The main
objectiveTo
of facilitate
the project
is
to provide clean and better light to
individual households in rural, semiurban and urban areas where the
Grid Connected
Sale to Discom
600 MW by 2017
5 MW - MNRE
1500 MW
20 MW
500 MW
RE non Solar
Unlimited
Preferential Tariff
NA
Unlimited
Captive Use
The State will promote Solar Power The State will promote Solar Power
Developers to set up Solar Power
Developers to set up Solar Power
Plants for sale through RE (Solar)
Plants for captive use
Certificate mechanism. The Solar
500-1000 MW
Unlimited
1150 MW
550 MW
200 MW
350 MW
SPV
Minimum 5MW
500 MW/Year
Solar Thermal
Solar RPO
Others
Minimum 5MW
Sale to Discom
Offtake arrangement
Sale to Third party /outside state
Sale to Captive
Yes
Power can be sold to Uttar Pradesh Solar Power Developers who want
Power Corporation Limited (UPPCL) to set up projects under this policy
through competitive bidding
and do not want to sign a PPA with
distribution utility of UPPCL and
ment
Power Purchase Agreement Sale to State Electricity BoardNo specific details on Offtake type
Yes
Yes
Others
Generating Company
Gr
TRANSMISSION SYSTEM ANDDeveloper-Interfacing
EVACUATION
arrangements
Developer
with costing to be developed an
PSPCL/LICENSEE on Preferential
tariff on long term basis then
developer
required
to lay its
Developer shall
shall be
develop
& maintain
the Grid Code. Grid Connectivity
charges shall be paid to the
DISCOM/RVPN
within 3 months
Interfacing arrangements
with of
costing to be developed and
maintained
Grid Interfacing
Transmission Company
Distribution Company
Costing
Capacity in MW
Completion Time
18 months
25 MW
Thermal
36 months
INR 100000/MW
15 months
INR 500000/MW
Upto 10 MW
48 Months
y Provisions
Extension Period
9 to 15 months delay
Other
Energy Cess
Industrial Grant
Electricity Duty
Electricity generated from the SPP 2% of the energy fed to the grid till
and used for self consumption/ sale the charge is determined by Gujarat
to third party/sale to licensees shall Electricity Regulatory Commission
be exempted from payment of
Yes
Yes
Yes
Yes
Banking Charges
Incentives
Demand Cut exemption
financial year
Banking of 100 % of energy in each
financial year
Yes
Land Allotment
Subsidy
Encouragement to cooperative
sector: a subsidy of 11% of the total
share capital of the project shall be
paid
from
Greenwill
Energy
Fund for up
the
Capital
subsidy
be applicable
Yes
Solar Park
REC
Yes
Yes
VAT Refund
Royalty
Government Land
Private Land
Land Allotment
Project developer will procureNo
land
specific details on Land Type
Inprinciple Clearance
Empowered Committee of
Administrative Secretaries for
according statutory and nonstatutory
NRSE
State Levelclearances
ScreeningofCommittee
Empowered Committee: An
Empowered Committee under the
Chairmanship of the Honourable
Minister for Electricity will accord
Empowered Committee of
Administrative Secretaries if formed
for approvals/ clearances
Single Window Empowered
Committee: The
clearances/approvals, which are not
accorded within the specified
Contact Details
Last Reviewed
25 March 2014
02 April 2014
Energy (MNRE)
SPV
Division
Ministry
of New and Renewable
Energy
02 April 2014
02 April 2014
Energy,
Block No. 14, CG.O. Complex,
Lodi
Road,
Ministry
of New
New Delhi-11003
and Renewable
02 April 2014
Energy
Block - 14, CGO Complex
Lodhi
Road,
Newand
Delhi
- 110 003
Ministry
of New
Renewable
02 April 2014
Energy
(MNRE)
Block
14,of
CGO
Complex
Ministry
New
and Renewable
02 April 2014
Energy (MNRE)
Block 14, CGO Complex
Lodi
Road,
003
Ministry
of New
New Delhi-110
and Renewable
02 April 2014
Energy (MNRE)
Block No. 14, CGO Complex, Lodi
Road
20 September 2013
20 September 2013
02 April 2014
20 September 2013
Energy
19 September 2013
19 September 2013
Energy Development Agency
(CREDA),
Department
Energy,
Government 19 September 2013
Chhattisgarhof
State
Renewable
Energy Development Agency
(CREDA),
Department
Chhattisgarh State Renewable
19 September 2013
Energy Development Agency
(CREDA),
Department
of Energy,
Government
Gujarat Energy
Development
Agency 11 September 2013
4th floor, Block No. 11 & 12 Udyog
Bhavan,
Sector -11 Gandhinagar-382 017,
September 10,2014
20 September 2013
Department ( HAREDA)
Akshay Urja Bhawan
Institutional
Plot No.1
Himachal Pradesh
Government
05 September 2013
Energy
Development Agency (HIMURJA),
Block
Himachal Pradesh Government
05 September 2013
17 September 2013
13 September 2013
19 September 2013
08 May 2014
Development Ltd
Head Office Bangalore
Karnataka Renewable Energy
Development Ltd (KREDL)
No.39,"Shanthigruha"
Bharath
Scouts
& Guides Building,
Agency for
Non-conventional
11 June 2014
19 September 2013
The
Director
02 April 2014
ANERT
Madhya Pradesh Urja Vikash Nigam 19 September 2013
Limited,
Urja Bhawan, Link Road
No-2,
Madhya Pradesh Urja Vikash
19 September 2013
Nigam Limited (MPUVNL)
Urja Bhawan, Link Road
No-2,
Madhya Pradesh Urja Vikash
19 September 2013
Nigam Limited,
Urja Bhawan, Link Road
No-2,
Madhya Pradesh Urja Vikash Nigam 04 September 2013
Limited,
Urja Bhawan, Link Road No-2,
Shivaji
Nagar,Energy Development 19 September 2013
Maharashtra
Agency
MHADA Commercial Complex, II
floor,
Maharashtra Energy Development
19 September 2013
Agency
MHADA Commercial Complex, II
floor,
Manipur Renewable Energy
03 September 2013
Development Agency (MANIREDA),
SAI Complex Takyel,
Imphal
795001,
Meghalaya
Non-Conventional and 20 September 2013
Rural Energy Development Agency,
Near BSF Camp,
P.O.
Mawpat,
Odisha
Renewable Energy
19 September 2013
Development Agency,
S-59, Mancheshwar Industrial
Estate,
Punjab Energy Development Agency 19 September 2013
(PEDA)
Solar Passive Complex,
Plot.
no. 1 &
2,
Rajasthan
Renewable
Energy
19 September 2013
Corporation Limited
E-166, Yudhishthir Marg,
C-Scheme,
Rajasthan Renewable Energy
Corporation Limited
E-166, Yudhishthir Marg, C-Scheme,
Jaipur-302005
Rajasthan Renewable Energy
Corporation Limited
E-166, Yudhishthir Marg, C-Scheme,
Jaipur-302005
19 September 2013
11 June 2014
19 September 2013
Agency (TEDA)
E.V.K Sampath Maaligai,
5thfloor,
No.68,
Uttar
Pradesh
New and
19 September 2013
19 September 2013
Energy Development
Agency(UPNEDA),
Vibhuti Khand,
05 September 2013
05 September 2013
20 September 2013