00-2 Installation Manual Table of Contents

This document provides installation instructions for the SmartAX MA5300 Broadband Access System cabinet. It discusses preparing for installation, unpacking the equipment, and installing the cabinet in different ways such as using cement or mounting on a pole. It also covers installing the power distribution system including the lightning arrester, power supply, and batteries. Finally, it describes the different boards found in the cabinet and how to connect cables between the boards.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
87 views4 pages

00-2 Installation Manual Table of Contents

This document provides installation instructions for the SmartAX MA5300 Broadband Access System cabinet. It discusses preparing for installation, unpacking the equipment, and installing the cabinet in different ways such as using cement or mounting on a pole. It also covers installing the power distribution system including the lightning arrester, power supply, and batteries. Finally, it describes the different boards found in the cabinet and how to connect cables between the boards.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Installation Manual

SmartAX MA5300 Broadband Access System

Table of Contents

Table of Contents
Chapter 1 System Overview ......................................................................................................... 1-1
1.1 Cabinet Introduction........................................................................................................... 1-1
1.2 Cabinet Features ............................................................................................................... 1-2
1.2.1 Easy Installation and Maintenance ......................................................................... 1-2
1.2.2 Superior Environment Monitoring............................................................................ 1-2
1.2.3 Compact and Reliable Structure ............................................................................. 1-3
1.2.4 Wide Application Environments .............................................................................. 1-3
1.3 System Architecture........................................................................................................... 1-3
1.3.1 Cabinet Composition............................................................................................... 1-3
1.3.2 Equipment Configuration......................................................................................... 1-6
1.3.3 List of MA5300 Boards............................................................................................ 1-8
1.4 Technical Specifications .................................................................................................... 1-9
1.4.1 Equipment Dimensions and Weights ..................................................................... 1-9
1.4.2 Power Supply Requirements................................................................................... 1-9
1.4.3 Equipment Power Consumptions.......................................................................... 1-10
1.4.4 Reliability Specifications........................................................................................ 1-12
1.5 Standards Compliance .................................................................................................... 1-13
1.5.1 Port Standards ...................................................................................................... 1-13
1.5.2 Engineering Standards.......................................................................................... 1-13
Chapter 2 Installation Preparations............................................................................................. 2-1
2.1 Preparing Project Documents............................................................................................ 2-1
2.2 Preparing Tools and Instruments....................................................................................... 2-2
2.3 Checking Installation Conditions........................................................................................ 2-2
2.4 Unpacking Packing Cases and Checking Equipment ....................................................... 2-4
2.4.1 Unpacking Requirements........................................................................................ 2-4
2.4.2 Procedure for Unpacking a Packing Case .............................................................. 2-5
Chapter 3 Cabinet Installation...................................................................................................... 3-1
3.1 Installation Overview.......................................................................................................... 3-1
3.1.1 Engineering Data .................................................................................................... 3-1
3.1.2 Cabinet Installation Modes...................................................................................... 3-2
3.1.3 Cabinet Installed...................................................................................................... 3-3
3.2 Cement-Based Installation................................................................................................. 3-4
3.2.1 Making the Cement Platform................................................................................... 3-5
3.2.2 Installing the Cabinet............................................................................................... 3-8
3.2.3 Installing Protection Fences .................................................................................. 3-12
3.2.4 Opening Front and Side Doors ............................................................................. 3-13
3.3 Pole-Mounted Installation ................................................................................................ 3-15
Huawei Technologies Proprietary
i

Installation Manual
SmartAX MA5300 Broadband Access System

Table of Contents

3.3.1 Building a Pole-Mounted Platform......................................................................... 3-16


3.3.2 Installing the Cabinet............................................................................................. 3-20
3.3.3 Setting up the Workbench..................................................................................... 3-22
3.3.4 Opening Cabinet Doors......................................................................................... 3-22
Chapter 4 Installation of the Power Distribution System .......................................................... 4-1
4.1 Basic Concepts .................................................................................................................. 4-1
4.1.1 Power Cables .......................................................................................................... 4-1
4.1.2 Cabinet Grounding .................................................................................................. 4-2
4.1.3 Distribution of the Power Supply ............................................................................. 4-3
4.2 Installing the Lightning Arrester ......................................................................................... 4-4
4.2.1 Introduction.............................................................................................................. 4-4
4.2.2 Connecting Cables for SPD27SZ/SPD33SZ Lightning Arrester............................. 4-5
4.3 Installing the Power System .............................................................................................. 4-6
4.3.1 Introduction.............................................................................................................. 4-6
4.3.2 Connecting Cables for GEPS4845 Power System ................................................. 4-7
4.4 Installing Batteries ........................................................................................................... 4-12
4.4.1 Introduction............................................................................................................ 4-12
4.4.2 Installing Batteries................................................................................................. 4-12
Chapter 5 Board Introduction and Cable Connection ............................................................... 5-1
5.1 General Cabling Requirements ......................................................................................... 5-1
5.2 Cable Routing in the B01D200 Cabinet............................................................................. 5-4
5.3 ESM Introduction and Cable Connection .......................................................................... 5-6
5.3.1 Introduction to the ESM Board ................................................................................ 5-6
5.3.2 Connecting the ESM Cable..................................................................................... 5-9
5.4 EVD Introduction and Cable Connection......................................................................... 5-12
5.4.1 Introduction to the EVD Board .............................................................................. 5-12
5.4.2 Connecting Cables of the EVD and ESP Boards.................................................. 5-13
5.4.3 Jumpering the EVD Board .................................................................................... 5-20
5.5 EAD Introduction and Cable Connection......................................................................... 5-21
5.5.1 Introduction to the EAD Board .............................................................................. 5-21
5.5.2 Connecting Cables of the EAD and ESP Boards.................................................. 5-22
5.5.3 Jumpering the EAD Board .................................................................................... 5-27
5.6 ESH Introduction and Cable Connection......................................................................... 5-27
5.6.1 Introduction to the ESH Board .............................................................................. 5-27
5.6.2 Connecting the ESH Cable ................................................................................... 5-29
5.7 ISU Introduction and Cable Connection .......................................................................... 5-31
5.7.1 Introduction to the ISU Board................................................................................ 5-31
5.7.2 Connecting the ISU Cable..................................................................................... 5-34
5.8 EIU Introduction and Cable Connection .......................................................................... 5-34
5.8.1 Introduction to the EIU Board................................................................................ 5-34
5.8.2 Connecting the EIU Cable..................................................................................... 5-36
5.9 Connection of the Subtending Cable ............................................................................... 5-36
Huawei Technologies Proprietary
ii

Installation Manual
SmartAX MA5300 Broadband Access System

Table of Contents

5.9.1 Introduction to Subtending .................................................................................... 5-36


5.9.2 Arranging Optical Fibers and Network Cables...................................................... 5-38
5.10 Connection of the Monitoring Cable .............................................................................. 5-38
5.10.1 Monitoring Cable of Temperature and Humidity ................................................. 5-38
5.10.2 Smoke Monitoring Cable..................................................................................... 5-39
5.10.3 MDF Monitoring Cable ........................................................................................ 5-40
5.10.4 Door Control Monitoring Cable............................................................................ 5-40
5.10.5 Lightning Arrester Monitoring Cable ................................................................... 5-42
5.10.6 Temperature Monitoring Cable of the Battery..................................................... 5-43
5.11 Connection and Arrangement of the Optical Fiber ........................................................ 5-44
5.11.1 Guidelines for Routing the Optical Fiber ............................................................. 5-44
5.11.2 Routing Optical Fibers Inside the Cabinet .......................................................... 5-44
5.11.3 Introduction to the ODF....................................................................................... 5-45
5.12 JPX658 MDF Installation ............................................................................................... 5-46
5.12.1 Introduction to MDF Cable Distribution ............................................................... 5-46
5.12.2 Appearance of the Internal and External Cable Units......................................... 5-47
5.12.3 Installing Cable Units .......................................................................................... 5-48
5.12.4 Cable Distribution in the External and Internal Cable Units................................ 5-49
5.12.5 Installing Security Units....................................................................................... 5-50
5.12.6 MDF Tools and Their Applications ...................................................................... 5-52
5.12.7 Sealing the Inlets of the MDF.............................................................................. 5-54
Chapter 6 Checkup of Hardware Installation.............................................................................. 6-1
6.1 Checkup Items Before Power-on....................................................................................... 6-1
6.2 Power-on Debugging ......................................................................................................... 6-3
6.3 Checkup Items After Power-on.......................................................................................... 6-4
Chapter 7 Monitoring System Configuration.............................................................................. 7-1
7.1 Overview of Monitoring System ......................................................................................... 7-1
7.2 Hardware Connections and Settings ................................................................................. 7-6
7.2.1 Connection of Sensor Cables ................................................................................. 7-6
7.2.2 Connection of Standby Monitoring Ports .............................................................. 7-10
7.2.3 Settings of Jumpers and DIP Switches................................................................. 7-11
7.3 Data Configuration ........................................................................................................... 7-11
Chapter 8 Equipment Maintenance ............................................................................................. 8-1
8.1 Routine Maintenance Requirements ................................................................................. 8-1
8.1.1 General Requirements ............................................................................................ 8-1
8.1.2 Detailed Requirements............................................................................................ 8-1
8.2 Maintenance of the Lightning Arrester............................................................................... 8-2
8.2.1 Maintenance Period ................................................................................................ 8-2
8.2.2 Maintenance Principles ........................................................................................... 8-3
8.2.3 Handling of Typical Faults....................................................................................... 8-3
8.3 Maintenance of the Power Module .................................................................................... 8-4

Huawei Technologies Proprietary


iii

Installation Manual
SmartAX MA5300 Broadband Access System

Table of Contents

8.3.1 Maintenance of the Rectifier Module ...................................................................... 8-4


8.3.2 Maintenance of the Monitoring Module................................................................... 8-5
8.3.3 Maintenance of the Power Distribution Module ...................................................... 8-5
8.4 Maintenance of the Battery................................................................................................ 8-5
8.4.1 Routine Maintenance .............................................................................................. 8-5
8.4.2 Battery Replacement............................................................................................... 8-7
8.5 Maintenance of the Temperature Control Unit .................................................................. 8-7
8.6 Maintenance of the MDF ................................................................................................. 8-10
8.7 Maintenance of the Air Filter............................................................................................ 8-11
8.8 Other Maintenance Suggestions ..................................................................................... 8-11
Appendix A Connection Diagrams of B01D200 Cabinet ...........................................................A-1
A.1 Connection Diagrams of Integrated Equipment Cabinet...................................................A-1
A.2 Connection Diagram of the MA5300 .................................................................................A-4
Appendix B Making Network Cables ...........................................................................................B-1
B.1 Introduction to Network Cables .........................................................................................B-1
B.2 Making Ordinary Network Cables......................................................................................B-2
B.3 Making Shielded Network Cables .....................................................................................B-4
Appendix C Cable Labels .............................................................................................................C-1
C.1 Label Introduction..............................................................................................................C-1
C.1.1 Specifications..........................................................................................................C-1
C.1.2 Type and Shape .....................................................................................................C-1
C.1.3 Printing Labels ........................................................................................................C-3
C.1.4 Writing Labels .........................................................................................................C-5
C.1.5 Affixing Labels ........................................................................................................C-6
C.1.6 Label Contents........................................................................................................C-8
C.1.7 Remarks .................................................................................................................C-9
C.2 Labels for External Cables of the Alarm Box ....................................................................C-9
C.3 Labels for Network Cables ..............................................................................................C-10
C.4 Labels for Optical Fibers .................................................................................................C-12
C.4.1 Labels for the Fiber that Connects Two Devices..................................................C-12
C.4.2 Labels for the Fiber that Connects the Device and the ODF ...............................C-13
C.5 Labels for Subscriber Cables ..........................................................................................C-14
C.6 Labels for Power Cables .................................................................................................C-15
C.6.1 Labels for DC Power Cables ................................................................................C-15
C.6.2 Labels for AC Power Cables ................................................................................C-17
Appendix D Environment Requirements ....................................................................................D-1
D.1 Storage Environment Requirements .................................................................................D-1
D.2 Transportation Environment Requirements ......................................................................D-3
D.3 Running Environment Requirements ................................................................................D-6