Power up procedure
To power up the storage array, follow these steps:
Table 1
Power Up Steps
Step
Action
1.
Verify that the master switch/circuit breakers for each cabinet power strip are
ON. If you are powering up the VNX5300 Unifiedsystem in a cabinet that
contains other components, do not turn off the cabinet circuit breakers.
Ensure that the SPS switches are in the OFF position.
2.
Ensure that the power cable for SP A is plugged into the SPS and power cord
retention bails are in place.
3.
Ensure that the power cord for SP B is plugged into the nearest power
distribution unit (PDU) on a different circuit from SPS A and that power cord
retention bails are in place. In a system with two SPSs, plug SP B into SPS B.
4.
Verify that the power cables connecting each SPS is connected to the
appropriate cabinet power strip and that retention bails are in place.
5.
Verify that the power cables for any DAEs are plugged into the cabinets
power strips.
6.
7.
Connect the blade enclosure power cables to the PDU and wait for the
blade(s) to power up. The power LED on the front of the blade enclosure will
light when the blades have powered up.
8.
Wait 4-5 minutes as the blade(s) power up. This insures that the blades will
have booted up and that they are ready. Then connect the power cable for the
Control Station 0 to the PDU.
9.
Check the system power LED on the front of the Control Station. If that LED
indicates that Control Station 0 has not started to power up, turn on the
Control Station by pressing the power button on the front. Make sure that
Control Station 0 is powered up before continuing.
Note: The front bezel must be removed to access the power button of the
Control Station.
Table 1
Power Up Steps
Step
Action
10.
11.
12.
13.
14.
Power up procedure
2
1
2
1
0
2
1
MODEM plug
2
1
2
1
0
2
1
0
Control Station 1
optional
1U
X4
6Gb SAS
Disk-array enclosure
3U
X4
6Gb SAS
CS
VGA socket
MODEM plug
Control Station 0
1U
MGMT
Serial Console
MGMT
Serial Console
CS
8Gb 6Gb
fibre SAS
2
TAG
1 X4
8Gb 6Gb
fibre SAS
Power
Power
6Gb SAS
0 X4
Switch
Figure 1
1 X4
6Gb SAS
0 X4
Switch
15 or 25 disk processor
enclosure
3U
VGA socket
Power
Power