Installing and Configuring Primavera P6 EPPM Rel 8.1
Installing and Configuring Primavera P6 EPPM Rel 8.1
Rel 8.1
Course Description
The Installing and Configuring Primavera P6 Rel 8.1 course provides in-depth coverage of the Primavera P6 installation process, including
integration with Fusion Middlware components such as Oracle Business Intelligence Enterprise Edition (OBIEE), BI Publisher, and Oracle
Universal Content Management (UCM). It is intended for implementation teams tasked with installing and integrating Primavera P6, not end
users.Students first install and test the base Primavera P6 product, then install its various options (Help, Tutorials, Web Services, Progress
Reporter, and the P6 Optional Client). Once the student has finished installing and configuring the P6 products, he or she then installs and
configures P6 Analytics using Oracle Business Intelligence Enterprise Edition (OBIEE), P6 Reports using Oracle BI Publisher, and document
management using Oracle Universal Content Management. Finally, students enable e-mail support in P6, as well as P6 Team Member E-Mail
Statusing Service.Learn To:Install Primavera P6, P6 Help, and P6 TutorialsInstall P6 Progress ReporterInstall P6 Web ServicesInstall P6
Optional ClientInstall P6 Analytics and P6 ReportsIntegrate P6 with UCMA Live Virtual Class (LVC) is exclusively for registered students;
unregistered individuals may not view an LVC at any time. Registered students must view the class from the country listed in the registration
form. Unauthorized recording, copying, or transmission of LVC content may not be made.
Audience
Architect
Developer
Functional Implementer
Support Engineer
System Administrator
System Integrator
Technical Consultant
Course Objectives
Perform a base Primavera P6 installation
Configure Primavera P6 Help and Tutorials
Install additional Primavera P6 components, including Web Services, Progress Reporter, and the P6 Optional Client
Integrate Oracle Business Intelligence Enterprise Edition (OBIEE) with a P6 installation
Integrate Oracle BI Publisher with a P6 installation
Integrate Universal Content Management with a P6 installation
Add e-mail support to a P6 installation
Course Outline
Introduction to Primavera P6 and its Integrations
Review Primavera P6 base functionality
Describe the additional functionality provided by the integrations used in this course
Primavera P6 Installation Considerations
Review the P6 architecture that will be used in this course
Provide a general overview of the installation process
Installing Primavera P6
Copyright 2013 by Quint Wellington Redwood. All rights reserved.
Qui nt Wel l i ngt on Redwood
www. Qui nt Group. com
Describe the options for installing and configuring Primavera P6
Prepare a database for Primavera P6 installation
Install and test the base Primavera P6 product
Installing P6 Help and Tutorials
Use the Primavera P6 Administrator Tool to configure Primavera P6 Help and P6 Tutorials
Deploy Primavera P6 Help locally
Deploy Primavera P6 Tutorials locally
Installing P6 Progress Reporter
Install, configure, and test Primavera P6 Progress Reporter
Installing P6 Optional Client
Install, configure, and test Primavera P6 Optional Client
Installing and Configuring P6 Web Services
Install, configure, and test Primavera P6 Web Services
Installing and Configuring P6 Analytics
Describe the P6 Analytics architecture
Install and populate the P6 Reporting Database
Install, configure, and test P6 Analytics
Installing and Configuring P6 Reports
Describe the P6 Reports architecture
Install, configure, and test P6 Reports
Integrating with Univeral Content Management
Describe the technical challenges and solutions addressed by integrating P6 with Oracle Universal Content Management
(UCM)
Configure UCM to work with P6
Integrate UCM with P6
Integrating E-mail
Configure e-mail service settings to enable notification by e-mail
Install and configure P6 Team Member E-mail Statusing Service to enable querying and updating projects and activities
through e-mail
Copyright 2013 by Quint Wellington Redwood. All rights reserved.
Qui nt Wel l i ngt on Redwood
www. Qui nt Group. com