C-Report1 (Gravity System)

This document analyzes the existing pipeline system between Belutong reservoir and Sungai Buloh reservoir to determine the achievable flow rates from new proposed pumps. Field measurements of flow rates and pressures were taken at 5 points along the pipeline over 3 days. The Hazen-Williams C value was calculated to be 36.35 based on the gradient of the pressure-flow graph. The system characteristic curve was plotted against the pump curves to determine the pumps will be able to deliver a minimum flow of 2411 L/s when 4 pumps are running.

Uploaded by

Ah Leng Lau
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
126 views

C-Report1 (Gravity System)

This document analyzes the existing pipeline system between Belutong reservoir and Sungai Buloh reservoir to determine the achievable flow rates from new proposed pumps. Field measurements of flow rates and pressures were taken at 5 points along the pipeline over 3 days. The Hazen-Williams C value was calculated to be 36.35 based on the gradient of the pressure-flow graph. The system characteristic curve was plotted against the pump curves to determine the pumps will be able to deliver a minimum flow of 2411 L/s when 4 pumps are running.

Uploaded by

Ah Leng Lau
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 7

CONTENTS

1. INTRODUCTION.................................................................................................................................1
2. SYSTEM CHARACTERISTIC...........................................................................................................1
3. DATA ACQUISITION..........................................................................................................................2
4. HAZEN WILLIAM C VALUE AND PUMP DUTY POINT..........................................................4
5. CONCLUSION......................................................................................................................................6
List of Graphs
Graph 1: Flows against Time Plot........................................................................................3
Graph 2: - Pressure VS Flow
1.85
...........................................................................................4
Graph 3: - Sstem !hara"teristi" !ur#e..............................................................................5

Appendix A: - Pressures and Flow Recordins
Appendix !: - Pipe Pro"le #$ Site Sur%e$
1. Introduction
$ew pumps are propose% to &e installe% to in"rease the 'lows 'rom (elutong reser#oir to
)i"om reser#oir. !urrentl* the 'low to (elutong reser#oir to )i"om reser#oir is &
gra#it. To ensure that the re+uire% %esign 'lows "an &e a"hie#e% with the new pumps* the
e,isting sstems "hara"teristi" nee% to &e esta&lishe%. The parameters re+uire% to "on'irm
sstem "hara"teristi" are the pipeline parameters* pump "hara"teristi" "ur#es an% stati"
li'ts. There'ore* this report shall in#estigate the a#aila&ilit o' e,isting %ata an% "arr out
ne"essar tests* i' ne"essar* to "olle"t the missing %ata to esta&lish the sstem
"hara"teristi" "ur#e to "on'irm the a"hie#a&le %ut 'lows 'rom the propose% new pumps.
2. System Characteristic
For a gra#it sstem* the 'low rate is the 'low that is pushe% through the "on#eing pipes
'rom start en% to %eli#er en%* against the total hea%* whi"h is the 'ri"tion loss in the
"on#eing pipes. There'ore* the sstem "hara"teristi" parameters are re+uire% to
%etermine the 'low through the sstem. The sstem "hara"teristi" is a 'un"tion o' #arious
parameters as %es"ri&e% &elow:
a- Pipe si.e / the si.e o' pipe or pipes i' there are man %i''erent si.es in#ol#e%
&- Pipe length / the length o' the pipeline 'rom pump en% to re"ei#ing reser#oirs.
"- Pipe 'ri"tion 'a"tor / using )a.en 0illiam 'ormula* this 'a"tor is terme% as 1!2.
%- Stati" hea% / the %i''erent in water le#els &etween su"tion an% %eli#er.
The pipe 'ri"tional hea% loss is gi#en & )a.en 0illiam 'ormula as:
83 . 4 85 . 1
85 . 1
4
4 4 53 . 16
d C
Q L
H
l
= -----------------------------71-
0here*
8 / length o' pipe in m
9 / Flow rate in m
3
:se"
% / Pipe %iameter in m
1
! / )a.en 0illiam 'ri"tion 'a"tor
8et
83 . 4 85 . 1
4
4 53 . 16
d C
L
K =
85 . 1
4Q K H
t
= ---------------------------------73-
0hi"h is in the 'orm o' ; m, < " = where " is .ero 76-
There'ore* the plot o' Ht against Q
1.85
will &e a straight line* where the -inter"ept will &e
the origin* an% with gra%ient >. The )a.en 0illiam ! "an &e "al"ulate% as shown &elow.
85 . 1
83 . 4
4
4 53 . 16
d K
L
C = -------------------------------------74-
)en"e* the #al#e o' ! will %epen% on 8 / length o' pipe an% % / %iameter o' the pipe. ?'
the pumping main ha#e mi, o' pipe si.es in parallel an%:or series* the a"tual ! #al#e o'
ea"h pipe "annot &e %etermine%. @ut the %ut point still "an &e %etermine% &ase on
sstem "hara"teristi" e+uation 73-* with > as the "om&ine% pipe "hara"teristi"* pro#i%e%
the 'iel% measurements are a""urate.
3. Data Acquisition
?n Se"tion 2 a&o#e* to o&tain the ! #al#e* the 'low against the pressure rea%ings at the
pipes are re+uire% 7at least 3 point to "on'irm the set is straight line-. Aata "olle"tion
worB shall &e "arrie% out & installing the "orrespon%ing measuring e+uipments at the
'ollowing lo"ation:
a- Ceser#oir 8e#el at (elutong Ceser#oir
&- Pipe ?n#ert 8e#el 1 at (elutong Dut'low meter 7Point 1-
"- @ellmouth 8e#el at )?!DE Ceser#oir inlet 7Point 2-
%- Pressure at (elutong Ceser#oir outlet 7Point ?-
e- Pressure at )?!DE Ceser#oir inlet 7Point 2-
'- Flowrate at (elutong Ceser#oir Flowmeter 7Point 1-
The %ata "olle"tion inter#al shall &e "arrie% out in a""or%an"e to the ta&le summar
&elow:
2
In!" P#$#%&"&$' D#"# C())&*"+(n
M&",(-
.$&/!&n*0
Ceser#oir 8e#el F (elutong
Ceser#oir
)%rostati" 8e#el
Eonitoring Gnit
H#er 15 minutes
73 %as-
Pipe ?n#ert 8e#el 1 F (elutong
Dut'low meter 7Point 1-
!olle"t Aata 'rom
Sur#eor
Dn"e
@ellmouth 8e#el F )?!DE
Ceser#oir inlet 7Point 2-
!olle"t Aata 'rom
Sur#eor
Dn"e
Pressure F (elutong Ceser#oir
outlet 7Point ?-
Pressure
Sensor:Trans%u"er
H#er 15 minutes
73 %as-
Pressure F )?!DE Ceser#oir
inlet 7Point 2-
Pressure
Sensor:Trans%u"er
H#er 15 minutes
73 %as-
Flowrate F (elutong Ceser#oir
Flowmeter 7Point 1-
!lamp-on Gltrasoni"
Flowmeter
H#er 15 minutes
73 %as-
The 'lows an% pressures rea%ings against time %ata "olle"te% are shown in Ippen%i, I.
The re%u"e% le#els at (elutong reser#oir an% )i"om reser#oir are 5J.56m an% 54.88m
respe"ti#el. I total o' J6 hours o' rea%ing 'rom 5:66 pm on J
th
o' D"to&er till J:36 am on
13
th
o' D"to&er were re"or%e%. The plot o' 'low rates against time is shown in Graph 1*
whi"h shows that the 'low rate is re%u"ing a'ter 53 hours an% re"o#ere% a'ter 53 hours.
1$#, 12 .)(3' #4#+n'" T+%& P)("
I "he"B on the water le#el
insi%e (elutong reser#oir an%
also the pressure at point 1*
ha#e "on'irme% that the
reser#oir is empt &etween
these times. The 'low in the
pipe ma not 'low 'ull when the
reser#oir is emptie%= there'ore*
%ata &etween 53 hours to 53
hours are omitte% in this stu%.

3
4. Hazen Wiiam !C" #aue and $ump Duty $oint
Is-&uilt %rawings on the pipelines are not a#aila&le* an% a sur#e was "arrie% out to
esta&lish the pipe pro'ile o' the pipe line. I total o' 26 points along the pipeline route
were sur#ee% to o&tain the groun% le#els with un%er groun% pipe %ete"tion e+uipment to
%etermine the %epth o' the pipeline. The lo"ations o' the points sur#ee% together with the
pipe pro'ile plot are shown in Ippen%i, @.
@ase% on the 'low an% pressures rea%ings re"or%e% at (elutong reser#oir an% )i"om
reser#oir the hea% loss 7)- &etween the rea%ing points is "al"ulate% as the sum o' the
%i''erent in pressures rea%ing an% the %i''erent in ele#ations. The analsis o' the 'low-
pressure rea%ings an% the graph o' pressure against 'low
1.85
are plotte% in Graph 2.
1$#, 22 5 P$&''!$& VS .)(3
1.65

4
The point "lusters in Graph 2 shows a general tren% o' a straight line to war%s the origin
with &est 'it gra%ient o' 4.55. There'ore* &ase% on the gra%ient o' 4.55* pipe %iameter o'
1.5m an% total pipe length o' 13826m* the "al"ulate% ! 'or this pipeline is J6.35. The
re"or%e% 'low %ata ha#e shown that the 'low rates are "onstantl "hanging* %ue to the
"hange o' water le#el insi%e the (elutong reser#oir. The water le#el insi%e the (elutong
reser#oir is "hanging is &e"ause o' "onstant +uantit o' water 'lowing in:out o' the
reser#oir with respe"t with time. In% pro&a&l %ue to long pipeline= the "ompressi&ilit
o' water an% elasti"it pipe that "ause the 'low in the pipe are not the same at %i''erent
se"tion o' the pipe at an one time* although the "ontinuit o' 'low is maintaine%. This
has a''e"te% the points "lusters to iel% a weaB the "orrelation 'a"tor 7C
2
- o' 6.213J.
@ase% on the "ompute% ! #alue o' J1* the sstem "ur#es are plotte% on the pump "ur#es
as shown in Graph 2* to %etermine the pumps %ut points
1$#, 32 5 S0'"&% C,#$#*"&$+'"+* C!$7&
The minimum %ut 'low rate is 24J1 l:s 7;215 ml%- when 'our 72- pumps are running
when the water le#el at (elutong reser#oir is at @08 o' 56.51m. The 'low will in"rease%
5
to 2332 l:s 7;235 ml%-* i' the water le#el at (elutong reser#oir is at T08 o' 5J.21m.
)en"e* the sele"te% pumps are a&le to %eli#er the target 'low.
%. Concusion
?%eall* all the %ata 'or estimation o' pump %ut 'lows shoul% &e a#aila&le 'rom re"or%
%rawings or in#entor %ata&ase. @ut almost non are a#aila&le* an% these %ata are o&taine%
& means o' estimation. There'ore* the a""ura" o' the "ompute% %ut points "oul% &e
"ompromise%. )owe#er* &ase% on the "ompute% 1!K #alue o' J1* the pumps are a&le to
%eli#er the re+uire% 'low o' 215 ml% un%er the worst s"enario.
5