Geomatic Laboratory: Fakulti Kejuruteraan Awam Dan Alam Sekitar Jabatan Kejuruteraan Awam
Geomatic Laboratory: Fakulti Kejuruteraan Awam Dan Alam Sekitar Jabatan Kejuruteraan Awam
Construction surveying which is also known as lay-out or setting-out is to stake out reference
points and markers that will guide the construction of new structures such as roads or buildings.
survey existing conditions of the future work site, including topography, existing
stake out reference points and markers that will guide the construction of new structures
conduct an As-Built surveying: a survey conducted at the end of the construction project
to verify that the work authorized was completed to the specifications set on plans.
In this setting out work, we transfer all the measurement from plan plotted to the land
surface. This process is including points and lines for determine the location and level for
2.0 OBJECTIVE .
The aim of this practical is to expose student in field work procedures of setting out building
Carry out all the necessary calculations to establish the setting-out points.
4.0 THEORY .
Setting out is the translation of construction plans into physical points on the ground that can
be used as a basis for the actual construction. Construction surveying provides not only the
horizontal location of new structure, but also the vertical information required. The setting out
survey consists of locating and marking horizontal and vertical control points of the layout
structure. The Setting Out surveying will start with calculates information from the drawing to
ensure that :
.1 Buildings can be positioned correctly along with all the necessary structural
.3 Lines and levels for structural, roads, drainage and earthworks are provided.
When a site layout design has finish plotted , all the information is accurately transferred
onto site. Using the latest survey instruments setting out points can set out on site required, base
on design drawing and design co-ordinates. In additional the setting out work also include the
check survey at various stages throughout the construction process; which involve the
independent checking of points set out by other, where quality monitoring is required.
5.0 EQUIPMENT .
Total station ( 1 set )
Prism ( 1 set )
Mini prism ( 1 set )
Pole ( 1 set )
Tripod ( 2 sets )
Tape
Pegs ( 6 sets )
Hammer
6.0 PROCEDURE
Firstly, determine the station within or near the site as a set point before the setting out
work is done.
Then, set up the total station at the station 1 and set up the prism at point A as a reference
bearing.
After that, to plot the point A, used the tape measurement to determine the istance
between the station 1 to A. Then, used the mini prism at the point A and to get the
Then, repeat the procedure for measure the bearing and the distance from station 1 to
After all the works done, the checking work can be done by using the tape measurement
Then compared the distance measured by the tape with the distance from the autocad .
Then marked the layout with sand and labeled as Group 13 .
7.0 RESULTS .
By setting out, we get all the point for the purposed building. But, we have to check to make
sure the distance whether it was same as in the drawing. To check the distance, we used
calculation and measurement by tape. For calculation, our group used the triangle method. After
calculate the distance, we use tape to measure every distance from point to point. Below shows
4m
C D
8m E
F
1
B A
4m 4m
STN
TO BEARING HZ DISTANCE REMARKS
1
2 219 06 00 32.476
A 243 40 53 12.323
A
1 63 40 53 12.323
B 270 00 00 8.000
C 315 00 00 11.314
D 333 26 06 8.944
E 315 00 00 5.567
F 00 00 00 4.000
AC = √ 82 + 82 = 11.314 m .
MANUAL
STN ON SITE DIFFERENCE
CALCULATION
AC 11.270 11.314 0.044
AD 8.900 8.944 0.044
AE 5.600 5.657 0.017
BD 8.960 8.940 0.020
BE 5.640 5.657 0.017
BF 8.960 8.940 0.020
angle AC : tan θ = 8 / 4
θ = 45 .
8.0 DISCUSSION .
In area of our traverse site, we found that there are open space without any construction
where we can construct a new building called proposed building . We need to construct the L-
shape building before setting out . We draw the L-shape building using the Auto-Cad in
tachometry plan . At this empty area, our group had done the setting out point by referred the
After done the setting out at this area, we know that there are several point should be
taking where the setting out must be doing after we calculate the bearing at each point. After we
shoot using the total station to the mini prism at each point by insert the bearing that has been
calculated. We then can determine where is the exact point can be located. There are some
difference value of distance between the real one and the value that being calculated. There
might be happened some errors in setting the bearing or the angle is not exactly 90°.
9.0 CONCLUSION .
For conclusion, we found that setting out is important in civil engineering work. Setting
out is add on from tacheometry survey because with this method, we can found any opened
space by looking at the tacheometry plan. Besides that, if we need that space but there are many
trees there, so we can plan to cut it from tacheometry plan. So, we can know which place is
suitable to make any construction. After the setting out is finish, we can determine the point and
the area for the purposed structure. The location of the setting out point is at the large area
include the traverse area. After all the works finish, we can learn the setting out process and how
to get the bearing and distance as in objective and we can apply it in the future work