Request For Inspection - Form

This document is a request form for an inspection of construction works. It requests the attendance of an engineer to inspect the type of works listed, including setting out, bush clearing, formwork, and concreting. The form provides fields to specify the project number, employer, contractor, date, location, purpose and details of the inspection. Signatures from the engineer and inspector are required on the completed form.

Uploaded by

drebighead
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (5 votes)
13K views1 page

Request For Inspection - Form

This document is a request form for an inspection of construction works. It requests the attendance of an engineer to inspect the type of works listed, including setting out, bush clearing, formwork, and concreting. The form provides fields to specify the project number, employer, contractor, date, location, purpose and details of the inspection. Signatures from the engineer and inspector are required on the completed form.

Uploaded by

drebighead
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Request for Inspection Form

Proj No. :

Employer : Request No.
Engineer :

Contractor : Date
//

Request for Inspection

We request your attendance to inspect the following works :
1. Type :
2.Inspection time :

Date : / /
3. Location :


4. Inspection First Second Third
5. Purpose of the Inspection
o Setting out
o Bush Clearing
o Land Grubbing
o Formwork
o Reinforcement
o Concreting
o Walling
o Roofing
o Finishes

Other (Specify)...
Particular Details....

Submitted by :_____________________________ Signature________________________________
6. Inspection Report Signature
Engineer
Surveyor
Materials Technician
Inspectoe of Works

Date/Time of Inspection : / / :
7. Engineer;s Representative Comments



The Works are : Approved Approved as noted Rejected
Signature________________