0% found this document useful (0 votes)
207 views7 pages

Louis Berger S.A.: 805. Equipment in Workshop

1. This document provides specifications for 10 workshops that will be part of a maintenance facility, including main mechanical, electrical, mechanical, welding, accumulator repair, carburetor, maintenance, precision mechanics, electrical, and washing workshops. 2. It describes the equipment and machines that will be installed in each workshop, such as lathes, grinders, compressors, and welders. Concrete foundations and specifications are provided for mounting many of the machines. 3. The workshops will perform functions like vehicle maintenance, electrical repair, mechanical work, welding, accumulator and carburetor repair, and laundry. Operations, equipment, and required installations are outlined for each workshop.

Uploaded by

relu1986
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
207 views7 pages

Louis Berger S.A.: 805. Equipment in Workshop

1. This document provides specifications for 10 workshops that will be part of a maintenance facility, including main mechanical, electrical, mechanical, welding, accumulator repair, carburetor, maintenance, precision mechanics, electrical, and washing workshops. 2. It describes the equipment and machines that will be installed in each workshop, such as lathes, grinders, compressors, and welders. Concrete foundations and specifications are provided for mounting many of the machines. 3. The workshops will perform functions like vehicle maintenance, electrical repair, mechanical work, welding, accumulator and carburetor repair, and laundry. Operations, equipment, and required installations are outlined for each workshop.

Uploaded by

relu1986
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 7

Louis Berger S.A.

805. EQUIPMENT IN WORKSHOP


Romaia ! Mo"or#a$ Bu%&ares" ! 'os"a"a( Su)se%"ios *ra+a ! ,e"es"i a- ,e"es"i ! 'era.o-a
*e"ai/e- Egieerig S"u-$( Pro%ureme" Ser.i%es a- Su0er.isio o1 'i.i/ Wor2s
Te%&i%a/ S0e%i1i%a"ios Page 805 3 4
Louis Berger S.A.
TABLE OF CONTENTS
Section Description Page number
805.1. General 805 - 3
805.1.1. Description 805 - 3
1. Main mechanical workshop 805 - 3
. !lectrical workshop 805 -3
3. Mechanical workshop 805 - "
". #el$ing workshop 805 - "
5. %ccumulators repairing an$ charging workshop 805 -"
&. 'arburator workshop 805 - 5
(. Maintenance workshop )*' + *,- 805 - 5
8. Precision mechanics workshop 805 -5
.. !lectrical workshop 805 -&
10. #ashing workshop 805 -&
805.1.. *e/erence $ocuments 805 - &
805.. 0ualit1 control /or acceptance 805 - &
Romaia ! Mo"or#a$ Bu%&ares" ! 'os"a"a( Su)se%"ios *ra+a ! ,e"es"i a- ,e"es"i ! 'era.o-a
*e"ai/e- Egieerig S"u-$( Pro%ureme" Ser.i%es a- Su0er.isio o1 'i.i/ Wor2s
Te%&i%a/ S0e%i1i%a"ios Page 805 3 5
Louis Berger S.A.
805.4. 6eera/
805.4.4. *es%ri0"io
The herein Specifcations enclose the layout and mounting
requirements for plants in each workshop.
The maintenance workshop is located in the hall for current
revision and repair works, as well as in the repair for pieces and
subassemblies.
The works organization project specifes the endowments of
each workshop, which are partly included also in equipment lists, with
and without mounting.
4. Mai me%&ai%a/ #or2s&o0
n this workshop there will be e!ecuted S"#s maintenance
works. There are provided all the necessary plants for the e!ecution of
such works.
The boring machine $ %& will be mounted on a plain concrete
foundation. t will be mounted after maintaining the conditions of
concrete pouring and hardening. The position of holes for foundation
screws will be assessed only after verifying the holes' a!les in
machine's trunk. The levels provided in the machine book will be also
observed. The supply voltage is %%()*+( ".
#ouble grinder ,# *(( will be mounted on a - .&( reinforced concrete
foundation, after complying with the foundation e!ecution
requirements.
The position of holes for anchoring bolts will be assessed only after
verifying the holes/ a!les in machine's trunk.
The levels provided in the machine book will be observed. The supply
voltage will be %%()*+( ".
The vice bench is necessary for e!ecuting some dismantling 0
mounting operations, for repair works.
The provided stand is necessary for storage of repaired S#"s.
5. E/e%"ri%a/ #or2s&o0
This workshop is provided for checking and repairing the electric
installations of the plants and vehicles necessary for road
maintenance.
The boring machine $ .* provided for this workshop will be mounted
on a plain concrete foundation. The position of holes for anchoring
bolts will be assessed only after verifying the holes' a!les in machine's
trunk. The levels provided in the machine book will be observed. The
Romaia ! Mo"or#a$ Bu%&ares" ! 'os"a"a( Su)se%"ios *ra+a ! ,e"es"i a- ,e"es"i ! 'era.o-a
*e"ai/e- Egieerig S"u-$( Pro%ureme" Ser.i%es a- Su0er.isio o1 'i.i/ Wor2s
Te%&i%a/ S0e%i1i%a"ios Page 805 3 7
Louis Berger S.A.
supply voltage will be %%()*+( ". 1ork norms in force, regarding the
layout of plant, machines and installations will be %%()*+( ". 1ork
norms in force, regarding the layout of plant, and machines and
installations will be complied with.
7. Me%&ai%a/ #or2s&o0
There will be carried out mechanical working out and rehabilitation
operations for pieces and units that are out of use. 2or this purpose
the workshop will be ftted out with plants, devices and industrial
furniture.
The lathe S34 5(% ! .((( will be mounted on a plan concrete
foundation.
The position of holes for foundation screws will be assessed only after
verifying the holes' a!les in machine's trunk. The levels provided in
the machine book will be also observed. The supply voltage is
%%()*+( ".
The labor protection measures will be complied according to the
norms in force.
8. We/-ig #or2s&o0
This workshop is provided for recovering the used or damaged pieces
and for repairing the metal sheet subassemblies. t is ftted out with
plants, devices and appropriate industrial furniture.
The grinder ,# *(( will be mounted on a - .&( reinforced concrete
foundation, after complying with the foundation e!ecution
requirements.
The position of holes for anchoring bolts will be assessed only after
verifying the holes' a!les in machine's trunk.
The levels provided in the machine book will be observed. The supply
voltage will be %%()*+( ".
The welding transformer T4S6 *(( is necessary for arc welding.
The transformer characteristics are7
- welding nominal current 0 *(( 4
- nominal operating voltage 0 *% "
- nominally frequency 0 &( 8z
- nominal supply voltage 0 %%()*+( "
1elding table with own ventilation 0 6S .(( #
9haracteristics7
- engine power 0 .,. kw
- weight 0 .*& kg
2or dismantling 0 mounting operations, the workshop was provided
with a working bench.
There was also provided a stand for storage of repaired pieces.
Romaia ! Mo"or#a$ Bu%&ares" ! 'os"a"a( Su)se%"ios *ra+a ! ,e"es"i a- ,e"es"i ! 'era.o-a
*e"ai/e- Egieerig S"u-$( Pro%ureme" Ser.i%es a- Su0er.isio o1 'i.i/ Wor2s
Te%&i%a/ S0e%i1i%a"ios Page 805 3 8
Louis Berger S.A.
5. A%%umu/a"ors re0airig a- %&argig #or2s&o0
This workshop is provided for recovering and repairing accumulators.
The main operations that will be e!ecuted in this workshop are7
- dismantling of accumulator batteries
- replacement of used plates and remounting
- battery charging.
9. 'ar)ure"or #or2s&o0
This workshop is necessary for verifying, recovering and repairing of
carburetors, water pumps, injection pumps, supply devices, fuel
flters.
The operations that will be e!ecuted are7
- dismantling in component pieces
- washing
- assessment of defects
- replacement of defect pieces with new or recovered pieces.
2or this purpose, there were provided plants and appropriate
industrial furniture, as working bench, washing bath, stand, and cases.
:. Mai"ea%e #or2s&o0 ;R' < RT=
n this workshop there will be carried out technical revision and
current repair works, necessary for assuring a good operation of the
plant.
1ithin the framework of revision works, according to the technical
prescriptions, there will be carried out control works, tightening and
adjustments, lubrication operations, cleaning and checking, washing.
1ithin the framework of repair works there will be carried out
recovery operations, including replacement of pieces and units, that
have to be performed after maintaining the operating state of the
plants.
The workshop is also provided with a boring machine $ %&, a double
grinder ,# *(( and an electric compressor :9; *&(, /$ira<e/ crane of
..%& tf and a /9rocodile/ type hydraulic lever.
=... The hydraulic crane is necessary for lifting the engines from the
bearers and for transporting them as well as other pieces to the repair
place.
=.%. The hydraulic lever is necessary for lifting various loads >font
deck, back deck, etc.?.
=.*. The boring machine $ %& and the grinder ,# *(( will be mounted
on foundations described at the workshops that are ftted out with
such plants.
Romaia ! Mo"or#a$ Bu%&ares" ! 'os"a"a( Su)se%"ios *ra+a ! ,e"es"i a- ,e"es"i ! 'era.o-a
*e"ai/e- Egieerig S"u-$( Pro%ureme" Ser.i%es a- Su0er.isio o1 'i.i/ Wor2s
Te%&i%a/ S0e%i1i%a"ios Page 805 3 5
Louis Berger S.A.
8. Pre%isio me%&ai%s #or2s&o0
t is provided for carrying out some mechanical working out and
recovering operations for measuring and controls devices, mounted
on 9..9.'s machines and units.
t is located at the frst level of the operation building.
t is ftted out with plants, devices and appropriate industrial furniture.
+... The fne mechanics lathe S62 *% will be mounted on the @oor.
The f!ing solution will be assessed after plant's procurement, in
accordance with the requirements of the machine book.
The labor protection measures will be complied with, according to the
norms in force. 2rom the department norms of labor protection in
road, water and air transport the chapter no. AAA" related to the
labor protection measures for cold treatment of metals by means of
machine tools will be observed.
+.%. The grinder ,# *(( will be mounted on a metal base, on the @oor
or on the working table. The supply voltage is %%()*+( ".
>. E/e%"ri%a/ #or2s&o0
t is provided for repairing 9..9.'s electric and electronic apparatus
and it is located at the frst level of the operation building.
40. Was&ig #or2s&o0
This workshop is necessary for doing the laundry for the sections of
the operation building, which are intended for accommodation.
t is located at the frst @oor of the building.
t is ftted out with an automatic washing machine, dryer, appropriate
furniture and other equipment, as chown in 4nne! & bill.
The labor protection measures related both to the mechanical part
and to the electric part will be complied with, according to the norms
in force.

805.4.5. Re1ere%e -o%ume"s
1. ' 0" 2orm /or check o/ work assemblage 3ualit1 /or technological e3uipment
. ' 5&.
2orm /or 3ualit1 control an$ partial acceptance o/ construction an$ their
installations.
3. 4ow nr. 105 1..5 4ow o/ 3ualit1 in ci6il constructions.


805.5. Qua/i"$ %o"ro/ 1or a%%e0"a%e
0ualit1 control /or acceptance7 3ualit1 o/ materials8 apparatus an$ e3uipment8 obser6ing
characteristics /rom $esign8 preliminar1 works8 obser6ing o/ technolog18 assemblage8
location8 minimal spacing8 $imensions8 tightness8 mechanical proper operation8 electrical
Romaia ! Mo"or#a$ Bu%&ares" ! 'os"a"a( Su)se%"ios *ra+a ! ,e"es"i a- ,e"es"i ! 'era.o-a
*e"ai/e- Egieerig S"u-$( Pro%ureme" Ser.i%es a- Su0er.isio o1 'i.i/ Wor2s
Te%&i%a/ S0e%i1i%a"ios Page 805 3 9
Louis Berger S.A.
operation8 start o/ operation8 a$9ustment o/ plant as norms /rom re/erence $ocuments /rom
these speci/ications.

Romaia ! Mo"or#a$ Bu%&ares" ! 'os"a"a( Su)se%"ios *ra+a ! ,e"es"i a- ,e"es"i ! 'era.o-a
*e"ai/e- Egieerig S"u-$( Pro%ureme" Ser.i%es a- Su0er.isio o1 'i.i/ Wor2s
Te%&i%a/ S0e%i1i%a"ios Page 805 3 :

You might also like