0% found this document useful (0 votes)
144 views3 pages

Op QP

Download as docx, pdf, or txt
Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1/ 3

SKASC 2014

1
SKASC October/November 2014/NOV2011SKASC | Nov.2011

SRI KRISHNA ARTS AND SCIENCE COLLEGE
An Autonomous college affiliated to Bharathiar University, Coimbatore 641 008
Model Examination: October/November 2014

Programme(s) Course Code(s) Title
MIB 13IBP20 Operations management
Time: 3 Hrs Max. Marks:75
No. of Pages: 3

Section A - Answer all questions (10 x 1 = 10)

1 The basic inputs in an operating system are labour, material, and___________
A Machinery C Capital
B Land D Building
2 ______ are materials held at various locations in a production system
A Store C Godown
B Inventories D Yard
3 ______________is a long-range game plan of organization and provides a road map of
how to achieve the mission.
A Corporate Mission C Operation Strategy
B Product Plan D Competitive Priorities
4 CIM refers to ________
A Computer Integrated Machining C Computer Integrated Manufacturing
B Compute Integrated Models D Computer Integrated Mechanisms
5 ___________is a list of the materials and their quantities required to produce one unit of
product

A MPS C BOM
B MRP D BOR
6 . _____________ sets the quantity of each end item to be completed each week of the
short range planning.

A MPS C Weekly schedule
B Quarter Schedule D Basic Production Schedule
7 Safety stock is also known as_______________
A Opening Stock C Closing Stock
B Buffer Stock

D None of these
8 Which of the following is the carrying cost
SKASC 2014

2
SKASC October/November 2014/NOV2011SKASC | Nov.2011

A Interest On Debt C Warehouse Rent
B Shipping D All the above
9 ._____________,the emphasis is on the not disturbing the existing production system
A Level Strategy C Chase Strategy
B Mixed Strategy D Business Strategy
10 Motorola total quality management program called as______________
A Leadership Through Quality C (PDQ)
2
B Total Quality Control D Six Sigma

Section B - Answer All questions (5 x 5 = 25 )
11 A Define operations management
OR
B Define corporate mission, business strategy and operations strategy
12 A Write a short note on cellular manufacturing system.
OR
B Write a short note on agile and lean manufacturing system.
13 A Define and describe aggregate planning.
OR
B Describe the process of MRP.
14 A Define the TQM program. What are the some of the names used by companies for their
TQM program?
OR
B Write a short note on safety stock.
15 A What is the quality management? what are its four components?
OR
B What are the cost and benefits of implementing ISO 14001?

Section C - Answer All questions ( 5 x 8 = 40)
16 A Explain the types of production systems.
OR
B Explain the functions of operations management.
17 A Explain the detailed steps of process design highlighting the form of flow chart.
OR
B Name and describe four types of layouts for manufacturing operation.

SKASC 2014

3
SKASC October/November 2014/NOV2011SKASC | Nov.2011

18 A Explain the relationship among MPS, MRP and CRP.
OR
B Explain the detail concepts of MPS, Scheduling and facility loading
19 A Classify different types of inventory
OR
B Explain the important elements of TQM and its contribution to superior quality of
production and Service.
20 A Explain the relationship between standards, technical regulation and SPS measures
OR
B Explain the seven tools of quality control and how do they assist in solving quality related
problem.

You might also like