Vung Ang 1 Thermal Power Plant 2 X 600Mw: Document Submission Status: Ap
Vung Ang 1 Thermal Power Plant 2 X 600Mw: Document Submission Status: Ap
Vung Ang 1 Thermal Power Plant 2 X 600Mw: Document Submission Status: Ap
5.18.2012
second Issue
3.20.2011
Initial Issue
REV
DATE
DESCRIPTION
DRWN
OWNER
CHKD
OWNERS CONSULTANT
VIETNAM MACHINERY
INSTALLATIONCORPPORATION (LILAMA)
Co. KG
PROJECT TITLE
APPN
M_LOT1D-BOP OF TURBINE
DRAWING TITLE
FUNCTION
NAME
SIGN
DRWN
Yao Jun
5.18.2012
CHKD
Zhang Fei
5.18.2012
APPD
Jiang BaoCai
5.18.2012
SCALE
2 / 40
DATE
REV B
3 / 40
4 / 40
Table of content
PART ONE EQUIPPMENTS DETERMINATION CALCULATION.........................5
PART TWO PUMP CALCULATION..........................................................................14
PART THREE THE PRESSER VESSEL WALL THICKNESS CALCULATION.....26
PART FOUR WASTEWATER CALCULATION........................................................27
PART FIVE WASTE WATER BASIN AND TRENCH CALCULATION..................37
5 / 40
prefilters:
LDB24BB001
Configuration
=3 no
=0.7m3/m2h
Q1 753
165.5 no
q1 4.55
=1700mm
Prefilter tube height depends on the filter element height, and to maintain the proper
operation of space. The filter element height is 1788mm.
Prefilter tube height
=1788+247+365=2400mm
Where the 247mm means the distance from the bottom of the filter element to the
bottom of the prefilter;
The 365mm means the top of the filter element to the top of the prefilter;
6 / 40
2.
Mixed beds
LDF24BB001
Configuration
=3 no
Q2=753 m3/h
=110m/h
Inside diameterD2
= 4 S2
Q2 753
6.84m 2
V2 110
Inside diameterD2selected
Volume of the resin
= 2.95m
=3000mm
=6.9m3
=4.6m3
=2.3m3
3.
Resin trap
LDF24BB002
Configuration
1000
1000
476
b1 b2 1.9 0.2
8 / 40
S
0.21
1410mm
S1 0.149
Where the 200mm means the distance from the bottom of the filter element to the
bottom of the resin trap;
The 650mm means the top of the filter element to the top of the resin trap;
The height of the resin trap is selected 2280mm
4.
=00LDP14BB001
Quantity
=1 no
Inside diameter
2
3.14
Xd
1.592 1.98m 2
4
4
The resin separation tank is designed a straight tube on the bottom part and a cone
shape on the top part.
9 / 40
=4.6m3;
H1
V1 8.26
4.172m
S1 1.98
Considering the resin inlet, the straight height of the separated tank is selected to
4400mm
4.2.2
3.14
D2
2.42 4.52m 2
4
4
Sbottom =S1
H2
Stop
=1.98m2
3 V
2.190m
Sbottom Stop Sbottom
H2 selected
5.
=2700mm
=00LDP13BB001
Quantity
=1 no
Inside diameter
2 3.14
Xd
1.492 1.74m 2
4
4
=2.3m3
=0.61m3
11 / 40
V1 1.69
0.971m
Sa 1.74
Va
2.3
1.322m
Sa 1.74
H2 selected
=1300mm
=200mm
6.
=00LDP12BB001
12 / 40
Quantity
=1 no
Inside diameter
2 3.14
Xd
1.792 2.515m 2
4
4
=4.6m3
=0.79m3
V1
3.81
1.515m
Sc 2.515
When the anion resin is transferred into the cation resin regeneration tank, the height
of the cation and anion resinH2
H2
Vc Va V3 6.9 0.79
2.430m
Sc
2.515
H2 selected
=2500mm
=400mm
13 / 40
14 / 40
=00LDN21AP001/00LDN21AP002
Quantity
be reserved)
1.2 Design Data
fluid type
=hydrochloric acid
concentration (CHCL)
=30%
density(HCL)
=1150kg/m3
Diluted acid regeneration fluid density (c) c=1000kg/m3, the mass flow of acid
regeneration fluid (Qmc)
Qmc Qc c 12.6 1000 12600kg / h
=CcQmc=0.0512600=630kg/h
Qm1
630
1.83m3 / h
CHCL HCL 0.30 1150
=2.5m3/h
The acid metering pump head is designed to be higher than the pressure of the pipe
where the acid is added, the pressure of the pipe where the acid is added is usually 0.3
0.4MPa, so the head of the acid metering pump is selected as 0.5MPa.
2.
=00LDN22AP001/00LDN22AP002
Quantity
be reserved)
2.2 Design Data
fluid type
=Sodium hydroxide
concentration (CNaOH)
=30%
density (NaOH)
=1370kg/m3
Diluted acid regeneration fluid density (a) a=1000kg/m3, the mass flow of acid
regeneration fluid (Qma)
Qma Qa a 8.7 1000 8700kg / h
Diluted concentrationCa
=4%
=CaQma=0.048700=348kg/h
Qm 2
348
0.85m3 / h
CNaOH NaOH 0.30 1370
=1.250.85=1.06 m3/h
=1.5 m3/h
The caustic metering pump head is designed to be higher than the pressure of the pipe
where the caustic is added, the pressure of the pipe where the caustic is added is
usually 0.30.4MPa, so the head of the caustic metering pump is selected as 0.5MPa.
3.
Backwashing pump
=00LDB10AP001/00LDB10AP002
16 / 40
Quantity
be reserved)
3.2 Design Data
fluid type
= demineralized water
density(NaOH)
=1000kg/m3
17 / 40
DESIGN DATA
1 Fluid type
= Water
2 Viscosity
3 Specific gravity
= 1.00
0.00107V 2
d 1j .3
Where
=110m3/h
=130mm ID dj
6 pipe material
=304SS
FORMULA
dj(m)
V(m/s
I(m/m
PIPE
PRESSURE
LENGTH
LOSS(m)
0.13
2.49
0.099
30
2.97
dj(m)
V(m/s
QTY
PRESSURE
A) PIPE
0.00107V 2
I
d 1j .3
B)FITTING
)
Elbow 90
Equal Tee
LOSS(m)
V
2g
0.13
2.49
0.60
0.76
0.13
2.49
0.84
0.27
V2
2g
0.13
2.49
0.63
0.2
0.13
2.49
7.5
2.37
Branch
C )VALVE
butterfly
check
6.57
18 / 40
4.
Recirculating pump
=0.6Q2=451.9m3/h
=470m3/h
= 2.584mH2O
Calculation result
= 0.175+0.1+0.026=0.301MPa
=0.32MPa
19 / 40
1 Fluid type
= Water
2 Viscosity
3 Specific gravity
= 1.00
0.00107V 2
where I :pressure loss for 1m length pipe(m/m)
d 1j .3
dj inside diameter(m)
V: Velocity inside pipe (m/s)
=470m3/h
=258mm ID dj
6 pipe material
FORMULA
=304SS
dj(m)
V(m/s)
I(m/m)
PIPE LENGTH
PRESSURE LOSS(m)
A PIPE
0.258
2.48
0.039
10
0.39
B)FITTING
dj(m)
V(m/s)
QTY
PRESSURE LOSS(m)
Elbow 90
V2
2g
0.258
2.48
0.60
0.565
V2
2g
0.258
2.48
0.70
0.219
0.258
2.48
4.5
1.41
C )VALVE
butterfly
check
2.584
20 / 40
5.
ROOTS BLOWER
=00LDC21AN001/00LDC22AN001
Quantity
will be reserved)
5.2 Design Data
fluid type
=air
temperature
=25
pressure in atmosphere
=1.01105Pa
=3.6Nm3/m2min
=2.54m2
=qS=3.62.54=9.14Nm3/min
The selected
=9.36Nm3/min
21 / 40
1 Fluid type
= air
2 density
= 1.205kg/m3
I 30.5 Pa / m
where
5 pipe material
FORMULA
=340SS
dj(m)
A)PIPE
B)FITTING
V(m/s)
I(Pa/m)
PIPE
PRESSURE
LENGTH
LOSSpa)
0.080
16.4
30.5
20
kg./m3
V(m/s)
QTY
Elbow 90
V
2g
C )VALVE
1.205
16.4
kg./m3
V(m/s)
QTY
check
silencer
V 2
2g
82.5
PRESSURE
LOSS(kg/m2)
butterfly
PRESSURE
LOSS(kg/m2)
610
1.205
16.4
1.205
16.4
1.205
16.4
10
165
22 / 40
6.
Flushing pump
=00LDP10AP001/00LDP10AP002
Quantity
be reserved)
6.2. Design Data
fluid type
= Demineralized water
density
=1000kg/m3
23 / 40
DESIGN DATA
1 Fluid type
= Water
2 Viscosity
3 Specific density
= 1.00
0.00107V 2
d 1j .3
where
=3m/s
5 pipe size
=80mom ID dj
6 pipe material
=304SS
24 / 40
FORMULA
dj(m)
V(m/s
I(m/m
PIPE
PRESSURE
LENGTH
LOSS(m)
0.08
0.257
40
10.28
dj(m)
V(m/s
QTY
PRESSURE
A) PIPE
0.00107V 2
I
d 1j .3
B)FITTING
)
Elbow 90
Equal Tee
LOSS(m)
V2
2g
0.08
0.30
0.69
0.08
V2
2g
0.13
1.13
0.65
0.04
0.13
1.13
7.5
0.49
Branch
C )VALVE
butterfly
check
11.5
25 / 40
26 / 40
NO.
1
2
3
NAME
Prefiliter
Resin trap
Resin
ID(m
Design
Design
m)
pressure(M
tempera
ible
Pa)
ture
stress(
selected(
()
60
Sa516Gr7
MPa)
160
60
0
Sa516Gr7
160
50
0
A36
1700
600
1600
4.0
4.0
0.6
Material
Permiss
133
Where
Thicknes
coefficient
calculation(mm) s
1.0
23.85
mm)
30
1.0
9.86
14
calculation(mm)
0.85
7.22
10
0.85
7.84
10
0.85
6.91
0.85
7.56
R:vesselsradius 0.5ID
1800
0.6
50
A36
133
1500
0.6
50
A36
133
on tank
Air tank A 1800
regenerati
6
P R
Tm Tc
S E 0.6 P
Thickness by
regenerati
on tank
Anion
Tr
Welding
Tr: thickness by
separation
tank
Cation
Formula
50
Sa516Gr7
160
27 / 40
NO.
7
8
NAME
ID(m
Design
Design
m)
pressure(M
tempera
ible
Pa)
ture
stress(
selected(
()
MPa)
mm)
and B
Air tank C 1600
Electric
1.0
Material
Permiss
Formula
Welding
Thickness by
Thicknes
coefficient
calculation(mm) s
50
0
Sa516Gr7
160
0.85
6.97
138
0.85
7.64
10
160
1.0
21.1
28
1800
0.6
99
0
304
3000
4.0
60
Sa516Gr7
water
9
heater
Mixed
bed
Tr
P D
Tm Tc
4 S E P
Where
Tr:thickness by
calculation(mm)
P: design pressure (MPa)
D:vesselsinside diameter
S:permissible stress (MPa)
E:welding coefficient
28 / 40
NO.
NAME
ID(m
Design
Design
Material
Permiss
Formula
m)
pressure(M
tempera
ible
Pa)
ture
stress(
selected(
()
MPa)
mm)
Tm:negative deviation of the
material, 0.25mm
Tc:corrosion allowance,2mm
29 / 40
Welding
Thickness by
Thicknes
coefficient
calculation(mm) s
Timessec
Backwash
Volume
onds
flow(m3/h)
of
Remark
discharge
(m3)
1
Pressure discharge
120
No water will be
discharged
Backwash water
Backwash and
2
discharge until to
the 2/3 level
140
110
6.31
volume :4.28
The drainage from
the prefilter:2.03
Backwash by the
3
110
0.15
water(first)
Backwash and
4
discharge until to
the 1/3 level
Backwash water
120
110
5.94
volume :3.67
The drainage from
the pre-filter:2.27
Backwash by the
5
110
0.15
water(second)
Backwash and
6
discharge until to
the bottom of the
Backwash water
100
110
4.24
filter element
Backwash by the
7
water(third)
Backwash and
volume :3.06
The drainage from
the pre-filter:1.18
110
0.15
120
110
4.97
discharge until to
Backwash water
volume :3.67
27 / 40
pre- filter
Discharge until to
the pre-filter:1.30
120
~0.05
filter
Water filling until
10
120
Discharge without
pressure
No water will be
110
discharged
pre-filter
21.96
once
Usually the backwash will be done at less three times, so the total discharge water
volume is 21.963=65.88 m3
2.
Pressure
discharge of MB
Resin transfer
by the
timesecon
ds
flushing or
Volume of
backwash
discharge
flow(m3/h)
(m3)
remarks
30
600
2.02
compressed air
Resin transfer
by the
3
compressed air
900
45
11.25
180
The resin
2.75
water
MB discharge
and the resin
pipe
pipe
rush:45m3/h;
28 / 40
water(about~0.5m3) in
flushing(first)
MB discharge
5
The resin
60
pipe
pipe
1.5
flush:90m /h;
3
flushing(second)
17.52
2.2 the spare resin transfer from the cation regeneration tank to the mixed bed
process
timeseconds
Flushing or
Volume of
backwash
discharge
flow(m3/h)
(m3)
remarks
transfer to MB
No water will
300
by the
be discharged
compressed air
The spair resin
transfer to MB
2
by the
500
30
180
60
No water will
be discharged
compressed air
and water
The flushing of
CRT
The resin pipe is
flushed while
600
MB is filled
5
CRT is filled
45
7.5
No water will
900
be discharged
10.5
2.3 the exhausted resin separation and transfer to the anion regeneration tank and the
cation regeneration tank
process
timesecon
Flushing or
Volume
ds
backwash
29 / 40
of
remarks
flow(m3/h)
discharge
(m3)
1
2
3
5
6
7
8
9
10
11
12
13
SPT is filled
Discharge of
SPT
Pressure in the
SPT discharge
Resin scrub by
the air from the
roots blower
Backwash of
the resin in SPT
SPT pressure
drainage
flushing of the
upper part
Resin first
separation (1)
Resin first
separation (2)
Resin first
separation (3)
Resin first
separation (4)
Resin first
separation (5)
Anion resin is
waiting to be
transferred to the
No water will be
600
180
8.88
60
No water will be
discharged
No water will be
20
discharged
~6.05
60
36
0.6
600
100
36.60
600
50
18.30
600
30
600
15
2.5
600
7.5
1.2
60
0.03
420
18
2.1
120
2.5
0.07
ART
Anion resin is
14
15
16
transferred to
ART
second separation
prepare
Second seperstion
resin:8.88m3
No water will be
discharged
900
360
discharged
The water above the
81.33
30 / 40
17
18
19
Cation resin
transfer prepare
Cation resin
transfer to CRT
flushing of the
resin pipe
120
2.5
0.07
360
20
120
60
20
ART filled
300
21
CRT filled
600
No water will be
discharged
No water will be
discharged
process
timesecon
ds
flushing or
backwash
flow(m3/h)
166.73
Volume
of
discharge
remarks
(m3)
Anion resin
1
scrub
first
ART
discharge by
1-1
the
180
2.54
compressed
1-2
1-3
air
ART
discharge
Anion resin
scrub by the
air from the
1-5
1-6
scrub by the
air and water
ART
pressured
ART
anion resin
No water will be
30
discharged
No water will be
120
discharged
roots blower
Anion resin
1-4
20
20
90
0.8
31 / 40
discharged
Water above the resin
discharge by
the air
1-7
ART filled
No water will be
360
discharged
Cation resin
2
scrub
first
CRT
discharge by
2-1
the
180
5.9
compressed
2-2
2-3
air
CRT
discharge
Cation resin
scrub by the
air from the
2-5
2-6
scrub by the
air and water
CRT
pressured
CRT
discharge by
No water will be
120
discharged
Water will be added into
300
30
20
90
2.5
the air
2-7
3
4
5
6
7
CRT filled
Prepare for
regeneration
regeneration
CRT/ART
exchange
CRT/ART
flushing
Anion resin
resin
30
roots blower
Cation resin
2-4
resin
No water will be
450
12
60
22
0.37
3600
22
22
2400
22
14.7
1200
22
7.4
32 / 40
discharged
scrub
second
ART
discharge by
7-1
the
180
2.54
compressed
7-2
7-3
air
ART
discharge
Anion resin
scrub by the
air from the
30
120
roots blower
Anion resin
7-4
7-5
scrub by the
air and water
ART
pressured
ART
360
20
7-6
discharge by
120
7-7
8
the air
ART filled
ART rinse
Cation resin
480
1500
9-1
20
0.8
20
18
7.5
scrub
second
Cation resin
scrub
CRT
180
5.9
discharge by
9-2
the
30
compressed
9-3
9-4
air
CRT
discharge
Cation resin
No water will be
120
360
30
33 / 40
discharged
Water will be added into
scrub by the
9-5
9-6
roots blower
CRT
pressured
CRT
discharge by
90
2.5
the air
9-7
CRT filled
450
12
10
CRT rinse
1500
36
No water will be
discharged
15
11
Adjust
180
90.45
Flushing or
Volume of
backwash
discharge
180
flow(m /h)
20
(m )
1.0
300
10
0.83
3
4
and water
ART flushing
Pipe flushing
60
60
20
60
ART filled
1200
20
CRT filled
1200
20
process
1
ART flushing
Anion resin
transfer to
timesecon
ds
process
CRT
discharge
remarks
0.33
1.0
No water will
be discarged
No water will
be discarged
3.16
flushing
Volume
timesecon
or
of
ds
backwash
discharge
flow(m3/h)
(m3)
600
4.18
34 / 40
remarks
Resin mixed
2
by the air
from roots
No water will be
600
discharged
blower
Resin mixed
3
while CRT
300
0.3
discharge
4
CRT filled
600
5
6
CRT rinse
Pipe adjust
900
300
No water will be
discharged
30
7.5
12.0
Qd
=0.097 m2
3600 v
36 / 40