Compressive Strength Test On Cement

This document describes a procedure to determine the compressive strength of cement. Mortar cubes are prepared using cement, sand, and water. The cubes are cured and then tested in a compression testing machine at 3 days and 7 days. The compressive strength is calculated and should not be less than 16 N/mm^2 at 3 days and 22 N/mm^2 at 7 days. This test is important because compressive strength is the most important property of hardened cement.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
743 views3 pages

Compressive Strength Test On Cement

This document describes a procedure to determine the compressive strength of cement. Mortar cubes are prepared using cement, sand, and water. The cubes are cured and then tested in a compression testing machine at 3 days and 7 days. The compressive strength is calculated and should not be less than 16 N/mm^2 at 3 days and 22 N/mm^2 at 7 days. This test is important because compressive strength is the most important property of hardened cement.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

COMPRESSIVE STRENGTH TEST ON CEMENT

Aim:

To determine the compressive strength of cement

Apparatus Required

1. Non porous enamel tray
2. Trowel
3. Cube mould of size 7.06cm
4. Platform vibrator (or) Equipment for hand compaction
5. Compression testing machine
6. Balance to measure weight

Significance of the test:

The compressive strength of hardened cement is the most important of all the
properties. Therefore, it is not surprising that the cement is always tested for its
compressive strength at the laboratory before the cement is used in important works.

Strength Test:

Strength test are not done on neat cement paste because of difficulties of excessive
shrinkage and subsequent cracking of neat cement. Strength of cement is indirectly
found on cement sand mortar in specific proportion.The cubes are prepared for this
purpose. The cubes are then tested in compression testing machine at the end on
three days and seven days. Testing of cubes is carried out on their three sides
without packing. Thus the cubes are tested at each time.

Procedure:

Preparation of cement mortar cubes:

1. Take 555 gms of standard sand, 185gms of cement (i.e.ratio of cement
to sand is 1:3) in a non porous enamel tray and mix them with a trowel for one
minute.
2. Add water quantity (P/4 + 3.0) % of combined weight of cement and
sand and mix the three ingredients thoroughly until the mixture is of uniform
colour. The time of mixing should be less than three minutes and not more
than four minutes.
3. Immediately after mixing fill the mortar into a cube mould of sizes
7.06cm.
4. Compact the mortar either by hand compaction in a standard specified
manner or on the vibrating table.
5. Place the moulds in cabin at a temperature of 27 2 C for 24 hours
6. Remove the specimen from the moulds and submerge them in clean
water for curing.

Testing of cement mortar cubes:

1. Take the cube out of water at the end of three days with dry cloth.
Measure the dimensions of the surface in which the load is to be applied. Let
be L and B respectively.
2. Place the cube in compressive testing machine and apply the load
uniformly at the rate of 35N/mm
2
.
3. Note the load at which the cube fails. Let it be P.
4. Calculate the compressive strength of the cube by using formula. The
compressive strength at the end of three days should not be less than
16N/mm
2

5. Repeat the same procedure (steps 1 to 4) for other two cubes.
6. Repeat the whole procedure (Step 1 to 5) to find the compressive
strength of the cube at the end of 7 days and it should not be less than 22
N/mm
2
.


Tabulation

(a) For 3 days strength:

Sl.No. Length (L) in
mm
Breadth (B) in
mm
Load (P) in
N
compressive strength in
N/mm
2

1
2
3
Average =

(b) For 7 days strength:

Sl.No. Length (L) in
mm
Breadth (B) in
mm
Load (P) in
N
compressive strength in
N/mm
2

1
2
3
Average =

Result:

Compressive strength of cement at 3 days = N/mm
2
.
Compressive strength of cement at 7 days = N/mm
2