0% found this document useful (0 votes)
43 views3 pages

Channel 82, When There Came A Handover Command To It, The Handover Successfully

1. High call handover failures were reported on site SCB sector 3. Investigation found issues with timeslots 12 and 7 on the BCCP channel using frequency channel 8 operating on that sector. 2. Handovers were successful on other frequency channels and other timeslots on frequency channel 8. 3. The problem appears isolated to timeslots 12 and 7 on the BCCP channel using frequency 8 on SCB sector 3. Further action is needed by BTS engineers to check this channel on the sector.

Uploaded by

RZ
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
43 views3 pages

Channel 82, When There Came A Handover Command To It, The Handover Successfully

1. High call handover failures were reported on site SCB sector 3. Investigation found issues with timeslots 12 and 7 on the BCCP channel using frequency channel 8 operating on that sector. 2. Handovers were successful on other frequency channels and other timeslots on frequency channel 8. 3. The problem appears isolated to timeslots 12 and 7 on the BCCP channel using frequency 8 on SCB sector 3. Further action is needed by BTS engineers to check this channel on the sector.

Uploaded by

RZ
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 3

REPORT 1 (3)

CSC Indonesia / Network Planning Services SCB 3 !O "#I$%RE


IN&ESTI'#TION RES%$T
enn( 'alant
P)ri *+S+
Ba,-ang P+
1.+/0+11
Introduction
#s re2orted3 2ro-le, detected on site SCB sector 3+ T4e 2ro-le, re2orted are t4ose calls
4andovered 5ro, ot4er cell to SCB 3 (inco,ing !O) s4own 4ig4 !O 5ail)res+
Below are res)lt o5 investigation 5ro, Network Planning 2oint o5 view+
Investigation Result
1. Facts
- #t new site3 SCB3 4ig4 !O 5ail)res recorded+
- St)d( on R" ,eas)re,ent 5ile datas s4own it is NOT inter5erence
- #lso 5o)nd t4at t4e serving signal streng4t 5ro, -ot4 so)rce cell to target cell on !O
2rocess -ot4 are in 'OO level
- Para,eter setting we C!EC6E alread(+ Ever(t4ing see,s nor,al setted+
SCB sector 3 4ave 5ollowing TR7 5re8)encies in o2eration9
- C4annel .: (BCC! TR7)
- C4annel ;<
2. Findings
T4e co,2laint is !O 5ail)re+ $et see on eac4 TR73 4ow were t4e 4andover 2er5or,ed as
clearl( dis2la(ed on 5ile anal(sis res)lt -elow+
Below 2ict)re is sa,2le o5 drive test res)lt taken+ "or e=a,2le3 4ere we can see t4at on
channel 823 w4en t4ere ca,e a 4andover co,,and to it3 t4e 4andover s)ccess5)ll(
co,2leted+ T4is onl( one sa,2le+ In 5act3 investigation o5 4andover 2rocess t4ro)g4 w4ole
drive test 5ile res)lt are also s4own a s)ccess5)ll( co,2leted !O on t4is c4annel ;<+
"ig)re 1+ !O Co,2leted >essages on "re8)enc( C4annel ;<3 SCB 3
So3 in t4is stage3 we ,a( sa( t4at we do not see an( i,2ro2er 4andover 2rocess on TR7
c4annel ;<+
REPORT < (3)
CSC Indonesia / Network Planning Services SCB 3 !O "#I$%RE
IN&ESTI'#TION RES%$T
enn( 'alant
P)ri *+S+
Ba,-ang P+
1.+/0+11
#nd 4ow a-o)t c4annel .:3 w4ic4 is t4e BCC! TR7+ $et see on 5ollowing 2ict)re
"ig)re <+ !O "ail)red >essages on "re8)enc( C4annel .:3 Ti,eSlot ?3 SCB 3
"ig)re 3+ !O "ail)red >essages on "re8)enc( C4annel .:3 Ti,eSlot <3 SCB 3
"ro, t4ose < dis2la(ed la(er 3 ,essages 5ro, t4e res)lt anal(ser3 it see,s like t4ere is
tro)-le wit4 certain ti,e slots on certain TR73 w4ic4 is TR7 c4annel .:+ Ti,e slot looks like
4aving 2ro-le, is ti,e slot < and ?+ #ll 4andover 5ail)res we 5o)nd so 5ar occ)rred w4en
t4e >S received co,,and 5ro, BTS to go to t4ose ti,e slot ( < @ ?)+ T4is is w4( 4andover
5ail)res s4own 4ig4 val)es+ T4e ti,e slot / it sel5 is working 2ro2erl(3 5or s)re+ T4at is w4(
t4e call set)2 still can -e ,ade3 and t4e BCC! still -roadcasted+ B)t once t4e call set)2
need to -e 2laced in availa-le ti,e slot3 and let sa( t4e ti,e slot is ti,e slot < or ?3 t4en it
2ossi-le even 2ro-le, occ)rred in t4is set)2+ It is also ,a( -e t4e ca)se t4at t4e set)2
tra55ic in SCB 3 -eca,e low so,e ti,es+
It is 5o)nd also t4at on ot4er ti,e slot3 w4en t4e 4andover co,,and e=ec)ted 5ro, BTS to
t4e >S to go to SCB 3 on3 let sa(3 ti,e slot 13 t4e 4andover co,2leted s)ccess5)ll(+ #s
can -e seen on 5ollowing 2ict)re+
REPORT 3 (3)
CSC Indonesia / Network Planning Services SCB 3 !O "#I$%RE
IN&ESTI'#TION RES%$T
enn( 'alant
P)ri *+S+
Ba,-ang P+
1.+/0+11
"ig)re 1+ !O Co,2leted >essages on "re8)enc( C4annel .:3 Ti,eSlot <3 SCB 3
#s can -e seen a-ove3 t4e 4andover on ti,e slot 1 at t4is TR7 c4annel .: went well+
3. Conclusion
1+ Based on R" investigations3 it see,s t4at t4ere is so,e 2ro-le, wit4 t4e TR7 c4annel
.:3 on SCB sector 3+ T4e 2ro-le, looks occ)rred onl( on certain ti,e slot+ In t4is
case3 detected on ti,e slot < and ?+
<+ #ction 5ollow )2 can -e cond)cted -( BTS engineer to c4eck t4e TR7 c4annel .: on
SCB sector 3+

You might also like