Daily Report Gi
Daily Report Gi
Daily Report Gi
Cikarang Listrindo
SITE NAME
Week POSITION
PERIODE
08:00 - 08:30 Instel room Finish
08:00 - 08:30 Instel room
08:00 - 08:30 Instel room Finish
08:00 - 08:30 Instel room Finish
08:00 - 08:30 Instel room Finish
: SUPORT : Anggi
: 1 : Instrument Elektric Technician 2
: Des 31, 2012 - jan 6, 2013
NO
Date
Subject Time Description No Work Order (WO) location Wo editing Remarks
Day
1
December 31, 2012 routine Daily meeting instel
Monday
2
January 1, 2013 routine Daily meeting instel
Tuesday
3
January 2, 2013 routine Daily meeting instel
Wednesday
4
January 3, 2013 routine Daily meeting instel
Thursday
5
January 4, 2013 routine Daily meeting instel
Friday
6
January 5, 2013
Saturday
7
January 6, 2013
Sunday
Sarip kosim Bondan Priyambodo
( Anggi) ( Supervisor I/E ) (Assisten Manager I/E )
Employee Signature Acknowledge By Approved By
PT. Cikarang Listrindo
SITE NAME
Week POSITION
PERIODE
08:00 - 08:30 Instel room Finish
08:30 - 10:30 50320 GTG 8 Finish cleaning, cek voltage, temp, charger
08:30 - 10:30 50311 GTG 9 Finish cleaning, cek voltage, temp, charger
10:30 - 11:30 50327 gas comp area Finish
record current motor, voltage,
cleaning filter motor
10:30 - 11:30 50328 gas comp area Finish
record current motor, voltage,
cleaning filter motor
10:30 - 11:30 50329 gas comp area Finish
record current motor, voltage,
cleaning filter motor
11:30 - 14:00 cooling tower Finish
replace tranducer, test running == >
ok , monitoring
08:00 - 08:30 Instel room
08:30 - 11:30
switch gear 6,3 kv room
blok 3
cleaning, cek voltage, temp, charger,
cleaning room
09:00 - 10:00 cooling Water Area
test running and cek actual vibration
b mech vib 0,5 mm/s
15:00 - 16:00 cooling Water Area
connect motor CWP and connect
heater after repair KSB
08:00 - 08:30 Instel room Finish
09:00 - 11:00
switch gear 6,3 kv room
blok 3
cek SG, with MDP at STG blok 3
08:00 - 08:30 Instel room Finish
09:00 - 10:00 cek tool, and test Finish
Cooling water Finish repair pump by KSB
08:00 - 08:30 Instel room Finish
09:00 - 15:00 bikin notulen QCC petir pertemuan 5
: SUPORT : Anggi
: 2 : Instrument Elektric Technician 2
: Jan 7 - jan 13, 2013
NO
Date
Subject Time Description No Work Order (WO) location Wo editing Remarks
Day
1
January 7, 2013 routine Daily meeting instel
PMS
Monday
Pms battery gtg 8
Pms battery gtg 9
2
January 8, 2013 routine Daily meeting instel
Tuesday
PMS
3
January 9, 2013 routine Daily meeting instel
Wednesday cek SG battery STG blok 3 with MDP
4
January 10, 2013 routine Daily meeting instel
Thursday
5
January 11, 2013 routine Daily meeting instel
Friday routine QCC Petir pertemuan 5 langkah 2
6
January 12, 2013
Saturday
7
January 13, 2013
Sunday
Sarip kosim Bondan Priyambodo
( Anggi) ( Supervisor I/E ) (Assisten Manager I/E )
Employee Signature Acknowledge By Approved By
record data and visual cek all motor gas comp 1
record data and visual cek all motor gas comp 2
record data and visual cek all motor gas comp 3
PMS
PMS
PMS
PMS
PMS
ctf 4 blok 3 trip
Pms battery STG blok 3
ctf 4 blok 3 trip
Connect motor CWP 4
Event
PT. Cikarang Listrindo
SITE NAME
Week POSITION
PERIODE
08:00 - 08:30 Instel room Finish
09:00-11:00 GTG 9 Finish
13:00-14:00 GTG 9 Finish
08:00 - 08:30 Instel room Finish
09:00-10:30 GTG 8 Finish timer ok, replace contactor
13:00-14:00 Instel room Finish
08:00 - 08:30 Instel room Finish
09:00-11:30
switch gear 6,3 kv room
blok 3
Finish
replace tranducer s/n 78010015-4093 ==> s/n
78010015-4008, kks: BBA33CE200-B73-002 tranducer
model 252-salw input 0-5 A, 50hz, 1p2w output 4-20
mA, source 125 vdc, for 6,3kv blok 3, brand cromton
cs15d opr: iqro, sarman
08:00 - 08:30 Instel room
09:00-15:00 cooling Water Area Finish cek flow condenser , support engineer pak ngadinu
15:00-16:30 cooling tower Finish
replace sensor vibration, cable and tranducer (
tranducer using old tranducer )
08:00 - 08:30 Instel room Finish
09:00-15:00 Instel room QCC Petir pertemuan 6 langkah 2, bikin notulen
15:00-16:30 Deaerator blok 3 replace transmitter, seting transmitter 0 -15 bar
: SUPORT : Anggi
: 3 : Instrument Elektric Technician 2
: Jan 14 - Jan 20, 2013
NO
Date
Subject Time Description No Work Order (WO) location Wo editing
Daily meeting instel
Monday
Event Pms cek VPR, lamp gtg 9
PMS
2
January 15, 2013 routine Daily meeting instel
Tuesday
Remarks
Day
1
January 14, 2013 routine
Event cek timer lamp gtg 8
PMS closing jobcard at WO editing
Event
Pms fuel forwading gtg 9
current tranducer of ACWP 2 is bad signal
3
January 16, 2013 routine Daily meeting instel
Wednesday Event
4
January 17, 2013 routine Daily meeting instel
Event cek flow condenser suction and discharge
5
January 18, 2013 routine Daily meeting instel
routine QCC Petir pertemuan 6 langkah 2
6
January 19, 2013
Saturday
7
January 20, 2013
Sunday
Employee Signature Acknowledge By Approved By
Sarip kosim Bondan Priyambodo
( Anggi) ( Supervisor I/E ) (Assisten Manager I/E )
Thursday
ctf 4 blok 3 trip Event
Friday Deaerator heater pressure transmitter alarm
30LAACP025
PT. Cikarang Listrindo
SITE NAME
Week POSITION
PERIODE
08:00 - 08:30 Instel room Finish
09:00-10:00 Sampling Rack Blok 3 Finish cleaning rotameter, cek leak, record
10:00-11:30 Gas turbine Generator 9 Finish test running ervor for record pressure, temp, RH
13:00-14:00 Stg hall Finish record pressure, RH, temp pressure
13:00-14:00 Stg hall Finish record pressure, RH, temp pressure
08:00 - 08:30 Instel room Finish
08:30-10:00 GTG 7 Finish
recalibration 45ht-6,recalibration 45ht-5 because
intermitten appear
10:00-11:30 GTG 9 Finish cek voltage, current, test running motor stand by
13:00-15:00 CAB 2
15:00-16:30 STG 3 Finish
cek voltage, current, test running motor stand by,
found connection terminal phasa R Vaccum pump 2
burn, replace terminal connection using terminal
spare.
08:00 - 08:30 Instel room Finish
10:00 - 11:30 GTG 8 continue cek resistance motor, short to ground 3,4 ohm
13:30 - 14:30 cooling Water Area Finish
Cek PID and actual, Pi sudah di install dan juga sudah
terdapat transmitter.
08:30 - 16:30 CAB 2
08:00 - 08:30 Instel room Finish
09:00 - 15:00 Instel room bikin notulen qcc pertemuan 6
NO
Date
Subject Time Description No Work Order (WO) location Wo editing Remarks
Day
1
January 21, 2013 routine Daily meeting instel
Monday
Event Pms sampling rack blok 3
PMS Pms Ervor gtg 9
PMS Pms Compressor Atlas copco no2
PMS
2
January 22, 2013 routine
Tuesday
Event
PMS
PMS Maintenance Ac
PMS
3
January 23, 2013 routine
Wednesday
Event 88BT 2 gtg 8 trip
install PI discharge cooling water
4
January 24, 2013
Thursday
5
January 25, 2013 routine
Friday routine
Event
6
January 26, 2013
Saturday
7
January 27, 2013
Sunday
Employee Signature Acknowledge By Approved By
Sarip kosim Bondan Priyambodo
( Anggi) ( Supervisor I/E ) (Assisten Manager I/E )
: SUPORT
: 4
: Anggi
: Instrument Elektric Technician 2
: Jan 21 - Jan 27, 2013
QCC Petir pertemuan 7 langkah 2
Daily meeting instel
Daily meeting instel
overtime no daily meeting
Daily meeting instel
Pms dryer Compressor Atlas copco no2
45ht6 gtg 7 alarm
PMS cek current motor gtg 9
PMS cek current motor common blok stg 3
Maintenance Ac
PT. Cikarang Listrindo
SITE NAME
Week POSITION
PERIODE
08:00 - 08:30 Instel room Finish
08:00 - 08:30 Instel room
13:00 - 14:00 HRSG#8 Continue mechanical problem
14:00 - 15:00 gtg 8 Finish
08:00 - 08:30 Instel room Finish
09:00 - 11:00 Instel room
13:00 - 17:30 Instel room
08:00 - 08:30 Instel room Finish
Upload data QCC Petir pertemuan 7, langkah 2
cek data QCC petir yang sudah di commen atasan.
14:00 - 16:30 #Dismantle cable power cooling water pump 3 Cooling water Finish repair pump by KSB
08:00 - 08:30 Instel room Finish
08:30 - 11:30 QCC Petir pertemuan 8 langkah 3 Instel room Finish
14:00 - 16:00 daily log report for WIG
08:00 - 17:00 Maintenance Ac Bedeng
Description Time
Daily meeting instel
Check by pass control valve CDHTR HRSG #9
Monthly meeting Instel
Daily meeting instel
Maintenance ERVOR gas turbine generator 8
Daily meeting instel
Finish
: Anggi
: Instrument Elektric Technician 2
: Jan 28 - Feb 3, 2013
: SUPORT
: 5
routine
Remarks location
Instel room
Bondan Priyambodo Sarip kosim
( Anggi) (Assisten Manager I/E ) ( Supervisor I/E )
Employee Signature Acknowledge By Approved By
6
February 2, 2013
5
Wo editing
7
February 3, 2013
4
January 31, 2013
routine
routine
Monday
3
January 30, 2013
Daily meeting instel
08:30 - 11:00
February 1, 2013
routine
routine
Subject No Work Order (WO)
Day
1
January 28, 2013
2
January 29, 2013
Event
Event
Sunday
Saturday
NO
Date
Wednesday
Cek personal tool, audit by APE
Thursday
Friday
routine
Daily meeting instel
PT. Cikarang Listrindo
SITE NAME
Week POSITION
PERIODE
08:00 - 08:30 Instel room
8:30 - 09:30 Switch gear 6.3kv Finish
09:30 - 11:30 Switch gear 6.3kv Continue
11:30 -12:00 Air compressor skid Finish ceklist PMS 3130
13:00 - 16:30 SWG 1 Finish
08:00 - 08:30 Instel room
08:30 - 10:00 Instel room Finish
10:00 - 11:30 Gas compressor 3 Finish
13:00 - 14:00 SWG 1 Finish
08:00 - 08:30 Instel room
09:30 - 10:00 Instel room Finish
10:00 - 17:00
Area gtg 8 & 9, swtihgear
6.3
continue
Pulling cable from gtg 9 & gtg 8 to
swg 6,3 kv
08:00 - 08:30 Instel room
08:30 - 15:00 Instel room
Bikin notulen, upload notulen
pertemuan 9, langkah 3, QCC petir
tema 2
NO
Date
Subject Time Description No Work Order (WO) location Wo editing Remarks
Day
1
February 4, 2013 Cuti
Monday
2
February 5, 2013 routine Daily meeting
Tuesday
PMS Maintenance charger room CAB2 blok 3
PMS Maintenance battery room
PMS Maintenance Self cleaning system
PMS Maintenance Ac
3
February 6, 2013 routine Daily meeting
Wednesday
Entered data measure PMS battery STG#3, wo :
51269 and closed wo editing.
PMS
Change filter motor gas compressor, Cleaning old
filter gas compressor #3
Event Maintenance Ac
4
February 7, 2013 routine Daily meeting
Thursday
Notulen QCC PETR pertemuan 8, upload at MTCE
web
Event pulling cable at charger battery gtg 8 and gtg 9
QCC Petir pertemuan 9 langkah 3
5
February 8, 2013 routine Daily meeting
Friday routine
Saturday
7
February 10, 2013
Sunday
: SUPORT : Anggi
: 6 : Instrument Elektric Technician 2
: Feb 4 - Feb 10, 2013
week 6 PMS 100% Finish
6
February 9, 2013
Sarip kosim Bondan Priyambodo
( Anggi) ( Supervisor I/E ) (Assisten Manager I/E )
Employee Signature Acknowledge By Approved By
PT. Cikarang Listrindo
SITE NAME
Week POSITION
PERIODE
08:00 - 08:30 Instel room Finish
08:30 - 16:00 SWG 3 Finish
08:00 - 08:30 Instel room
09:00 - 14:00 SWG 2
14:00 - 16:30 Instel LAB
Pengambilan data QCC Petir, TEST
overcurrent CB, test kekencangan V
belt vs noise
08:00 - 08:30 Instel room
09:00 - 11:30
control room blok 3, lt 2,
CAB 2
Finish
continuity cable for relay indication 52
AR, 52 AR found, jumper cable not
connected, connect cable and now
indication at Dcis and mozaik panel is
same. Opr : adi andoko
08:00 - 08:30 Instel room
09:00 - 11:30 gas comp Finish
Rewiring cable for Gas comp fault
alarm at gas comp panel 2
13:00 - 16:00 Instel LAB
Pengambilan data QCC Petir, data
drain mampet, filter dryer mampet vs
high pressure
08:00 - 08:30 Instel room
08:30 - 11:30
bikin notulen, pengambilan data temp
comp running non stop
Event
CB Indication for 52AR and 52AS of gtg # 7 are not
same with actual
Sarip kosim Bondan Priyambodo
( Anggi) ( Supervisor I/E ) (Assisten Manager I/E )
week 7 PMS 100% Finish
Employee Signature Acknowledge By Approved By
7
February 17, 2013
Sunday
6
February 16, 2013
Saturday
5
February 15, 2013 routine Daily meeting
Friday
routine QCC Petir pertemuan 10 langkah 3, tema 2
4
February 14, 2013 routine Daily meeting
Thursday
gas Comp Fault 2 Not Appear at MK6
Ambil data QCC Petir
3
February 13, 2013 routine Daily meeting
Wednesday
2
February 12, 2013 routine Daily meeting
Tuesday
Maintenance Ac
Ambil data QCC Petir
Remarks
Day
Monday
1
February 11, 2013 routine Daily meeting
PMS Maintenance Ac
: Feb 11 - Feb 17, 2013
NO
Date
Subject Time Description No Work Order (WO) location Wo editing
: SUPORT : Anggi
: 7 : Instrument Elektric Technician 2
PT. Cikarang Listrindo
SITE NAME
Week POSITION
PERIODE
08:00 - 08:30 Instel room Finish
08:30 - 10:00 STG hall lt 1 Finish
10:00 - 11:00 STG hall lt 1 Finish
11:00 - 12:00 ff skid gtg 9 Finish Screwpump N/A, tag Wp : 10237
13:00 - 15:00 Gtg 9 Finish
15:00 - 16:00 Cooling water Finish repair pump by KSB
08:00 - 08:30 Instel room
08:30 - 10:00 STG 3 motor standby, not yet changeover
10:00 - 11:00 Gtg 8 motor standby, not yet changeover
11:00 - 12:00 Gtg 9 motor standby, not yet changeover
13:00 - 15:00 Instel room
08:00 - 08:30 Instel room
08:30 - 11:30
control room blok 3, lt 2,
CAB 2
Finish
13:00 - 14:00
prepare cable power for new
komputer
08:00 - 08:30 Instel room
08:30 - 10:00 Gtg 9
Changeover motor standby together
with mech
10:00 - 11:30 Gtg 8
Changeover motor standby together
with mech
13:00 - 14:00 STG 3
No permit from Opration, because no
operator ( opr Training )
14:00 - 17:00 SWG 3
08:00 - 08:30 Instel room
08:30 - 11:30 5W2H
13:30 - 15:00 Gas compressor 1
Replace Filter and then cleaning old
filter for spare
PMS cek current motor common blok stg 3
: SUPORT : Anggi
: 8 : Instrument Elektric Technician 2
: Feb 18 - Feb 24, 2013
NO
Date
Subject Time Description No Work Order (WO) location Wo editing Remarks
Day
1
February 18, 2013 routine Daily meeting
Monday
PMS Maintenance Compressor Atlas Copco 2 STG3
PMS Maintenance Dryer Compressor Atlas Copco 2 STG3
PMS Maitenance Fuel Forwading skid blok3 ( gtg9 )
PMS Maintenance ERVOR gas turbine generator 9
Connect cable power + heater cooling water pump 3
2
February 19, 2013 routine Daily meeting
Tuesday
PMS cek current motor common blok stg 3
Input data PMS
PMS cek current motor gtg 8
3
February 20, 2013 routine Daily meeting
Wednesday
Connect power Charger 2, STG blok 3
Cek komputer for Kontainer gtg 7
4
February 21, 2013 routine Daily meeting
Thursday
PMS cek current motor gtg 9
Maintenance Ac
5
February 22, 2013 routine Daily meeting
Friday
routine QCC Petir pertemuan 11 langkah 4, tema 2
PMS
6
February 23, 2013
Saturday
February 24, 2013
Sunday
Sarip kosim Bondan Priyambodo
( Anggi) ( Supervisor I/E ) (Assisten Manager I/E )
week 8 PMS 100% Finish
PMS cek current motor gtg 8
IE013W Cleaning Of Main Motor Cooling Air Filters
Gas Compressor-1
PMS cek current motor gtg 9
Employee Signature Acknowledge By Approved By
7
PT. Cikarang Listrindo
SITE NAME
Week POSITION
PERIODE
08:00 - 08:30 Instel room Finish
08:30 - 09:30 gas turbine generator 8 Finish
09:30 - 10:30 gas turbine generator 8 Finish
10:30 -11:30 gas turbine generator 9 Finish
13:00 -14:30 HPFWP area Finish
14:30 - 16:00 Make up tank area Finish
08:00 - 08:30 Instel room
08:30 - 14:30 Gtg 9 Finish
Disconnect motor FC 1, Spare part need to
repair before replacing, connect and test
current 19,3 A
14:30 - 15:30 SWG 4 Finish
15:30 - 16:30 SWG 3 Finish
Instel room
08:00 - 08:30 Instel room Finish
08:30 - 09:30 Record data and visual check all motor GC 1 6,3 kv CAB 1 Finish
09:30 - 11:30 Gtg 9 Finish
Disconnect motor for replace, connect motor
test run.
13:00 - 13:30 6,3 kv CAB 1 Finish GC 2 off, overhoul
13:30 - 15:00 Record data and visual check all motor GC 3 20 KV, SWG 3 Finish
15:00 - 17:00 Instel room
bahas sundulan, tidak ada sundulan untuk
instel,kecuali yang baru
08:00 - 08:30 Instel room
09:00 - 11:30 Instel room
13:00 - 15:00 Instel room
15:00 - 16:30 Instel room
08:00 - 08:30 Instel room
08:30 - 11:30
preparation power point for presentation,
langkah 2 - 4
15:00 - 16:00 outdoor area megger motor ex FC1, FC2 gtg9
Maintenance Ac
Sarip kosim Bondan Priyambodo
( Anggi) ( Supervisor I/E ) (Assisten Manager I/E )
Employee Signature Acknowledge By Approved By
PMS
PMS
PMS
PMS
week 9 PMS 100% Finish
7
March 3, 2013
Sunday
Megger motor 88 FC 1 , 88 FC2 gtg#9
6
March 2, 2013
Saturday
IDP AUMA
5
March 1, 2013 routine Daily meeting
Friday
routine QCC Petir pertemuan 12 langkah 4, tema 2
Monthly meeting instel
4
February 28, 2013 routine Daily meeting
Thursday
persiapan makalah IDP, pressure transmitter
QCC petir cek data yg sudah di Upload di server.
3
February 27, 2013 routine Daily meeting
Wednesday
PMS Maintenance motor 88 FC2 GTG 9
PMS Record data and visual check all motor GC 2
2
February 26, 2013 routine Daily meeting
Tuesday
PMS Maintenance motor 88 FC1 GTG 9
Maintenance Ac
Maintenance battery & charger gtg 8
PMS Maintenance battery & charger gtg 9
Event Strainer DP transmitter HPFWP 2 is bad signal
Make up water CV dev Alarm Event
Remarks
Day
1
February 25, 2013 routine Daily meeting
Monday
PMS Maintenance ervor gtg 8
PMS
: Feb 25 - March 2, 2013
NO
Date
Subject Time Description No Work Order (WO) location Wo editing
: SUPORT : Anggi
: 9 : Instrument Elektric Technician 2
PT. Cikarang Listrindo
SITE NAME
Week POSITION
PERIODE
08:00 - 08:30 Instel room Finish
09:00 - 17:00 SWG 4
08:00 - 08:30 Instel room
08:30 - 12:00 HRSG 8
Check Transmitter, Cleaning transmitter,
record
13:00 - 14:00 HRSG 8 Check Lamp at HRSG area
14:00 - 16:00 Gtg 7
Resetting limit switch 33VL, test ok, opr : ari
PJ, Eko
08:00 - 08:30 Instel room
09:00 - 10:30 CAB LT 4
14:00 - 15:30 gas turbine generator 9
15:30 - 15:35 gas turbine generator 8
Unit running, no alarm appears at mk Vi
,Hold, wait shutdown
08:00 - 08:30 Instel room
09:00 - 10:30 Workshop cleaning motor, before replace bearing
10:30 - 15:30 Gas comp area JE, Di, Ak, Ag, install PI
08:00 - 08:30 Instel room
08:30 - 11:30 Instel room
Review tree diagram, ishikawa diagram, after
presentation
14:00 - 15:30 Instel room
location Wo editing
: SUPORT : Anggi
: 10 : Instrument Elektric Technician 2
Maintenance Ac
: March 3 - march 9, 2013
NO
Date
Subject Time Description No Work Order (WO)
CONT_FAUL, GTG7, L52VL_ALM Heat vent DLN Compt
Vent Fault
Remarks
Day
1
March 4, 2013 routine Daily meeting
Monday
PMS
March 5, 2013 routine Daily meeting
Tuesday
PMS IE013W Maintenance Instrument Measurement HRSG8
PMS IE013W Maintenance Lighting Area HRSG8
event
3
March 6, 2013 routine Daily meeting
Wednesday
Presentasi QCC PETIR langkah 2 - 4 ke MQT
2
PMS IE013W Check Self Cleaning System GTG#9
event
GTG#8, appear alarm flame detector trouble during
Shutdown GT8
4
March 7, 2013 routine Daily meeting
Thursday
Repair motor slurry pmp, with yuli, gatot
GC 2 trip, preparation for start up
March 8, 2013 routine Daily meeting
Friday
routine QCC Petir pertemuan 13 langkah 4, tema 2
Input data PMS
6
March 9, 2013
Saturday
5
Sunday
week 10 PMS 100% Finish
Employee Signature Acknowledge By Approved By
7
March 10, 2013
Sarip kosim Bondan Priyambodo
( Anggi) ( Supervisor I/E ) (Assisten Manager I/E )
PT. Cikarang Listrindo
SITE NAME
Week POSITION
PERIODE
Finish
08:00 - 08:30 Instel room
08:30 - 09:00 ff skid area
09:00 - 10:30 stg 3
10:30 - 11:30 WH
13:00 - 17:00 Instel room review qcc petir, for re presentasi to MQC
08:00 - 08:30 Instel room
09:00 - 11:00 gas turbine generator 7
Cannot test ervor, because oil level low,
alarm appears is low pressure fault
Breaker Q5 (GT air filter cubicle) always
trip ==> cek breaker, resetting overload
from 11 - 14
11:00 - 11:30 GTG9, alarm FAP at GTG9 gas turbine generator 9 Continue Hold wait shutdown
13:00 - 15:00 HRSG 9
15:00 - 16:00 HRSG 9
08:00 - 08:30 Instel room
08:30 - 11:30 cab1 LT#5 Re-presentasi langkah 2 -2 4
IE004W Maintenance Compressor Atlas Copco1 STG3 PMS
: SUPORT : Anggi
: 11 : Instrument Elektric Technician 2
: March 10 - march 16, 2013
NO
Date
Subject Time Description No Work Order (WO) location Wo editing Remarks
Day
1
March 11, 2013 Cuti
Monday
2
March 12, 2013 Libur nasional, hari raya nyepi
Tuesday
3
March 13, 2013 routine Daily meeting
Wednesday
PMS IE004W Check Instrument FFSkid Gtg-9
PMS IE004W Maintenance Dryer Atlas Copco Compressor1
Revisi notulen QCC PETIR, langkah 2 - 4
4
March 14, 2013 routine Daily meeting
Thursday
Compressor ervor cannot loading (idle only)
PMS
IE013W Maintenance Instrument Measurement
HRSG9
IE013W Maintenance Lighting Area HRSG9
5
March 15, 2013 routine Daily meeting
Friday
routine QCC Petir pertemuan 14 langkah 4, tema 2
6
March 16, 2013
Saturday
7
March 17, 2013
Sunday
Sarip kosim Bondan Priyambodo
( Anggi) ( Supervisor I/E ) (Assisten Manager I/E )
week 11 PMS 100% Finish
Employee Signature
PMS Maintenance Ac WH
PMS
Event
Acknowledge By Approved By
Event
PT. Cikarang Listrindo
SITE NAME
Week POSITION
PERIODE
08:00 - 08:30 Instel room Finish
09:00 - 10:00 STG 3 Record, cleaning Wp : 09453
10:00 - 11:00 STG 3 Record, cleaning Wp : 09454
11:00 - 12:00 FF skid Area Record, cleaning Wp : 09262
13:00 - 14:00 GTG 9
Record, cleaning ervor gtg 9, test run Wp :
09263
14:00 - 15:00 Deaerator blok 3 Cek lighting area deaerator, WP : 9455
15:00 - 16:00 Deaerator blok 3 cek, cleaning instrument, WP: 9455
08:00 - 08:30 Instel room
08:30 - 11:00 6,3 Kv STG 3 Continue
Record, Current, Voltage, Temperatur terminal
motor running.
13:00 - 14:30
Gtg 9 Continue
Record, Current, Voltage, Temperatur terminal
motor running.
14:30 - 16:00 Gtg 8 Continue
Record, Current, Voltage, Temperatur terminal
motor running.
08:00 - 08:30 Instel room
08:30 - 11:00 6,3 Kv STG 3 Finish
Record, Current, Voltage, Temperatur terminal
motor stand by.
13:00 - 14:30
Gtg 9 Finish
Record, Current, Voltage, Temperatur terminal
motor stand by.
14:30 - 16:00 Gtg 8 Continue
Record, Current, Voltage, Temperatur terminal
motor stand by.
11:00 - 12:00 Repaired by KSB
08:00 - 08:30 Instel room
09:00 - 10:00 Gtg 8 Finish
Record, Current, Voltage, Temperatur terminal
motor stand by.
10:00 - 11:30 GTG 7 Finish
Maintenance Record Current All Motor &
General Visual Check GTG7
test running, motor stand by
opr : romli
wp : 9269
13:00 - 15:00 Instel room
15:30 - 17:00
08:00 - 08:30 Instel room
08:30 - 11:30
14:00 - 15:00
06:00 - 18:00
Dismantle instrument, and motor for HGPI gtg
8, calib transmitter,
Connect motor CWP 3, after repair by KSB
Preparation for event tube bundle HRSG
07:00 - 09:00 Mtce 88FC1 gtg 8
07:00 - 09:00 Mtce 88FC2 gtg 8
08:00 - 13:00
Dismantle instrumen, at Generator Exitasi, Vib.
Bently nevada, BB-10, 11
: March 18 - march 24, 2013
NO
: SUPORT : Anggi
: 12 : Instrument Elektric Technician 2
Subject location
event
Wo editing
PMS
IE004W Check Compressor pressure, lamp,
sequence
routine Daily meeting
IE013W Maintenance Instrument Measurement
Dearator Block3
PMS PIE004W Record current and visual check all motors
GTG#9
Remarks
Day
March 18, 2013 routine Daily meeting
PMS
Date
Time Description No Work Order (WO)
event
Tuesday
PIE004W Record current and visual check all motors
GTG#8
PMS
PIE004W Record Current And Visual Check All Notor
STG Block 3
routine Daily meeting
PMS
PIE004W Record current and visual check all motors
GTG#8
PIE004W Record current and visual check all motors
GTG#9
PMS
PIE004W Record Current And Visual Check All Notor
STG Block 3
Closing job card, daily report
Meeting Monthly Instel
Daily meeting
routine
PMS
PIE004W Record Current And Visual Check All Notor
STG Block 3
PMS
PIE004W Maintenance Record Current All Motor &
General Visual Check GTG7
March 23, 2013
Daily meeting
Meeting preparation for HGPI gtg 8
QCC Petir pertemuan 15 langkah 4, tema 2
2
March 20, 2013
5
routine
PMS
routine
event
March 19, 2013
4
March 21, 2013
Thursday
PMS
HGPI GTG 8 event
event HGPI GTG 8
week 12 PMS 100% Finish
7
March 24, 2013
Sunday
Acknowledge By Employee Signature
( Anggi) ( Supervisor I/E ) (Assisten Manager I/E )
Approved By
Sarip kosim Bondan Priyambodo
1
PMS
IE004W Maintenance Dryer Atlas Copco
Compressor2 STG3
PMS
IE013W Maintenance Lighting Area Dearator
Block3
PMS
IE004W Maintenance Fuel Forwading Skid
Block3
IE004W Maintenance Compressor Atlas Copco2
STG3
Monday
PMS
Disconnect - connect motor, replace motor +
blower by mech
Wednesday
3
Disconnect motor CWP 3 Blok 3
6
Saturday
PMS
March 22, 2013
Friday
PT. Cikarang Listrindo
SITE NAME
Week POSITION
PERIODE
08:00 - 08:30 Instel room Finish
09:00 - 17:00 GTG #8
08:00 - 08:30 Instel room
09:00 - 17:00 GTG #8
08:00 - 08:30 Instel room
09:00 - 17:00 GTG #8
08:00 - 08:30 Instel room
09:00 - 17:00 GTG #8
08:00 - 08:30 Instel room
09:00 - 17:00 GTG #8
: SUPORT & AC : Anggi
: 13 - 16 : Instrument Elektric Technician 2
: March 25 - April 14, 2013
NO
Date
Subject Time Description No Work Order (WO) location Wo editing Remarks
Day
1
routine Daily meeting
Monday
Event HGPI GTG 8
2
routine Daily meeting
Tuesday
event
Event HGPI GTG 8
3
routine Daily meeting
Wednesday
Event HGPI GTG 8
4
routine Daily meeting
Thursday
Event HGPI GTG 8
5
routine Daily meeting
Friday
Event HGPI GTG 8
6
Saturday
7
January 1, 1900
Sunday
Sarip kosim Bondan Priyambodo
( Anggi) ( Supervisor I/E ) (Assisten Manager I/E )
week 13 - 15 PMS Finish
Employee Signature Acknowledge By Approved By
PT. Cikarang Listrindo
SITE : SUPORT & AC NAME
Week : 16 POSITION
: PERIODE
08:00 - 09:00 Instel room
09:00 - 17:00 Gas turbine generator #8
08:00 - 09:00 Instel room
09:00 - 11:00 HRSG #8
13:00 - 17:00 Gas turbine generator #2
06:00 - 09:00
Gas turbine generator #2
09:00 - 12:00 Gas turbine generator #2
13:00 - 17:00 CAB#1
08:00 - 09:00 Instel room
09:00 - 17:00 HRSG #2
08:00 - 09:00 Instel room
09:00 - 17:00 All
08:00 - 13:00 panel sgs
13:00 - 17:00 All
Approved By
Thursday
( Anggi) ( Supervisor I/E ) (Assisten Manager I/E )
Sarip kosim Bondan Priyambodo
: Anggi
: Instrument Elektric Technician 2
: Apr 15 - Apr 21 , 2013
Employee Signature Acknowledge By
3
Monday
4
6
7
week 16 PMS 100% Finish
location Wo editing Remarks
1
2
Event PMS ALL JobCard
Sunday
April 16, 2013
Tuesday
Wednesday
April 18, 2013
April 21, 2013
April 20, 2013 Event Calibration Isolation trafo level
Saturday
5
April 19, 2013 routine Daily meeting
Friday
Event PMS ALL JobCard
routine Daily meeting
Event Maintenance Ac (Gt 5)
Event
April 17, 2013 Event
prepared loosen GAC ( generator auxilery
compartment ), dismantle cable generator R,S,T.
Event Continuity cable Jplug 15 and 45
Maintenance Ac ( Lt.4 )
routine Daily meeting
Event Normalisasi line cdhtr system
Event Prepared over haul gas turbine generator #2,
CL
Day
April 15, 2013 routine Daily meeting
Event
Prepared star up GTG #8
No Work Order (WO) WI JSA NO
Date
Subject Time Description
PT. Cikarang Listrindo
SITE NAME
Week POSITION
PERIODE
08:00 - 08:30 Instel room
09:00-17:00 gtg 2
08:00 - 08:30 Instel room
09:00-17:00 gtg 2
08:00 - 08:30 Instel room
09:00-17:00 gtg 2
08:00 - 08:30 Instel room
09:00-17:00 gtg 2
15:30 - 17:00
08:00 - 08:30 Instel room
09:00-17:00 gtg 2
Sarip kosim Bondan Priyambodo
( Anggi) ( Supervisor I/E ) (Assisten Manager I/E )
week 17 - 19 PMS 100% Finish
Employee Signature Acknowledge By Approved By
7
Sunday
6
Saturday
Meeting Monthly Instel
5
routine Daily meeting
Friday
routine over houl
routine over houl
4
routine Daily meeting
Thursday
3
routine Daily meeting
Wednesday
routine over houl
2
routine Daily meeting
Tuesday
routine over houl
Remarks
Day
1
routine Daily meeting
Monday
routine over houl
: March 18 - mei 19, 2013
NO
Date
Subject Time Description No Work Order (WO) location Wo editing
: SUPORT & AC : Anggi
: 17 - 19 : Instrument Elektric Technician 2
PT. Cikarang Listrindo
SITE : SUPORT & AC NAME
Week : 20 POSITION
: PERIODE : Mei 13 - Mei 19 , 2013
08:00 - 09:00 Instel room
09:00 - 17:00 Swg#3
08:00 - 09:00 Instel room
09:00 - 17:00 Swg#3
08:00 - 09:00 Instel room
09:00-17:00 gtg#2
08:00 - 09:00 Instel room
10:00 - 11:00 FF # 9
11:00 - 12:00 STG haul Closed
13:00 - 14:00 STG haul Closed
14:00 - 17:00 STG # 3 Closed
08:00 - 09:00 Instel room
08:00-11:30 Ervor #9 Closed
13:30 - 14:30 GTG#7 Closed
14:30 -15:30 GTG#8 Closed
15:30 - 16:30 GTG#9 Closed
( Anggi)
Employee Signature
PMS 100% Finish
Bondan Priyambodo
( Supervisor I/E ) (Assisten Manager I/E )
: Anggi
: Instrument Elektric Technician 2
Acknowledge By Approved By
Daily meeting
6
May 18, 2013
Saturday
7
May 19, 2013
Sunday
4
May 16, 2013
Thursday
5
May 17, 2013
Friday
Monday
2
May 14, 2013
Tuesday
3
Wednesday
location Wo editing Remarks
1
Sarip kosim
Pms
Maintenance Record Current All Motor & General
Visual Check GTG9
Pms
Maintenance ERVOR GTG9
not test ervor, make permit 4 hours.
check and clean compressor 102 & 122.
Pms
Maintenance Record Current All Motor & General
Visual Check GTG7
Pms
Maintenance Record Current All Motor & General
Visual Check GTG8
routine
Pms
Maintenance Dryer Atlas Copco Compressor2
STG3
record at display & clean.
Pms
Maintenance Record & Visual Check Motor
Common Block 3
routine Daily meeting
Pms Maintenance fuel forwading skid
Pms
Maintenance Compressor Atlas Copco2 STG3
record and clean compressor .
May 15, 2013 routine Daily meeting
routine over houl - start up
Daily meeting
Maintenance Ac
CL
Day
May 13, 2013 Daily meeting
Maintenance Ac
No Work Order (WO) WI JSA NO
Date
Subject Time Description
PT. Cikarang Listrindo
SITE : SUPORT & AC NAME
Week : 21 POSITION
: PERIODE : Mei 20 - Mei 26 , 2013
08:00 - 09:00 Instel room
09:00 - 12:00 CAB 2 floor 3
08:00 - 08:30 Instel room
08:30 - 09:30 Gas turbine generator #7 closed
09:30 - 10:30 Gas turbine generator #8 closed
10:30 - 11:30 Gas turbine generator #9 closed
13:00 - 14:30 Gas turbine generator #8 closed
14:30 - 17:00 SWG#3
08:00 - 09:00 Instel room
09:00 - 17:00 CAB 2
08:00 - 09:00 Instel room
08:30 - 09:30 Gas compressor #1 closed
09:30 - 10:30 Gas compressor #2 closed
10:30 - 11:30 Gas compressor #3 closed
13:00 - 14:30 Gas compressor #1 closed
14:30 - 17:00 SWG#3
08:00 - 09:00 Instel room
09:00 - 17:00 Instel room
: Instrument Elektric Technician 2
Sarip kosim Bondan Priyambodo
Approved By
Record data and visual check all motor GC #3
Maintenance battey & charger unit GTG #9
JSA
QCC PETIR
( Anggi) ( Supervisor I/E ) (Assisten Manager I/E )
PMS 100% Finish
Employee Signature Acknowledge By
7
May 26, 2013
Sunday
6
May 25, 2013
Saturday
Maintenance cooling air filter GC #1
PMS Maintenance Ac
5
May 24, 2013 routine Daily meeting
Friday
4
routine
May 23, 2013 routine Daily meeting
Thursday
PMS Record data and visual check all motor GC #1
PMS Record data and visual check all motor GC #2
PMS
PMS
3
May 22, 2013 routine Daily meeting
Wednesday
Install computer siemens S7, support adnan
PMS Maintenance Ervor GTG#8
PMS Maintenance Ac
2
May 21, 2013 routine Daily meeting
Tuesday
PMS Maintenance battey & charger unit GTG #7
PMS Maintenance battey & charger unit GTG #8
PMS
1
May 20, 2013 routine Daily meeting
Monday
Support adnan to modification pc siemens s7 blok #3
location Wo editing Remarks
Day
NO
Date
: Anggi
Subject Time Description No Work Order (WO) WI CL
PT. Cikarang Listrindo
SITE : SUPORT & AC NAME
Week : 22 POSITION
: PERIODE : Mei 27 - June 02 , 2013
08:00 - 09:00 Instel room
09:00 - 10:30 X X X hrsg#8
10:30 - 12:00 X X X hrsg#9
13:00 - 15:00 GTG#7
08:00 - 08:30 Instel room
09:00 - 12:00 6.3kv Room
12:00 -15:00 6.3kv Room Continue SG meter
08:00 - 09:00 Instel room
09:00 - 12:00 GTG#7
13:00 - 15:00 6.3kv Room
08:00 - 09:00 Instel room
09:00-17:00 Swg#3
08:00 - 09:00 Instel room
09:00 - 17:00 Instel room
: Anggi
: Instrument Elektric Technician 2
Sarip kosim Bondan Priyambodo
Approved By
QCC PETIR
Maintenance Ervor GTG#7
Cleaning container room
( Anggi) ( Supervisor I/E ) (Assisten Manager I/E )
PMS 100% Finish
Employee Signature Acknowledge By
7
June 2, 2013
Sunday
6
June 1, 2013
Saturday
5
May 31, 2013 routine Daily meeting
Friday
routine
4
May 30, 2013 routine Daily meeting
Thursday
Pms Ac Swg#3
3
May 29, 2013 routine Daily meeting
Wednesday
PMS
PMS Maintenance battery room CAB2
Maintenance battery room CAB2
2
May 28, 2013 routine Daily meeting
Tuesday
PMS Maintenance Charger room Cab2
1
PMS
May 27, 2013 routine Daily meeting
Monday
PMS
Maintenance visual check temperature indicator
HRSG#8
PMS
Maintenance visual check temperature indicator
HRSG#9
PMS
JSA CL location Wo editing Remarks
Day
NO
Date
Subject Time Description No Work Order (WO) WI
PT. Cikarang Listrindo
SITE : SUPORT & AC
Week : 22
:
Employee Signature
7
June 2, 2013
Sunday
PMS 100% Finish
6
June 1, 2013
Saturday
5
May 31, 2013 routine
Friday
routine
4
May 30, 2013 routine
Thursday
3
May 29, 2013 routine
Wednesday
PMS
PMS
PMS
PMS
PMS
2
May 28, 2013 routine
Tuesday
Day
1
May 27, 2013 routine
Monday
PMS
PMS
NO
Date
Subject
( Anggi)
08:00 - 09:00 Instel room
09:00 - 10:30 X X X
10:30 - 12:00 X X X
13:00 - 15:00
08:00 - 08:30 Instel room
09:00 - 12:00
12:00 -15:00
08:00 - 09:00 Instel room
09:00 - 12:00
13:00 - 15:00
08:00 - 09:00 Instel room
09:00-17:00
08:00 - 09:00 Instel room
09:00 - 17:00 Instel room
Acknowledge By Approved By
Daily meeting
QCC PETIR
Daily meeting
Pms Ac Swg#3
Daily meeting
Maintenance Ervor GTG#7
Maintenance battery room CAB2
Maintenance Charger room Cab2
Maintenance battery room CAB2
Maintenance visual check temperature
indicator HRSG#9
Cleaning container room
Daily meeting
Daily meeting
Maintenance visual check temperature
indicator HRSG#8
No Work Order (WO) WI JSA CL Time Description
Sarip kosim Bondan Priyambodo
( Supervisor I/E ) (Assisten Manager I/E )
NAME
POSITION
PERIODE : Mei 27 - June 02 , 2013
Instel room
hrsg#8
hrsg#9
GTG#7
Instel room
6.3kv Room
6.3kv Room Continue SG meter
Instel room
GTG#7
6.3kv Room
Instel room
Swg#3
Instel room
Instel room
Approved By
Remarks location Wo editing
: Anggi
: Instrument Elektric Technician 2
Bondan Priyambodo
(Assisten Manager I/E )
PT. Cikarang Listrindo
SITE : SUPORT & AC
Week : 22
:
Employee Signature
7
June 2, 2013
Sunday
PMS 100% Finish
6
June 1, 2013
Saturday
5
May 31, 2013 routine
Friday
routine
4
May 30, 2013 routine
Thursday
3
May 29, 2013 routine
Wednesday
PMS
PMS
PMS
PMS
PMS
2
May 28, 2013 routine
Tuesday
Day
1
May 27, 2013 routine
Monday
PMS
PMS
NO
Date
Subject
( Anggi)
08:00 - 09:00 Instel room
09:00 - 10:30 X X X
10:30 - 12:00 X X X
13:00 - 15:00
08:00 - 08:30 Instel room
09:00 - 12:00
12:00 -15:00
08:00 - 09:00 Instel room
09:00 - 12:00
13:00 - 15:00
08:00 - 09:00 Instel room
09:00-17:00
08:00 - 09:00 Instel room
09:00 - 17:00 Instel room
Acknowledge By Approved By
Daily meeting
QCC PETIR
Daily meeting
Pms Ac Swg#3
Daily meeting
Maintenance Ervor GTG#7
Maintenance battery room CAB2
Maintenance Charger room Cab2
Maintenance battery room CAB2
Maintenance visual check temperature
indicator HRSG#9
Cleaning container room
Daily meeting
Daily meeting
Maintenance visual check temperature
indicator HRSG#8
No Work Order (WO) WI JSA CL Time Description
Sarip kosim Bondan Priyambodo
( Supervisor I/E ) (Assisten Manager I/E )
NAME
POSITION
PERIODE : Mei 27 - June 02 , 2013
Instel room
hrsg#8
hrsg#9
GTG#7
Instel room
6.3kv Room
6.3kv Room Continue SG meter
Instel room
GTG#7
6.3kv Room
Instel room
Swg#3
Instel room
Instel room
Approved By
Remarks location Wo editing
: Anggi
: Instrument Elektric Technician 2
Bondan Priyambodo
(Assisten Manager I/E )
PT. Cikarang Listrindo
SITE : SUPORT & AC
Week : 22
:
Employee Signature
7
June 2, 2013
Sunday
PMS 100% Finish
6
June 1, 2013
Saturday
5
May 31, 2013 routine
Friday
routine
4
May 30, 2013 routine
Thursday
3
May 29, 2013 routine
Wednesday
PMS
PMS
PMS
PMS
PMS
2
May 28, 2013 routine
Tuesday
Day
1
May 27, 2013 routine
Monday
PMS
PMS
NO
Date
Subject
( Anggi)
08:00 - 09:00 Instel room
09:00 - 10:30 X X X
10:30 - 12:00 X X X
13:00 - 15:00
08:00 - 08:30 Instel room
09:00 - 12:00
12:00 -15:00
08:00 - 09:00 Instel room
09:00 - 12:00
13:00 - 15:00
08:00 - 09:00 Instel room
09:00-17:00
08:00 - 09:00 Instel room
09:00 - 17:00 Instel room
Acknowledge By Approved By
Daily meeting
QCC PETIR
Daily meeting
Pms Ac Swg#3
Daily meeting
Maintenance Ervor GTG#7
Maintenance battery room CAB2
Maintenance Charger room Cab2
Maintenance battery room CAB2
Maintenance visual check temperature
indicator HRSG#9
Cleaning container room
Daily meeting
Daily meeting
Maintenance visual check temperature
indicator HRSG#8
No Work Order (WO) WI JSA CL Time Description
Sarip kosim Bondan Priyambodo
( Supervisor I/E ) (Assisten Manager I/E )
NAME
POSITION
PERIODE : Mei 27 - June 02 , 2013
Instel room
hrsg#8
hrsg#9
GTG#7
Instel room
6.3kv Room
6.3kv Room Continue SG meter
Instel room
GTG#7
6.3kv Room
Instel room
Swg#3
Instel room
Instel room
Approved By
Remarks location Wo editing
: Anggi
: Instrument Elektric Technician 2
Bondan Priyambodo
(Assisten Manager I/E )
PT. Cikarang Listrindo
SITE : SUPORT & AC
Week : 33
:
08:00 - 09:00
09:00 - 11:30
13:00 -16:00
08:00 - 08:30
09:00 - 12:00
13:00 -16:00
08:00 - 09:00
09:00-12:00
13:00 -16:00
08:00 - 09:00
09:00-11:00
13:00 -16:00
08:00 - 09:00
09:00-11:00
13:30 -16:00
NO
Date
Subject Time
Day
1
August 12, 2013 routine
Monday
PMS
PMS
2
August 13, 2013 routine
Tuesday
PMS
PMS
3
August 14, 2013 routine
Wednesday
PMS
PMS
4
August 15, 2013 routine
Thursday
PMS
PMS
5
August 16, 2013 routine
Friday
6
August 17, 2013
Saturday
PMS 100% Finish
Employee Signature Acknowledge By
7
August 18, 2013
Sunday
Sarip kosim
( Anggi) ( Supervisor I/E )
NAME
POSITION
PERIODE
Instel room
STG
STG
Instel room
STG
STG
Instel room
STG
STG
Instel room
STG
STG
Instel room
STG
STG
Description No Work Order (WO) WI JSA CL location
Daily meeting
Maintenance Motor CTF5 STG1
Maintenance Motor CTF6 STG1
Daily meeting
Maintenance Motor Vacuum Pump 1
Maintenance Motor Vacuum Pump 2 STG1
Daily meeting
Maintenance Motor CEP 1 STG1
Maintenance Motor CEP 2 STG1
Daily meeting
Maintenance Motor ACWP1 (Stork) STG1
Maintenance Motor ACWP2 (Stork) STG1
Daily meeting
Maintenance Motor CTF3 STG1
Maintenance Motor CTF4 STG1
Acknowledge By Approved By
Sarip kosim Bondan Priyambodo
( Supervisor I/E ) (Assisten Manager I/E )
: Mei 27 - June 02 , 2013
: Anggi
: Instrument Elektric Technician 2
Wo editing Remarks
Approved By
Bondan Priyambodo
(Assisten Manager I/E )
PT. Cikarang Listrindo
SITE : SUPORT & AC
Week : 34
:
08:00 - 09:00
09:00 - 11:30
13:00 - 14:00
08:00 - 08:30
09:00 - 12:00
13:00 -16:00
08:00 - 09:00
09:00-12:00
08:00 - 09:00
09:00-11:00
13:00 -16:00
08:00 - 09:00
09:00-11:00
13:30 -16:00
08:00 - 17:00
NO
Date
Subject Time
Day
1
August 19, 2013 routine
Monday
PMS
PMS
2
August 20, 2013 routine
Tuesday
PMS
PMS
3
August 21, 2013 routine
Wednesday
4
August 22, 2013 routine
Thursday
PMS
PMS
5
August 23, 2013 routine
Friday
6
August 24, 2013
Saturday
PMS
PMS 100% Finish
Employee Signature Acknowledge By
7
August 25, 2013
Sunday
Sarip kosim
( Anggi) ( Supervisor I/E )
NAME
POSITION
PERIODE
Instel room
swg#3
swg#3
Instel room
swg#3
swg#3
Instel room
swg#3
Instel room
STG
STG
Instel room
STG
STG
STG
Description No Work Order (WO) WI JSA CL location
Daily meeting
Service AC CU1 - 1B 20KV Switch Gear 3
Service AC CU1 - 2A 20KV Switch Gear 3
Daily meeting
Service AC CU1 - 2B 20KV Swg 3
Service AC CU1 - 3A 20KV Swg 3
Daily meeting
Service AC CU1 - 3B 20KV Switch Gear 3
Daily meeting
Maintenance Motor CTF1 STG1
Maintenance Motor CTF2 STG1
Daily meeting
Maintenance Motor CTF3 STG1
Maintenance Motor CTF4 STG1
Acknowledge By Approved By
maintenance vlv bypass
Sarip kosim Bondan Priyambodo
( Supervisor I/E ) (Assisten Manager I/E )
: Mei 27 - June 02 , 2013
: Anggi
: Instrument Elektric Technician 2
Wo editing Remarks
Approved By
Bondan Priyambodo
(Assisten Manager I/E )
PT. Cikarang Listrindo
SITE : SUPORT & AC
Week : 35
:
08:00 - 09:00
09:00 - 11:30
13:00 - 14:00
08:00 - 08:30
09:00 - 12:00
13:00 -16:00
08:00 - 09:00
09:00-17:00
08:00 - 09:00
09:00-11:00
08:00 - 09:00
09:00 - 17:00
08:00 - 17:00
17:00 - 22:00
08:00 - 17:00
NO
Date
Subject Time
Day
1
August 26, 2013 routine
Monday
event
PMS
2
August 27, 2013 routine
Tuesday
event
3
August 28, 2013 routine
Wednesday
4
August 29, 2013 routine
Thursday
event
5
August 30, 2013 routine
Friday
6
August 31, 2013
Saturday
HGPI GTG #5
PMS 100% Finish
Employee Signature Acknowledge By
7
September 1, 2013
Sunday
( Anggi)
Sarip kosim
( Supervisor I/E )
NAME
POSITION
PERIODE
Instel room
X X X swg#2
X X X gtg#9
Instel room
server room
Instel room
Instel room
cab#1
Instel room
cab#1
Instel room
Lab.room
Event Gtg 2
Lab.room
Description No Work Order (WO) WI JSA CL location
Daily meeting
Maintenance breaker ac cu for swg 2
Check Instrument FF Skid Gtg9
Daily meeting
maintenance Ac leaked at server room
Prepared presentasi QCC PETIR
Daily meeting
QCC DAY
Daily meeting
maintenance motor AC CU03, 6.3 Kv
Daily meeting
Calib temp. switch and vpr
Acknowledge By Approved By
Calib temp. switch and vpr
Sarip kosim Bondan Priyambodo
( Supervisor I/E ) (Assisten Manager I/E )
: Mei 27 - June 02 , 2013
: Anggi
: Instrument Elektric Technician 2
Wo editing Remarks
Approved By
Bondan Priyambodo
(Assisten Manager I/E )
PT. Cikarang Listrindo
SITE : SUPORT & AC
Week : 36
:
08:00 - 09:00
09:00 - 11:30
13:00 - 17:00
08:00 - 08:30
09:00 - 12:00
13:00 -16:00
08:00 - 09:00
09:00-17:00
08:00 - 09:00
09:00-11:00
13:00-17:00
08:00 - 09:00
09:00 - 17:00
08:00 - 17:00
17:00 - 22:00
08:00 - 17:00
NO
Date
Subject Time
Day
1
September 2, 2013 routine
Monday
PMS
PMS
2
September 3, 2013 routine
Tuesday
event
3
September 4, 2013 routine
Wednesday
4
September 5, 2013 routine
Thursday
PMS
5
September 6, 2013 routine
Friday
6
September 7, 2013 HGPI GTG #5
Saturday
7
September 8, 2013
Sunday
PMS 100% Finish
Employee Signature Acknowledge By
Sarip kosim
( Anggi) ( Supervisor I/E )
Description No Work Order (WO) WI JSA CL
Daily meeting
calib temp. switch and vpr
check level switch
Daily meeting
check level switch
pemasangan 71QL
Daily meeting
Maintenance breaker mcc panel
Daily meeting
Pemasangan temperatur switch
repair auma for msp
Daily meeting
Acknowledge By Approved By
Sarip kosim Bondan Priyambodo
( Supervisor I/E ) (Assisten Manager I/E )
NAME
POSITION
PERIODE : Mei 27 - June 02 , 2013
Instel room
lab IE
Instel room
gtg#5
gtg#5
Instel room
lab IE
Instel room
gtg#5
lab IE
Instel room
: Anggi
: Instrument Elektric Technician 2
location Wo editing Remarks
Approved By
Bondan Priyambodo
(Assisten Manager I/E )