Anchored Sheet Pile Wall Design

Download as pdf or txt
Download as pdf or txt
You are on page 1of 6
At a glance
Powered by AI
The document discusses the design procedure for anchored sheet pile walls in both cohesionless and cohesive soils.

The main steps include calculating lateral earth pressures, determining the embedded depth, calculating anchor forces, determining maximum moments, selecting sheet pile sections, and sizing tie rods and soldier beams.

The main steps include calculating the free-standing height, lateral earth pressures at the bottom, determining the embedded depth D through iteration, calculating anchor forces, determining maximum moments, selecting sheet pile sections, and sizing tie rods and soldier beams.

Anchored Sheet Pile Wall Design

http://www.ce-ref.com/Foundation/Sheet_pile/Anchor-Sheet_pile/Anchor_sheet_pile.html[12/09/2014 2:15:03 CH]


Custom Search

CE-REF.COM
Home About News Products Services Calendar Contact
Anchored sheet pile wall
Topics:
Anchored sheet pile wall in cohesionless soil
Anchored sheet pile wall in cohesive soil
Design using free earth support method
Assumptions:
1. Sheet pile is rigid, and lateral deflection is small.
2. The lateral pressure distributes according to Rankines or Coulombs theories
3. The tie back is strong, and sheet pile rotate about the tie rod anchor point at failure.
4. Bottom of sheet pile is free to move.

The embedded depth can be determined by summarizing horizontal earth pressures and moments about the anchor.

F
x
= 0 [1]
M
o
= 0 [2]

The difficulty is that the lateral earth pressure is a function of embedded depth. Both equations are highly nonlinear. A trial and error
method has to be used to determine the root.
For structural design, the sheet pile needs to be able to withstand maximum moment and shear from lateral pressure. A structural
analysis needs to be done to determine maximum moment and shear.
Anchored sheet pile wall in cohesionless soil
Design length of sheet pile
Headline 3
insert content here
Search
Anchored Sheet Pile Wall Design
http://www.ce-ref.com/Foundation/Sheet_pile/Anchor-Sheet_pile/Anchor_sheet_pile.html[12/09/2014 2:15:03 CH]

Theory
Calculating active earth pressure
The method for calculating active earth pressure is the same as that in cantilever sheet pile wall. The lateral forces H
a1
is calculated as
H
a1
=g K
a
h
2
/2+q K
a
h
The depth a can be calculated as
a = p
a
/ g (K
p
-K
a
)
The lateral forces H
a2
can be calculated as
H
a2
=p
a
*a/2
Calculating passive earth pressure
The slope from point C to E in the figure above is g (K
p
-K
a
). The passive earth pressure at a depth Y below a is calculated as
P
p
= g (K
p
-K
a
) Y
The passive lateral force
HCEF = g (K
p
-K
a
) Y
2
/2
Derive equation for Y from Mo = 0
M
o
= H
a1
*y
1
+ H
a2
* y
2
HCEF* y
3
= 0
Where
y
1
= (2h/3-b)
y
2
= (h+a/3-b)
y
3
= (h+a+2Y/3)
The equation needs to be determined by a trial and error process.
Determine anchor force T from F
x
= 0
F
x
= H
a1
+ H
a2
HCEF-T = 0
Then,
T = H
a1
+ H
a2
HCEF
Design size of sheet pile
The structural is the same as cantilever sheet piles in cohesionless soil.
Maximum moment locates at a distance y below T where shear stress equals to zero.
T-g K
a
(y+b)
2
/2=0
Solve for y, we have, y = -b+2*T/(g K
a
)
The maximum moment is
Mmax = T y - g K
a
(y+b)
3
/6
The required section modulus is S = M
max
/ F
b
The sheet pile section is selected based on section modulus
Design of tie rod and soldier beam
Anchored Sheet Pile Wall Design
http://www.ce-ref.com/Foundation/Sheet_pile/Anchor-Sheet_pile/Anchor_sheet_pile.html[12/09/2014 2:15:03 CH]
The sheet pile design above is based on a unit width, foot or meter. The tie back force T calculated from sheet pile design is force per
linearly width of sheet pile. The top of sheet pile often supported with soldier beams and tie rods at certain spacing.
Assume the spacing of tie rod is s, the tension in the rod is T times s. The required area of tie rod is
A = T s / F
t
Where F
t
is allowable tensile stress of steel and is equal to 0.6F
y
in AISC ASD design.
The soil beam is designed as a continuous beam that subjected to tie back force T. The maximum moment in the soldier beam is
calculated from structural analysis. The required section modulus is equal to S = M
max
/ F
b
.
Design procedure
1. Calculate lateral earth pressure at bottom of excavation, pa and Ha1.
p
a
= g K
a
H, H
a1
=p
a
*h/2
2. Calculate the length a, and Ha2.
a = p
a
/ g (K
p
-K
a
), H
a2
=p
a
*a/2
3. Assume a trial depth Y, calculate HCEF.
HCEF = g (K
p
-K
a
) Y
2
/3
4. Let R = H
a1
*y
1
+ H
a2
* y
2
HCEF* y
3
y
1
= (2h/3-b)
y
2
= (h+a/3-b)
y
3
= (h+a+2Y/3)
Substitute Y into R, if R = 0, the embedded depth, D = Y + a.
If not, assume a new Y, repeat step 3 to 4.
5. Calculate the length of sheet pile, L = h+F.S.*D, FS is from 1.2 to 1.4.
6. Calculate anchored force T = H
a1
+ H
a2
HCEF
7. Calculate y = -b+2*T/(g K
a
)
8. Calculate M
max
= T y - g K
a
(y+b)
3
/6
9. Calculate required section modulus S=M
max
/F
b
.
10. Select sheet pile section.
11. Design tie rod
12. Design soldier beam.
Example 3. Design anchored sheet pile in cohesionless soil.
Given:
Depth of excavation, h = 10 ft
Unit weight of soil, g = 115 lb/ft
3
Internal friction angle, f = 30 degree
Allowable design stress of sheet pile = 32 ksi
Yield strength of soldier beam, F
y
= 36 ksi
Location of tie rod at 2 ft below ground surface, spacing, s = 12 ft
Requirement: Design length of an anchored sheet pile, select sheet pile section, and design tie rod
Solution:
Design length of sheet pile:
Calculate lateral earth pressure coefficients:
K
a
= tan (45-f/2) = 0.333
K
p
= tan (45-f/2) = 3
The lateral earth pressure at bottom of excavation is
p
a
= K
a
g h = 0.333*115*10 = 383.33 psf
Anchored Sheet Pile Wall Design
http://www.ce-ref.com/Foundation/Sheet_pile/Anchor-Sheet_pile/Anchor_sheet_pile.html[12/09/2014 2:15:03 CH]
The active lateral force above excavation
H
a1
= p
a
*h/2 = 383.33*10/2 = 1917 lb/ft
The depth a = p
a
/ g (K
p
-K
a
) = 383.3 / [115*(3-0.333)] =1.25 ft
The corresponding lateral force
H
a2
= p
a
*a/2 = 383.33*1.25/2 = 238.6 lb/ft
Assume Y = 2.85 ft
HCEF = g (K
p
-K
a
) Y
2
/3 = 115*(3-0.333)*2.85
2
/3 = 830.3 lb/ft
y
1
= (2h/3-b) = (2*10/3-2)=4.67 ft
y
2
= (h+a/3-b) = (10+1.25/3-2)=8.42 ft
y
3
= (h+a+2Y/3) = (10+1.25+2*2.85/3) = 13.15 ft
R = H
a1
*y
1
+ H
a2
* y
2
HCEF* y
3
= 1917*4.67+238.6*8.42-830.3*13.15 = 42.5 lb
R closes to zero, D = 2.85+1.25 = 4.1 ft
Length of sheet pile, L = 10 + 1.2* 4.1 = 14.9 ft Use 15 ft
Calculate anchor force,
T = H
a1
+ H
a2
HCEF = 1917+238.6-830.3 = 1326 lb/ft
Calculate location of maximum moment,
y = -b+2*T/(g K
a
) = -2 ft + 2*1326/(115*0.333) = 6.32 ft
M
max
= T y - g K
a
(y+b)
3
/6 = 1326*6.32 115*0.333*(6.32+2)
3
/6 = 4.7 kip-ft/ft
The required section modulus S=M
max
/F
b
= 4.7*12/32 = 1.8 in
3
/ft
Use PS28, S = 1.9 in
3
/ft
Design tie rod, the required cross section area,
A = T s / (0.6*F
y
) = 1.326*12/(0.6*36) = 0.442 in
3
.
Use diameter tie rod, A = 0.442 in
3
.
Design soldier beam:
The maximum moment of a continuous beams with 3 or more span is
M = 0.1*T s
2
= 0.1*1326*12
2
=19.1 kip-ft
Required section modulus, S = M / (0.6*F
y
) = 19.1*12/(0.6*36) = 6.4 in
3
.
Use W6x15, S = 9.72 in
3
.
Anchored sheet pile wall in cohesive soil.
Theory
Calculating active earth pressure
Calculation of active earth pressure above excavation is the same as that of cantilever sheet pile in cohesive soil. The free-standing
height of soil is d = 2C/g
The lateral earth pressure at bottom of excavation, p
a
= g h 2C, where g is unit weight of soil. The resultant force H
a
=p
a
*h/2
Calculating passive earth pressure
For cohesive soil, friction angle, f = 0, K
a
= K
p
= 1. The earth pressure below excavation,
p
1
= s
p
-s
a
= 2C-(gh-2C) = 4C-gh
Assume the embedded depth is D, the resultant force below bottom of excavation is
HBCDF = p
1
*D
Anchored Sheet Pile Wall Design
http://www.ce-ref.com/Foundation/Sheet_pile/Anchor-Sheet_pile/Anchor_sheet_pile.html[12/09/2014 2:15:03 CH]
Derive equation for D from M
o
= 0
M
o
= H
a1
*y
1
HBCDF* y
3
= 0
Where
y
1
= 2(h-d)/3-(b-d)
y
3
= h-b+D/2
The equation can be determined with a trial and error process.
Determine anchor force T from F
x
= 0
F
x
= Ha1 HBCDF-T = 0
T = H
a1
+ H
a2
HCEF
Design size of sheet pile
Maximum moment locates at a distance y below T where shear stress equals to zero.
T-g K
a
(y+b-d)
2
/2=0
Solve for y, we have, y = -b+d+2*T/(g K
a
)
The maximum moment is
Mmax = T y - g K
a
(y+b-d)
3
/6
The required section modulus is S = M
max
/ F
b
The sheet pile section is selected based on section modulus
Design of tie rod and soldier beam
Design of tie rod and soldier beam is the same as that of anchored sheet pile in cohesionless soil.
Design procedure
1. Calculate free standing height, d = 2C/g
2. Calculate p
a
=g(h-d)
3. Calculate H
a
=p
a
*h/2
4. Calculate p
1
=4C-gh,
5. Assume a value of D, and calculate HBCDF = p
1
*D
6. Calculate R=Ha*y
1
HBCDF* y
3
.
Where
y
1
= 2(h-d)/3-(b-d)
y
3
= h-b+D/2
If R is not close to zero, assume a new D, repeat steps 5 and 6
7. The design length of sheet pile is L=h+D*FS, FS=1.2 to 1.4.
8. Calculate anchored force T = H
a
HBCDF
9. Calculate y = -b+d+2*T/g
10. Calculate M
max
= T y - g (y+b-d)
3
/6
11. Calculate required section modulus S=M
max
/F
b
. Select sheet pile section.
12. Design tie rod
13. Design soldier beam.
Example 4: Design anchored sheet pile in cohesive soil.
Given:
Depth of excavation, h = 15 ft
Unit weight of soil, g = 115 lb/ft
3
Cohesion of soil, C = 500 psf
Internal friction angle, f = 0 degree
Allowable design strength of sheet pile = 32 ksi
Yield strength of soldier beam, Fy = 36 ksi
Location of tie rod at 2 ft below ground surface, spacing =12 ft.
Requirement: Design length of sheet pile and select sheet pile section
Solution:
Design length of sheet pile:
The free standing height, d = 2C/g = 2*500/115 = 8.7 ft
The lateral pressure at bottom of sheet pile, p
a
= g(h-d)=115*(10-8.7)=150 psf
Total active force, H
a
=p
a
*h/2 = 150*10/2 = 750 lb/ft
p
1
=4C-gh = 4*550-115*15 = 275 psf
Assume D = 11.5 ft,
HBCDF = p
1
*D = 3163 lb/ft
y
1
= 2(h-d)/3-(b-d) =2 (15-8.7)/3-(2-8.7) = 10.9 ft
y
3
= h-b+D/2 = 15-2+11.5/2 = 18.75 ft
R=H
a
*y
1
HBCDF* y
3
= 5438*10.9-3163*18.75 = -36 lb Close to zero
The length of sheet pile, L = 15 + 1.2*11.5 = 28.8 ft Use 29 ft
Anchored force per foot of wall, T = H
a
HBCDF = 5438 3163 = 2275 lb/ft
Calculate location of maximum moment,
y = -b+d+2*T/g = -2+8.7+2*2275/115 = 13 ft
Anchored Sheet Pile Wall Design
http://www.ce-ref.com/Foundation/Sheet_pile/Anchor-Sheet_pile/Anchor_sheet_pile.html[12/09/2014 2:15:03 CH]
Home | About | Calendar | Contact | Employees | Employment | FAQ | Information Links | News | Photo Gallery | Press | Products | Promotions | Services | Site Map
Disclaimer: The content of this website was obtained and edited from various resources. The editor made reasonable effort of editing. Nevertheless, the editor does not warrant, and assume no
liability for accuracy and completeness of its content. The viewer shall use his/her professional knowledge and judgment in use of the web content. Webmaster: www.ce-ref.com
Copyright: www.ce-ref.com. All Rights Reserved.
Maximum moment,
Mmax = T y - g (y+b-d)
3
/6 = 2275*13 115*(13+2-8.7)
3
/6 = 24770 lb-ft/ft
Required section modulus of sheet pile, S=M
max
/F
b
= 22.47*12/32 = 8.4 in
3
/ft
Use PDA 27 section modulus 10.7 in
3
/ft
Design tie rod
Cross section of tie rod required, A = T*s/(0.6*F
y
) = 2.275*12/(0.6*36) = 0.91 in
2
.
Diameter of tie rod, d = 4*A/p = 1.08 in
Use 1-1/8 diameter tie rod.
Design soldier beam
Maximum moment in solider beam, Mmax = 0.1*T*s
2
= 0.1*2275*12
2
= 32760 lb-ft
Required section modulus, S=M
max
/F
b
= 32.76*12/(0.6*36) = 13.1 in
3
.
Use W 8x18, section modulus S = 15.2 in
3
.
Topics:
Anchored sheet pile wall in cohesionless soil
Anchored sheet pile wall in cohesive soil

You might also like