Recommendations for construction of

Earthquake Safer Buildings


For RCC Frame Structure buildings up to three stories
(For Buildings with room sizes up to 3.0 x 4.5m)
1. Construction of Foundations
The minimum depth of foundation should be up to 1500 mm.
Foundation should not be laid on flling soil and should goes up to original frm soil.
The thickness at side of sloped footing should be minimum of 200 mm.
If columns are located at property line of neighboring plot either combined footing or strap beams should be
constructed to avoid the eccentricity of foundation.
When the columns are located very close combined footings should be provided. The thickness of footing,
numbers, size and layers of reinforcement bars (single or double layer) depend upon the load in foundations.
Vibrators must be used during concreting works in foundation.
2. Construction of Columns
Columns should be comparatively stronger as all vertical loads of building transfer to the
foundations through columns and as well as they withstand lateral seismic forces generated by
earthquake.
All columns should be in grid in both direction in plan.
The minimum sizes of columns for building up to three stories with room sizes not more
than 4.5 m. x 3.0 m. should be 300 mm x 300 mm or 75 mm more than width of beam.
There should be minimum 4 numbers of 16mm diameter reinforcement bars in
columns located in outer faces of building and minimum 8 numbers of 12 mm diameter
reinforcement bars in columns located at centers.
8mm reinforcement bars should be used for lateral ties. The spacing of ties below the
foundation should be 100 mm c/c up to tie beam. In the superstructure the spacing of ties should be 100 mm c/c up to 600
mm above and below the beam bottom/top and 150 mm spacing in mid height of columns. The length of hooks of ties
should be 75 mm and should be bent in 135 inside the column as shown in fgure no. 2 (d).
The ratio of concrete mix should be preferably M20 (1 cement : 1.5 sand: 3 aggregates) with concrete cover 40 mm (clear
distance from face of column/formwork to the vertical reinforcement).
The formwork should be removed only after 24 hours of concreting. The curing of columns should be carried properly by
putting water on the column surfaces for minimum 7 days. Jute bags can be used to cover the column surfaces during curing to
keep the surfaces wet.
Shear key of size 100 x 100 x 100 mm should be provided at the top surface of the column to avoid cold joint between old
and new concrete and to strengthen the column as shown in the fgure 2 (b).
3. Lapping in Columns
The lapping in columns should be at the mid height of column starting
from 600 mm from top of beam or ending up to 600 mm from bottom of
beam as shown in fgure no.
3 (a).
The reinforcement bars
should not be lapped at one
level i.e. should be lapped in
staggered position aligned
in a vertical line as shown in
fgure no. 3 (b).
The lapping length should
be 60 times the diameter
of reinforcement bars (for
concrete mix 1:2:4). The
spacing of lateral ties should
be 100 mm c/c through out
the length of lapping.
4. Construction of Beams
There should be minimum 2 nos of 16 mm diameter reinforcement bars at
top and bottom of beams.
Extra bars should be provided at support and span as per the length of beams
Extra top bars should be provided up to 1/3 span of beam measured from
the inside face of the columns and extra bottom bars should be provided
at mid span leaving
1/7 length of beam
measured from inside
face of column in
both sides.
The minimum size
of vertical stirrups
should be 8 mm
diameter. The spacing
should be 100 mm
c/c at 1/3 span of
beam at supports
and 150 mm c/c at
remaining mid span
of beam.
Nepal
Government of Nepal
Ministry of Physical Planning and Works
Earthquake Risk Reduction and Recovery Preparedness Programme for Nepal
(UNDP/ ERRRP-Project: NEP/07/010)
Department of Urban Development and Building Construction, Babar Mahal, Kathmandu, Nepal
Tel: (977-1) 4262474 | Fax: (977-1) 4262431 | Email: [email protected]| Website: www.errrp.org.np
1500
150 PCC
Brick Soling
Foundation
Reinforcement bars
Footing Base
Column
min 200
Isolated Footing
Figure no. 1 (a)
Isolated Footing
Strap Beam
Isolated Footing
Strap Beam
Eccentric Footing
Eccentric Footing
Combined Footing
Foundation with Strap Beam Foundation with Strap Beam
Chairs
Figure no. 1 (b) Figure no. 1 (c) Figure no. 1 (d)
beam
min 2 nos lateral ties
l
a
p
p
i
n
g

6
0

t
i
m
e
s

d
i
a
m
e
t
e
r

o
f

b
a
r
la
p
p
in
g

6
0

t
im
e
s

d
ia
m
e
t
e
r

o
f

b
a
r
8

m
m

d
i
a

t
i
e
s

@

1
0
0

c
/
c
600
600
min 2 nos lateral ties
beam
F
i
g
u
r
e

n
o
.

3

(
a
)
F
i
g
u
r
e

n
o
.

3

(
b
)
1/3 length
1/7 length 1/7 length
bottom bars
vertical stirrups
top
bars
Length
stirrups @ 100 c/c stirrups @ 100 c/c stirrups @ 100 c/c
1/3 length 1/3 length
300
135
75
180
Figure no. 4 (a)
Based on Nepal National Building Code
column 300 mm X 300 mm
column
reinforcement
bars
Lateral ties
of column
300
40 cover
300
Figure no. 2 (a)
100x100x100 Shear Key
Figure no. 2 (b)
240
240
75
1
6
5 1
6
5
75
Lateral ties for column
Figure no. 2 (c)
135
Column
Column
Column
Column
Column
Column
Top reinforcement
bars
Bottom
reinforcement
bars