This document outlines the terms and conditions for ordering and purchasing reports and technical documents from Railway Technical Publications. It details pricing structures, methods of payment, delivery and acceptance policies, and intellectual property terms. Customers can order documents by post, email, phone or online shopping cart and can get expert advice from specialists in various railway topics.
This document outlines the terms and conditions for ordering and purchasing reports and technical documents from Railway Technical Publications. It details pricing structures, methods of payment, delivery and acceptance policies, and intellectual property terms. Customers can order documents by post, email, phone or online shopping cart and can get expert advice from specialists in various railway topics.
This document outlines the terms and conditions for ordering and purchasing reports and technical documents from Railway Technical Publications. It details pricing structures, methods of payment, delivery and acceptance policies, and intellectual property terms. Customers can order documents by post, email, phone or online shopping cart and can get expert advice from specialists in various railway topics.
This document outlines the terms and conditions for ordering and purchasing reports and technical documents from Railway Technical Publications. It details pricing structures, methods of payment, delivery and acceptance policies, and intellectual property terms. Customers can order documents by post, email, phone or online shopping cart and can get expert advice from specialists in various railway topics.
The document provides information about publications from Railway Technical Publications including prices, contact details for experts, and instructions for ordering publications.
The document covers prices for publications, contact details for experts in different topics, and instructions for ordering publications.
Contact details are provided for experts in topics like braking systems, freight vehicle technology, satellite and telematics, and vehicle-track interaction.
LIST OF REPORTS & TECHNICAL DOCUMENTS (FORMER ERRI)
This document replaces all previous versions
May 2009
ETF sas au capital de 142 450 - 16 rue Jean Rey F-75015 Paris
2 List of Prices
Price Code EUR A 150 B 200 C 300 D 400 E 600 F 800 G 1 000
ND Not available to third parties
Note:
Publications marked with an asterisk * are publications which were until recently only available to UIC member railways, but are now for sale to third parties. ETF sas au capital de 142 450 - 16 rue Jean Rey F-75015 Paris
3 Providing expert advice
You may find it more convenient to call our specialists directly. Please feel free to contact any of the following:
Topic Expert Tlphone e-mail
Braking systems & Diesel Engines Hans Paukert +33 (1)44 49 21 05 [email protected]
The switchboard is open from Monday to Friday: 10 a.m. - midday / 2 p.m. - 4 p.m. on +33 (0) 1 44 49 21 81/82. Our premises are not open to the public.
ETF sas au capital de 142 450 - 16 rue Jean Rey F-75015 Paris
5
Methods of Payment
Cheque to ETF
Credit Card: please specify the card number, the card holder, the expiry date and the CVV security code (the three-digit code printed on the back of the credit card)
Bank Transfer payable to ETF (All transfer costs to be paid for by the customer):
BNP Paribas Agence Maine Montparnasse 20 boulevard du Vaugirard - 75015 PARIS IBAN : FR76 3000 4002 7400 0106 6070 758 RIB : 58 Code BIC : BNPAFRPPPXV
The prices quoted do not include VAT (5.5%).
Mailing costs
Customs duties and other taxes or fees linked to the importation of goods are not covered by
1 to 2 documen ts 3 to 5 documen ts 5 to 10 documen ts 10 to 15 documents More than 15 documents France 3.50 4.70 8.30 European Union 8.00 12.00 22.90 Standard mail Outside Europe 9.50 16.00 40.00 Service unavailable Service unavailable France 5.80 7.20 8.50 9.20 European Union (Switzerland and Norway)* 12.80 13.60 15.10 16.60 Actual cost Track and confirm standard mail Outside Europe Service unavailable France 14.20 17.50 19.20 21.40 European Union 13.20 26.70 41.05 47.40 Track and confirm express mail Outside Europe 22.50 69.70 58.85 109.45 Actual cost
* Does not include the countries that joined the European Union in 2004, nor Greece.
N.B.: -If the "standard mail" option is chosen, we will not accept claims for non-delivery. -If you do not select a delivery option, your order will automatically be sent by secure (registered) post for countries where this service is available. For all other countries, the order will be sent by regular mail. - You will be charged postage and packing for free publications.
ETF sas au capital de 142 450 - 16 rue Jean Rey F-75015 Paris
6 BON DE COMMANDE / BESTELLSCHEIN / ORDER FORM 1. N_________________________
E mail ................................................... ......................................................................... ..................
Numro de TVA (pour les pays de lUnion Europenne sauf la France) ............................................. Mehrwertsteuer-Nummer (fr die EU-Lnder ausgenommen Frankreich)........................................... VAT number (for EU countries other than France) ..............................................................................
Je dsire commander / Ich mchte bestellen / I would like to order :
Quantit Anzahl Quantity
Ref Titre Titel Title Langue Sprache Language Prix Preis Price
DATE :
SIGNATURE :
ETF sas au capital de 142 450 - 16 rue Jean Rey F-75015 Paris
7
General terms and conditions of sale for reports, leaflets, drawings and other similar documents
1. APPLICATION OF THE GENERAL TERMS AND CONDITIONS OF SALE - ENFORCEABILITY OF THE GENERAL TERMS AND CONDITIONS OF SALE The current general terms and conditions of sale (GTCS) shall be issued to purchasers via the catalogue of reference titles, in paper or electronic form. Consequently the placing of an order shall imply the purchaser's full and unconditional acceptance of these general terms and conditions of sale, notwithstanding any other document. No special condition may prevail over the GTCS unless formally accepted in writing by the vendor.
2. SCOPE OF APPLICATION All our quotations and contracts concerning the sale of reports, drawings, leaflets and any similar documents, are governed by these general terms and conditions. These conditions do not apply to our quotations and contracts regarding the provision of software.
3. MODIFICATION OF ORDER Orders only become final when they have been confirmed in writing or following payment of a pro-forma invoice. If an item is out of stock, the vendor shall process the orders in the order in which they are received and based on availability. Any modification or cancellation of an order requested by the purchaser will only be considered valid if made in writing prior to the dispatch of the products. If the vendor does not accept the modification or cancellation, any down payment made shall be refunded in goods value only.
4. PRICE All our prices exclude VAT. The prices given on a price list shall remain valid until the day the said list is replaced by a more recent price list. The prices detailed in a quotation shall remain valid for a period of 30 days following dissemination of the quotation.
5. CONDITIONS OF PAYMENT Unless payment is made prior to dispatch via a pro-forma invoice, payment shall be due upon receipt of the invoice. In the event of late payment, the vendor may suspend any ongoing order, without prejudice to any other course of action. In the event of non payment within forty-eight hours of the delivery of a formal notice to which no response has been given, the sale shall be automatically rescinded. The vendor shall then be entitled to request, by way of an injunction, the return of the goods, without prejudice to any other possible damages. The ruling shall apply not only to the order at issue, but also to any previously unpaid orders, whether already delivered or in the course of being delivered, and whether or not the payment thereof has fallen due. In the event of late payment or non payment, the customer shall be liable for all recovery costs. All claims pertaining to invoices must be submitted in writing no later than ten (10) days after the corresponding invoices were sent. Once this period has expired, invoices will be considered as having been accepted.
6. DELIVERY AND ACCEPTANCE Deliveries are only carried out according to availability and in the order in which the orders are received. The vendor is authorised to make partial or complete deliveries. Deliveries past pre-set deadlines shall not constitute grounds for damages, interest or cancellation of the ongoing orders. However, if the product has not been delivered 2 months following the stated delivery date for any reason other than events of force majeure, the sale may then be rescinded at the request of either of the parties. Events of force majeure shall release the vendor from his supply obligations. If the nature or quantity of the delivered products are different to the description of the products ordered, the customer must send any complaints to the vendor within a period of seven (7) days following the day of delivery. If the vendor agrees to have the goods returned, the customer must return the products at issue, at his own expense, accompanied by the invoice. A credit note will be issued to the customer for any goods accepted for return. Once the afore-mentioned seven day period has expired, the documents supplied shall be considered as having been accepted.
7. RETENTION OF TITLE Ownership of products sold will only be transferred to the customer once payment in full has been received.
8. INTELLECTUAL PROPERTY AND USAGE RIGHTS The intellectual property of reports, drawings, leaflets and any similar documents shall belong to UIC. The customer shall only be authorised to use the contents of the documents concerned for his own needs and/or for those defined in the special conditions. The customer may in no event transfer, disclose in any form, or communicate to third parties a document it has purchased. The customer may not make any changes to documents sold to him, nor translate them into other languages, nor transpose them in any specific form, without the prior written authorisation of the vendor.
9. DISPUTES This contract is governed by French law. In the event of disputes over the interpretation or fulfilment of the present contract and where the parties are unable to come to an agreement in a conciliation process, the dispute shall be referred to the Paris courts of law which shall have exclusive jurisdiction. 10. LANGUAGE The general terms and conditions of sale are drawn up in French, English and German. In the event of differences in meaning between these versions, the French text shall be the authentic one.
ELECTRIC TRACTION - SIGNALLING AND TELECOMMUNICATIONS - PROCESSING AND TRANSMISSION OF DATA
A 1A CALCULATION OF CATENARY MASTS AND FOUNDATIONS A 1B SECTION INSULATORS FOR OVERHEAD EQUIPMENT'S A 2 PANTOGRAPH PANS AND CONTACT STRIP MATERIALS A 3 BEHAVIOUR OF THE PANTOGRAPHS AND THE OVERHEAD EQUIPMENT AT HIGH SPEEDS A 4 SHUNTING SENSITIVITY OF TRACK CIRCUITS A 5 INSULATED JOINTS FOR TRACK CIRCUITS A 25 SAFETY DEVICES FOR TRACK LAID ON CONCRETE OR STEEL SLEEPERS A 31 STUDY OF SIGNALLING RELAYS WITH A VIEW TO OBTAINING THE LONGEST LIFE IN SERVICE HAVING REGARD TO THEIR PHYSICAL DIMENSION A 38 DISTURBANCE CAUSED IN THE SUPPLY AND DISTRIBUTION NETWORK BY ELECTRIC TRACTION SYSTEMS A 46 TRANSMISSION OF INFORMATION BETWEEN RAIL AND MOTIVE POWER UNITS A 50 PROTECTION OF INSTALLATIONS AND ELECTRIC MOTIVE POWER UNITS AGAINST THE EFFECTS OF OVER-VOLTAGE A 59 INFLUENCE OF GLAZED FROST AND HOAR FROST ON THE INSTALLATIONS AND ELECTRIC MOTIVE POWER UNITS A 69 WEAR OF CONTACT STRIPS AND OF THE OVERHEAD EQUIPMENT WHEN USING METALLIC OR COMPOSITE CONTACT STRIPS A 73 APPROACH TIME EQUALISER FOR FLASHING LIGHT INSTALLATIONS FOR LEVEL CROSSINGS A 76 DATA TRANSMISSION BY MEANS OF RAILWAY TELEPHONE CIRCUITS AT SPEEDS EXCEEDING 600 BAUDS A 78 THE USE OF MICROWAVE FOR TRAIN CONTROL CIRCUITS A 84 BEHAVIOUR OF PANTOGRAPHS AND THE OVERHEAD EQUIPMENT AT SPEEDS HIGHER THAN 160 KM/H A 89 NEW FORMS OF ENERGY CONVERSION A 97 IDENTIFICATION OF WAGON NUMBERS A 99 WARNING DEVICES USING RADIO A 103 TRANSMISSION OF INFORMATION THROUGH THE TRAINLINE A 110 DEVELOPMENT OF A DEVICE FOR THE DETECTION OF WHEEL-FLATS OF A CERTAIN SIZE A 118 USE OF ELECTRONIC COMPONENTS IN SIGNALLING A 122 APPLICATION OF THYRISTORS IN RAILWAY TECHNOLOGY: CONSEQUENCES AND REMEDIES A 124 AUTOMATIC WARNING OF TRACK MAINTENANCE GANGS A 129 HIGH POWER TRACTION CURRENT COLLECTION AT HIGH SPEEDS A 133 PROPAGATION OF RADIO WAVES A 145 TRANSMISSION OF DATA TO 9600 BITS/S A 155 USE OF ELECTRONICS IN RAILWAY SIGNALLING A 157 INTERFERENCE IN RAILWAY RADIO COMMUNICATIONS A 158 INDIVIDUAL WARNING SYSTEMS FOR PERSONNEL WORKING ON THE TRACK A 159 RAILWAY APPLICATION OF OPTICAL FIBRE COMMUNICATIONS A 168 RAILWAY ENERGY PROBLEMS A 171 CALCULATION METHODS FOR DETERMINING INTERFERENCE WITH LIGHT CURRENT INSTALLATIONS A 174 TRAIN DETECTION A 175 RAILWAY RADIO PROPAGATION, INCLUDING ASPECTS OF TRANSMISSION OF SAFETY INFORMATION A 186 PANTOGRAPH/OVERHEAD LINE INTERACTION A 188 AUTOMATIC VEHICLE IDENTIFICATION A 200 PAN-EUROPEAN TRAIN CONTROL SYSTEM A 201 HARMONISATION OF FUNCTIONAL CONDITIONS OF SIGNALLING SYSTEMS A 211 SYSTEM FOR THE DETECTION OF IRREGULARITIES ON RUNNING TRAINS
8 SEMINARS RESEARCH PROGRAMS VIENNA ARSENAL
AZ 12.03/1 VISIT OF THE UIC/ORE DELEGATION OF THE JOINT 45C SUBCOMMITTEE ON THE OCCASION OF THE VISIT TO THE "INTERNATIONAL INTERMODAL EXPO 90" IN ATLANTA USA AZ 12.03/2 FUNCTIONING, MAINTENANCE AND ECONOMIC ASPECTS OF BRAKING SYSTEMS FOR FREIGHT TRAINS IN THE 21ST CENTURY AZ 30 VIENNA-ARSENAL VEHICLE TESTING STATION AZ 32 ELECTRONICS TEST STATION (VIENNA-ARSENAL) AZ 40 - 49 SEMINARS AZ 60 RESEARCH PROGRAMME
9 ROLLING STOCK BRAKES DIESEL ENGINES RUNNING GEAR
B 7 STRENGTH OF BODIES OF PASSENGER COACHES B 10 CONSTRUCTIONAL ARRANGEMENTS FOR IMPROVING THE RIDING STABILITY AND THE GUIDING QUALITY OF ELECTRIC AND DIESEL LOCOMOTIVES AND VEHICLES B 12 WAGONS B 13 ACCEPTANCE TESTING AND MAINTENANCE OF DIESEL ENGINES B 24 METHODS USED FOR THE MEASUREMENT OF STRESSES IN THE ROTATING AXLES OF RAILWAY VEHICLES B 28 MEASURING EQUIPMENT USED FOR THE STUDY OF COMFORT IN CARRIAGES B 30 CARRIAGE AND RAILCAR HEATING B 36 ELASTIC SYSTEMS FOR TRACTION AND SHOCK GEAR (SIDE BUFFERS AND CENTREBUFFERS) B 36.1 MATHEMATICAL MODELS FOR SIMULATING WAGON IMPACTS B 37 INVESTIGATION TO DETERMINE THE DEFINITIVE SUSPENSION SYSTEM FOR OPEN WAGONS B 44 ADHESION OF LOCOMOTIVES FROM THE POINT OF VIEW OF THEIR CONSTRUCTION AND OPERATION B 47 SHOCK RECORDERS B 49 CHARACTERISTICS OF THE ACOUSTIC SIGNALS USED BY MOTIVE POWER UNITS IN INTERNATIONAL SERVICE B 51 BUFFING AND DRAWGEAR B 51.1 ACCEPTANCE TESTS WITH THE AUTOMATIC DRAW-ONLY COUPLER B 52 TESTS ON THE TRACK ON THE RIDING STABILITY AND THE GUIDING QUALITY OF VEHICLES BY MEANS OF A SPECIAL VEHICLE B 55 PREVENTION OF DERAILMENT OF GOODS WAGONS ON DISTORTED TRACKS B 56 IMPROVEMENT OF THE RIDING STABILITY OF EXISTING RIV WAGONS REQUIRED TO RUN, UNDER ANY LOADING CONDITIONS, AT SPEEDS OF 80 KM/H B 57 OMISSION OF BAFFLE-PLATES FROM CISTERN WAGONS B 61 STUDY OF A VIBRATION TABLE FOR TESTING PACKING MATERIALS TO BE USED IN THE TRANSPORT OF GOODS IN RAILWAY WAGONS B 62 REDUCTION OF THE FILLING TIME OF THE BRAKE CYLINDER IN THE "GOODS" POSITION B 63 DETONATOR OF OPTIMUM AUDIBILITY AND SAFETY B 64 COMPOSITION BRAKE-BLOCKS B 67 FILTRATION OF THE COMBUSTION AIR AND THE COOLING AIR OF MOTIVE POWER UNITS B 68 USE OF SYNTHETIC MATERIALS AND GLUED CONNECTIONS FOR THE STRESSED PARTS OF LIGHT WEIGHT ROLLING STOCK B 77 HEAT TRANSMISSION PHENOMENA IN REFRIGERATOR WAGONS B 79 MAINTENANCE OF THE WHEELSETS OF TRAILER STOCK B 83 ELECTROPNEUMATIC BRAKE B 85 APPLICATION OF THE AUTOMATIC COUPLER TO CARRIAGES B 93 OPTIMUM RELATIONSHIP BETWEEN WHEELBASE AND LENGTH OF TWO-AXLED GOODS WAGONS EQUIPPED WITH AUTOMATIC TRACTION AND SHOCK COUPLER B 94 USE OF LIQUID GAS COOLING FOR REFRIGERATOR VANS B 95 ROLLER BEARING AXLEBOXES AND AXLES B 96 TRANSMISSION OF VIBRATIONS BY SUSPENSION ELEMENTS AND CONNECTION COMPONENTS WITH THE VEHICLE BODY B 98 GENERAL PROBLEMS CONNECTED WITH WHEELS AND THEIR ASSEMBLY: SOLID CAST-STEEL WHEELS, WHEELS OF DIFFERENT DIAMETER AND SHAPE B 100 WINTER-RESISTANT MOTIVE POWER UNITS B 104 NOISE ABATEMENT ON DIESEL LOCOMOTIVES B 106 COACHES B 106.1 STANDARDISATION OF COACH WHEELSETS B 106.3 PRESSURE-TIGHTNESS AND STRESSES B 106.4 IMPROVEMENT OF PASSENGER SAFETY IN THE EVENT OF COLLISION DEVELOPMENT OF METHODS FOR THE INTERIOR FITTING-OUT OF COACHES B 107 UNIFICATION OF AIR-CONDITIONING AND HEATING INSTALLATIONS B 108 UNIFICATION OF AIR-CONDITIONING AND ELECTRICAL EQUIPMENT IN COACHES B 108.2 ENERGY SUPPLY FOR COACHES FROM DIESEL LOCOMOTIVES B 108.3 TRANSMISSION OF INFORMATION IN THE TRAIN BY A CENTRAL DATA LINE B 109 UNLOADING OF SELF-DISCHARGING WAGONS IN WINTER CONDITIONS B 112 STANDARDISATION OF TRANSCONTAINERS AND TRANSCONTAINER WAGONS B 114 STUDY OF A PLASMA TORCH FOR IMPROVING ADHESION B 125 RUNNING SAFETY OF VEHICLES FITTED WITH THE AUTOMATIC COUPLER B 126 BRAKING PROBLEMS B 126.2 ASSESSMENT OF BRAKES FOR INDIVIDUAL WAGONS AND GROUPS OF WAGONS B 127 DISTRIBUTION OF THE TEMPERATURE IN ICE COOLED OR MECHANICALLY REFRIGERATED VEHICLES B 131 INFLUENCE OF THE TRANSVERSE PLAY OF THE SUSPENSION SYSTEM ON THE RIDING QUALITY OF 2-AXLED WAGONS B 132 PROGRAMME OF TESTS ON THE BRAKE RIG B 134 MODERN SUSPENSION SYSTEM FOR TWO-AXLED WAGONS B 136 WHEELSETS WITH ASSEMBLED AXLEBOXES: DESIGN, MAINTENANCE AND STANDARDISATION B 140 NON-POLLUTING SANITARY INSTALLATIONS B 142 CONDITIONS WHICH SHOULD BE COMPLIED WITH BY WAGON COMPONENTS FOR 22 T AXLE-LOAD B 146 STANDARDISATION OF THE MATERIAL FOR CAST- IRON BRAKE BLOCKS B 153 APPLICATION OF THE ISO 2631 STANDARD TO RAILWAY VEHICLES B 164 ADHESION DURING BRAKING, AND ANTI-SKID DEVICES B 165 DYNAMIC RESISTANCE OF DRIVERS' CABS TO FRONTAL IMPACTS B 166 FAULT DIAGNOSTICS FOR AND ON TRAINS B 169 STANDARDISATION OF WHEELSETS B 169.4 ANALYSIS OF INTERNATIONAL REPORTS ON BLOCK-BRAKED MONOBLOC WHEELS B 169.5 INCREASING AXLE LOADS BEYOND 22.5 T FOR WHEELS WITH A DIAMETER OF 920 MM B 176 BOGIES WITH STEERED OR STEERING WHEELSETS B 177 PROBLEMS CONNECTED WITH THE BRAKING AND DYNAMICS OF GOODS TRAINS UP TO 700 M LONG, OPERATED USING THE P-BRAKE POSITION B 177.1 RISK OF DERAILMENT DUE TO HIGH LONGITUDINAL COMPRESSIVE FORCES IN GOODS TRAINS UP TO 700 M LONG, OPERATED USING THE P-BRAKE POSITION
10 ROLLING STOCK BRAKES DIESEL ENGINES RUNNING GEAR
B 177.4 COMPUTER PROGRAM RELATING TO THE LONGITUDINAL DYNAMICS OF TRAINS B 177.5 DERAILMENT RISK FROM HIGH LONGITUDINAL COMPRESSIVE FORCES FOR FREIGHT TRAINS WITH SCREW COUPLINGS AND WITH AUTOMATIC DRAW-ONLY COUPLERS B 180 SYSTEM FOR OVERRIDING THE EMERGENCY BRAKE B 203 TRANSMISSION OF INFORMATION IN THE TRAIN BY A CENTRAL DATA LINE B 205.1 ANALYSIS OF COLLISION ACCIDENTS B 207 EFFECTS OF VIBRATIONS ON PASSENGERS AND DRIVERS. APPLICATIONS OF THE ISO AND CEN STANDARDS CONCERNED B 208P DIESEL ENGINES
11 INTERACTION OF VEHICLE AND TRACK AERODYNAMICS - ENVIRONMENTAL QUESTIONS
C 9 PROBLEMS OF INTERACTION OF VEHICLES AND TRACK C 15 EFFECT OF A REDUCTION IN THE PLAY OF THE AXLES IN THE TRACK, ON THE RIDING STABILITY OF VEHICLES C 19 METHODS FOR REDUCING WEAR OF RAILS AND TIRES C 53 BEHAVIOUR OF THE METAL OF RAILS AND WHEELS IN THE CONTACT ZONE C 70 MUTUALLY PERMISSIBLE WEAR PROFILES OF WHEEL TYRES AND POINTS OF CROSSINGS C 102 TESTS CONCERNING THE PROBLEMS INVOLVED WITH THE KINEMATIC GAUGE C 113 PERMISSIBLE MASSES PER AXLE FOR TRAILER VEHICLES AS A FUNCTION OF THE WHEEL DIAMETER AND SPEED C 116 INTERACTION BETWEEN VEHICLES AND TRACK C 135 NEW TECHNOLOGIES FOR TRACKED GROUND TRANSPORT C 137 RAILWAY NOISE C 138 PERMISSIBLE LIMIT VALUES FOR THE Y AND Q FORCES AND DERAILMENT CRITERIA C 143 ENVIRONMENTAL POLLUTION BY THE RAILWAYS C 149 PROBLEMS ARISING FROM THE RUNNING OF HIGH SPEED TRAINS IN TUNNELS C 152 QUANTITATIVE EVALUATION OF GEOMETRIC TRACK PARAMETERS DETERMINING VEHICLE BEHAVIOUR C 163 RAILWAY NOISE C 167 TRAINS RUNNING AT HIGH SPEED IN TUNNELS C 172 IMPROVED CURVE NEGOTIATION C 178 STANDARDISATION OF THE METHODS FOR THE DETERMINATION OF THE LIFE OF DYNAMICALLY LOADED COMPONENTS C 179 RAILWAY AERODYNAMICS C 204 IMPROVEMENT OF THE PROTECTION AGAINST FIRE OF PASSENGER ROLLING STOCK C 204.1 IMPROVEMENT OF THE FIRE PROTECTION OF PASSENGER ROLLING STOCK C 206.2 EFFECTS OF AERODYNAMIC PHENOMENA ON WAGONS AND THEIR LOADS C 209 TEST AND APPROVAL OF RAILWAY VEHICLES FROM THE POINTS OF VIEW OF DYNAMIC BEHAVIOUR, SAFETY, TRACK FATIGUE AND RIDE QUALITY C 210 DEVELOPMENT OF METHODS TO DESCRIBE GEOMETRIC TRACK QUALITY, WITH THE AIM OF ANALYSING DYNAMIC VEHICLE BEHAVIOUR C 218 PRESSURE VARIATIONS IN TUNNELS C 223.1 THE MANAGEMENT OF PRESSURE VARIATIONS INSIDE COACHES C 224 BASNOISE C 926 RENVIB II, PHASE 1 C 926.2 RENVIB II, PHASE 2
12 PERMANENT WAY AND STRUCTURES
D 22 TECHNICAL AND ECONOMICAL STUDY OF TESTED TYPES OF CONCRETE SLEEPERS D 23 DETERMINATION OF DYNAMIC FORCES IN BRIDGES D 27 DETERMINATION OF THE MOST ECONOMIC WEIGHT OF RAILS D 32 DETERMINATION OF PRINCIPLES TO BE APPLIED FOR THE FISHPLATES OF UIC-RAILS D 40 PROBLEM OF THE WEEDING OF TRACKS D 45 QUALITY OF RAILS AND MEANS OF GUARANTEEING IT D 60 APPLICATION OF RUBBER FOR BRIDGE SUPPORTING PLATES D 71 STRESSES IN THE RAILS, THE BALLAST AND IN THE FORMATION RESULTING FROM TRAFFIC LOADS D 72 GUIDING PRINCIPLES FOR THE DESIGN OF POINTS & CROSSINGS (UIC 54 AND UIC 60 RAIL PROFILES) D 74 CONTINUOUS MEASUREMENT AND CONTROL OF THE SPEED OF WAGONS SHUNTED OVER HUMPS D 81 SPECIAL RAIL PROFILE FOR TUNNELS D 86 BENDING TESTS OF STRUCTURES CONSISTING OF TWO BEAMS WELDED AT RIGHT ANGLES D 87 UNCONVENTIONAL TRACKS D 88 STUDY OF RAIL FAULTS IN THE TRACK D 90 PROBLEMS OF HIGH STRENGTH BOLTED CONNECTIONS IN STEEL CONSTRUCTION D 91 STUDY OF A LIGHTER BRAKE SLIPPER D 101 BRAKING AND ACCELERATION FORCES ON BRIDGES AND INTERACTION BETWEEN TRACK AND STRUCTURES D 105 NOISE ABATEMENT ON BRIDGES D 115 DISTRIBUTION OF AXLE LOADS ON BALLASTED SLAB BRIDGES D 117 OPTIMUM ADAPTATION OF THE CONVENTIONAL TRACK TO FUTURE TRAFFIC D 120 DEVELOPMENT OF HEAVY RAIL-PROFILES D 121 UNIFICATION OF THE GEOMETRY OF POINTS AND CROSSINGS WITH RAILS OF 60 KG/M PERMITTING HIGH SPEEDS ON THE DIVERGING TRACK D 123 INVESTIGATION OF BRIDGE DECKS WITH CONCRETE ENCASED GIRDERS D 128 STATISTICAL DISTRIBUTION OF AXLE LOADS AND STRESSES IN RAILWAY BRIDGES D 130 FATIGUE PHENOMENA IN WELDED CONNECTIONS OF BRIDGES AND CRANES D 141 EFFECT ON THE TRACK OF RAISING THE AXLE LOAD FROM 20 TO 22 T D 144 UPDATING OF TECHNICAL SPECIFICATIONS FOR THE SUPPLY OF RAILS D 147 ADAPTATION OF MARSHALLING YARDS FOR TAKING WAGONS WITH WHEELBASE OF MORE THAN 14 M D 148 MEANS FOR IMPROVING RAILS D 150 DEVELOPMENT OF APPARATUS FOR MEASURING THE LONGITUDINAL FORCES IN RAILS LAID IN THE TRACK D 154 STRESSES AND STRENGTH OF LONGITUDINAL GIRDERS AND CROSS GIRDERS OF BRIDGES D 154.1 STRESSES AND STRENGTH OF ORTHOTROPIC DECKS D 156 POSSIBILITIES OF IMPROVING THE SERVICE CHARACTERISTICS OF RAILS BY METAL-LURGICAL MEANS D 160 PERMISSIBLE DEFLECTION OF BRIDGES D 161 DYNAMIC VEHICLE/TRACK INTERACTION PHENOMENA, FROM THE POINT OF VIEW OF TRACK MAINTENANCE D 161.1 DYNAMIC EFFECTS OF 22.5 T AXLE LOADS ON THE TRACK D 170 TRACK COMPONENT DIMENSIONS.STANDARDIZATION OF CHARACTERISTICS AND ACCEPTANCE TESTS D 173 ROLLING CONTACT FATIGUE D 181 LATERAL FORCES ON RAILWAY BRIDGES D 182 UNIFIED ASSESSMENT CRITERIA FOR BALLAST QUALITY AND METHODS FOR ASSESSING THE BALLAST CONDITION IN THE TRACK D 183 STRESSES AND STRENGTH OF REINFORCED AND PRESTRESSED CONCRETE DECKS ON RAILWAY BRIDGES D 184 IMPROVED DURABILITY OF SWITCHES AND CROSSINGS SUBJECTED TO INCREASED SPEEDS AND AXLE LOADS D 185 REDUCTION IN CORRUGATION OF RAILS D 187 DECISION SUPPORT SYSTEM FOR PERMANENT WAY MAINTENANCE AND RENEWAL D 189 LOADING DUE TO DYNAMIC PRESSURE AND SUCTION FROM RAILWAY TRAFFIC D 190 PERMISSIBLE DEFLECTION OF STEEL AND COMPOSITE BRIDGES FOR VELOCITIES V > 160 KM/H D 191 FATIGUE LIFE OF AN ORTHOTROPIC DECK WITH OPEN RIBS OF ROLLED STEEL D 192 LOADING DIAGRAM TO BE TAKEN INTO CONSIDERATION FOR THE CALCULATION OF RAIL- CARRYING STRUCTURES ON LINES USED BY INTERNATIONAL SERVICES D 202 IMPROVED KNOWLEDGE OF FORCES IN CWR TRACK (INCLUDING SWITCHES) D 214 RAIL BRIDGES FOR SPEEDS > 200 KM/H D 214.2 USE OF UNIVERSAL TRAINS FOR THE DYNAMIC DESIGN OF RAILWAY BRIDGES D 216 FATIGUE IN CONCRETE RAILWAY BRIDGES D 221 THEORETICAL DETERMINATION OF PARTIAL AND COMBINATION FORCES D 229 RAIL DEFECT MANAGEMENT D 230.1 BRIDGE ENDS D 251 SWITCHES AND CROSSINGS MANAGEMENT SYSTEM: ECOSWITCH
13 MATERIALS AND OTHER RELATED QUESTIONS
E 17 PROTECTION OF MATERIALS E 18A PROBLEMS CONCERNING THE QUALITY OF LUBRICANTS: BEARING LUBRICANTS E 18B PROBLEMS CONCERNING THE QUALITY OF LUBRICANTS: SUPERHEATED STEAM CYLINDER OILS E 18C OILS FOR INTERNAL COMBUSTION ENGINES E 18D GREASES FOR ROLLER BEARINGS E 18E GREASES FOR BRAKE COMPONENTS E 29 MODERN NON-DESTRUCTIVE METHODS FOR MATERIALS TESTING E 34 PROCEDURES FOR THE RECONSTITUTION OF WORN COMPONENTS E 39 METHODS OF CHECKING RESISTANCE TO CORROSION OF COPPER BEARING STEEL PLATE FOR GOODS WAGONS AND BASES FOR A SPECIFICATION FOR THIS TYPE OF STEEL E 54 SYNTHETIC INSULATING MATERIALS ON OVERHEAD EQUIPMENT E 58 SHEETS FOR THE PROTECTION OF LOADS E 82 NOISE ABATEMENT E 119 CRITERIA FOR ASSESSING THE EFFICIENCY AND THE AGGRESSIVENESS OF CLEANING PRODUCTS E 139 NON-DESTRUCTIVE EXAMINATION PROCEDURES E 162 NON-DESTRUCTIVE TESTING OF RAILWAY ITEMS IN SERVICE EU 921 SILENT FREIGHT PROJECT EU 922 SILENT TRACK PROJECT EU 950 COST, RELIABILITY, MAINTENANCE AND AVAILABILITY (CRMA) EU 953 FUEL CELL LOCOMOTIVE
14 SPECIAL
S 1001 PROBLEMS RAISED BY THE APPLICATION OF THE AUTOMATIC COUPLER TO LOCOMOTIVES S 1002 STANDARDISATION OF WHEEL PROFILE S 1003 CONSTRUCTIONAL MODIFICATION OF BUFFER STOPS FOR USE WITH THE AUTOMATIC COUPLER S 1004 MAXIMUM SPEED ATTAINABLE ON WHEEL/RAIL SYSTEMS S 1005 SIMPLIFIED VARIANTS OF THE LINEAR TRAIN CONTROL SYSTEM S 1010 AUTOMATIC VEHICLE IDENTIFICATION S 1012 MUTUAL RAIL/WHEEL WEAR AND CORRUGATORY WEAR S 1015 P ACCEPTANCE TESTING OF DIESEL ENGINES S 1017 FIBRE COMMUNICATIONS SYSTEMS S 1019 TRANSMISSION OF SAFETY INFORMATION S 1028 ELECTRIC ENERGY FOR TRACTION PURPOSES S 1035 CURRENT COLLECTION AT HIGH SPEED S 1037 BODY TILT COACHES S 1071 PRINCIPLES FOR SECURING BOLTED JOINTS S 1079 DETECTION SYSTEMS FOR LOCATING IRREGULARITIES ON RUNNING TRAINS S 1081 THE BEHAVIOUR OF WAGONS LOADS AT HIGHER SPEEDS
15 Project A 1a Price Code Title Approved CALCULATION OF CATENARY MASTS AND FOUNDATIONS Document B conclusions and practical applications RP 1 01/02/1957 Foundations, results of tests, mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 16 of 330 Project A 1b Price Code Title Approved SECTION INSULATORS FOR OVERHEAD EQUIPMENTS Document B CR 1 * 01/08/1954 Progress Report No. 1 B CR 2 * 01/03/1955 Supplementary Enquiry Report B RP 3 01/06/1960 Final Report mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 17 of 330 Project A 2 Price Code Title Approved PANTOGRAPH PANS AND CONTACT STRIP MATERIALS Document B measurements of wear; summary of the first test results CR 1 * 01/01/1956 Description of the test apparatus for mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 18 of 330 Project A 3 Price Code Title Approved BEHAVIOUR OF THE PANTOGRAPHS AND THE OVERHEAD EQUIPMENT AT HIGH SPEEDS Document B Tolerances RP 9 01/04/1963 Definition of Rail Head Profiles and B contact system and pantograph terms" DT 14 01/12/1969 Trilingual glossary of "Overhead mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 19 of 330 Project A 4 Price Code Title Approved SHUNTING SENSITIVITY OF TRACK CIRCUITS Document C RF 0 * 01/03/1962 Final Report B the electric insulation of an oxide layer on rails RP 1 01/07/1957 Interim report on tests carried out on C by sanding in the functioning of track- circuits RP 2 * 01/11/1957 Means of obviating difficulties caused B railcar track circuit with new supply methods RP 3 01/03/1958 Establishing of a contact piece for B contact in the case of oxidized track RP 4 01/11/1958 Study of the stationary rail/wheel B contact between two solid bodies having oxidised surfaces RP 5 01/11/1960 Scientific principles of electrical B soiled or oxidised running treads of wheels on the functioning of track circuits RP 6 01/11/1960 Influence exerted by sanded rails and B rolling wheel in the case of oxidised surfaces. Impedance of wheel-sets as a function of the frequency RP 7 01/03/1962 Electrical contact between rail and mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 20 of 330 Project A 5 Price Code Title Approved INSULATED JOINTS FOR TRACK CIRCUITS Document B principles of insulated joints. Results of the tests carried out in the track and the laboratory. Recommandations (Final Report) RF 0 01/10/1961 Functional analysis and construction B principles of insulated joints. Results of the tests carried out in the track and the laboratory RP 1 * 01/11/1958 Functional analysis and construction mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 21 of 330 Project B 7 Price Code Title Approved STRENGTH OF BODIES OF PASSENGER COACHES Document B carried out on passenger coach bodies intended for international and main line traffic RP 1 01/03/1958 Results of static and dynamic tests ND RP 2 01/11/1958 Report on the accidents D construction of passenger coach bodies intended for international and main line traffic RP 3 * 01/11/1960 Technical recommendation for the B general theory of redundant frames and the method of "finite elements" for the calculation of passenger coach bodies. Examination of results and costs (Final report) RP 8 01/10/1973 Description of the method using the mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 22 of 330 Project C 9 Price Code Title Approved PROBLEMS OF INTERACTION OF VEHICLES AND TRACK Document B CR 0 * 01/05/1953 Preliminary report B ment used for the purpose of deter- mining the riding stability of vehicles RP 1 01/06/1957 Demands to be made on measuring equip- B solution of the problem of hunting Part 2: Essays awarded prizes RP 2 01/11/1957 Part 1: Report on the competition for a B tyres by lubrication (State of develop- ment 1959) RP 3 * 01/04/1961 Methods of reducing wear of rails and B permanent way in relation to the state of the track and the riding of vehicles RP 4 * 01/04/1961 Permitted service tolerances of the B during 1961 to assess the clearance gauge allowing for rolling movements of the vehicles RP 5 01/10/1962 Measurements made with rail vehicles B tyres RP 6 * 01/10/1962 Worn profils of rail heads and wheel B obtuse crossings and diamond crossings with slips RP 7 * 01/10/1965 Performance of small wheels negotiating B tiques stochastiques des dviations des files de rails, en vue de l'tude du mouvement de lacet, par M. l'Ing. H.G. Stassen et M. le Dr P. van Bommel Exists only in French DT 7 01/03/1966 Dtermination de quelques caractris- B when traversing a 1 in 9 crossing on a curve of R = 450 m RP 8 01/06/1967 Performance of small diameter wheels B mouvement de lacet d'un vhicule ferroviaire Partie I: Vhicule deux essieux sans roulis, par M. le Dr Ir. P. van Bommel Exists only in French DT 12 01/11/1968 Considrations linaires concernant le B movement Part II: Two-axled vehicle, by Dr. Ir. P. van Bommel DT 17 01/11/1969 Linear considerations of the hunting B cule bogie, par M. Boutefoy Exists only in French DT 20 * 01/01/1971 Etude du mouvement de lacet d'un vhi- mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 23 of 330 Project B 10 GUIDING QUALITY OF ELECTRIC AND DIESEL LOCOMOTIVES AND VEHICLES Price Code Title Approved CONSTRUCTIONAL ARRANGEMENTS FOR IMPROVING THE RIDING STABILITY AND THE Document B CR 1 01/02/1955 Progress Report No. 1 B 1141.04 of the Austrian Federal Rail- ways (BB) RP 1 01/11/1957 Report on tests made on the locomotive B and 1956 by the SNCF RP 2 01/02/1959 Report on the tests carried out in 1954 B the locomotives 040 DE 12 of the SNCF and No. 0621 of the Westphalian Provincial Railway RP 3 01/10/1959 Results of the measurements made with B for determining the forces exerted by the wheels of a motive power unit on the rails in a curve of 300 m radius (Giornico 1957) RP 4 * 01/11/1960 Comparison of three measuring methods B the rails by various types of motive power units (measured in a curve of 300 m radius at Giornico) RP 5 * 01/11/1960 Measurements of the forces exerted on B (measuring rail of the CFF and measuring wheel-set of the SJ) for determining the forces exerted by the wheels of a vehicle on the rails RP 6 01/11/1960 Comparison of two measuring methods B locomotives E 424.065 and E 646.014 of the Italian State Railways (FS) RP 7 * 01/07/1961 Results of the measurements made on the B motives E 424.065 and 646.014 of the Italian State Railways (FS) RP 8 * 01/10/1962 Measurements relating to the loco- B the electric Co'Co' locomotive No. 1010.01 of the Austrian Railways (BB) RP 9 * 01/06/1964 Investigation of riding stability of B formation and wear in rails RP 10 01/10/1964 Energy studies concerning crack B measuring on the track and on wheels the lateral forces (Y) and vertical (Q) caused by rolling stock travelling round a curve at Vallorbe, 1962 RP 11 01/10/1964 A comparison of the methods of B techniques, Criteria RP 12 01/04/1969 Riding stability - Test and evaluation B hardened test rails (2nd Interim Report) RP 13 01/04/1973 Track tests on naturally-hard and head- mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 24 of 330 Project B 10 GUIDING QUALITY OF ELECTRIC AND DIESEL LOCOMOTIVES AND VEHICLES Price Code Title Approved CONSTRUCTIONAL ARRANGEMENTS FOR IMPROVING THE RIDING STABILITY AND THE Document B between wheel and rail RP 14 01/10/1973 Measurement of the forces acting B design recommandations (Final report) RP 15 01/10/1974 Summary of test results and vehicle mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 25 of 330 Project B 12 Price Code Title Approved WAGONS Document B standardisation of wagons and descrip- tion of standard of established classical design RP 1 01/04/1956 First report on the work of B for the design competition for the "Wagon of the future" Volume I: Results of the competition and conclusions Volume II: Memorandum on the work and technical discussions of the Jury for the Design Competition for the wagon of the future and Appendices RP 2 * 01/04/1956 Report on the activities of the jury B carried out on the prototype wagons RP 3 01/07/1959 Results of the static and dynamic tests B carried out on the prototype vans RP 5 01/07/1961 Results on the static and dynamic tests B unloading device. Proposed standard type RP 6 * 01/07/1962 Self-discharging wagon with gravity B on the prototype of vans RP 7 01/10/1962 Static and dynamic tests carried out B through roofs and walls of the type 1 covered vans RP 10 01/10/1964 Determinination of heat transfer B of oak or pine floors for wagons in current use Part 2: Economic comparison concerning the use of roofs formed of steel or of wood covered with waterproof fabric or of light alloy RP 12 * 01/06/1965 Part 1: Economic comparison of the use B and mechanically refrigerated wagons RP 13 * 01/10/1965 Junction boxes for refrigerator wagons B RP 14 01/11/1967 Standard bogie B types of copper bearing and non-copper bearing steel plate RP 15 01/04/1968 Results of corrosion tests on various B rigging of standard wagons RP 16 01/10/1969 Standardisation of the air-brake G wagons with steel underframe and body structure (suitable for being fitted with the automatic buffing and draw coupler) and on their cast steel frame bogies (8th edition) RP 17 01/04/1997 Programme of tests to be carried out on mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 26 of 330 Project B 12 Price Code Title Approved WAGONS Document B frames so as to make them suitable for subsequently taking the automatic buffing and draw coupler RP 18 01/04/1972 Conversion of standard wagon under- B RP 19 01/10/1972 Flat bogie wagon, type 2 B RP 20 01/10/1973 Flat bogie wagon, type 1 B RP 21 01/04/1985 Open bogie wagons (2nd edition) B (2nd edition) RP 22 01/12/1977 Bogie van with sliding walls, "Habiss" B brake in the underframe for SS-trafic RP 23 01/10/1975 Standardisation of a bogie with the B RP 24 01/04/1976 Covered bogie wagon, type Gabbs B (2nd edition) RP 25 01/09/1986 Flexibility of trapezoidal springs B the collision of two sets of coaches, comparing two structural arrangements RP 26 01/04/1987 Digital simulation (two-dimensional) of B suitable for use in S and SS trafic RP 27 01/04/1978 Standardisation of cast-steel bogies B the yield point of steel - Effect of repeated impacts on the yield point of the steel RP 29 01/10/1979 The influence of the strain rate on B coaches (Structural part of vehicle) RP 30 01/09/1980 Winter problems in connection with B in brake cylinder and brake rod adjuster suitable for S traffic RP 31 01/09/1980 Standardisation of a bogie with built- B evaluating impact tests with wagons simulating operational loading RP 32 01/04/1981 Principles of carrying out and B loading cradles for the carriage of steel coils - Sahimms (type 2 as per UIC Leaflet 571-3) RP 33 01/04/1982 Bogie wagon with telescopic hoods and B progressive characteristics for 2-axle wagons (2nd edition) RP 34 01/04/1989 Standardisation of leaf springs with mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 27 of 330 Project B 12 Price Code Title Approved WAGONS Document B cast steel frame, with built-in brake cylinder and brake gear adjuster, suitable for use at 100 km/h Part 2: Bogie operated hand brake, used on standard bogies with built- in brake cylinder and brake gear adjuster, suitable for use at 100 km/h RP 35 01/04/1983 Part 1: Standardisation of a bogie with B Taems RP 36 01/04/1984 Bogie wagon with opening roof Type B axle-load at a speed of 100 km/h Static and dynamic tests on bogie frames RP 37 01/09/1983 Adaptation of wagon bogies to a 22.5 t B loading by gravity, without roof, 75 m^3-Fals (construction type 1 in accordance with UIC-Leaflet 571-3) RP 38 01/04/1985 Bogie wagon with bilateral bulk un- B transport of semi-trailers, swap bodies and containers in block trains RP 39 01/04/1984 Recess wagons (Sdkkmss) for rail ND wagons RP 40 01/04/1984 Propelling tests with long two-axled B an axle-load of 22.5 t: Y25 L SNCF, Y25 L BR/PKP, 650.2 RP 41 01/09/1986 Line tests on bogies which are to take B standard bogie RP 42 01/04/1986 Structural modifications to the B calculation, treatment) RP 43 01/09/1988 Parabolic springs for wagons (design, B 22.5 t; Standardisation RP 44 01/09/1986 Bogies suitable for an axle-load of B gear for two-axle wagons with a view to increasing the axle load from 20 t to 22.5 t RP 45 01/09/1987 Tests carried out on the UIC suspension B of 22.5 (Type 2 of UIC-Leaflet 571-2) RP 46 01/04/1988 Eanos open bogie wagon for an axle-load C wagons to assess their suitability to run at a maximum speed of 100 km/h RP 47 01/09/1988 Tests on the running gear of existing B features of the sliding wall wagons for 22.5 t axle load Hbi(ll)ns (Type 1A and 1B of UIC Leaflet 571-3) and Hbbi(ll)ns (Type 2A and 2B of UIC Leaflet 571-3) RP 48 01/04/1989 Partial standardisation of certain mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 28 of 330 Project B 12 Price Code Title Approved WAGONS Document B set of diagrams for UIC Leaflet 530-2 RP 49 01/10/1991 Bases of calculation for preparing the C wagons in connection with their suita- bility or adaptation for a maximum speed of 100 km/h RP 50 18/04/1990 Studies on the bogies of existing B wagons, tabli par le CE B 12 (2me dition) Exists only in French and German DT 50 01/04/1979 Conception uniforme des extrmits des B 22.5 t axle loads at 100 km/h Dynamic lateral behaviour RP 51 18/04/1990 Operating of two-axled wagons with B cover for type Shimm(n)s bogie wagons with fixed endwalls and loading cradles RP 52 01/10/1992 Standardization of a sliding synthetic B bogie wagons regarding increasing the permissible axle load to 22.5 t (Rens/ Remmns) RP 53 01/10/1992 Study of Type 1 and 2 standardized flat B wagons RP 54 01/10/1992 Reduction in the aerodynamic drag of ND with buffer head radii Rh = 2 500 mm and Rv = 2 750 mm RP 55 01/06/1994 Pushing tests on long 2-axled wagons C radially adjustable wheelsets RP 56 01/10/1994 Standardization of the Y 25 bogie with B capacity recess wagons RP 57 01/02/1994 Standardization of a bogie for high- ND formation and negotiating track sec- tions with small-radius s-curves and short straight intermediate sections, studies of the permissible longitudinal compressive forces resulting from braking forces and pushing forces from low speeds RP 58 01/01/1994 Relative to two-axled wagons in train B Further development of the MEDYNA program for ride safety studies with freight wagons in three-wagon-sets RP 59/1 01/06/1996 Part 1 C Parameter studies with two-axled wagons as intermediate wagons in three-wagon-sets using the MEDYNA computer program RP 59/2 01/06/1996 Part 2 mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 29 of 330 Project B 12 Price Code Title Approved WAGONS Document B Model of a two-wagon-set with short coupling for studies of running safety using the MEDYNA simulation programm RP 59/3 01/10/1998 Part 3 B Modelling bogie wagons for ride safety studies with the multi-body simulation programm SIMPACK RP 59/4 01/10/1997 Part 4 B Continuation using SIMPACK of the development work started with MEDYNA on the simulation of three-wagon sets RP 59/5.1 01/10/1997 Part 5.1 B Continuation using SIMPACK of the development work started with MEDYNA on the simulations of three-wagon sets RP 59/5.2 01/10/1997 Part 5.2 B Final report on the further development of models for the SIMPACK simulation program RP 59/6 01/09/1998 Part 6 F permissible stresses 2nd Edition RP 60 01/06/2001 Regulations for proof tests and maximum C trains for combined transport (CT) incorporating bimodal groups and bimodal block trains RP 61 01/09/1998 Study of dynamic longitudinal forces in ND Operation at 100 km/h and 120 km/h RP 62 01/11/1993 Two-axled wagons loaded to 22.5 t/axle C RP 63 01/02/1995 Standardization of the screw coupler C in Report B 12/RP 17 (Section 3.1) Volume 1 Analysis of the questionnaire sent to the railways and private wagon owners concerning the fitting of wagons with buffers and the handling of wagons during marshalling operations RP 64/1 01/11/1995 Revision of the buffing test conditions C in Report B 12/RP 17 (Section 3.1) Volume 2 Comparative tests with a view to selecting a reference buffer for the impact-receiving wagon Summary of results RP 64/2 01/11/1995 Revision of the buffing test conditions mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 30 of 330 Project B 12 Price Code Title Approved WAGONS Document C in Report B 12/RP 17 (Section 3.1) Volume 3 Confirmation tests for the purpose of revising the buffing test conditions RP 64/3 01/11/1995 Revision of the buffing test conditions C in Report B 12/RP 17 (Section 3.1) Volume 4 Summary of the test results and proposals for amendments RP 64/4 01/11/1995 Revision of the buffing test conditions ND wagons with a wheel base of 2a* < 8 m and 22.5 t axleload when operated at 100 and 120 km/h RP 65 01/04/1995 Dynamic riding stability of two-axled C 120 km/h and with a 22.5 t axleload Part 1: Results of running tests and additional tests RP 66/1 01/09/1995 Ride behaviour of bogie wagons at C 120 km/h and with a 22.5 axleload Part 2: Characteristics of track layout and geometry of the test sections RP 66/2 01/09/1995 Ride behaviour of bogie wagons at C for a 22.5 t axleload and a wheelbase of less than 8 m, for speeds of 100 km/ and 120 km/h RP 67 01/10/1997 Dynamic behaviour of two-axled wagons ND on the running stability of bimodal systems. RP 68 01/02/1999 Influence of connecting component wear C that can be sustained by bogie wagons RP 69 01/10/1998 Propelling tests to establish the LCF C permissible longitudinal compressive forces for bogie wagons. RP 70 01/11/1999 Pushing tests to determine the maximum D buffer securing elements on wagons and coaches (CD-ROM) RP 71/1 01/02/2001 Transverse stresses on buffers and D buffer securing elements on wagons and coaches (CD-ROM) RP 71/2 01/02/2001 Transverse stresses on buffers and F wagons with a wheel base < 8 m RP 72 01/10/2001 Wagons - Dynamic behaviour of two-axled E Scoring RP 73 01/01/2007 Wagons - Prevention of Buffer Head mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 31 of 330 Project B 12 Price Code Title Approved WAGONS Document C transversaux exercs sur les tampons. Document pour les utilisateurs. Preuve de la rsistance des fixations de tampons sur la traverse de tte Exists only in French and German RP 74 27/06/2007 Wagons. Sollicitations dues aux efforts F Study into the suitability of a Y/Q limit value of 0,8 for empty wagons RP 76 01/01/2009 Y/Q Limit value B tion du cahier des charges et le contrle des dossiers techniques de construction relatifs aux wagons Liste des documents de rfrence (2me dition) Exists only in French and German DT 80 * 01/01/1995 Prescriptions gnrales pour l'labora- C gnrale et directives pour la construction des wagons (3me dition) Exists only in French and German DT 85 01/02/1996 Elments constitutifs d'utilisation B vehicles DT 122 01/07/1985 Dimensional accuracy checking of C rale pour l'tude de nouveaux types de wagons ou de nouveaux bogies de wagons (3me dition) Exists only in French and German DT 135 01/10/1995 Mthodes de calcul d'application gn- ND welded bogie frame for 22.5 t axleload - drawn up by the BR DT 152 01/09/1983 Static and service tests with Y25 B body and the bogie of goods wagons This documents was drawn up by the members of the ORE B 12 Specialists Committee and the WP "Bogies - General Questions" DT 191 01/03/1987 Rotational torque between the vehicle B Essais et tudes techniques ayant conduit la dfinition des carac- tristiques respecter sur les couplages de wagons 2 essieux. Exists only in French and German DT 214 01/11/1990 Wagon accoupls par attelage permanent. B de wagons longs deux essieux sous l'effet d'efforts longitudinaux de compression levs (LADKA 1.2) Exists only in French and German DT 215 01/10/1989 Simulation de la qualit de roulement mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 32 of 330 Project B 12 Price Code Title Approved WAGONS Document B selon la fiche UIC 517 dans le cadre de l'augmentation de la charge par essieu en trafic SS Exists only in French and German DT 216 01/05/1990 Vrification des ressorts trapzodaux B technology and prospects for the immediate future DT 230 01/10/1990 The current stage of goods wagon C of buffer contact DT 281 01/02/1994 UNKE 89 subroutine for the simulation B wagons with respect to rail wear in curves and measurement of the curving strength of two-axled wagons in gravity hump yards DT 314 * 01/10/1995 Testing of two-axled and four-axled D strength of wagons DT 320 01/06/1995 Computer analysis of the fatigue C end steps and handrails, taking special account of radio remote-controlled marshalling DT 335 01/10/1997 Constructional provisions for improved D permissible longitudinal compressive force for two-axled wagons DT 388 01/11/2001 Approximate determination of the C de rouleaux de tle lamins chaud transports sur des wagons ouverts berces Exists only in French and German DT 389 01/11/2001 Solutions techniques de calage latral B scoring. Evaluation of a survey carried out in 2003 DT 404 01/10/2004 Wagons - Prevention of buffer head mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 33 of 330 Project B 13 Price Code Title Approved ACCEPTANCE TESTING AND MAINTENANCE OF DIESEL ENGINES Document B tives (Cancels February 1956 edition) RP 1 01/06/1963 ORE code for standard diesel locomo- B types after general "invitation" to industry RP 2 01/03/1957 Proposed choice of standard European B tests on diesel engines according to UIC Leaflet 623 OR RP 6 01/10/1961 Manual for the carrying out of type B of locomotives with internal combus- tioned engines under the supervision of ORE RP 7 01/10/1961 Regulations for the tests on prototypes B Report on the tests carried out at Croy-Romainmtier from 5th to 10th September 1960 RP 8 01/07/1962 Noise abatement on diesel locomotives B Supplement to Document No. 8 RP 9 01/10/1962 Noise abatement on Diesel locomotives B of diesel locomotives liable to be chosen as standard locomotives RP 11 01/06/1964 Regulations for the homologation by ORE B shafts RP 12 * 01/10/1965 Maintenance of diesel engine crank- B diesel-hauled trains Cost of supplying steam and electric heating energy RP 13 * 01/04/1968 Collective heating of coaches in B piston rings and cylinder liners of Diesel locomotives RP 14 * 01/10/1969 Maintenance of pistons, gudgeon pins, B test-bench of diesel traction engines liable to be fitted to railway vehicles (100 hour type-test and 360 hour test) RP 15 01/10/1970 ORE regulations for the testing on the B engine cooling circuits RP 16 01/10/1970 Prevention of corrosion in diesel B testing by ORE of diesel traction engines liable to be fitted to railway vehicles RP 17 01/04/1972 Regulations for the official acceptance B and accessoires RP 18 01/04/1974 Maintenance of cylinder heads, valves B engines RP 19 01/04/1975 Maintenance of fuel injector of diesel mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 34 of 330 Project B 13 Price Code Title Approved ACCEPTANCE TESTING AND MAINTENANCE OF DIESEL ENGINES Document B endurance testing of diesel traction engines on the test bed, according to the regulation of ORE Report B 13/RP 15 RP 20 01/10/1974 Manual for the carrying out of 360-hour B RP 21 01/04/1977 Atmospheric pollution by exhaust gases B exhaust RP 22 01/04/1978 Limits for pollutants in diesel engine mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 35 of 330 Project C 15 STABILITY OF VEHICLES Price Code Title Approved EFFECT OF A REDUCTION IN THE PLAY OF THE AXLES IN THE TRACK, ON THE RIDING Document B provisional conclusions RP 1 01/02/1955 Report of research to date and mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 36 of 330 Project E 17 Price Code Title Approved PROTECTION OF MATERIALS Document ND for the cleaning of passenger coaches RP 16 01/02/1963 Applied procedures and machines used ND exteriors of rolling stock RP 20 01/10/1963 Methods of removal of paint from ND with the use of adhesive labels RP 21 01/06/1964 Damage on rolling stock in connection ND coatings for the protectin of steel structures against corrosion RP 24 01/02/1965 Specification for sprayed metal ND of paint material (for rolling stock) RP 26 01/10/1965 Airless (hydraulic) spray application B body panels Part I: Questionnaire regarding the painting systems now applied Part IIA: Recommendations concerning the design, the protection against corrosion and the problems caused by the appli- cation of fillers RP 27 01/10/1966 Painting of the exterior of vehicle ND panels Part IIB: Recommendations for the finishing coat RP 32 01/04/1969 Exterior painting of vehicle body ND the bodies of open wagons and of special wagons of various types RP 33 01/04/1970 Protection of the interior surfaces of ND panels Part IIB: Recommendations for the finishing coat Supplement to Report No. 32 concerning modern finishing coat systems (final report) RP 34 01/04/1972 Exterior painting of vehicle body mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 37 of 330 Project E 18a BEARING LUBRICANTS Price Code Title Approved PROBLEMS CONCERNING THE QUALITY OF LUBRICANTS: Document B RP 1 01/07/1959 (Without title) mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 38 of 330 Project E 18b SUPERHEATED STEAM CYLINDER OILS Price Code Title Approved PROBLEMS CONCERNING THE QUALITY OF LUBRICANTS: Document ND Exists only in French and German RP 1 01/03/1955 Rapport final mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 39 of 330 Project E 18c Price Code Title Approved OILS FOR INTERNAL COMBUSTION ENGINES Document B RP 1 01/03/1958 Final Report mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 40 of 330 Project E 18d Price Code Title Approved GREASES FOR ROLLER BEARINGS Document B based greases RP 1 01/10/1961 Tests carried ou with lithium soap- B bearings under service conditions RP 3 01/10/1964 Temperature measurement in roller mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 41 of 330 Project E 18e Price Code Title Approved GREASES FOR BRAKE COMPONENTS Document ND RE 1 01/03/1966 Lubrication of brake cylinders ND the Vienna Arsenal Testing Station Final Report RP 2 01/11/1967 Tests with brake cylinder lubricants at mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 42 of 330 Project C 19 Price Code Title Approved METHODS FOR REDUCING WEAR OF RAILS AND TYRES Document B RP 0 * 01/11/1953 Preliminary report B RP 1 01/03/1958 Final Report mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 43 of 330 Project D 22 Price Code Title Approved TECHNICAL AND ECONOMICAL STUDY OF TESTED TYPES OF CONCRETE SLEEPERS Document B CR 1 01/03/1958 Progress Report No. 1 B RP 2 01/04/1961 Final Report B the CFF (Aarau-Rupperswill) and on the NS (Gorinchem-Giessendam). State of the question on 1st January 1965 RP 3 * 01/04/1965 Continuation of the tests conducted on ND observation period 1965 - 1966). Effects and derailments on concrete sleepers RP 4 01/04/1968 Behaviour of ORE test sections (2nd mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 44 of 330 Project D 23 Price Code Title Approved DETERMINATION OF DYNAMIC FORCES IN BRIDGES Document B CR 1 01/03/1955 Progress Report No. 1 B Rhne bridge of the CFF at Riddes RP 1 01/06/1957 Report on the preliminary test on the B tests on bridges for the determination of dynamic forces RP 2 01/03/1959 Directives for the carrying out of B Bridges of the a3-Series RP 3 01/04/1961 Report of the tests carried out on B bridges with solid web main girders and upper track) RP 4 01/10/1961 Test of the al series (Single track B tracks through type, track laid on springer, without ballast RP 5 01/03/1962 Steel lattice bridges with single B model RP 6 01/03/1962 Preliminary tests on a reduced scale B (A 7-Series) RP 7 01/04/1963 Single track bridges with twin girders B mination of the dynamic forces in the metallic bridges RP 8 01/04/1963 Provisional proposals for the deter- B bridges RP 9 01/10/1964 Single track prestressed concrete B built-in beams RP 10 01/10/1964 Slab bridges of reinforced concrete and B RP 11 01/06/1966 Rail bearers and cross-girders B metal bridges RP 12 01/06/1966 Presentation of the results obtained on B comparison with the results obtained on the Oerlikon bridge RP 13 01/11/1967 Tests on the reduced scale model and B different types (steel bridges and composite steel-concrete bridges) RP 14 01/06/1967 Tests for the comparison of bridges of B dynamic effects measured on bridges RP 15 01/04/1970 Statistical investigation of the B bridges RP 16 01/04/1970 Theoretical study of dynamic forces in B D 23 Committee and preparation of general formulae for calculating the dynamic effect (Final Report) RP 17 01/04/1970 General survey of the work of the mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 45 of 330 Project B 24 WAY VEHICLES Price Code Title Approved METHODS USED FOR THE MEASUREMENT OF STRESSES IN THE ROTATING AXLES OF RAIL- Document B CR 1 01/08/1954 Preliminary Report mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 46 of 330 Project A 25 Price Code Title Approved SAFETY DEVICES FOR TRACK LAID ON CONCRETE OR STEEL SLEEPERS Document B circuits on tracks with wooden, concrete and steel sleepers as well as ways and means of improving the insulation RP 1 * 01/06/1957 The electrical resistance of track B of a track circuit RP 2 01/06/1957 Study of the electrical characteristics B RP 3 01/06/1957 Methods of computing track circuits B sulating properties of track laid on wooden sleepers RP 4 01/03/1959 Report on the questionnaire on the in- B RP 5 01/03/1959 Axle counters B on wooden sleepers and practical determination of its essential characteristic data RP 6 01/04/1963 Electrical properties of a track laid B on concrete sleepers RP 7 01/10/1963 The electrical insulation of rails B RP 8 01/10/1964 Summary of the studies of the Committee mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 47 of 330 Project D 27 Price Code Title Approved DETERMINATION OF THE MOST ECONOMIC WEIGHT OF RAILS Document B RP 1 01/12/1957 Report of inquiry mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 48 of 330 Project B 28 Price Code Title Approved MEASURING EQUIPMENT USED FOR THE STUDY OF COMFORT IN CARRIAGES Document ND RE 0 01/07/1961 Documentary report mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 49 of 330 Project E 29 Price Code Title Approved MODERN NON-DESTRUCTIVE METHODS FOR MATERIALS TESTING Document B methods - Recommandations RF 0 01/07/1962 Catalogue - Application of the test B RP 1 01/07/1961 Documentary Report mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 50 of 330 Project B 30 Price Code Title Approved CARRIAGE AND RAILCAR HEATING Document B improving climatic conditions in railway carriages RP 4 01/10/1959 Report on the investigations for B current carrying capacity of coupling components and main through wiring for electric train heating, carried out during the year 1959 RP 5 01/11/1960 Report on the tests determining the B lities of development of vehicle air- conditioning installations on the West-European administrations RP 11 01/10/1961 State of progress and future possibi- B on the designing of the cooling part of air conditioning plants in passsenger coaches RP 12 01/07/1962 Influence of the relative air humidy B RP 16 * 01/10/1964 Oil burner train heating systems B coaches RP 19 * 01/02/1965 Tests on filters for passenger mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 51 of 330 Project A 31 SERVICE HAVING REGARD TO THEIR PHYSICAL DIMENSION Price Code Title Approved STUDY OF SIGNALLING RELAYS WITH A VIEW TO OBTAINING THE LONGEST LIFE IN Document B RF 0 01/10/1962 Final report mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 52 of 330 Project D 32 Price Code Title Approved DETERMINATION OF PRINCIPLES TO BE APPLIED FOR THE FISHPLATES OF UIC-RAILS Document B RP 1 01/10/1959 Enquiry Report mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 53 of 330 Project E 34 Price Code Title Approved PROCEDURES FOR THE RECONSTITUTION OF WORN COMPONENTS Document B the procedures for the reconstitution of worn components Catalogue B - Procedures for the recon- stitution of worn compo- nents of railway vehicles Catalogue C - Procedures for the recon- stitution of worn track components RP 1 01/07/1959 Catalogue A - Documentation concerning ND RP 2 01/10/1962 Supplementary enquiry ND and C of interim report no. 1 RP 3 01/10/1963 Supplements (1963) to catalogue A, B mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 54 of 330 Project B 36 BUFFERS) Price Code Title Approved ELASTIC SYSTEMS FOR TRACTION AND SHOCK GEAR (SIDE BUFFERS AND CENTRE Document B buffers of various designs, carried out in 1957 - 1958 and 1959, at the SNCF testing station at Vitry-sur-Seine RP 1 01/02/1960 Results of comparative tests on B springs at low temperatures RP 2 01/07/1962 Behaviour of buffers with rubber B RP 3 01/07/1962 Comparative tests on buffers B buffers RP 4 * 01/02/1963 Tests on improved "Oleo-Pneumatics" B passenger rolling stock RP 5 * 01/02/1963 Comparative tests om buffers for B Bertrix (Belgium) in 1965 RP 6 * 01/03/1966 Tests with hydro-pnuematic buffers at B side-buffers on the stressess exerted on the load during impacts (Test car- ried out at Maarn, Netherlands, in 1967) RP 7 * 01/04/1969 Influence of the characteristic of the B RP 8 01/04/1970 Loading of buffers i service B of longitudinal forces in goods trains equipped with conventional elastic elements (force a function of stroke only) RP 9 01/04/1972 Theoretical studies of the development ND palletised loads through buffing tests RP 10 01/04/1973 Study of load protecting devices for ND systems RP 11 01/10/1973 Tests with long-stroke shock absorbing B for the automatic coupler RP 14 01/04/1975 Comparison tests of elastic systems ND protecting devices RP 15 01/04/1976 Supplementary tests with load- B the "Ring Spring" type B 412 B for the automatic coupler RP 16 01/04/1976 Acceptance tests for elastic system of B the "Ring Spring" type B 412 A for the automatic coupler RP 17 01/10/1976 Acceptance tests for elastic system of B elastic system for the automatic coupler RP 19 01/10/1979 Acceptance tests for the "Jarret DC 13" B 129-11U" elastic system for the automtic coupler RP 20 01/10/1978 Acceptance tests for the "Rheinmetall mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 55 of 330 Project B 36 BUFFERS) Price Code Title Approved ELASTIC SYSTEMS FOR TRACTION AND SHOCK GEAR (SIDE BUFFERS AND CENTRE Document B system of type "Ring spring B 612 B" for the automatic coupler RP 21 01/10/1978 Acceptance tests for the elastic B longitudinal forces in trains RP 22 01/04/1980 Theoretical calculations of B longitudinal forces in trains RP 23 01/04/1983 Comparative studies concerning B tests with wagons (with side buffers or with automatic coupler) RP 24 01/04/1984 Guidelines for the execution of impact C (Basic computer program TULIP 1) RP 25 01/04/1983 Simulation of wagon buffing impacts B type elastic system for the automatic coupler RP 26 01/04/1985 Acceptance tests for the "SAGEM 12054" B (computer program TULIP 2) RP 27 01/04/1986 Simulation of wagon buffing impacts B the drawgear of goods wagons RP 28 01/04/1988 Definition of technical conditions for B automatic coupler RP 29 01/04/1987 Yoke design for elastic systems of the B buffing impacts RP 30 18/04/1990 Reduction of acceleration during B buffing and draw gear of coaches RP 31 26/09/1989 Study of the characteristics of the C draw gear of wagons to ensure the safe running of long vehicles in small- radius curves RP 32 26/09/1989 Characteristics of the buffing and B proving the wear behaviour of buffer heads (application of high tensile- strength manganese) RP 33 01/10/1991 Study of suitable measures for im- B gear (side buffers and centre buffers) Directions for use of computer program B 36/P 22 "Theoretical determination of longitudinal forces in trains" DT 102 01/05/1982 Elastic systems for traction and shock B programme de calcul B 36/RP 22 "Calculs thoriques des efforts longitudinaux se produisant dans les trains" Exists only in French and German DT 178 01/12/1986 Instructions pour l'utilisation du C tions for wagon drawgear DT 195 01/10/1991 Specification of the technical condi- mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 56 of 330 Project B 36.1 Price Code Title Approved MATHEMATICAL MODELS FOR SIMULATING WAGON IMPACTS Document C de calcul B 36/RP 27 Simulation du processus de tamponnement des wagons (Programme de calcul TULIP 2) Exists only in French and German DT 148 01/03/1987 Directives d'utilisation du programme B tats des essais en vue de l'tude sur modle de l'influence d'un chargement isol rigide Essais de la DR Exists only in French and German DT 174.1 01/05/1987 Compte rendu global relatif aux rsul- B sais en vue de la modlisation des dis- positifs lastiques et de l'influence de leur type, du type du wagon et du type de chargements isols rigides Exists only in French and German DT 174.2 01/05/1987 Rapport synoptique des rsultats d'es- mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 57 of 330 Project B 37 Price Code Title Approved INVESTIGATION TO DETERMINE THE DEFINITIVE SUSPENSION SYSTEM FOR OPEN WAGONS Document B (annexes en allemand) Exists only in French and German RP 1 01/03/1959 Rapport final - extrait mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 58 of 330 Project A 38 TION SYSTEMS Price Code Title Approved DISTURBANCE CAUSED IN THE SUPPLY AND DISTRIBUTION NETWORK BY ELECTRIC TRAC- Document ND RF 0 01/10/1964 Final report mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 59 of 330 Project E 39 FOR GOODS WAGONS AND BASES FOR A SPECIFICATION FOR THIS TYPE OF STEEL Price Code Title Approved METHODS OF CHECKING RESISTANCE TO CORROSION OF COPPER BEARING STEEL PLATE Document ND RP 1 01/07/1958 Final report mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 60 of 330 Project D 40 Price Code Title Approved PROBLEM OF THE WEEDING OF TRACKS Document B RP 1 01/11/1958 Enquiry Report mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 61 of 330 Project B 44 OPERATION Price Code Title Approved ADHESION OF LOCOMOTIVES FROM THE POINT OF VIEW OF THEIR CONSTRUCTION AND Document B RP 1 * 01/11/1960 Report on inquiry B Frasne 1962 RP 2 01/06/1964 Adhesion tests between Pontarlier and B improving locomotive adhesion RP 3 01/06/1964 The development of spark cleaning for B locomotive adhesion RP 4 * 01/06/1965 Statistical methods in the study of B practical application of Sparking for improving locomotive adhesion RP 5 01/03/1966 General Report on te development of the B hesion, carried out on British Rail- ways RP 6 01/11/1967 Tests of rail sparking to improve ad- B RP 7 01/04/1969 Use of sand to improve adhesion B variable constructional characteristics RP 8 01/10/1969 Equipping of a test machine with B Hargarten - Preliminary tests and tests in 1970 RP 9 01/10/1971 Adhesion tests between Wadgassen and B RP 10 01/10/1973 Adhesion tests in 1971 B RP 11 01/04/1975 Adhesion tests of Autumn 1972 B November 1975 between BB thyristor locomotive class 1044 and SBB direct- engine locomotive Re 4/4 III and BB class 1042 with respect to their efficiency at the limit of adhesion RP 12 01/10/1976 Comparison tests carried out in B tests machine 18000 converted to 16 2/3 Hz traction RP 13 01/04/1977 Adhesion tests of spring 1975 with the B knowledge about wheel-rail adhesion (final report) RP 14 01/04/1978 Synthesis report: The current state of B Adhesion DT 28/1 01/12/1977 1977 Supplement B DT 28/2 12/10/1977 1977 Supplement B regulation of tractive effort, compiled within the scope fo activities of the ORE Specialists Committee for B 44 DT 48 01/05/1977 Protection against slip, control and mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 62 of 330 Project B 44 OPERATION Price Code Title Approved ADHESION OF LOCOMOTIVES FROM THE POINT OF VIEW OF THEIR CONSTRUCTION AND Document B adhesion of 3 kV d.c. multiple unit trains (thyristor controlled and conventional types). This document has been compiled within the scope of activities of the ORE Specialists Committee for ORE Question B 44 DT 69 01/12/1977 Comparative tests concerning the mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 63 of 330 Project D 45 Price Code Title Approved QUALITY OF RAILS AND MEANS OF GUARANTEEING IT Document B RP 1 * 01/03/1959 Falling weight test B specification UIC 860-1 concerning: Dimensional tolerances, falling weight test, tensils test-piece, detection of piping RP 2 * 01/03/1962 Conditions of use for technical B concerning the principal rail defects RP 3 * 01/03/1962 Collection of documentary leaflets B recording the flaw echoes supplied by an ultrasonic apparatus RP 4 * 01/03/1962 Development of a mechanical device for B tests (1st and 2nd series of tests) RP 5 01/04/1963 Falling weight tests and definition B continuous examination of rails in the track RP 6 * 01/10/1963 Tests with apparatus for the B profile RP 7 * 01/03/1964 Checking of the asymmetry of the rail B sulphur prints appended to UIC- Leaflet 860 for the supply of rails RP 8 * 01/06/1966 Revision of the album of sample B Thomas steel rails having proved satisfactory in the track, and those having shown a poor performance (Third series of tests) RP 9 01/06/1966 Definition tests and special tests on B the third series of tests by means of the RALUS ultrasonic procedure Documentary reports of IRSID and BAM RP 10 * 01/11/1967 Examination of Thomas steel rails of B of Technical Specification 860-0 governing the supply of Vignole (flat-bottom) rails of non-treated steel RP 11 01/04/1969 Proposals concerning the 6th edition B rails of normal quality made of Siemens-Martin steel and also on rails of wear-resisting quality made of Siemens-Martin steel, electric furnace steel and LD steel RP 12 01/04/1971 Definition tests and special tests on mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 64 of 330 Project A 46 Price Code Title Approved TRANSMISSION OF INFORMATION BETWEEN RAIL AND MOTIVE POWER UNITS Document B RP 1 01/04/1963 Principles B from industry RP 2 * 01/10/1963 Evaluation of the tenders received B systems Determination of information require- ments RP 3 01/06/1964 General description of speed control B ferent control systsems for track of comparison RP 4 01/06/1966 Technical solutions and costs of dif- B tests and measurements of track- conductor characteristics RP 5 01/04/1970 Results of practical transmission B control system RP 6 01/10/1971 Examples of a European linear train- B WP S 1005 DT 123 01/04/1981 Continuous train control, prepared by mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 65 of 330 Project B 47 Price Code Title Approved SHOCK RECORDERS Document ND RP 1 01/07/1959 Final report mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 66 of 330 Project B 49 TERNATIONAL SERVICE Price Code Title Approved CHARACTERISTICS OF THE ACOUSTIC SIGNALS USED BY MOTIVE POWER UNITS IN IN- Document B installations with different acoustic characteristics RP 1 * 01/02/1960 Comparative tests with warning signal mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 67 of 330 Project A 50 EFFECTS OF OVER-VOLTAGE Price Code Title Approved PROTECTION OF INSTALLATIONS AND ELECTRIC MOTIVE POWER UNITS AGAINST THE Document B arresters on direct current overhead contact systems RP 1 01/03/1962 Tests made with horn type lightning B the operation of fuses on 3 kV and 1.5 kV direct current electric traction systems RP 2 01/04/1963 International voltage surges caused by B 3000 V direct current) RP 3 * 01/03/1964 Tests on surge diverters (1500 V and B and horn gap arresters (3000 V direct current) RP 4 * 01/03/1964 Tests in service on surge diverters B ting current installations and motive power units against overvoltage RP 5 * 01/10/1964 Enquiry on the protection of alterna- B arresters (1500 V D.C.) and on capacitor type arresters (1500 V and 3000 V D.C.) RP 6 * 01/10/1965 Tests on non-linear resistor type B the equipment to be protected against overvoltages RP 7 01/10/1966 Definition of the constituent parts of B types of lightning arrestor for 1500 V and 3000 V overhead contact systems RP 8 * 01/11/1967 Comparison in service of different B RP 9 01/11/1967 Arcing tests on catenary insulators B impulse voltages on 1500 and 3000 Volt overhead contact systems RP 10 01/10/1968 Tests concerning the propagation of B arresters for 1500 and 3000 V sub- stations, paralleling points and vehicles RP 11 01/04/1970 Service tests on different types of B tions for protection. Future trends and questions not yet resolved. Final report RP 12 01/04/1970 General survey of the different solu- mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 68 of 330 Project B 51 Price Code Title Approved BUFFING AND DRAWGEAR Document ND the 31st July 1962 RP 1 01/02/1963 Work of the ORE Committee B 51 up to ND (August 1962 - September 1963) RP 2 01/06/1964 Work of the Committee B 51 ND from October 1963 - December 1964 RP 3 01/06/1965 Work of the B 51 Specialists Committee ND from January to December 1965 RP 4 01/10/1966 Works of the B 51 Specialists Committee ND from January to December 1966 RP 5 01/11/1967 Work of the B 51 Specialists Committee ND RP 6 01/11/1967 Hundred coupler tests B suspension RP 7 01/10/1969 The cross-beam and sliding cradle B RP 8 01/10/1969 Simple traction coupling B Vaires from 1966 to 1968 RP 9 01/10/1969 Compression tests on the track at B in 1968 - 1969) RP 10 01/04/1970 Coefficient of reduction k (Tests made B UIC 1969 type (adapted by the UIC and by the OSShD - improved manufacturing procedure) RP 11 01/04/1971 Tests with automatic couplers of the ND to December 1969 RP 12 01/10/1971 Work of the Committee from January 1967 ND to December 1971 RP 13 01/10/1972 Work of the Committee from January 1970 B RP 14 01/10/1972 Tests on mechanical mixed couplers ND 1972 to December 1973 and the current state of the studies and tests relating to the introduction of the automatic coupler RP 15 01/04/1974 Work of Committee B 51 from January B couplings RP 16 01/04/1975 Tests with the GLK 2 mixed air B with the automatic coupler RP 17 01/04/1975 Tests of ferry-boats in 1971 and 1973 ND Committee B 51 from January 1974 to December 1975 and state of the studies and tests made in connection with the introduction of the automatic coupler RP 18 01/10/1976 Work carried out by the Specialists B 1969e RP 19 01/10/1976 UIC automatic coupler, Basic version mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 69 of 330 Project B 51 Price Code Title Approved BUFFING AND DRAWGEAR Document B articulation, particularly the braking tests at Eilte and the compression tests at Vaires RP 20 01/04/1977 Report on tests made with stabilising B of the basic variant of the automatic coupler 1969e for wagons RP 21 01/04/1980 Strength studies with the coupler body B cast in two sections, then welded; automatic coupler type 69e, made of cast steel in accordance with UIC- Leaflet 829-1 (steel grade C) - ORE variant - RP 22 01/04/1982 Acceptance tests with a coupler body C cast in two sections, then welded: automatic coupler type 69e made of cast steel in accordance with UIC Leaflet 829-1 (steel grade A) - OTE-HRS variant - RP 23 01/04/1983 Acceptance tests with a coupler body C of the type 69e automatic coupler in welded form - SFB variant - RP 24 01/09/1983 Acceptance tests with a coupler body E the production costs of the automatic buffing and draw coupler RP 25 01/04/1986 Studies in connection with reducing B automatic draw-only coupler RP 26 01/09/1988 Study of the feasibility of an C wagons RP 27 01/07/1995 Design and testing of new drawgear for C dynamic and hydrostatic coach buffers RP 28 01/09/1995 Testing the service life of hydro- C in coaches RP 29 01/10/1995 Effect of buffer plate shape on comfort mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 70 of 330 Project B 51.1 Price Code Title Approved ACCEPTANCE TESTS WITH THE AUTOMATIC DRAW-ONLY COUPLER Document B meters for the acceptance tests with the automatic draw-only coupler (ADOC) RP 1 01/01/1995 Technical testing and approval para- D tests with the automatic draw-only coupler (ADOC), with recommendations RP 2 01/04/1997 Results and evaluation of acceptance D and supplementary tests with the ADOC ADOC (automatic draw-only coupler) with recommendations RP 3 01/06/1998 Results and evaluation of confirmatory mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 71 of 330 Project B 52 CLES BY MEANS OF A SPECIAL VEHICLE Price Code Title Approved TESTS ON THE TRACK ON THE RIDING STABILITY AND THE GUIDING QUALITY OF VEHI- Document B vehicle RP 1 01/06/1963 Characteristics of the experimental B RP 2 01/06/1963 Results of the first track tests B elastic primary suspension between axles and frame RP 3 01/10/1971 Description of the new bogie with B experiments RP 4 01/04/1976 Evaluation of railway contact theory by mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 72 of 330 Project C 53 Price Code Title Approved BEHAVIOUR OF THE METAL OF RAILS AND WHEELS IN THE CONTACT ZONE Document B shelling cracks in rails (Enquiry Report) RE 0 * 01/10/1961 Introductory study on the causes of B RP 1 * 01/03/1964 Preliminary calculations B of a loaded but non-bent rail RP 2 01/10/1965 Three-dimensional photo-elastic study B diamter wheels RP 3 01/10/1966 Enquiry into the problem of small B rail (part 1) RP 4 01/10/1966 Residual longitudinal stresses in the B by photo-elastic and extensometer measurements RP 5 01/10/1969 Tentative study of stresses in a rail B Study of the work-hardened zone RP 6 01/10/1970 Residual stresses in the rail (cont.). B conditions in the wheel/rail contact zone. Development of a new fatigue criterion RP 7 01/04/1972 Composition of the different stress B 1. Work-hardening speed with the EMS 60 machine (additional measurements) 2. Residual stresses in hard-grade steel rails (additional measure- ments) 3. Checking of fatigue criterion proposed by Mr. DANG VAN RP 8 01/10/1973 Experimental studies: B in the rail subjected to rolling loads Assessment of the danger of damage (continued) RP 9 01/10/1973 Calculation of complex stress cycles B mensionnel et du problme lasto- plastique bidimensionnel concernant les contraintes dans le champignon du rail, par M. le Prof. Dr I.F. Besseling, M. le Dr P. van Bommel et M. l'Ing. G. Ten Hoeve Exists only in French DT 9 01/06/1968 Calculs du problme lastique tridi- B (additional measurements) 2. Checking of the fatigue criterion proposed by Mr. Dang Van (additional measurements) 3. Relationships between dynamic wheel- load and wheel diameter 4. General conclusions RP 10 01/04/1976 1. Residual stresses in rails mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 73 of 330 Project E 54 Price Code Title Approved SYNTHETIC INSULATING MATERIALS ON OVERHEAD EQUIPMENT Document B RE 0 01/03/1962 Report of inquiry B insulating materials: ORE programme of tests RP 2 01/10/1965 Laboratory tests on test specimens of B made of synthetic insulating materials RP 3 01/04/1970 Site tests on specimens or insulators B service tests - Conclusions and prospects (Final Report) RP 4 01/04/1971 Summarised report of laboratory and mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 74 of 330 Project B 55 Price Code Title Approved PREVENTION OF DERAILMENT OF GOODS WAGONS ON DISTORTED TRACKS Document B testing 2-axled goods wagons RP 1 * 01/10/1964 Wheel load measurements as a means for B two-axled goods wagons RP 3 01/10/1966 Permissible wheel-load variations on B simultaneous stresses due to track distortion and to transverse components of the forces of the automatic coupler; Dynamic effects of track distortions RP 4 01/10/1970 Two-axled wagons subjected to B twists for base lengths of 1.80 to 19.80 m RP 5 01/10/1973 Enquiry on the distribution of track C twists: calculation and measurement of important vehicle parameters RP 6 01/04/1975 Conditions for negotiating track B and small radius RP 7 01/04/1978 Derailment on curves with high cant B B 55/RP 8. 2. Entwurf Exists only in German SP 8 01/09/1984 Anwendungsdokument zum Bericht G - Recommended values for the track twist and cant - Calculation and measurement of the relevant vehicle parameters - Vehicle testing (Final report) RP 8 01/04/1983 Conditions for negotiating track twists B zwei- und vierachsiger Schienenfahr- zeuge, von Herrn Dipl.-Ing. Dr. Techn. A. Stvarnik (BB) Exists only in German DT 8 01/05/1967 Graphische Feder- und Radlastmechanik B for two-axled goods wagons, as the basis for safety against derailment in track twist - DB DT 78 01/01/1981 Investigations using probability theory mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 75 of 330 Project B 56 UNDER ANY LOADING CONDITIONS, AT SPEEDS OF 80 KM/H Price Code Title Approved IMPROVEMENT OF THE RIDING STABILITY OF EXISTING RIV WAGONS REQUIRED TO RUN, Document B RE 0 01/07/1962 Enquiry Report B of a two-axled wagon to run at a maximum of 80 km/h. Test procedure based on this criterion RP 1 * 01/02/1965 Criteria for assessing the suitability B simple modifications on the stability of old-type two-axled wagons (first work-progress report) Part 2: Attempt to define a general criterion for riding quality RP 2 01/03/1967 Part 1: Study of the effect of various B RP 3 01/10/1968 Supplementary tests and recommendations B Final Report RP 4 01/04/1969 Summary of the work of the Committee - B of a two-axled wagon, by Messrs. Juricic, Vukobratovic and Parezanovic of JZ DT 21 01/05/1971 Theoretical study of the riding quality mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 76 of 330 Project B 57 Price Code Title Approved OMISSION OF BAFFLE-PLATES FROM CISTERN WAGONS Document B RF 0 01/07/1962 Final Report B RP 1 * 01/11/1960 Report of inquiry mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 77 of 330 Project E 58 Price Code Title Approved SHEETS FOR THE PROTECTION OF LOADS Document B RP 1 01/07/1959 Report of inquiry B RP 2 01/07/1961 Report of inquiry and programme of work ND manufacture of sheets RP 3 01/10/1962 Definition of coated fabrics for the ND RP 4 01/06/1963 Assembly and repair of coated fabrics ND possibilities for organising same within the scope of ORE RP 5 01/06/1964 Expediency of service tests and mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 78 of 330 Project A 59 MOTIVE POWER UNITS Price Code Title Approved INFLUENCE OF GLAZED FROST AND HOAR FROST ON THE INSTALLATIONS AND ELECTRIC Document B RP 1 01/06/1963 Tests in the low temperature cabinet B RP 2 01/10/1963 Icing phenomena on pantographs B RP 3 * 01/02/1965 Icing pehnomena on pantographs B systems RP 4 01/06/1967 De-icing tests on overhead contact mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 79 of 330 Project D 60 Price Code Title Approved APPLICATION OF RUBBER FOR BRIDGE SUPPORTING PLATES Document B tures - Recommendations (Final report) RF 0 01/10/1965 Tests carried out at extreme tempera- B load with constant angle of shear and fluctuating angle of shear with constant vertical load RP 1 01/10/1962 Fatigue test under fluctuating centric B vertical loads - Ultimate loads, longterm loading tests and coefficients of friction - Provisional recommenda- tions RP 2 01/03/1964 Fatigue with fluctuating excentric mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 80 of 330 Project B 61 TRANSPORT OF GOODS IN RAILWAY WAGONS Price Code Title Approved STUDY OF A VIBRATION TABLE FOR TESTING PACKING MATERIALS TO BE USED IN THE Document B RE 0 * 01/07/1962 Inquiry report B port in railway wagons RP 1 01/10/1964 Oscillations which arise during trans- B vegetables in transit from Italy and France RP 2 01/10/1964 Behaviour of despatches of fruits and mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 81 of 330 Project B 62 Price Code Title Approved REDUCTION OF THE FILLING TIME OF THE BRAKE CYLINDER IN THE "GOODS" POSITION Document ND RE 0 01/07/1962 Enquiry report mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 82 of 330 Project B 63 Price Code Title Approved DETONATOR OF OPTIMUM AUDIBILITY AND SAFETY Document B RP 1 * 01/10/1962 Comparative tests with detonators B cation RP 2 * 01/06/1963 Additional tests - Technical Specifi- B signalling means RP 3 * 01/10/1964 Replacement of detonators by modern mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 83 of 330 Project B 64 Price Code Title Approved COMPOSITION BRAKE-BLOCKS Document B RE 0 01/02/1963 Report of enquiry B RP 1 01/06/1965 Comparative tests on the testing plant B blocks and wheels RP 2 01/03/1967 Interaction between composition brake B RP 3 01/11/1967 Effects on adhesion B RP 4 01/04/1968 Effects on humidity on braking B braking with tyred wheels RP 5 01/10/1968 Limits of energy dissipation during B brake blocks RP 6 01/10/1969 Metallic inclusions in the composition B RP 7 01/04/1970 Effects of ice and snow B various dimensions and shape RP 8 01/10/1970 Tests with composition brake-blocks of B physical properties of composition brake-blocks and their effect on thermal cracking of tyres RP 9 01/04/1971 The determination of chemical and C RP 10 01/10/1972 Final Report B constructeurs de semelles K, en dcembre 1967, Paris Exists only in French and German DT 22 01/01/1971 Runion commune du comit B 64 et des mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 84 of 330 Project B 67 Price Code Title Approved FILTRATION OF THE COMBUSTION AIR AND THE COOLING AIR OF MOTIVE POWER UNITS Document B Part B: Infiltration of snow RE 0/1 01/06/1963 Part A: Air filtration B RE 0/2 01/06/1963 Supplementary enquiry (Winter 1962/63) B istics of the sorts of dust to be filtered on motive power units (deter- mination of one or more types of dust) RP 1 01/10/1966 Research made in 1964 on the character- B RP 2 * 01/10/1968 Tests on filters in the laboratory B RP 3 * 01/04/1969 Operating tests with air filters B in the field of dusts and air-filters - Final Report RP 4 * 01/10/1969 Investigations carried out by the SNCF mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 85 of 330 Project B 68 LIGHT WEIGHT ROLLING STOCK Price Code Title Approved USE OF SYNTHETIC MATERIALS AND GLUED CONNECTIONS FOR THE STRESSED PARTS OF Document B RE 0 01/06/1963 Enquiry report B RP 2 01/03/1967 Enquiry report B RP 3 01/10/1970 Enquiry and final report mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 86 of 330 Project A 69 OR COMPOSITE CONTACT STRIPS Price Code Title Approved WEAR OF CONTACT STRIPS AND OF THE OVERHEAD EQUIPMENT WHEN USING METALLIC Document B RP 1 * 01/10/1963 Enquiry report B RP 2 * 01/10/1966 Second enquiry report B RP 3 * 01/04/1969 Line tests: Part 1 B pantographs for powered vehicles used in international traffic RP 4 * 01/04/1970 Recommendations for the construction of B RP 5 01/04/1971 Line tests: Part 2 B analysis of the results of the line tests - Conclusions and recommendations RP 6 01/04/1971 General survey - Comparison and mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 87 of 330 Project C 70 Price Code Title Approved MUTUALLY PERMISSIBLE WEAR PROFILES OF WHEEL TYRES AND POINTS OF CROSSINGS Document B RE 0 * 01/06/1964 Report of enquiry B wear profiles of wheel flanges and switch components (Final Report) RP 1 01/04/1969 Assessment criteria for the permissible mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 88 of 330 Project D 71 TRAFFIC LOADS Price Code Title Approved STRESSES IN THE RAILS, THE BALLAST AND IN THE FORMATION RESULTING FROM Document B RP 1 01/04/1965 Stresses in rail B RP 2 01/06/1966 Stress distribution in the rails B and fatigue tests made in the labora- tory on various types of fastening systems (German, English and French systems) RP 3 01/06/1966 Stresses in fastening systems - Static B the first phase: Development of tech- niques, static tests) RP 4 01/06/1966 Stresses in the formation (Results of B starting and braking RP 5 01/06/1967 Stress increments in rails during B fastenings RP 6 01/06/1967 Track measurements of stresses in rail B RP 7 01/06/1967 Classification of ballast prescriptions B the second phase: influence of sleeper parameters and thickness of construc- tion) RP 8 01/04/1968 Stresses in the formation (Results of B RP 9 01/10/1969 Stresses in concrete sleepers B (Laboratory and track tests) RP 10 01/04/1970 Deformation properties of ballast B formation (Results of the third phase: measurements under dynamic conditions) RP 11 01/10/1970 Stresses in the ballast and in the B foundation design RP 12 01/10/1970 Repeated loading of clay and track B Nos. 1-12 - Final report RP 13 01/10/1970 Summary of the results given in reports B Exists only in French DT 13 01/12/1968 Calcul des traverses, par M. R. Sauvage mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 89 of 330 Project D 72 RAIL PROFILES) Price Code Title Approved GUIDING PRINCIPLES FOR THE DESIGN OF POINTS & CROSSINGS (UIC 54 AND UIC 60 Document B RP 1 01/03/1964 Theoretical study and principles B of switches RP 2 01/06/1966 3. Factors affecting the construction B of common and obtuse crossings RP 3 01/10/1966 4. Factors affecting the construction B trical principles and the principles of construction of single switches and crossings for standard track RP 4 01/07/1967 Results of the enquiry into the geome- B the design of switches and crossings RP 5 01/10/1968 5. Additional requirements concerning B consideration the increase in speed and axle loads - Recommandations - Final report RP 6 01/04/1969 6. General principles taking into B the UIC 60 rail (Supplement to the Final Report No. 6) RP 7 01/10/1970 Asymmetrical switch rail section for B design of points and crossings (UIC 54 and UIC 60 rail profiles) - 1. Terminology DT 15 01/04/1969 D 72 - Guiding principles for the mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 90 of 330 Project A 73 SINGS Price Code Title Approved APPROACH TIME EQUALISER FOR FLASHING LIGHT INSTALLATIONS FOR LEVEL CROS- Document B RP 1 01/10/1963 Basic theoretical studies B specification RP 2 01/03/1964 Effect or reduced acceleration - Draft mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 91 of 330 Project D 74 HUMPS Price Code Title Approved CONTINUOUS MEASUREMENT AND CONTROL OF THE SPEED OF WAGONS SHUNTED OVER Document B RP 1 01/04/1963 Report of Enquiry B RP 2 01/03/1964 Complementary report of enquiry B of automatic humping system RP 4 01/04/1969 The potential capacity of various types B RP 5 * 01/04/1971 Costs of the various systems B rolling stock with automatic couplers on the capacity of automatic hump systems RP 6 01/04/1973 Influence of the future goods wagon mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 92 of 330 Project A 76 CEEDING 600 BAUDS Price Code Title Approved DATA TRANSMISSION BY MEANS OF RAILWAY TELEPHONE CIRCUITS AT SPEEDS EX- Document B RP 1 01/10/1964 Basic studies B telephone circuits RP 2 01/04/1965 Measurements conducted on existing B conducted on existing telephone circuits RP 3 01/10/1965 Evaluation of the measurements B ment, transmission equipment and data transmission systems RP 4 01/06/1967 Description of modems, terminal equip- B tion and scope of the measuring installation RP 5 01/10/1968 Programmes of measurements - Descrip- B the measuring installation and its operation - Results of the first measurements RP 6 * 01/10/1968 Description of the different parts of B and carrier-frequency telephone circuits due to the methods of trans- mitting low-frequency selection pulses and measures to be adopted for reducing them RP 7 01/10/1969 Interference in adjacent audiofrequency B dispatching system and of motive power units with "thyristor" firing-angle control on telephone circuits intended for data transmission RP 8 * 01/04/1970 Influence of the Western Electric B characteristics of railway circuits forming part a transmission system and description of the basic conditions for the construction of such a system - Final Report RP 9 01/10/1970 Final recommendations concerning the mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 93 of 330 Project B 77 Price Code Title Approved HEAT TRANSMISSION PHENOMENA IN REFRIGERATOR WAGONS Document B heat transmission coefficient K RP 1 01/06/1964 Various methods used for measuring the B of the K value of refrigerator wagons RP 2 01/10/1965 Recommended method for the measurement B factors on the K-value RP 3 01/04/1968 The effect of physical and parasitic B of the K-value - Final Report RP 4 01/04/1969 Shortened methods for the determination mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 94 of 330 Project A 78 Price Code Title Approved THE USE OF MICROWAVE FOR TRAIN CONTROL CIRCUITS Document B RP 1 * 01/03/1964 Report of enquiry mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 95 of 330 Project B 79 Price Code Title Approved MAINTENANCE OF THE WHEELSETS OF TRAILER STOCK Document B the optimum conditions for fitting the wheels onto the axle RP 1 01/03/1966 Contribution to the determination of B the optimum conditions for fitting the wheels onto the axle RP 2 01/10/1966 Contribution to the determination of B mine an economic reprofiling procedure using build-up welding or machining of the wheel flange or a combined procedure RP 3 01/10/1966 Research and studies in order to deter- B bogie vehicles, the effects on the riding stability of wheel flanges of reduced thickness after reprofiling RP 4 01/10/1966 Tests in order to determine, on two B the maximum permissible out-of- roundness of wheels (speeds lower than 150/km/hr) RP 5 01/11/1967 Tests on passenger coaches to determine B the maximum permissible out-of-balance of wheels (speeds lower than 150 km/hr) RP 6 01/11/1967 Tests on passenger coaches to determine B of tyre profiles in service: a) on passenger coaches and wagons: special colar profilres; b) on wagons: tyre profiles with thinned flanges or flanges built up by welding RP 7 01/04/1968 Tests for ascertaining the performance B function of the precision of machining and the possible presence of hard spot RP 8 01/04/1968 Development of out-of-roundness as a B the permissible out-of-roundness and out-of-balance of the wheels of these for speeds of between 0 and 250 km/h RP 9 01/10/1970 Tests on passenger coaches to ascertain B railway trailer stock RP 10 01/10/1970 Catalogue of defects on the wheels of mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 96 of 330 Project D 81 Price Code Title Approved SPECIAL RAIL PROFILE FOR TUNNELS Document B RP 1 * 01/04/1965 Final report B against corrosion (Supplement to Final Report) RP 2 01/10/1971 Protection of rails and rail fastenings mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 97 of 330 Project E 82 Price Code Title Approved NOISE ABATEMENT Document B RP 2 01/06/1965 Comparative sound measurements B RP 3 01/04/1969 Propagation of noise by railway traffic B ment in the field of railway transpor- tation (Final Report) RP 4 01/10/1969 Measuring principles for noise abate- mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 98 of 330 Project B 83 Price Code Title Approved ELECTROPNEUMATIC BRAKE Document B RP 1 * 01/10/1964 Basic tests on the test-bench B RP 2 01/11/1967 Track tests B electropneumatic brake RP 3 01/10/1968 Cost of fitting wagons with the B two systems of electropneumatic brake RP 4 01/04/1970 Technical and economic study of the mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 99 of 330 Project A 84 160 KM/H Price Code Title Approved BEHAVIOUR OF PANTOGRAPHS AND THE OVERHEAD EQUIPMENT AT SPEEDS HIGHER THAN Document B with several pantographs RP 1 01/10/1966 Tests made by the DB at high speeds and B pantograph RP 2 01/10/1966 Test runs on the FS with more than one B RP 3 01/11/1967 Static tests of the FS B on 1.5 kV dc systems RP 4 01/11/1967 High-speed tests conducted by the SNCF B phase traction current) RP 5 01/10/1968 SNCF tests at very high speed (single- B (single-phase a.c. electrification) RP 6 01/10/1968 Static tests carried out by the SNCF B RP 7 01/10/1968 DB tests in Nirm and Eilendorf tunnels B RP 8 01/10/1968 Tunnel tests carried out on the FS B experimental tests by BR (static behaviour) RP 9 01/10/1970 Theoretical investigations and B conducted by BR (dynamic behaviour) RP 10 01/10/1970 Theoretical studies and tentative tests B - Recommendations concerning the design of pantographs and overhead equipment - Final Report RP 11 01/10/1970 Comparison and analysis of test results mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 100 of 330 Project B 85 Price Code Title Approved APPLICATION OF THE AUTOMATIC COUPLER TO CARRIAGES Document B suitable for receiving the automatic traction and shock coupler RP 1 01/10/1968 Strength tests on passenger coaches B passenger coaches with and without side buffers RP 3 01/04/1975 Testing automatic coupler equipped B de l'attelage automatique - Essais DB avec rame rversible, tabli par le CE B 85 Exists only in French and German DT 55 * 01/11/1976 Essais en service de voitures quipes mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 101 of 330 Project D 86 Price Code Title Approved BENDING TESTS OF STRUCTURES CONSISTING OF TWO BEAMS WELDED AT RIGHT ANGLES Document B RP 1 01/10/1968 Static tests B RP 2 01/04/1969 Dynamic tests B RP 3 01/04/1971 Final Report mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 102 of 330 Project D 87 Price Code Title Approved UNCONVENTIONAL TRACKS Document B RP 1 * 01/10/1966 Enquiry Report B RP 2 01/06/1967 Measuring methods B selected types of direct fixing for underground lines RP 3 01/10/1968 Laboratory repeated-loading tests of B RP 4 01/04/1970 Coordination of theory and experiment B RP 5 01/10/1971 Enquiry Report B tracks (Experiments at Radcliffe-on- Trent 1969 and 1970) RP 6 01/04/1973 Noise and vibration from unconventional B Construction and running experience RP 7 01/04/1974 Test track at Radcliffe-on-Trent B stiffness and damping of selective types of direct fixing for tracks without ballast RP 8 01/04/1973 Laboratory and site measurements of B paved concrete track at Duffield - Construction and running experience RP 9 01/04/1975 British Railways prototypes main line B concrete track at Radcliffe-on-Trent (Phase II) 1971-72 RP 10 01/04/1975 British Railways prototype paved B track - Theoretical approach RP 11 01/04/1975 Effect of cracks in paved concrete B at Rheda (Westphalia) RP 12 01/10/1975 Construction of the ballast-free track B in Oelde station Constructional arrangements and measurements RP 13 01/10/1975 Report on the experimental slab track B track at Neuilly-sur-Marne RP 14 01/10/1975 Laying of pre-stressed concrete slab B of the track without ballast in the Heitersberg Tunnel of Swiss Federal Railways RP 15 01/10/1975 Report on the design and construction B RP 16 01/10/1976 Slab track tests at Velim B RP 17 01/04/1977 Resume report on unconventional tracks B knowledge and future use RP 18 01/10/1979 Enquiry report - Present state of mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 103 of 330 Project D 88 Price Code Title Approved STUDY OF RAIL FAULTS IN THE TRACK Document B RP 1 * 01/04/1965 Standard rail failure statistics B RP 2 * 01/10/1965 Study on the dynamics of rail defects B tonnage carried RP 3 * 01/10/1965 Guarantee of rails according to B of internal transverse rail failures - Studies of the SNCB concerning the dynamics of failures in the rail-ends RP 4 01/10/1966 Measurements in the track of the size ND Rail fractures causing derailments - Final Report RP 5 01/04/1968 Standard rail failure statistics 1965 mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 104 of 330 Project A 89 Price Code Title Approved NEW FORMS OF ENERGY CONVERSION Document B RP 1 01/10/1964 Report of Enquiry mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 105 of 330 Project D 90 Price Code Title Approved PROBLEMS OF HIGH STRENGTH BOLTED CONNECTIONS IN STEEL CONSTRUCTION Document B surfaces subjected to various pre- treatments RP 1 01/10/1966 Coefficients of friction of faying B surfaces subjected to various corrosion-protective treatments RP 2 01/06/1967 Coefficients of friction of faying B cients of friction of unprotected and protected faying surfaces RP 3 01/10/1968 Effects of weathering on the coeffi- B RP 4 01/10/1969 Sustained loading tests B surfaces RP 5 01/10/1970 Fatigue tests with protected faying B RP 6 01/04/1972 Protection of bolts, nuts and washers B high strength bolted connections under various conditions RP 7 01/04/1973 The effect of weathering on assembled B Nos. 1 - 7 (Final report) RP 8 01/10/1973 Summarised contents of Reports mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 106 of 330 Project D 91 Price Code Title Approved STUDY OF A LIGHTER BRAKE SLIPPER Document B slippers; Survey of work carried out RP 1 * 01/10/1968 Present position with regard to brake B manufacture of a lighter braker slipper RP 2 01/10/1970 Recommendations for the design and mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 107 of 330 Project B 93 EQUIPPED WITH AUTOMATIC TRACTION AND SHOCK COUPLER Price Code Title Approved OPTIMUM RELATIONSHIP BETWEEN WHEELBASE AND LENGTH OF TWO-AXLED GOODS WAGONS Document B RP 1 01/03/1967 Running tests on DB track B RP 2 01/10/1968 Running tests on SNCF and DB track B suspensions and summary of the results (Final Report) RP 3 01/10/1969 Tests with modified double shackle long mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 108 of 330 Project B 94 Price Code Title Approved USE OF LIQUID GAS COOLING FOR REFRIGERATOR VANS Document B RP 1 * 01/10/1966 Enquiry report B equipped with various cooling systems RP 2 * 01/04/1969 Comparative tests on refrigerator vans B rator vans cooled by different means RP 3 * 01/10/1969 The atmosphere created inside refrige- B refrigerator vans cooled by various means The effects on perishable goods of different atmospheres Final Report RP 4 01/10/1970 Line tests and an economic survey of mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 109 of 330 Project B 95 Price Code Title Approved ROLLER BEARING AXLEBOXES AND AXLES Document B electric current through axle roller bearings RE 0 * 01/06/1965 Special enquiry report - Passage of B RP 1 * 01/10/1966 Report of Enquiry B Position of other studies in progress RP 2 01/10/1970 Terminology and catalogue of damages B nance rules and frequencies for roller bearing axleboxes of goods wagons RP 3 01/10/1972 Recommendations concerning the mainte- B tion and conditions for the official testing and acceptance of greases in- tended for the lubrificaiton of roller bearing axle-boxes of railway-vehicles (Final report) RP 4 01/10/1974 Recommendations concerning the selec- B DT 23 01/01/1972 Roller bearing axle-boxes mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 110 of 330 Project B 96 WITH THE VEHICLE BODY Price Code Title Approved TRANSMISSION OF VIBRATIONS BY SUSPENSION ELEMENTS AND CONNECTION COMPONENTS Document B RP 1 01/03/1967 Enquiry report B the B 79 Committee on the Minden test rig and on the track RP 2 01/10/1969 Analysis of the tests made on behalf of B the B 79 and B 96 Committees on the Vitry test-rig and on the track, for speeds comprised between 0 and 250 km/h RP 3 01/10/1971 Analysis of the tests made on behalf of B vibrations (Final Report) RP 4 01/10/1972 Theoretical investigation of coach-body mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 111 of 330 Project A 97 Price Code Title Approved IDENTIFICATION OF WAGON NUMBERS Document B RP 1 * 01/10/1967 Description of the systems B RP 2 * 01/04/1971 Test conditions of the systems B system RP 3 * 01/04/1972 Recommendation for the choise of a B gaps RP 4 * 01/10/1972 Detection and localisation of reading B microwave system RP 5 * 01/04/1975 A review of the application of the mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 112 of 330 Project B 98 WHEELS, WHEELS OF DIFFERENT DIAMETER AND SHAPE Price Code Title Approved GENERAL PROBLEMS CONNECTED WITH WHEELS AND THEIR ASSEMBLY: SOLID CAST-STEEL Document B provisional conclusions RP 1 * 01/10/1966 Enquiry report B of wheels with small diameter RP 2 01/04/1968 First contribution towards the study B solid cast-steel wheels RP 3 * 01/04/1968 A first contribution to the study of B of the optimum conditions for fitting wheel tyres onto wheel centres RP 4 01/04/1968 First contribution to the determination B solid cast-steel wheels RP 5 * 01/10/1969 Second contribution to the study of B tion to the study of small wheels RP 6 01/10/1969 Rolled steel wheels - Second contribu- B small wheels RP 7 01/10/1970 Third contribution to the study of B solid cast-steel wheels RP 8 * 01/10/1970 Third contribution to the study of B of solid rolled-steel wheels for wagons and coaches - Recommendations (Final Report) RP 9 01/10/1973 Problem of the grade of steel and shape mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 113 of 330 Project A 99 Price Code Title Approved WARNING DEVICES USING RADIO Document B train by another, either direct or through a fixed or mobile radio on the track, and radio warning of a train by means of a fixed or mobile radio on the track RP 1 01/10/1968 Enquiry report: Radio warning of one mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 114 of 330 Project B 100 Price Code Title Approved WINTER-RESISTANT MOTIVE POWER UNITS Document B filters of motive power units and other winter problems RP 1 * 01/10/1968 Infiltration of snow through the air B the supply of alkaline and lead-acid starter batteries (Final Report) RP 2 * 01/04/1970 Draft of technical specificaiton for mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 115 of 330 Project D 101 AND STRUCTURES Price Code Title Approved BRAKING AND ACCELERATION FORCES ON BRIDGES AND INTERACTION BETWEEN TRACK Document B and starting forces in the track RP 1 01/10/1969 Magnitude and distribution of braking B RP 2 01/04/1970 Force measuring cells B RP 3 01/10/1970 Measurement and evaluation methods B unballasted steel bridges of about 15, 30 and 60 metre span RP 4 01/10/1971 Braking and starting tests on three B bridge of 30 m span with ballast bed RP 5 01/04/1973 Braking and starting tests on a steel B acceleration forces on bridges RP 6 01/10/1974 Theoritical studies of braking and B a long train RP 7 01/04/1975 Braking tests on straight track with B two-span (2 x 15 m continuous beams) concrete bridge; ballast track RP 8 01/04/1976 Braking and starting tests on a SBB B bridges - Accummulated results RP 9 01/10/1975 Braking and acceleration forces on B welded rails on structures RP 10 01/10/1977 Enquiry into the laying of continuous B reinforced concrete bridge with neoprene bearings RP 11 01/04/1977 Braking forces on a prestressed B of thermal phenomena associated with interaction between CWR track and bridges RP 12 01/04/1978 Measuring methods adopted in the study B continuous triple-span reinforced concrete bridge, with neoprene bearings RP 13 01/10/1978 Braking and starting tests on a B concerning the effects of longitudinal forces on tracks and bridges due to starting and braking RP 14 01/04/1979 Theoretical studies and calculations B - Synthesis Report RP 15 01/10/1979 Braking and starting forces on bridges B between CWR and structure on two RATP reinforced concrete bridges of 35 m length (with track laid on ballast and with track laid direct) RP 16 01/04/1980 Thermal Phenomena in the interaction B between CWR and structure on a RENFE four-span prestressed concrete bridge RP 17 01/04/1981 Thermal phenomena in the interaction mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 116 of 330 Project D 101 AND STRUCTURES Price Code Title Approved BRAKING AND ACCELERATION FORCES ON BRIDGES AND INTERACTION BETWEEN TRACK Document B track and structure in the case of a DB steel box-girder bridge with continuous ballast bed (Isarbrcke Munich-North) RP 18 01/04/1982 Measurement of thermal effects on B and structure on a four span reinforced concrete bridge with long welded rails laid on ballast, belonging to the RATP (R de Maubu Viaduct) RP 19 01/09/1982 Measurement of thermal effects on track C bridges with continuously welded track (theoretical studies and applications) RP 20 01/04/1983 Circulation of thermal reactions on C track and structure in the case of a DB steel boxgirder bridge with continuous ballast bed (Isar-Brcke Munich-North) (Additions and conclu- sions) RP 21 01/04/1983 Measurement of thermal effects on C the interaction between continuous welded rails and superstructure in the case of a SNCF bridge with steel side bearers with concrete slab and ballast (Donzre bridge on the Paris- Marseille line) RP 22 01/04/1983 Measurement of the thermal effects in C the interaction between continuous welded rails and superstructure in the case of a CSD steel bridge with track laid direct (Chlumpcany bridge) RP 23 01/04/1983 Measurement of the thermal effects in C between CWR and bridges in the case of a RENFE prestressed concrete bridge with 20 isostatic spans carrying ballasted track (HACHO bridge) RP 24 01/09/1983 Thermal phenomena in the interaction B between CWR and bridges in the case of a DB prestressed concrete bridge with ballasted track (Kocher Bridge at Kochendorf) RP 25 01/04/1984 Thermal phenomena in the interaction B between CWR and bridges in the case of a steel CFF bridge with three spans, an expansion lenght of 56 m, non ballasted track and CWR (bridge across the Emmen near Luterbach) RP 26 01/09/1984 Thermal phenomena in the interaction mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 117 of 330 Project D 101 AND STRUCTURES Price Code Title Approved BRAKING AND ACCELERATION FORCES ON BRIDGES AND INTERACTION BETWEEN TRACK Document B the interaction between continuous welded rails and superstructure in the case of a CFF two-span steel structure with an expansion lenght of 110 m, non-ballasted track and long welded rails (bridges across the Aare near Bruegg) RP 27 01/09/1984 Measurement of the thermal effects in C structure due to the influence of temperature in the case of continuous welded rails: synthesis report RP 28 01/04/1985 Interactions between track and C dmarrage sur les piliers, les cules et les fondations d'un pont deux traves (Eiken et modle), tabli par le CE ORE D 101 Exists only in French and German DT 65 * 01/10/1978 Influence des forces de freinage et de C dplacement pour dterminer la valeur de la constante K, tabli dans le cadre des activits du comit d'experts pour la question D 101 Exists only in French and German DT 96 * 01/10/1979 Mesure de la rsistance de la voie au B dans les appuis de ponts par suite d'efforts de freinage ou de dmarrage, par M. l'Ing. Dipl. F. Bijl, NS dans le cadre des activits du comit d'experts pour la question ORE D 101 Exists only in French and German DT 98 * 01/10/1979 Efforts dus aux ractions horizontales B sur les ponts et interactions voies- ponts Campagne de mesures effectue sur le pont de Navilly, tabli par la SNCF Exists only in French DT 126 01/09/1982 Influence du dmarrage et du freinage B des valeurs des rsultats de mesures des contraintes supplmentaires dans le rail, rapportes aux variations de la longueur du tablier M. Winand (SNCB) M. Weber (DB) M. de Maddalena (CFF) Exists only in French and German DT 173 01/06/1986 Enveloppe et rgression non linaire mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 118 of 330 Project C 102 Price Code Title Approved TESTS CONCERNING THE PROBLEMS INVOLVED WITH THE KINEMATIC GAUGE Document B the position of vehicles in the track RP 1 01/04/1968 Theoretical investigations concerning B RP 2 01/10/1969 Tests and final report mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 119 of 330 Project A 103 Price Code Title Approved TRANSMISSION OF INFORMATION THROUGH THE TRAINLINE Document B the firms RP 2 * 01/10/1972 Evaluation of the proposals made by B information circuits in trains RP 3 01/10/1976 Analysis of interference voltages on B system for transmitting information through the train line RP 4 01/10/1977 Specification for the experimental B ligne d'informations dans un train des PKP, compos de 29 wagons quips de l'attelage automatique Exists only in French and German DT 79 01/08/1978 Circulations de mesure pour examiner la mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 120 of 330 Project B 104 Price Code Title Approved NOISE ABATEMENT ON DIESEL LOCOMOTIVES Document B vehicles RP 1 01/03/1967 Exhaust silencers on railed diesel B Noise radiating zones of a diesel engine before and after its fundamental overhaul RP 2 01/04/1968 The diesel engine as a source of noise: B Investigation into the noise produced by various mechanical moving parts RP 3 01/04/1968 The diesel engine as a noise source: B RP 4 01/04/1969 Fan noise B RP 5 01/04/1971 The diesel engine as a source of noise B fans; noise-reduction proposals based thereon RP 6 01/04/1972 Noise measurements taken at locomotive B measures adopted for the abatement of noise and vibrations on diesel-engined rails vehicles (Final Report) RP 7 01/10/1972 Summarising presentation of the B Kritische bersicht ber bisherige Erfahrungen und Erkenntnisse von Herrn J.A. Muheim und Herrn Dr.-Ing. E.J. Rath Exists only in German DT 10 01/08/1968 Geruschverhalten von Ventilatoren - B Geruschbekmpfung (SVA B 104 und E 82 von den Herren Ir. J.A. van der Hoek (NS), Dipl.-Ing. W. Klopper (DB), Dr. C. Stber (DB)) Exists only in German DT 18 01/05/1971 Krperschaften und Vorschriften fr die B terms, by Mr. R. Lutz DT 19 01/04/1976 A dictionary of acoustic and vibration mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 121 of 330 Project D 105 Price Code Title Approved NOISE ABATEMENT ON BRIDGES Document B bridges RP 1 01/10/1966 Noise development in steel railway B bridge RP 2 01/04/1969 Noise measurements on the Rosenheim B RP 3 01/04/1971 Final report mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 122 of 330 Project B 106 Price Code Title Approved COACHES Document C of passsenger coaches RP 2 01/04/1980 Permissible loading of internal parts B of passenger coaches RP 3 01/09/1982 Permissible loading of external parts B bearings for passenger coaches RP 4 01/04/1984 Standard wheelsets and axle-box roller B tures of railway vehicles - General - Inquiries - Classification of materials RP 5 01/09/1985 Fire behaviour of materials and struc- B structures of railway vehicles. Reaction to fire of materials - Test methods RP 6 01/09/1985 Fire behaviour of the materials and B coaches RP 7 01/09/1985 Load tests on seats in passsenger B coaches and luggage vans RP 8 01/09/1986 Load tests on access doors of passenger B carrying wagons excluding the bogies RP 9 01/04/1988 Test programme for coaches and car B under winter conditions Insulation of coaches RP 10 01/04/1988 Reaction of access doors of coaches B structures of railway vehicle. Test methods and selection criteria for the materials. Full-scale fire tests. Structural measures for fire prevention RP 11 01/09/1987 Fire behaviour of materials and B wheel (tread diameter 920 mm) for coaches with a top speed of 160 km/h - Basic calculations RP 12 26/09/1989 Standardisation of a block-braked solid C wheel (tread diamter 930 mm) designed for coaches operated at a maximum speed of 160 km/h. Measurement of stresses and loads in service RP 13 18/04/1990 Standardisation of block-braked solid B wheel (tread diameter 920 mm) designed for coaches operated at a maximum speed of 160 km/h. Mechanical rig tests RP 15 04/04/1991 Standardization of a block-braked solid B wheel (tread diameter 920 mm) designed for coaches operated at a maximum speed of 160 km/h. Measurement of permanent thermal deformation RP 16 04/04/1991 Standardization of a block-braked solid mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 123 of 330 Project B 106 Price Code Title Approved COACHES Document B structures of railway vehicles. Use of halon fire extinguishers in railway rolling stock RP 17 04/04/1991 Fire behaviour of materials and C structures of railway vehicles. Test method to determine the toxicity of fumes RP 18 04/04/1991 Fire behaviour of materials and ND with non-airtight FS passenger coaches and airtight DB coaches Analysis of physical phenomena in conjunction with the reactions of test subjects RP 19 01/02/1995 Tests on the Direttissima line (Italy) ND impacts Consequences of accidental impacts for passengers Document study Proposals for specifications RP 20 01/12/1994 Resistance of railway coach bodies to D through tunnels at high speed. Pilot study in a pressure chamber of subjective responses of test persons to air pressure changes RP 21 01/09/1993 Pressure wave stresses when passing B studies on improvement of the protec- tion of coaches against fire RP 22 01/07/1992 Reasons for undertaking supplementary B in trains and in the pressure chamber RP 23 01/02/1995 Comparison of the comfort ratings made D movable seats and buffing and braking tests with coaches containing such seats RP 24 01/07/1993 Tests of the stability and strength of B of fires in railway vehicles with a view to improving passenger safety RP 25 01/11/1992 Feasibility study of computer modelling ND the collision of two sets of coaches, comparing two structural arrangements RP 26 01/01/1995 Digital simulation (two-dimensional) of B construction) RP 27 01/11/1993 Winter problems on coaches (vehicle ND bodies Study with a view to optimizing vehicle body structure in high-speed fixed rake trains for coupling RP 28 01/12/1995 Longitudinal strength of railway coach mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 124 of 330 Project B 106 Price Code Title Approved COACHES Document C through tunnels at high speed Synthesis of the results of on-line and pressure-chamber tests RP 29 01/12/1995 Pressure wave stresses when passing B coaches (Structural part of vehicle) RP 30 01/11/1994 Winter problems in connection with B normes, rglementations et recommanda- tions pour la protection des personnes transportes en cas de choc (air, route, rail) par R. Valent (ESI) Exists only in French DT 250 01/10/1991 Recherche documentaire relative aux D Literaturbericht nach H. Fischer, F. Collin Exists only in German DT 252 01/04/1992 Sicherheit von Fahrzeugen B (coach construction) This document was prepared by ORE B 106 chaired by Mr LAGNEAU DT 253 01/09/1991 Winter problems on passenger coaches B coaches Programme of tests DT 277 01/04/1994 Winter problems in connection with B DT 300 01/05/1994 Japanese Railway Standards B trains ICE 2 ainsi que locomotive de secours contre train ICE 2 l'arrt Responsable: Dr Ing. Rudolf Gurr Exists only in French and German DT 324 01/10/1995 Simulation de chocs d'accouplement: B d'une rame type TGV Par A. Oudshoorn et Y. Ravalard Publi par A. Kaminski, Conseiller Technique de l'ERRI Exists only in French and German DT 325 01/09/1995 Etudes d'optimisation en accostage mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 125 of 330 Project B 106.1 Price Code Title Approved STANDARDIZATION OF COACH WHEELSETS Document B lments finis, de la rsistance mca- nique de l'essieu mont standard Exists only in French DT 149 01/12/1982 Calcul numrique, par la mthode des mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 126 of 330 Project B 106.3 Price Code Title Approved PRESSURE-TIGHTNESS AND STRESSES Document B variations on passengers and structures Literature study by members of WP B 106.3 Chaired by Mr Cheret (SNCF) DT 213 01/04/1991 Studies into the effect of pressure B chamber Dr Med. Wolfgang Wormer DT 255 01/04/1992 Planning pressure tests in the pressure B train passenger comfort. Results of tests in a pressure chamber by Messrs Gawthorpe (BR) and Robertson (ICE) DT 295 01/02/1994 The effects of air pressure changes on B chamber to show the difference between the various sensations felt by passengers in tunnels Use of the results by Mr Bressanutti (Specialist invited by SNCF) edited by Mr Kaminski (ERRI) DT 311 01/01/1995 Supplementary tests in the pressure B Dr Bressanutti Louis, Medical Practitioner Editing work: A. Kaminski, ERRI DT 316 01/06/1995 Pressure ramps mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 127 of 330 Project B 106.4 DEVELOPMENT OF METHODS FOR THE INTERIOR FITTING-OUT OF COACHES Price Code Title Approved IMPROVEMENT OF PASSENGER SAFETY IN THE EVENT OF COLLISION Document B RP 1 01/11/1997 Final report B par: H. Farge (Technoforme) et M. Robin (Seram) rvis par: J.P. Cheret (SNCF) dit par: A. Kaminski (ERRI) Exists only in French DT 326 01/09/1995 Etat d'avancement des tudes B rglementation de l' habillage intrieur du matriel roulant voyageurs vis--vis de la scurit des passagers Exists only in French DT 373 01/11/1997 Etablissement d' un projet de B rglementation de l'habillage intrieur du matriel roulant voyageurs vis--vis de la scurit des passagers Etude, conception et mcanique Exists only in French DT 374 01/11/1997 Etablissement d'un projet de mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 128 of 330 Project B 107 Price Code Title Approved UNIFICATION OF AIR-CONDITIONING AND HEATING INSTALLATIONS Document B passenger coach air-conditioning in use with the ORE Member-Administrations RP 1 * 01/10/1970 Enquiry into the present position of B application RP 2 01/04/1972 Air conditioning system for Immediate B for railway service RP 3 01/04/1973 Unconventional air conditioning systems B Vienna Arsenal climatic chambers with several passenger coach air- conditioning systems RP 4 01/10/1975 Evaluation of the tests made in the mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 129 of 330 Project B 108 Price Code Title Approved UNIFICATION OF AIR-CONDITIONING AND ELECTRICAL EQUIPMENT IN COACHES Document B conditioning passenger coaches RP 1 01/04/1974 Energy supply systems for air- B of the main high-voltage line as a fonction of the outside temperature RP 2 01/04/1974 Tests to determine the loading capacity B energy supply systems for air conditioned passenger coaches RP 3 01/04/1976 Evaluation of the tests with several B to determine the optimum air circulation and temperature distribution in a couchette compartment RP 4 01/10/1979 Evaluation of the tests carried out B and control equipment for coaches RP 5 01/09/1980 Specification for electronic regulating B converters for feeding fluorescent lamps RP 6 01/04/1981 Specification for transistorized B temperature distribution in coach compartments equipped with seats and with couchettes RP 7 01/09/1982 Optimisation of the air flow and B applicable to static converters of passenger coaches) RP 8 01/04/1982 Criteria (harmonic and input impedance) B between the power supply equipment of diesel locomotives and coaches with air-conditioning equipment RP 9 01/04/1983 Tests to determine the interaction D of coaches: harmonic current and input impedance Preliminary tests on a coach RP 10 01/04/1984 Measurements on the static converters B comfort of passenger coaches RP 11 01/04/1985 Effect of air jets on the heating and C of coaches: Harmonic currents and input impedance. Measurements on 15 EUROFIMA coaches. Laws of addition. Case of supply by overhead lines. RP 12 01/09/1986 Measurements on the static converters B panels for electrical equipment in coaches RP 13 01/09/1985 Unification of control and monitoring B of coaches: Harmonic currents and input impedances. Measurements on 15 EUROFIMA coaches. Laws of addition. Diesel traction RP 14 01/04/1987 Measurements on the static converters mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 130 of 330 Project B 108 Price Code Title Approved UNIFICATION OF AIR-CONDITIONING AND ELECTRICAL EQUIPMENT IN COACHES Document B RP 15 01/04/1987 Tests on HT fuses on coaches B harmonic currents generated by the static converters in coaches RP 16 01/09/1987 Study of transmission in the rail of B the UIC 12-core train line (loudspeaker cable); Additional preliminary tests RP 17 01/04/1988 Transmission of information through C of coaches: harmonic currents and input impedances - Synthesis of work - Proposal for new limiting values RP 18 01/04/1988 Measurements on the static converters B line for data transmission RP 19 01/01/1993 Definition of the UIC 12-core train B ference currents and input impedances of the static converters on passenger coaches - Theoretical approach RP 20 18/04/1990 Principles of measurement of inter- B tests with a "TOKEN" system RP 21 01/05/1993 Tests with a "MASTER-SLAVE" system and B equipment on diesel locomotives and electrical equipment in coaches fed from the train line RP 22 01/09/1994 Compatibility between power supply B voitures Corail, tabli par la direc- tion commerciale voyageurs de la SNCF Exists only in French and German DT 127 01/04/1981 Optimisation de la temprature dans les B UIC train line Preliminary tests DT 196 01/12/1986 Transmission of information through D the UIC 12-core train line Test on a "master/slave" transmission system DB tests DT 227 01/04/1990 Transmission of information through mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 131 of 330 Project B 108.2 Price Code Title Approved ENERGY SUPPLY FOR COACHES FROM DIESEL LOCOMOTIVES Document B vrifier la compatibilit des voitures avec les locomotives diesel Exists only in French and German DT 286 01/06/1995 Essais poste fixe raliss pour B miner la compatibilit entre les loco- motives diesel et les voitures Exists only in French and German DT 296 01/06/1995 Essais en ligne effectus pour dter- mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 132 of 330 Project B 108.3 Price Code Title Approved TRANSMISSION OF INFORMATION IN THE TRAIN BY A CENTRAL DATA LINE Document D UIC 12-core train line: test with a token transmission system (SNCF/ Alsthom) DT 273 01/08/1992 Transmission of information through the mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 133 of 330 Project B 109 Price Code Title Approved UNLOADING OF SELF-DISCHARGING WAGONS IN WINTER CONDITIONS Document B RP 1 01/04/1969 Enquiry report (Final report) mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 134 of 330 Project A 110 Price Code Title Approved DEVELOPMENT OF A DEVICE FOR THE DETECTION OF WHEEL-FLATS OF A CERTAIN SIZE Document B Cause of wheel deformation Effects of derformed wheels Automatic defection of deformed wheels (Enquiry report) RP 1 01/10/1968 Definitions of wheel deformation C of a system for the detection of wheelflats RP 2 * 01/10/1971 Recommendations for the construction C the A 110 Specialists Committee for the detection of wheelflats RP 3 * 01/10/1974 Testing of the system recommended by B RP 4 * 01/10/1975 Detailed description of the JUL 400 B and JUL 400 detectors in traffic RP 5 * 01/04/1977 Comparative study of the Kolumbus mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 135 of 330 Project B 112 Price Code Title Approved STANDARDISATION OF TRANSCONTAINERS AND TRANSCONTAINER WAGONS Document B in connection with the standardisation of wagons and their locating and securing systems RP 1 01/04/1969 Studies of the Committee during 1968 B transcontainers RP 2 01/04/1969 Standadisation of corner castings for B wagons for liner-trains: - Wagons with two bogies and with an effective loading length of 60 ft (18.400 m) - Wagons with three bogies and with an effective loading length of 80 ft (26.000 m) Standardisation of locating and securing systems RP 3 01/10/1970 Standardisation of transcontainer B category 20/8 - ISO 1C - Standard designs for normal, closed containers RP 4 01/10/1970 Specification for transcontainers of B category 40/8 - ISO 1A - Standard design for normal closed containers RP 5 01/10/1971 Specification for transcontainers of B category 30/8 - ISO 1B - Standard designs for normal closed containers RP 6 01/10/1971 Specification for transcontainers of B large containers RP 7 01/10/1973 Effect of wind on the stability of B containers on container wagons RP 8 01/10/1973 Locating and securing systems for large B in liner trains RP 9 01/10/1973 60' wagon for carrying large containers B in liner trains RP 10 01/10/1973 80' wagon for carrying large containers B during the acceptance testing of large containers and for the possible issue of certificates RP 11 01/10/1973 Standard report form intended for use B ISO 1C - with side wall doors, standard version - Development, construction and testing RP 13 01/04/1975 Normal closed container class 20 - B mediate pieces for use in the carriage of two stacked low-height containers RP 14 01/04/1976 Technical specifications for inter- B with impact dampers and 60' loading length for the transport of large containers in ordinary trains RP 15 01/10/1977 Standardisation of the bogie wagons mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 136 of 330 Project B 112 Price Code Title Approved STANDARDISATION OF TRANSCONTAINERS AND TRANSCONTAINER WAGONS Document B and lashing compenents RP 16 01/10/1977 Technical conditions for door-locking B exerted on large containers during rail transport and inland transfer with reference to the test conditions of UIC leaflet 592-2 RP 17 01/10/1977 Investigation into the stresses B wagons according to UIC leaflet 571-4 - Section I RP 18 01/10/1977 Loading conditions for large container mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 137 of 330 Project C 113 WHEEL DIAMETER AND SPEED Price Code Title Approved PERMISSIBLE MASSES PER AXLE FOR TRAILER VEHICLES AS A FUNCTION OF THE Document B speed and the sub rated wheel load on the fatigue of the track RP 1 01/04/1970 Influence of the nature of wagons, the B (Final report) RP 2 01/10/1970 Measurements taken on vehicles B axle-loads for wagons with Y 25 bogies (920 mm wheels) at hight speed (beyond 120 km/h) RP 3 01/10/1974 Investigation of the permissible B purpose wagons with very small wheels ( < 630 mm) RP 4 01/04/1975 Permissible masses per axle for special B missible mass per axle for wagons with very small wheels ( < 630 mm) RP 5 01/10/1976 Vehicle measurements to define the per- C vehicles as a function of the wheel diameter and speed - The effect of vehicle and track para- meters upon the loads at a dipped joint, by ORE Specialists Committee C 113 DT 59 * 01/01/1977 Permissible masses per axle for trailer mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 138 of 330 Project B 114 Price Code Title Approved STUDY OF A PLASMA TORCH FOR IMPROVING ADHESION Document B torch equipment RP 1 01/04/1970 Design and construction of plasma B low temperature studies RP 2 01/10/1971 Operational results and preliminary B head contamination RP 3 01/10/1971 The effect of the plasma torch on rail B rail surfaces RP 4 01/10/1972 Laboratory experiments to simulate B plasma toch train (Final report) RP 5 01/04/1973 Final operational assesment of the mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 139 of 330 Project D 115 Price Code Title Approved DISTRIBUTION OF AXLE LOADS ON BALLASTED SLAB BRIDGES Document B measurements (V 4 tests) RP 1 01/04/1971 Preliminary investigantions and B V 13 Conclusions and recommendations (Final report) RP 2 01/10/1972 Measurements relating to tests V 1 to mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 140 of 330 Project C 116 Price Code Title Approved INTERACTION BETWEEN VEHICLES AND TRACK Document C irregularities Part 1: Definitions, conventions and available data RP 1 01/10/1971 Power spectral density of track B experimental vehicle behaviour using a 2-axled special vehicle RP 2 01/10/1972 A comparison of theoretical and F wheelset and track Part 1: Methods of measurement and analysis RP 3 01/10/1973 Geometry of the contact between C vehicle RP 4 01/10/1974 Equations of motion of a railway B parameters of existing railway vehicles RP 5 01/04/1975 Methods for determining the vibratory B wheelset and track. Part 2: Equivalent conicity values for wheelsets in service RP 6 01/04/1976 Geometry of the contact between B track parameters and views on their influence on vehicle riding RP 7 01/10/1976 A survey of current practice concerning C quality of passenger vehicles RP 8 * 01/04/1977 Methods for assessing the comfort B using a bogie vehicle RP 9 01/10/1978 Linear theory validation experiment C gauge related to wheel profiles adapted to wear RP 10 01/09/1981 Study of optimum rail inclination and B gngen bei der Fahrt von Fahrzeugen, von Prof. Dipl.-Ing. Ladislav Freibauer Exists only in German DT 37 01/03/1975 Untersuchung von stochastischen Vor- B survey of recent literature, by G.E. Fletcher, BR DT 47 01/10/1975 Human response to vibration: critical B for the S 1002 wheel profile on UIC 60 rails, by A.E.W. Hobbs (BR) DT 54 01/10/1975 Calculation of equivalent conicities B on the DB network, by Mr. Nefzger (BZA Munich) DT 81 01/12/1979 Development of the S 1002 wheel profile B S 1002 et SNCF sur le rseau de la SNCF, par G. Sauvage Exists only in French DT 132 01/07/1981 Exprimentation des profils de roue mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 141 of 330 Project C 116 Price Code Title Approved INTERACTION BETWEEN VEHICLES AND TRACK Document B the S 1002 profile with goods wagons equipped with Y25 Cs bogies) by Mr. W. Kosieradzki (PKP) DT 133 01/12/1981 Investigation into the variations of B for passenger coaches and iron ore wagons on the SJ network, by T.J. Anderson (SJ) DT 134 01/06/1983 Evolution of the S 1002 wheel profile mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 142 of 330 Project D 117 Price Code Title Approved OPTIMUM ADAPTATION OF THE CONVENTIONAL TRACK TO FUTURE TRAFFIC Document B Definitions RP 1 01/10/1971 Description of the research methods B as a function of the traffic and of the track components. (First results of laboratory and site tests) RP 2 01/04/1973 Study of the change in the track level B their conditions of use RP 3 01/04/1973 The behaviour of rails in relation to B RP 4 01/04/1974 Rheological properties of the track B repeated loading (Triaxial tests) RP 5 01/10/1974 Deformation of railway ballast under B (continued) RP 6 01/04/1975 Rheological properties of the track B as a function of traffic. Additional results RP 7 01/10/1975 Study of the change in track geometry B resistance to transverse displacement of unloaded track RP 8 01/10/1976 A study of factors ifluencing the B contributions for different types of track superstructure RP 9 01/10/1976 Investigation of the maintenance work ND functions of maintenance machines RP 10 01/10/1978 Synthesis of the tests on transfer B methods RP 11 * 01/10/1978 Stabilisation of ballast by chemical B RP 12 01/04/1979 Dynamic stabilisation of the track B structures and soil under the influences of rainfall RP 13 01/10/1979 Hydraulic performance of track bed B of repetitive stresses as a function of particle size and water content RP 14 01/09/1980 Performance of soil under the effect B foundation of railways: Design of protective measures RP 15 01/09/1980 The influence of frost on the B Part 1 - General Filtration rules suitable for drainage systems RP 16 01/04/1981 Filtration and drainage B methods RP 17 01/04/1981 Stabilisation of ballast by chemical mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 143 of 330 Project D 117 Price Code Title Approved OPTIMUM ADAPTATION OF THE CONVENTIONAL TRACK TO FUTURE TRAFFIC Document B under repeated loading (First phase - Vienna Arsenal tests) RP 18 01/04/1982 The behaviour of track bed structures ND reliability of tampers and ballast cleaners RP 19 01/04/1982 Investigation into the service B stabilisation using the DTS RP 20 01/09/1981 The effectiveness of dynamic track B Part 2: Filtration rules suitable for materials of track bed structures RP 21 01/09/1981 Filtration and drainage B railways; frost protection by insulation boards RP 22 01/09/1981 Influence of frost on the foundation of B different types of sub-structure layers (temperature, water content and soil pressure measurements): Tests in Ostermunchen station RP 23 01/09/1982 Comparative study of the behaviour of D Part 3: Use of geotextiles RP 24 01/04/1983 Filtration and drainage: C structure under repeated loading (Tests at Vienna-Arsenal and Derby) RP 25 01/04/1983 The behaviour of the track bed C sub-grade protective layers RP 26 01/04/1983 Effect on track quality of various B gomtrique de la voie en fonction du trafic support - Descriptions d'essais et mthodologies, par MM. Prof. Birmann, Dr Shenton, Dr Hlasny, Janin et Dr Ing. Dogneton Exists only in French DT 26 01/12/1973 Etude de l'volution de la qualit C under repeated loading (comparison of test results and theoretical predictions) RP 27 01/09/1983 The behaviour of track bed structure D system RP 28 01/09/1983 Design charts for the track/foundation C maintenance machines by Mr. C. Esveld DT 29 * 01/04/1976 Theoretical transfer functions of some D RP 29 01/09/1983 Synthesis report B axial and lateral track-ballast resistance, by Dr.-Ing. P. Dogneton DT 32 01/04/1975 The experimental determination of the mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 144 of 330 Project D 117 Price Code Title Approved OPTIMUM ADAPTATION OF THE CONVENTIONAL TRACK TO FUTURE TRAFFIC Document B rheologische Verhalten des Gleises (ORE D 117 Bericht 4 und 6), von HH. Birmann, Montagn, Lyon, Shenton, Esveld und Towpik Exists only in German DT 42 01/01/1976 Synthese-Bericht von Versuchen ber das B den Querverschiebewiderstand des un- belasteten Gleises, von HH. Hofmann und Pfarrer unter Mitarbeit der nach- stehenden Verwaltungen: SNCF-DB-BR-SJ- CSD-PKP-NS-SBB Exists only in German DT 44 01/05/1976 Einfluss verschiedener Massnahmen auf B assessing the performance of mainte- nance machines, by Mr. C. Esveld, Permanent Way Department, Netherlands Railways DT 77 01/03/1978 Spectral analysis of track geometry for mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 145 of 330 Project A 118 Price Code Title Approved USE OF ELECTRONIC COMPONENTS IN SIGNALLING Document B RP 1 * 01/10/1971 General considerations B components - Standards RP 2 01/10/1972 Catalogue of failures of electronic B systems RP 3 01/10/1972 Faults and safety in railway safety B of electronic signalling systems RP 4 01/04/1974 Non-electrical environment in the case B in the signalling technique Introduction RP 5 01/10/1975 System structures for archieving safety B of safety systems RP 6 01/04/1975 Methods of calculating the performance B tronic safety installations RP 7 01/04/1975 Definition of terms concerning elec- B of circuits operating according to the fail-safe principle RP 8 01/04/1975 Technical requirements for the design B of electronic process computers used in signalling technique? Introduction and definition of problems RP 9 01/10/1975 How can safety be guaranteed by means B way signalling installations RP 10 01/10/1976 Electrical environment affecting rail- B computer based safety-systems (documenting, checking and testing) RP 11 01/10/1976 Software verification procedures from B information on colour video display units for computer systems RP 12 01/10/1977 Procedures for the safe display of B safety conditions to be fulfilled when using electronic components in signalling RP 13 01/10/1977 An information leaflet about the B Railway Administrations in answer to the Questionnaire of ORE concerning electrical interference in railway signalling installations through environmental conditions, prepared by the Specialists Committee A 118 DT 41 01/06/1977 Survey of the replies received from the B safety information, compiled within the scope of activities of ORE Specialists Committee for A 118 DT 86 01/11/1978 Some aspects of the transmission of mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 146 of 330 Project E 119 PRODUCTS Price Code Title Approved CRITERIA FOR ASSESSING THE EFFICIENCY AND THE AGGRESSIVENESS OF CLEANING Document B RP 1 01/10/1970 Report of enquiry ND exterior paint coats of passenger coach and tractive unit body panels RP 2 01/04/1972 Optimum methods of cleaning modern B agents currently used for cleaning the outside of coaches RP 3 01/10/1975 Report of enquiry and table of cleaning B for the development of cleaning products intended for the exterior cleaning of rail vehicles RP 4 01/04/1976 Purchasing specification and guide mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 147 of 330 Project D 120 Price Code Title Approved DEVELOPMENT OF HEAVY RAIL-PROFILES Document B of heavy rail-profiles RP 1 01/04/1971 Guiding principles for the development B RP 2 01/04/1973 Study of a new 60 kg/m rail B profile) RP 3 01/10/1974 Study of a new 71 kg/m rail (ORE 71 mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 148 of 330 Project D 121 PERMITTING HIGH SPEEDS ON THE DIVERGING TRACK Price Code Title Approved UNIFICATION OF THE GEOMETRY OF POINTS AND CROSSINGS WITH RAILS OF 60 KG/M Document B 100 to 200 km/h and above - General design - Experience acquired by certain Administrations RP 1 01/04/1974 Diverging turnouts for speeds of B espacially designed at the proposals of the D 121 Specialists Committee - Initial Conclusions RP 2 01/04/1976 Tests on existing turnouts or those B especially designed at the proposals of the D 121 Specialists Committee - Supplementary conclusions RP 3 01/04/1978 Tests on existing turnouts or those B (Final report) RP 4 01/10/1978 Conclusions and recommendations mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 149 of 330 Project A 122 Price Code Title Approved APPLICATION OF THYRISTORS IN RAILWAY TECHNOLOGY: CONSEQUENCES AND REMEDIES Document B the disturbances of signalling and communication installations caused by thyristor-controlled locomotives RP 1 01/10/1971 Theoretical investigations to determine B controlled motive power units on 100 Hz track-circuits with motor-type relays RP 2 01/10/1971 Effects caused by 16 2/3 thyristor B magnitude and propagation of harmonics produced by thyristor controlled motive power units RP 3 01/04/1972 Effects of booster transformers on the B tractive units for 16 2/3 Hz on the same test track RP 4 01/10/1972 Tests to compare thyristor-controlled B interfering currents proposed by several thyristor-controlled a.c. tractive units RP 5 01/10/1972 Addition of psophometrically weighted B units with several thrysistor circuits (tests and results obtained from the BLS-locomotive Re 4/4 No. 161) RP 6 01/04/1973 Investigations on a.c. motive power B RP 7 01/04/1973 Chopper-control systems B for 50 - 16 2/3 Hz RP 8 01/04/1973 Tests with a static frequency converter B track circuits RP 9 01/10/1973 Study of the effect of interference on B equipped with choppers - Test with several railcars on the 3 kV d.c. system of the SNCB RP 10 01/10/1973 Investigation of tractive units B caused by thyristor locomotives working on 25 kV, 50 and 60 Hz RP 11 01/10/1973 Studies and results of interference B trainsets Tests on the NS 1,5 kV d.c. power supply system RP 12 01/10/1974 Studies with d.c. chopper controlled B for 15 kV 16 2/3 Hz cycles and the effect on 100 Hz track-circuit installations (tests with BB locomo- tive 1043) RP 13 01/04/1974 Studies of a.c. thyristor locomotives B harmonics in catenary contact wires on high voltage supply networks RP 14 01/04/1974 Investigation of the effects of mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 150 of 330 Project A 122 Price Code Title Approved APPLICATION OF THYRISTORS IN RAILWAY TECHNOLOGY: CONSEQUENCES AND REMEDIES Document B trainset equipped with different asymmetric thyristor bridges with controlled turn-off RP 15 01/04/1975 Tests with a series 420 16 2/3 Hz a.c. B relating to interference from thyristor control systems RP 16 01/10/1974 Progress of work and summary of results B locomotives: Investigations and results obtained on the 1.5 kV SNCF system RP 17 01/04/1975 Interference from chopper controlled B circuits from static converters used for electric passenger train heating RP 18 01/04/1975 Investigation of interference in track B current in tractoin supply systems RP 19 01/04/1976 Thyristor chopper control and harmonic B the operation of thyristor controlled tractoin vehicles on the CSD railway system RP 20 01/10/1975 Signal installation interference from B power units on 25 kV, 50 Hz power supply installations of CSD RP 21 01/04/1976 Effect of thyristor controlled motive B cations lines including data trans- mmission with a.c. traction RP 22 01/04/1977 Study of interference in telecommuni- B economic assessment of possibilities obtainable with thyristor from the user's viewpoint RP 23 01/04/1979 Final report (1st part). Technical and B adverse reactions in the power supply system RP 24 01/04/1980 Power technology problems - Study of B mation systems installations - Investi- gation into the disadvantages as regards the electromagnetic compatibi- lity of power and telecommunications installations RP 25 01/04/1980 Problems of interference with infor- B advantages and disadvantages RP 26 01/04/1980 Final considerations - Comparison of B technical terms and definitions of terms connected with the "use of thyristors in railway technology" prepared by ORE Specialists' Committee A 122 DT 31 01/04/1976 Trilingual glossary of commonly used mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 151 of 330 Project A 122 Price Code Title Approved APPLICATION OF THYRISTORS IN RAILWAY TECHNOLOGY: CONSEQUENCES AND REMEDIES Document B track circuits interference caused by thyristor locomotives Prepared by WP 4 of the ORE Specialists Committee A 122 DT 39 01/04/1976 Methods for measuring and recording B quality of telephone communications, by Dr.-Ing. Vollmeyer DT 40 01/04/1976 The effect of thyristor noise on the B ques de la voie en fonction de la frquence et des courants de prmagn- tisation, tabli par le CE A 122 Exists only in French and German DT 53 01/11/1976 Dtermination des paramtres lectri- B 184 de la DB et la locomotive E 444 des FS sur le rseau FS 3 kV courant continu, tabli par le CE A 122 Exists only in French and German DT 56 01/06/1976 Essais avec la locomotive thyristors B sub-station filter installations and track circuits caused by traction vehicles with choppers, by ORE Specia- lists Committee A 122 DT 64 01/09/1978 Measurement of interference in railway B current between rail and ground depending on the frequency and the distance of a train from the sub- station, by ORE Specialists Committee A 122 DT 72 01/09/1978 Distribution of the overhead line D in telecommunications installations by electric traction vehicles in a.c. (25 kV, 50 Hz) and d.c. (3 kV) systems. Part I: SNCF test results obtained on the Annemasse-St. Gervais line (25 kV, 50 Hz) Part II: PKP test results obtained on the Chabowka-Skawina line (3 kV d.c.) DT 73 01/10/1984 Tests to determine disturbance caused B circuits due to electric traction, prepared by ORE Specialists Committee A 122 DT 91 01/06/1979 Calculation of interfrence with track B current circuit prepared by ORE Specialists Committee A 122 DT 92 01/12/1979 Oscillation phnenomena in the traction B niques, tabli par le CE A 122 Exists only in French and German DT 93 01/06/1979 Propagation et superposition des harmo- mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 152 of 330 Project A 122 Price Code Title Approved APPLICATION OF THYRISTORS IN RAILWAY TECHNOLOGY: CONSEQUENCES AND REMEDIES Document B track circuit receivers, by Mr. Studnicka, BB (Enquiry report) DT 108 01/08/1980 Permissible signal-to-noise ratios for mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 153 of 330 Project D 123 Price Code Title Approved INVESTIGATION OF BRIDGE DECKS WITH CONCRETE ENCASED GIRDERS Document B deck No. 1 RP 1 01/04/1972 Static tests on experimental bridge B Nos. 2 and 3 RP 2 01/04/1973 Static tests on experimental decks B concrete encased girders Nos. 4 and 5 RP 3 01/04/1974 Static tests on experimental decks with B RP 4 01/04/1975 Static tests on experimental deck No. 6 B Tests under dynamic loads Part B: Tables and Figures RP 5 01/10/1975 Twin span continuous bridge-deck B No. DI RP 6 01/10/1975 Dynamic tests on experimental deck B Tests under static load RP 7 01/04/1976 Twin span continuous bridge deck B Test under dynamic and static loads RP 8 01/10/1976 Statically determinate deck B D II and D III RP 9 01/04/1977 Dynamic tests on exprimental decks B RP 10 01/04/1978 Final report B models by holography, prepared by ORE Specialists Committee D 123 DT 61 01/04/1977 Static tests on experimental deck mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 154 of 330 Project A 124 Price Code Title Approved AUTOMATIC WARNING OF TRACK MAINTENANCE GANGS Document B progress and the types of systems and equipment used by the Member Administrations of ORE for the automatic warning of track maintenance gangs RP 1 01/10/1971 Enquiry concerning the state of B by track maintenace machines RP 2 01/04/1973 Method of measuring the noise emitted B visual warning devices RP 3 01/04/1973 Enquiry into the use of acoustic and B visual warning of track maintenance gangs at night and in tunnels. Conclusions and recommendations RP 6 01/04/1975 Research and tests of methods for the B of using and designing individual warning devices for staff working in the track danger area RP 7 01/04/1976 Enquiry report about the suitability B Technical specifications for automatic track gang warning systems (AuRoWa) Part II: Elucidations to the specification for an automatic track gang warning system (AuRoWa) RP 10 01/09/1980 Part I: ND warning systems (AuRoWa) Summary of test results obtained at the Electronic Testing Installation of Vienna-Arsenal RP 11 01/04/1981 Test manual for automatic track gang B developments in track gang warning systems Final report RP 12 01/04/1981 Summary report and possible future B generators to ascertain the possibility of monitoring the safety system of an automatic gang-warning system, prepared by the DR in connection with the work of Committee A 124 DT 99 * 01/03/1980 Testing of electro-acoustic signal B tion "AZW 5". Test Report - Functional test and safety investigation DT 113 * 01/03/1982 Automatic train announcement installa- B tion "Mini - awa". Test Report - Functional test and safety investiga- tion DT 114 * 01/03/1982 Automatic train announcement installa- mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 155 of 330 Project A 124 Price Code Title Approved AUTOMATIC WARNING OF TRACK MAINTENANCE GANGS Document B tion "Pintsch Bamag", Test Report - Functional test and safety investiga- tion DT 115 * 01/03/1982 Automatic train announcement installa- B l'approche des trains "AEG-Telefunken" Rapport d'essais - Essais de fonction- nement et de scurit Exists only in French and German DT 116 * 01/03/1982 Installation d'alerte automatique B tion "AZW 5 Siliani". Test Report - Functional test and safety investiga- tion DT 117 * 01/03/1982 Automatic train announcement installa- mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 156 of 330 Project B 125 Price Code Title Approved RUNNING SAFETY OF VEHICLES FITTED WITH THE AUTOMATIC COUPLER Document B vehicles fitted with the automatic coupler and possible solutions RP 1 01/10/1970 Problems of running safety for B play in the suspension, compatible with a good riding quality, especially for two-axled wagons, in taking into account the results of the tests carried out by the B 93 and B 56 Committees RP 2 01/10/1971 Considerations concerning the traverse B fitting of a vertical and horizontal stabilising articulation (Part 1: Two-axled wagons); Calculation bases for determining the permissible longitudinal compressive force for two-axled wagons without allowing for the introduction of a progressive suspension system RP 3 01/04/1974 Advisability of the systematic B the permissible longitudinal force for 2-axled wagons in allowing for the introduction of a progressive sus- pension system; typical results of some calculations made RP 4 01/10/1974 Calculation bases for determining B longitudinal compressive forces for wagons RP 5 01/10/1977 Methods for calculating permissible B RP 6 01/10/1977 Commentary on interim report RP 5 B questions covered (Final report) RP 7 01/10/1977 Survey of problems. Presentation of B to the assessment of measures intended to increase the safety against derail- ment, by Mr. W. Saliger DT 34 01/04/1974 Probability consideration with a view mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 157 of 330 Project B 126 Price Code Title Approved BRAKING PROBLEMS Document B acceptance of brake pads for disc brakes RP 1 * 01/04/1972 Provisional specifications for the B and analytical test procedures for acceptance testing and quality control of disc brake pads RP 2 01/10/1974 Development of physical and mechanical B the use of composition brake-blocks RP 3 * 01/10/1974 Enquiry undertaken in 1973 concerning B of brake tests on full-scale brake dynamometers RP 4 01/04/1978 Reproducibility and comparability B physical properties and the behaviour of disc brake pads during brake applications RP 5 01/04/1979 Correlation between the chemical and B functioning of disc brakes RP 6 01/09/1981 The effect of moisture on the C on the functioning of disc brakes and composition brake blocks RP 7 01/04/1983 The influence of winter conditions B on 14 full-scale dynamometers RP 8 01/09/1983 Comparative tests with disc brakes B RP 9 01/04/1985 Power limits of the disc brake B pads by measuring the coefficient of friction RP 10 01/04/1984 Quality control testing of disc brake B dynamic of freight trains up to 700 m in length and operated using the P braking system. Basic studies with a view to assessing the influencing parameters RP 11 01/09/1986 Problems relating to the braking and C load RP 12 01/09/1987 Brake for wagons with a 22.5 t axle C passenger trains for speeds of 200 to 300 km/h RP 13 01/05/1988 Study of the braking distance of E and groups of vehicles RP 14 01/11/1996 Brake assessment for separate vehicles E means of the braked weight percentage for the speed range 120 km/h to 200 km/h RP 15 01/03/1995 Assessment of the brakes of trains by D (vmax > 200 km/h) by deceleration RP 16 01/09/1994 Brake assessment of high-speed trains mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 158 of 330 Project B 126 Price Code Title Approved BRAKING PROBLEMS Document C RP 17 01/06/1997 Assessment of G braking E of friction materials - requirements This report replaces B 126/DT 192 dated May 1987 and the first edition of RP 18 dated February 1997. RP 18 01/03/2000 Dynamometers for international approval E for the brake assessment of single vehicles at speeds of 120 km/h to 200 km/h RP 19 01/11/1996 The use of the braked weight percentage D RP 20 01/02/1997 The use of disc brakes on wagons C freight trains under different operating conditions (long gradients in particular) RP 21 01/01/1997 Pneumatic behaviour of the air brake on E formance of high-speed trains RP 22 01/04/1999 Determination of the braking per- C RP 23 01/12/1998 Winter problems with disc brakes C equipment RP 24 01/01/2002 Type approval of wheel slide protection D performance of trains RP 25 01/12/1997 Effect of train length on the braking D meter RP 26 01/12/1997 Expert appraisal of SNCF's MF3 dynamo- B RP 27 01/12/2000 Assessment of the PKP dynamometer B RP 28 01/10/2000 Assessment of the ZSR dynamometer B RP 29 01/06/2000 Pneumatic derailment detector D command systems on the European railways. Models for deceleration curves. RP 30 01/04/2001 Existing and future train control and D matriau composite du type K Exists only in French and German RP 31 01/03/2002 Essais au banc de semelles de frein en D semelles en matriau composite du type K Exists only in French and German RP 32 01/05/2002 Essais au lancer avec wagons quips de E semelles composites sur les wagons - Rapport de synthse sur les semelles de frein du type K Exists only in French and German RP 33 01/01/2004 Problmes de freinage - Utilisation de mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 159 of 330 Project B 126 Price Code Title Approved BRAKING PROBLEMS Document D for ETCS/ERTMS RP 34 01/01/2004 Braking Questions. Deceleration curves ND components. Wheel slide protection device Knorr MGS2. Confirmation of UIC approval for locomotives (Railway Traction Vehicles), Multiple Unit Trains and High Speed Trains This report is the property of the Knorr-Bremse Systeme fr Schienenfahrzeuge GmbH Company. Any distribution to third parties without their permission is prohibited. RP G4 01/11/2008 Conformity assessment of brake B surface structure of pads used for disc braking, compiled within the scope of work of the B 126 Specialists Committee by the BR, Derby DT 49 01/04/1977 A study of the debris and changes in ND components. Compliance testing of brake lining type Becorit V30 according to reference document UIC Leaflet 541-3. <i> This report is property Becorit GmbH and may not be released to third parties without permission.</i> RP A2 01/10/2007 Conformity Assessment of brake ND Certificate for the extension of the UIC approval of Bremskerl 2000 disc brake lining <i> This report is property of Bremskerl. It may not be released to third parties without the permission of that company.</i> RP B2 01/05/2008 UIC approval of brake components ND Conformity testing of the Bremskerl 7699 brake pad in accordance with reference document UIC Leaflet 541-3 <i> This report is property of Bremskerl. It may not be released to third parties without the permission of that company.</i> RP B3 01/04/2008 Conformity testing of brale components ND Brake module MBF-01 A from BUMAR- consisting of triple valve ZBF-01 and load-proportional brake valve PBF-01A <i> This report is property of Bumar-Fablok S.A., ul. Fabryczna 16, 32500 Chrzanow, Poland. It may not be released to third parties without the permission of that company. </i> RP E1 01/03/2008 Conformity Testing of brake components mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 160 of 330 Project B 126 Price Code Title Approved BRAKING PROBLEMS Document ND components. Certification of the brake module MBF-01 B in accordance with UIC Leaflets 540 and 547 <i> This report is property of Bumar-Fablok. It may not be released to third parties without the permission of that company. RP E2 01/09/2008 Conformity Assessment of brake ND components. Certification of the brake module MBF-02 in accordance with UIC Leaflets 540 and 547. <i> This report is property of Bumar-Fablok. It may not be released to third parties without the permission of that company.</i> RP E3 01/09/2009 Conformity assessment of brake ND components. Conformity Assessment of the Knorr EDU relay valve against UIC Leaflets 540, 541-04 and 547. Conformity assessment of the Knorr EDU relay valve against UIC Leaflets 540, 541-04 and 547. <i>This report is property of Knorr-Bremse (Rail vehicle Systems) GmbH and may not released to third parties without permission.</i> RP G1 01/08/2007 Conformity Assessment of brake ND components. Knorr KKV-20 characteristic inflected curve valve ("kink valve"). <i> This report is property of Knorr-Bremse (Rail Vehicle Systems) GmbH and may not be released to third parties without permission.</i> RP G2 01/08/2007 Conformity Assessment of brake B materials, prepared by the Research and Development Division of the BR Techni- cal Centre, Derby DT 105 01/04/1980 A study of "model" pad friction B of railway vehicles by C. Pritchard DT 143 01/11/1983 Effect of water on the friction brake B matriaux de frottement, par H. Sandholm Exists only in French and German DT 153 01/11/1983 L'amiante et son utilisation dans les C international approval of friction materials DT 192 01/05/1987 Suitability of dynamometers for the mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 161 of 330 Project B 126 Price Code Title Approved BRAKING PROBLEMS Document C forward motion on the results of braking tests with freight trains and individual wagons DT 308 01/06/1998 Analysis of the effect of resistance to C trains DT 350 01/03/1997 Brake requirements for high-speed B vehicles DT 351 01/03/1997 Aquaplaning on disc brakes of rail B DT 354 01/05/1999 Pre-calculating braked mass B on FS, CFR and CD DT 359 01/10/1998 Periodic checking of the dynamometers D long gradients DT 366 01/06/1998 Brake control for freight trains on C magnetic track brake DT 371 01/05/1999 Pre-calculating the performance of the G homogne quip de semelles composites, sur la ligne du St-Gothard Only available on CD Exists only in French and German DT 379 01/02/2000 Essais de freinage d'un train fret C de frein en matriau composite du type K Exists only in French and German DT 381 01/05/2000 Essais hivernaux en Sude avec semelles F homogne quip de semelle composite sur les lignes du St-Gothard et des Tauern. Only available on CD-ROM! Exists only in French and German DT 383 01/03/2001 Essais de freinage d'un train fret non D hivernales, dans la chambre climatique de Vienne-Arsenal, de semelles en matriau composite (K et LL) et en fonte grise pour wagons Exists only in French and German DT 390 01/03/2002 Essais de freinage en conditions C tion des essais sur le banc d'essais avec les semelles de frein en matires composites de type K pour la dtection de la susceptibilit de formation des inclusions mtalliques en exploitation Exists only in French and German DT 392 01/01/2004 Etude sur l'valuation et l'apprcia- B Recommendations for input into ERTMS curves DT 393 01/01/2004 Inquiry on braking safety margins mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 162 of 330 Project B 126 Price Code Title Approved BRAKING PROBLEMS Document C 810 - Essais de freinage simplifis en conditions hivernales, en Sude (fv.-avr. 2002) Exists only in French and German DT 395 01/01/2004 Essai de semelles K Jurid 816 et Cosid C d'essais climatiques de Vienne-Arsenal pour dmontrer l'aptitude au freinage en conditions hivernales de semelles en matriau composite Exists only in French and German DT 396 01/01/2004 Essais de freinage dans la chambre C bei Verwendung von Verbundstoffbrems- sohlen des Typs K in Gterwagen Exists only in German DT 400 01/12/2004 Fragen des Bremswesens. Studie zur D continuous speed control systems on existing lines and migration strategies for ETCS/ERTMS DT 407 01/01/2005 Braking questions. Safety margins for C Reibungsprstande. Exists only in German DT 408 01/06/2005 Fragen des Bremswesens. Belftung der D Streckenversuchen unter Winterbedingungen, Versuchen in der Klimakammer von RTA und Prfstandversuchen Exists only in German DT 412 01/11/2004 Bremsewesen. Zusammenfassende B faisabilit sur le remplacement des semelles de frein en fonte grise par des semelles L sur le frein en sabot supplmentaires des voitures Exists only in French and German DT 413 01/05/2005 Problme de freinage. Etude de D safety margin calculation of the emergency brake intervention curve for trains operated by ETCS/ERTMS DT 414 01/06/2006 Braking questions. Methodology for the E htrogne quip de semelles composites de type LL sur la voie Sud des Tauern Exists only in French and German DT 420 01/10/2008 Freinage. Essais d'un train de fret mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 163 of 330 Project B 126 Price Code Title Approved BRAKING PROBLEMS Document ND components. Expertise for the assessment of conformity of Ferrodo ID 1005 brake pads with the reference document UIC Leaflets 541-3. <i> This report is property of Federal Mogul Operations Italy, Srl, Corso Inghilterra 2, 12084 Mondovi (Italy) It may not be released to third parties without the permission of that company. </i> RP I1 01/06/2008 Conformity Assessment of brake ND components. Conformity assessment against UIC Leaflet 541-3 of Carbone Lorraine G35 sintered brake pads for high speed trains with Vmax = 300 km/h Category 1 - Type 1.2. <i>This report is property of Socit Faiveley Transport Genevilliers, 41 rue Jean Jaurs, 92231 Gennevilliers, France It may not be released to third parties without permission. </i> RP J1 01/06/2008 Conformity Assessment of brake ND components. Assessment of compliance with the requirements of UIC Leaflet 541-3 (6th edition - November 2006) Flertex 666 brake linings made of organic material for carriages vmax = 200km/h - Category 4 - Type 4. <i>This report is property of Flertex, 304 bd Charles de Gaulle, 92396 Villeneuve la Garenne, cedex, France. No transfer to third parties is allowed without the company's agreement. </i> RP L1 01/12/2007 Conformity Assessment of brake ND Relay valve MZT-Hepos AKR SS/20 with MV 1 weighing valve for self-ajusting load-proportional braking with continuous brake cylinder pressure control. Relay valve MZT-Hepos AKR S/20 with MV 2 weighing valve for empty-loaded change-over. <i>This report is property of MZT Hepos AD, a POLI Group company, 1000 Skopje, Republic of Macedonia. No transfer to third parties is allowed without the company's agreement. </i> RP M1 01/04/2008 Conformance test for brake components. mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 164 of 330 Project B 126 Price Code Title Approved BRAKING PROBLEMS Document ND components. MZT- Hepos MKV-20 kink valve. <i> This report is property of MZT HEPOS AD, a company of the POLI group, 1000 Skopje, R. Macedonia, and may not be released to third parties without permission. </i> RP M2 01/04/2008 Conformity Assessment of brake ND components. Conformity test of brake pad type Cosid 828 in accordance with reference document UIC Leaflet 541-3 <i> This report is property of TMD Friction EsCo GmbH, Industriestrae 9, 01640 Coswig, Germany and may not be released to third parties without permission.</i> RP O1 01/05/2008 Conformity Assessment of brake mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 165 of 330 Project B 126.2 Price Code Title Approved ASSESSMENT OF BRAKES FOR INDIVIDUAL WAGONS AND GROUPS OF WAGONS Document B semelles de frein de wagons lorsque la charge par essieu passe de 20 22,5 t Exists only in French and German DT 197 01/05/1988 Essais au banc relatifs l'usure des B et avec train en rgime "G" Exists only in French and German DT 198 01/05/1988 Essais de freinage avec wagons isols mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 166 of 330 Project B 127 VEHICLES Price Code Title Approved DISTRIBUTION OF THE TEMPERATURE IN ICE COOLED OR MECHANICALLY REFRIGERATED Document B cooled vans RP 1 01/04/1973 Different bunker arrangements in ice B in a 20' refrigerated container RP 2 01/10/1974 Comparison of air distribution systems B in a 20' refrigerated container - Part II RP 3 01/04/1977 Comparison of air distribution systems mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 167 of 330 Project D 128 Price Code Title Approved STATISTICAL DISTRIBUTION OF AXLE LOADS AND STRESSES IN RAILWAY BRIDGES Document B RP 1 01/04/1973 Introduction and definitions B rolling stock and bridges RP 2 01/04/1974 Report of enquiry concerning the B stresses in railway bridges RP 3 01/04/1975 The influence of high speed trains on B dynamic loading of railway bridges and measurement of the influence of track irregularities RP 4 01/04/1976 Study of parameters relating to the B lives of railway bridges RP 5 01/10/1976 Bending moment spectra and predicted B bridges with given traffic RP 6 01/10/1977 Estimate of the life of steel railway B bridges, derived from the statistical traffic spectrum RP 7 01/04/1977 Moment range spectra in railway B its relationship to fatigue RP 8 01/04/1978 Random loading of railway bridges and B service loading and the resulting stresses in railway bridges RP 9 01/04/1979 Measurements of axle-loads due to B RP 10 01/10/1979 Final report B ment des rsultats de mesures extenso- mtriques sur des ponts mtalliques, par M. l'Ing. Halchini (CFR) Exists only in French DT 58 01/11/1976 Considrations concernant le dpouille- mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 168 of 330 Project A 129 Price Code Title Approved HIGH POWER TRACTION CURRENT COLLECTION AT HIGH SPEEDS Document B contact-pantograph" system. Compa- rison between results of BR simulations and SNCF track tests RP 1 01/10/1974 Dynamic behaviour of the "Overhead B for high power collection at speeds up to 300 km/h RP 2 01/10/1975 Light a.c. overhead contact equipment B line types, power supply and protection RP 3 01/10/1975 Questionnaire relating to overhead B RP 4 01/10/1975 Power collection by an electric arc B transmission in overhead lines RP 5 01/04/1976 Computer program for determining power B head lines under continuous loading RP 6 01/04/1976 Heating and load capacity of the over- B of overhead line system wires and cables RP 7 01/04/1977 Short-circuit current load capacity B contact point between contact wire and current collector at rest and during starting RP 8 01/04/1977 Permissible current loading at the B area between contact wire and current collector at high speed RP 9 01/04/1978 High current collection at the contact B RP 10 01/10/1978 Final report B ments and pantographs in Alsace in November 1975, prepared by the SNCF DT 60 01/08/1977 High speed tests with overhead equip- B Gtersloh-Neubeckum section of line for research into components of the overhead contact system/pantograph system, by Mr. K.H. Bauer DT 62 01/06/1977 High-speed tests of DB on the B as a means of power collection at high-speeds, up to 500 km/h, by Dr. D. Klapas, Dr. R. Hackman, Prof. F.A. Benson, Department of Electronic and Electrical Engineering, the University of Sheffield. This study was carried out for and under the direction of ORE Committee A 129 DT 67 01/02/1977 Feasibility study of the electronic arc B square value of overhead lines current by Mr. K. Bauer, BZA Munich, DB (Part 1) and the PKP Research Institute (Part 2) DT 68 01/10/1978 Equipment for measuring the root-mean- mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 169 of 330 Project A 129 Price Code Title Approved HIGH POWER TRACTION CURRENT COLLECTION AT HIGH SPEEDS Document B at high speeds on the Rome-Florence Direttissima line in April 1978, prepared by the motive power and rolling stock department of the FS DT 82 01/05/1979 High power traction current collection B between pantograph and overhead contact system (BR, SNCF and DB methods), established by BR, SNCF (Direction du Matriel - Dpartement MC) and DB DT 83 01/05/1979 Measurement of the contact force B pantographes courant continu destins des vitesses de 250 - 300 km/h, tabli par Mme Roman (PKP) Exists only in French and German DT 84 01/05/1979 Analyse des paramtres concernant les B section Gtersloh-Neubeckum pour la dtermination des composantes du systme catnaire/pantographe (suite), par M. Schmitt-Manderbach, BZA Munich Exists only in French and German DT 90 01/05/1979 Essais grande vitesse de la DB sur la mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 170 of 330 Project D 130 Price Code Title Approved FATIGUE PHENOMEMA IN WELDED CONNECTIONS OF BRIDGES AND CRANES Document B bridges RP 1 01/04/1974 Fatigue of large butt welds on B RP 2 01/10/1975 Tests of box girders B 300 x 230 mm RP 3 01/10/1976 Fatigue tests on small I-beams B RP 4 01/04/1976 Fatigue testing of box beam slices B I-beams with transverse and longitudi- nal fillet welds RP 5 01/04/1977 Constant amplitude fatigue tests of B box-beams sealed with diaphragms, subjected to constant amplitude axial loading RP 6 01/10/1977 Study of the fatigue strength of B RP 7 01/04/1978 Tests on large I-beams at low stresses B stress load spectrum RP 8 01/04/1979 Tests with small I-beams with a low B of fatigue strength data for welded connections RP 9 01/04/1978 Graphical and analytical evaluation B RP 10 01/04/1979 Final report B strength data for welded joints of structural steel, by Strength Testing Laboratory, Darmstadt by Dr.-Ing. E. Haibach, Dipl.-Ing. R. Olivier DT 70 01/11/1978 Standardised Evaluation fatigue B test results, by Mr. J.E. Spindel, BR Board, London and Mr. E. Haibach, Laboratorium fr Betriebsfestigkeit, Darmstadt DT 71 01/06/1979 The statistical analysis of fatigue B tests with beams for ORE Question D 130 by Dr. Ing. E. Haibach, Ing. grad U. Wendt, Laboratorium fr Betriebsfes- tigkeit, Darmstadt and Mr. J. Davies, Research and Development Division, British Railways Board, Derby DT 75 01/05/1979 Evaluation of strain measurements from mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 171 of 330 Project B 131 QUALITY OF 2-AXLED WAGONS Price Code Title Approved INFLUENCE OF THE TRANSVERSE PLAY OF THE SUSPENSION SYSTEM ON THE RIDING Document B fitted with hybrid suspension and UIC- double-link suspension RP 1 01/04/1975 Field tests on 2-axled goods wagons mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 172 of 330 Project B 132 Price Code Title Approved PROGRAMME OF TESTS ON THE BRAKE RIG Document B test rig and calibration tests on line RP 1 01/04/1974 Description of Vienna Arsenal brake B Arsenal brake testing machine (Final report) RP 2 01/10/1977 Placing in service of the Vienna B - Acceptance tests on the brake test rig DT 45 01/04/1976 Vienna Arsenal vehicle testing station mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 173 of 330 Project A 133 Price Code Title Approved PROPAGATION OF RADIO WAVES Document B for radio propagation RP 1 01/04/1975 Classification of railway terrain B RP 2 01/10/1978 Radio progation in railway stations B RP 3 01/10/1978 Radio propagation along railway lines B radiating cables RP 4 01/10/1979 Radio propagation in tunnels using B propagation) RP 5 01/04/1980 Radio propagation in tunnels (natural B (Final report) RP 6 01/09/1980 Summary report and designers' guide B radio field strength along railway lines DT 103 01/09/1980 Computer program for the prediction of mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 174 of 330 Project B 134 Price Code Title Approved MODERN SUSPENSION SYSTEM FOR TWO-AXLED WAGONS Document B two-axled wagons RP 1 01/04/1976 Progressive suspension for existing B RP 2 01/10/1978 Progressive suspension - Field tests B built in future for high speeds RP 3 01/10/1978 Progressive suspension for wagons to be mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 175 of 330 Project C 135 Price Code Title Approved NEW TECHNOLOGIES FOR TRACKED GROUND TRANSPORT Document B on unconventional systems applicable to very high speeds RP 1 01/04/1974 State of studies and experimentation B of research and development, major parameters for operational unconventional high speed transport systems RP 2 * 01/10/1975 Up-to-date description of the state mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 176 of 330 Project B 136 Price Code Title Approved WHEELSETS WITH ASSEMBLED AXLEBOXES: DESIGN, MAINTENANCE AND STANDARDISATION Document B of roller bearing axleboxes for goods wagons according to UIC Leaflet 514-I OR RP 4 01/04/1977 Comparative study of different types B assembled axleboxes RP 7 01/10/1978 Maintenance of wheelsets with B for axleboxes RP 8 01/10/1978 Interchangeability of roller bearings B assembled axle-boxes for wagons fitted with small wheels (diameters 840-760-680 mm) (for block or disc brake) Standardisation of a wheelset with assembled axle-boxes for a passenger coach with wheels of 920 mm _ RP 9 01/04/1979 Standardisation of wheelsets with B axle-box roller bearings RP 10 01/04/1979 Flow of electric current through E RP 11 01/04/1979 Calculation of wagon and coach axles B assembled axleboxes for wagons equipped with 920 mm diameter wheels RP 12 01/04/1979 Standardisation of wheelsets with B assembled axleboxes for wagons equipped with 1000 mm diameter wheels RP 13 01/04/1979 Standardisation of wheelsets with B for wagons equipped with 920 mm diameter wheels RP 14 01/04/1979 Tests on ORE standard wheelsets B exceeding 160 km/h, by ORE Specialists Committee B 136 DT 57 01/01/1977 Thickness of wheel tyres for speeds mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 177 of 330 Project C 137 Price Code Title Approved RAILWAY NOISE Document B measures to be taken in order to reduce the noise and vibration on older railway vehicles RP 1 01/04/1975 Decision criteria, work schedule and B negotiating sharp curves; fundamental considerations and first test results RP 2 01/10/1975 Noise annoyance from braking and B roller stand: . Noise generated by various bogie elements . Acoustic influence of the side- skirting of the vehicle body RP 3 01/04/1976 Measurements of wheel/rail noise on a B - Present measuring values - Legal regulations - Provisional reference values for the permissible noise level RP 4 * 01/10/1977 Railway noise B railway noise . in open, flat country (free field) . in cutting . on embankments RP 5 01/10/1977 Generation and propagation of B of railway noise RP 6 01/04/1977 A theoretical model for the propagation B braking and running round a sharp curve: Results of tests and conclusions RP 7 01/10/1977 Tests to reduce the noise during ND railway stock (Part 1: Reference measurements RP 8 01/04/1979 Noise abatement measures on older B railway stock (Part 2: Conversion measures and results) RP 9 * 01/04/1979 Noise abatement measures on older B suitable for application to fixed installations RP 10 * 01/04/1979 The effectiveness of sound barrier B in the vicinity of railways Application of computer programs RP 11 * 01/04/1979 Advance determination of noise levels B caused by trains on different types of bridges RP 12 01/04/1981 Measurements of the running noise mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 178 of 330 Project C 137 Price Code Title Approved RAILWAY NOISE Document B in the vicinity of railway tracks - Measurements relating to the sound insulation effect of screens fitted on the body of vehicles or near the running gear RP 13 * 01/09/1980 Propagation of train running noise B disturbances caused by the work of track maintenance machines RP 14 * 01/09/1980 Reduction of environmental noise B of corrugations on the wheel treads of railway vehicles RP 15 * 01/09/1980 A contribution to the investigation B correlation between the noise produced and wheel-tread defects RP 16 01/04/1981 Running noise - An attempted C of noise of railway traffic - Comparison with other transport modes RP 17 * 01/04/1981 Assessment of the disturbing effect B National Railways DT 94 * 01/04/1979 Shinkansen Noise (II), by Japanese B Data for the assessment of railway noise, by Mr. Lutz (SJ) DT 125 * 01/09/1981 Railway noise mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 179 of 330 Project C 138 Price Code Title Approved PERMISSIBLE LIMIT VALUES FOR THE Y AND Q FORCES AND DERAILMENT CRITERIA Document B axles on the maximum permissible value of {Y = S, from the standpoint of track displacement. First part: Results of tests with a two-axled wagon RP 1 01/10/1977 Effect of the spacing of consecutive B from the point of view of rail stresses RP 2 01/10/1978 Limit values for the Y and Q forces B at Derby RP 3 01/10/1979 Derailment tests with two-axled wagon B axles on the maximum permissible value of {Y = S, from the point of view of track displacement- Second part: Tests on bogie wagons RP 4 01/04/1980 Effect of the spacing of consecutive B permissible maximum value of load {Y = S, from the point of view of track displacement RP 5 01/09/1980 Effect of train speed on the B Y and Q forces from the point of view of rail stresses as a function of different parameters RP 6 01/09/1980 Persmissible maximum values for the B the axle-load on the maximum permissi- ble value of load {Y = S, from the point of view of track displacement RP 7 01/09/1982 Effects pf oscillatory variations of E (Y/Q) a derailment criterion RP 8 01/09/1984 Statistical analysis of tests for the G - Tests under operating conditions - Comparison of limit values with the actual position (Final report) RP 9 01/09/1986 Verification of limit values B This document was compiled by the ORE Specialists Committee for C 138 DT 63 01/10/1977 Derailment tests at Derby (July 1976) B efforts transversaux appliqus par les essieux des vhicules du point de vue du risque de dripage de la voie - Point des rsultats acquis par les rseaux, par le GT No 3 du CE ORE C 138 Exists only in French DT 66 01/06/1977 Valeur limite admissible pour les B tests in Derby (September 1977) with two-axled goods wagons, compiled within the scope of work of the Specialists Committee for ORE Question C 138 DT 97 01/02/1979 Statistical evaluation of derailment mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 180 of 330 Project C 138 Price Code Title Approved PERMISSIBLE LIMIT VALUES FOR THE Y AND Q FORCES AND DERAILMENT CRITERIA Document B forces computation methods by J.W. Dubbeldam (NS) DT 104 01/01/1980 Rail force stresses due to Y and Q C of the loaded track from static tests DT 150 01/01/1986 Evaluation of the lateral resistance mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 181 of 330 Project E 139 Price Code Title Approved NON-DESTRUCTIVE EXAMINATION PROCEDURES Document B axles using the ultrasonic test procedure and magnetic particle examination method RP 1 01/04/1979 Description of laboratory tests on B material testing RP 2 01/04/1979 Terminology of non-destructive B the acceptance of rails at the works RP 3 01/04/1981 Non-destructive control checks for B wheel rims and tyres RP 4 01/09/1981 Ultrasonic examination of monobloc ND RP 5 01/09/1981 Inspection of rails in the track B manuel aux ultrasons des roues mono- blocs, raliss en laboratoire par les CFR, par M. Ing. Dipl. vi Serban Exists only in French DT 87 01/05/1979 Description des essais de contrle B for the detection of rail defects by eddy currents, by Messrs. Prasil and Dogneton (SNCF) DT 121 01/10/1980 Contribution to the study of methods B rails in the track using manual ultra- sonic methods, by E. Chmiel DT 124 01/12/1980 Control frequencies of UIC 60 type mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 182 of 330 Project B 140 Price Code Title Approved NON-POLLUTING SANITARY INSTALLATIONS Document B railway passenger coaches (Report of enquiry) RP 1 01/10/1975 Toilets of new design for use on B the coaches of European administrations (Enquiry report) RP 2 * 01/10/1977 Toilets of new design being tested on B Tests, technical specifications, bacteriological investigations RP 3 * 01/09/1982 Closed toilet systems B Closed toilet systems Technical description, method for assessing, effluent discharge equipment DT 138 * 01/03/1984 Non-polluting sanitary installations mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 183 of 330 Project D 141 Price Code Title Approved EFFECT ON THE TRACK OF RAISING THE AXLE LOAD FROM 20 TO 22 T Document B of fatigue defects as a function of the mean axle-load RP 1 01/10/1979 Statistical study of the development B of a track panel with different vertical loads RP 2 01/10/1979 Simulation tests involving the loading B with 22 t axle-load RP 3 01/09/1980 Tests on the Velim circular test track B with 20 t axle-load RP 4 01/09/1982 Tests on the VELIM circular test track C consequences of increasing the axle- load from 20 to 22 t RP 5 01/09/1982 Study of the technical and economical B ment, by BR DT 119 01/09/1981 Axle loading - Effect on track settle- B axleload from 20 t to 22 t, by PKP DT 120 01/11/1980 Effect on the track of raising the B circuit de Velim au cours des essais du comit D 141, tabli par la SNCF Exists only in French DT 146 01/01/1983 Etude de l'usure des rails sur le B de 20 22 t de la masse par essieu; Essais sur le circuit de Vlim (CSD) 22 et 20 t par essieu La dgradation de la qualit de la gomtrie de la voie Exists only in French DT 147 01/11/1982 Influence sur la voie de l'augmentation mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 184 of 330 Project B 142 LOAD Price Code Title Approved CONDITIONS WHICH SHOULD BE COMPLIED WITH BY WAGON COMPONENTS FOR 22 T AXLE- Document B of Y 25C bogie with a 22 t axleload RP 1 01/10/1978 Strength tests of three design variant B R7 and R8 steel RP 2 01/10/1978 Hauling tests with wheelsets of grade B of the three first series of tests with 22 t axleload, carried out at Velim RP 3 01/04/1980 Analysis and synthesis of the results B in accordance with the results of B 142/RP 1 and B 142/RP 3 RP 4 01/09/1980 Tests carried out on bogies modified B wagen-Drehgestellen und zweiachsigen Gterwagen auf dem Versuchsring der CSD; 1.-3. Versuchsreihe Exists only in German DT 106 01/12/1982 Bericht ber die Versuche mit Gter- B wagendrehgestellen auf dem Versuchsring der CSD; 4. Versuchsreihe Exists only in German DT 141 01/12/1982 Bericht ber die Versuche mit Gter- mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 185 of 330 Project C 143 Price Code Title Approved ENVIRONMENTAL POLLUTION BY THE RAILWAYS Document B administrations in the field of environmental pollution (report of enquiry) RP 1 01/04/1976 Problems encountered by the railway mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 186 of 330 Project D 144 Price Code Title Approved UPDATING OF TECHNICAL SPECIFICATIONS FOR THE SUPPLY OF RAILS Document B 71 rail - Programme of measurements RP 1 01/04/1976 Provisional tolerances for the ORE B Specification UIC 860 (Final report) RP 2 01/10/1977 Proposal for a new text for Technical mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 187 of 330 Project A 145 Price Code Title Approved TRANSMISSION OF DATA TO 9600 BITS/S Document B of the A 145 Committee (Final report) RP 1 * 01/10/1978 Report on the comprehensive proceedings mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 188 of 330 Project B 146 Price Code Title Approved STANDARDISATION OF THE MATERIAL FOR CAST-IRON BRAKE BLOCKS Document B of cast iron for the tests RP 1 01/10/1979 Manufacture and selection of grades B selected cast-iron grades RP 2 01/04/1981 Bench tests with brake blocks of B from selected grades of cast-iron (uncoupling tests) RP 3 01/04/1982 Track tests with brake blocks made D various grades of cast iron (Final report) RP 4 01/04/1983 Service tests on brake blocks of mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 189 of 330 Project D 147 THAN 14 M Price Code Title Approved ADAPTATION OF MARSHALLING YARDS FOR TAKING WAGONS WITH WHEELBASE OF MORE Document B existing automatic marshalling yards RP 1 01/10/1978 Preliminary study concerning the B permitting very long wagons to be hump shunted with automatic control RP 2 01/04/1979 Evaluation of existing solution for mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 190 of 330 Project D 148 Price Code Title Approved MEANS FOR IMPROVING RAILS Document B properties of rails by metallurgical means (Report of enquiry) RP 1 01/04/1980 Possible ways of improving the service B deterioration in track geometry at discrete irregularities in track level RP 2 01/09/1980 Theoretical calculations of the B son with theoretical prediction RP 3 01/09/1982 Measurements at rail welds and compari- B unevenness of the rail running surface caused by flashbutt welds and thermit welds RP 4 01/04/1982 Statistical investigation of the B RP 5 01/04/1982 Rail geometry and automatic inspection C irregularity types encountered in rail flash butt welds RP 6 01/04/1983 The assessment of a range of localised B straightness of rails (Final report) RP 7 01/09/1983 Summary of conditions concerning the mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 191 of 330 Project C 149 Price Code Title Approved PROBLEMS ARISING FROM THE RUNNING OF HIGH SPEED TRAINS IN TUNNELS Document B calculating unsteady flows in railway tunnels RP 1 01/09/1980 Theoretical prediction methods for B Heitersberg tunnel RP 2 01/09/1981 Aerodynamic measurements in the B number of tunnels on the new high- speed line between Rome and Florence RP 3 01/09/1981 Aerodynamic measurements taken in a B in tunnels Part I: Single trains in simple tunnels RP 4 01/04/1982 Parametric study of pressure changes B produced by a passing train (tests in Monte Perazzo tunnel) RP 5 01/09/1982 Measurements of the slipstream C in tunnels (Part 2: Trains passing in tunnels) RP 6 01/04/1983 Parametric study of pressure changes D Rilly-la-Montagne Tunnel RP 7 01/09/1983 Aerodynamic measurements taken in D air shafts on the pressure changes in a single track tunnel (berlingen tunnel) RP 8 01/09/1983 Tests to determine the effect of B generated by a single train in a double track tunnel (BR Stanton Tunnel) RP 9 01/04/1984 The slip-stream and wake flows ND subjective effects on the human ear caused by trains running at high speeds in tunnels RP 10 01/09/1985 Tests for the evaluation of the B pressure transients generated by a single train in a double track tunnel RP 11 01/09/1984 The effect of an airshaft on the B DES BACHEES tunnel RP 12 01/09/1984 Aerodynamic measurements in the B RP 13 01/09/1985 Final report mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 192 of 330 Project D 150 LAID IN THE TRACK Price Code Title Approved DEVELOPMENT OF APPARATUS FOR MEASURING THE LONGITUDINAL FORCES IN RAILS Document B for determining longitudinal rail forces RP 1 01/09/1980 Preliminary selection of techniques B magnetric parameter method RP 2 01/04/1981 Detailed appraisal of techniques - B The rail vibration method RP 3 01/04/1982 Appraisal of measuring technique - D parameters apparatus RP 4 01/04/1983 Description and evaluation of magnetic D technique to include whole rail magnetisation RP 5 01/09/1983 Extension of magnetic parameters B (Final report) RP 6 01/09/1983 Conclusion and recommendations B nique, based on phase measurements, for the determination of longitudinal rail force, by G.S. Lane (BR) DT 128 01/10/1981 Assessment of a flexural reponse tech- B forces in C.W.R. track - PKP DT 225 01/09/1990 Magnetic measurement of longitudinal mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 193 of 330 Project D 151 Price Code Title Approved VIBRATION TRANSMITTED THROUGH THE GROUND Document B research towards its evaluation RP 1 01/09/1981 First presentation of the problem, and B measures in current use RP 2 01/04/1982 An assessment of vibration counter D vibrations and comparison with experimental results RP 3 01/04/1983 Theoretical prediction of ground B their occupants - Analysis of the literature and commentary RP 4 01/09/1982 Effect of vibration on buildings and D train operations. Evaluation of test reports of various railways RP 5 01/09/1983 Vibrations produced in buildings by C various antivibration measures in the track RP 6 01/04/1984 Study of the long term behaviour of C effect of vibration on building elements RP 7 01/04/1984 An experimental investigation of the C ballasted track in Metro tunnels RP 8 01/04/1984 An investigation of resilient pads for B influencing the vibration and re- radiated noise produced by underground railway traffic RP 9 01/09/1984 Experimental study of factors C line: Effect of added track resilience RP 10 01/04/1986 Vibration isolation measures on open C RP 11 01/09/1988 Lneside vibration absorbers B vibrations due to railways RP 12 26/09/1989 Final report on a study of ground B vibration, by C.G. Stanworth (BR) DT 154 01/06/1984 Literature refrences on ground B response to railway-induced building vibration - Human Factors Research Unit - Institute of Sound and Vibration Research - The University Southampton DT 159 01/09/1983 Experimental studies of subject B tion by means of rigid layers and flexible ballast mats by Fischer, Wettschureck, Hlzl, Temple DT 212 01/12/1989 Reduction of railway vibration propaga- B borne noise and vibrations; the experience of SBB by A. Zach and G. Rutishauser DT 217 01/04/1989 Counter measures against structure - mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 194 of 330 Project C 152 BEHAVIOUR Price Code Title Approved QUANTITATIVE EVALUATION OF GEOMETRIC TRACK PARAMETERS DETERMINING VEHICLE Document B assessing track geometry on the basis of vehicle response RP 1 01/04/1981 Introductory study to the problem of D application of the mathematical methods for characterising the vehicle/track interaction RP 2 01/09/1983 Preliminary study concerning the C application of mathematical methods to characterise vehicle/track interaction in view of track quality assessment RP 3 01/04/1985 Practical recommendations for the B applications of the multiple input/ single output method, by C. Esveld (NS) W. Kosieradzki (PKP) and A. Peerboom (NS) DT 136 01/11/1982 Vehicle/track interaction - Theory and B track parameters determining vehicle behaviour Co-ordinated measurements of track geometry and vehicle reactions DT 142 01/09/1982 Quantitative evaluation of geometric mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 195 of 330 Project B 153 Price Code Title Approved APPLICATION OF THE ISO 2631 STANDARD TO RAILWAY VEHICLES Document B applying ISO Standard 2631, used by the Railways RP 1 01/09/1981 Study of the different methods of B railway seats in the laboratory Application to the case of a driver's seat RP 2 01/09/1982 Preparation of a procedure for testing C signals and processing of short- duration events RP 3 01/04/1983 Characterisation of railway vibration C railway seats in the laboratory Application to the case of a passenger seat RP 4 01/09/1983 Preparation of a procedure for testing E cations of the 5th draft revision of ISO Standard 2631 RP 5 01/04/1985 Application of the "Health" specifi- E vibrations and subjective comfort or activities of seated passengers. Results of SNCF laboratory tests (Vitry sur Seine test centre) RP 6 01/04/1985 Relationship between RMS value of B tions of the 5th draft revision of ISO Standard 2631 RP 7 01/09/1985 Application of "comfort" specifica- B and analysis of the vibrations to which passengers and staff are exposed when travelling in railway vehicles (2nd edition) RP 8 01/09/1986 Mechanical vibrations - Measurement B reclining position - tests in sleeping cars RP 9 01/09/1986 Characterisation of comfort in the B Drawing up weighting curves RP 10 01/09/1986 Vibratory comfort: B - Rail vehicle seat - Laboratory method for evaluating vibration transmission RP 11 01/09/1986 - Mechanical vibration B components on the evaluation of comfort RP 12 01/09/1987 Influence of the low frequency C tion RP 13 01/04/1988 Tests on comfort in standing posi- C RP 14 01/04/1988 Comfort in reclining position D RP 15 01/04/1988 Dynamic tests on seats B RP 16 01/04/1988 Tests on driver's activities mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 196 of 330 Project B 153 Price Code Title Approved APPLICATION OF THE ISO 2631 STANDARD TO RAILWAY VEHICLES Document B RP 17 26/09/1989 Comfort in seated position B RP 18 26/09/1989 Final report B Feasibility of using a dummy RP 19 01/01/1993 Direct method. B RP 20 01/11/1993 Feasibility of Indirect Method B Comparison with the ISO/SNCF comfort note and with the Wz RP 21 01/03/1993 Comfort index Nmv B cabs Evaluation of health risks RP 22 01/05/1993 Measurements of vibrations in drivers' B RP 23 01/12/1993 Summary report B multiple-input transfer functions by Mrs. A. Curtinot DT 166 01/03/1984 Theoretical and experimental study of B produced by vertical and lateral vibration in the range 0.5 to 5.0 Hz DT 179 01/12/1993 Experimental studies of discomfort B confort pour le compte du comit B 153 par M. P. Caille (SNCF) Exists only in French DT 219 01/03/1990 Dpouillement statistique d'essais de B Indirect Method Objective data used DT 280 01/12/1993 Determination of the comfort relations mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 197 of 330 Project D 154 Price Code Title Approved STRESSES AND STRENGTH OF LONGITUDINAL GIRDERS AND CROSS GIRDERS OF BRIDGES Document B steel railway bridges with rail bearers and cross girders - State of Technology (1970 - 1980) RP 1 01/09/1981 Loading, design and construction of B on rail bearers and cross girders of steel bridges RP 2 01/09/1981 Details of strain gauge measurements B Comparison of calculations and measurements RP 3 01/09/1983 Static studies C of rail bearers and cross girders of truss bridges and the theoretical models for their calculation RP 4 01/04/1985 Measurements of the dynamic stresses B bearers and cross girders of steel railway bridges with open deck RP 5 01/09/1985 Fatigue calculations for the rail B RP 6 01/09/1985 Final report mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 198 of 330 Project D 154.1 Price Code Title Approved STRESSES AND STRENGTH OF ORTHOTROPIC DECKS Document C railway bridges with orthotropic decks State of the art in 1983 on 10 European railways RP 1 01/04/1984 Loading, design and construction of C on ballasted steel, orthotropic deck bridges RP 2 01/04/1984 Details of strain gauge measurements C Comparison of calculations and measurements RP 3 01/04/1988 Static studies C of orthotropic decks RP 4 26/09/1989 Measurements of the dynamic stresses B tropic decks of steel railway bridges RP 5 26/09/1989 Fatigue calculations for the ortho- B RP 6 26/09/1989 Final report B of steel riveted connections DT 176 01/09/1986 Statistical analysis of fatigue tests B Schwingfestigkeitsversuchen an einer orthotropen Fahrbahnplatte mit offenen Steifen und Schotterbett Exists only in German DT 205 01/04/1989 Beschreibung und Auswertung von mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 199 of 330 Project A 155 Price Code Title Approved USE OF ELECTRONICS IN RAILWAY SIGNALLING Document B analysis of applications RP 1 01/09/1982 Review of published literature and B of Safety Information RP 2 01/12/1982 Theoretical background of Transmission B overview RP 3 01/04/1985 Software for safety systems - an B the protection of safety information during transmission RP 4 01/09/1984 A survey of the available measures for B RP 5 01/04/1985 Errors in digital transmission systems B ments specification RP 6 01/09/1985 Computer based safety systems require- B systems RP 7 01/04/1986 The design of computer based safety B systems RP 8 01/04/1986 On proving the safety of transmission B safety systems RP 9 01/09/1986 Software design for computer based B using non-safety-specific systems or equipment RP 10 01/09/1987 Transmission of safety information C safety systems RP 11 01/09/1987 Proof of safety of computer-based D components RP 12 01/04/1988 Failure catalogue for electronic B techniques and standards appropriate to the transmission of safety information RP 13 01/04/1988 Recommendations for protection B ling Computer programs for measurement and analysis of transmission error struc- tures for various transmission media and interference sources DT 177 01/01/1987 Use of electronics in railway signal- B of transmission error structures for various transmission media and inter- ference sources by Dipl.-Ing. G. List DT 184 01/05/1987 Results of the measurement and analysis B ling Studies concerning the efficacy of codes for protecting information against transmissions errors - by Dipl.-Ing. G. List - DT 185 01/04/1987 Use of electronics in railway signal- mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 200 of 330 Project D 156 LURGICAL MEANS Price Code Title Approved POSSIBILITIES OF IMPROVING THE SERVICE CHARACTERISTICS OF RAILS BY METAL- Document D resistance of rails in the unused condition RP 1 01/09/1984 Factors influencing the fracture B track due to brittle fracture RP 2 01/09/1985 Tests on used rails that failed in the B mination of the plane strain fracture toughness (K IC) of rail steels RP 3 01/09/1987 Recommended procedure for the deter- B improvement of the level of residual stresses RP 4 01/09/1987 Studies concerning the measurement and mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 201 of 330 Project A 157 Price Code Title Approved INTERFERENCE IN RAILWAY RADIO COMMUNICATIONS Document B systems in electrically noisy railway environments. Results of interference measurements and methods of application RP 1 01/09/1986 The design of radio communication B antennas for minimum mutual coupling (Final report) RP 2 01/09/1986 Optimisation of closely spaced B cations (literature report) "Radio interference by telecommunication and radio systems in the immediate vicinity" DT 167 01/01/1985 Interference in railway radio communi- B Distribution measuring equipment developed by the A 157 Committee DT 168 01/05/1986 Description of the noise amplitude mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 202 of 330 Project A 158 Price Code Title Approved INDIVIDUAL WARNING SYSTEMS FOR PERSONNEL WORKING ON THE TRACK Document B RP 1 01/04/1983 Problem analysis B systems for personnel working on the track RP 2 01/04/1984 Specifications for individual warning B Specification for individual and gang warning systems for personnel working on the track RP 3/1 01/12/1996 Part I C Explanatory comments on the specifica- tion for individual and gang warning systems for personnel working on the track RP 3/2 01/12/1996 Part II C preproduction individual warning installations IWA RP 4 01/01/1994 Final report on the development of C RP 5 01/11/1997 Final report B aufgestellt von DR und MAV Exists only in German DT 156 01/10/1983 Funkausbreitung an Oberbaumaschinen, B fr die individuelle Warnung, von Dipl.-Ing. Roman Bednarkiewicz Exists only in German DT 157 01/02/1984 Hrbarkeitsversuche mit Warnsignalen B for individual warning installations DT 158 01/08/1983 Safety and reliability considerations B signals in individual warning systems for personnel working on the track, by M. Dipl.-Ing. R. Bednarkiewicz DT 172 01/12/1985 Audibility tests on continuous warning ND stellt von der Elektronik-Versuchs- stelle Wien-Arsenal fr und mit dem ORE-Ausschuss A 158 Exists only in German DT 187 01/01/1987 Laborversuche mit Detektoren aufge- ND Dipl.-Ing. STAAB Zentralstelle Sicherungs- und Tele- kommunikationstechnik der Deutschen Reichsbahn Exists only in German DT 203 01/12/1991 Feldversuche mit AEG-Zugdetektoren ND Exists only in German DT 238 01/06/1991 Feldversuche mit IWA-Prototypen B installation (IWA) DT 288 01/03/1993 Workshop on the individual warning mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 203 of 330 Project A 158 Price Code Title Approved INDIVIDUAL WARNING SYSTEMS FOR PERSONNEL WORKING ON THE TRACK Document B Sicherheitsprfung der Individualwarn- anlage der Firma STEIN GmbH (Deutsch- land) Autor: Herr LIST (ETI Arsenal, Wien) Exists only in German DT 318 01/05/1995 Kurzfassung zum Prfbericht ber die B warning system IWS Proceedings Rome, 27 June 1996 DT 340 27/06/1996 Presentation of the radio-controlled B Bericht ber die Entwicklung und Erprobung. Exists only in German DT 349 01/06/1997 Individualwarnsystem IWS mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 204 of 330 Project A 159 Price Code Title Approved RAILWAY APPLICATION OF OPTICAL FIBRE COMMUNICATIONS Document E optical fibre communication systems RP 1 01/09/1987 Guidelines for the design of railway C investigations of connectors in automatic coupler on Vienna Stadtbahn RP 2 * 01/09/1987 Application on rolling stock and B communications. Systems installed or in course of installation at the end of 1982 DT 144 01/11/1983 Railway applications of optical fibre B particular reference to vibration - literature study, by W.R. Smith, ORE Engineer DT 171 01/09/1985 Fracture of optical fibres, with B for on-site splicing of optical fibres used in railway service DT 194 * 01/02/1988 Installation and evaluation of methods mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 205 of 330 Project D 160 Price Code Title Approved PERMISSIBLE DEFLECTION OF BRIDGES Document B RP 1 01/12/1983 Bibliographical study and presentation D RP 2 01/04/1984 Analysis of existing computer programs B when passing over the Hrstel and Plattling bridges RP 3 01/04/1985 Tests and measurements carried out C generated when passing over bridges RP 4 01/09/1986 Effect on comfort of vibrations D tion and measurements on two bridges - Selection of the most suitable computer program RP 5 01/04/1986 Comparison of the results of calcula- C RP 6 01/04/1988 Final report B Prsentation de la littrature, tabli par le CE D 160 Exists only in French DT 160 * 01/06/1984 Flche admissible des ponts B - Discussion and explanations - "Permissible deflection of bridges" DT 190 01/09/1986 Presentation of the report of ISVR B bei Hrstel und am Isar-Viadukt bei Plattling im Netz der DB Exists only in German DT 201 01/09/1988 Versuche an der Ems-Weser-Kanal-Brcke B des calculs effectus l'aide des 3 programmes SNCB, CSD et UPM (TRIGRA) Exists only in French DT 202 01/07/1988 Prsentation des rsultats dtaills mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 206 of 330 Project D 161 TRACK MAINTENANCE Price Code Title Approved DYNAMIC VEHICLE/TRACK INTERACTION PHENOMENA, FROM THE POINT OF VIEW OF Document B the evolution of track geometry based on historical information RP 1 01/04/1987 General conditions for the study of C rails from their defect occurrence RP 2 01/04/1987 Assessment of the service life of C recommendations RP 3 01/09/1988 Final report - Conclusions and mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 207 of 330 Project D 161.1 Price Code Title Approved DYNAMIC EFFECTS OF 22.5 T AXLE LOADS ON THE TRACK Document C taken on the track under 20 and 22.5 t axle loads RP 1 01/09/1985 Results of acceleration measurements C with the ORE measuring train with axle loads of 20 and 22.5 t RP 2 01/04/1986 Analysis of dynamic measurements taken C track with 20 and 22.5 t axle-loads RP 3 01/09/1986 The influence of wheelflats on the D axle load from 20 to 22.5 t and the estimated increase in track maintenance costs RP 4 01/09/1987 The dynamic effects due to increasing mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 208 of 330 Project E 162 Price Code Title Approved NON-DESTRUCTIVE TESTING OF RAILWAY ITEMS IN SERVICE Document B methods used for tyres, wheels, axles, springs and draw gear components RP 1 01/04/1984 Survey of non-destructive testing B components. Literature survey and emperical assessment having regard to non-destructive testing RP 2 01/04/1985 Laws of track propagation in railway B in service in tyres, wheels and axles RP 3 01/04/1986 Cracks and fractures which may occur B in rails and rail welds RP 4 01/04/1987 Cracks and fractures which may occur B wheels and axles RP 5 01/04/1987 Type and size of critical defects in B rails and rail welds RP 6 01/04/1988 Type and size of critical defects in B axles and draw hooks in service: state of the art, experience and recommen- dations RP 7 01/09/1988 Non-destructive testing of wheels, B removing the wheels RP 8 01/09/1987 Inspection of wheel treads without B rupture linaire- lastique en tech- nique ferroviaire, par le Dr Ing. Edel Exists only in French and German DT 155 01/09/1984 Application de la mcanique de la B diction des cycles optimaux de contrle des essieux-axes en service par la mthode aux ultrasons Exists only in French DT 181 01/01/1987 Modle mathmatique en vue de la pr- B risse in laufflchengebremsten Voll- rdern auf der Grundlage der probabi- listischen Bruchmechanik, von Dr.-Ing. Karl-Otto Edel Exists only in German DT 182 01/01/1987 Die Festlegung zulssiger Radkranzquer- B fr Schienen und Schienenschweissungen auf der Grundlage der probabilistischen Bruchmechanik, von Dr.-Ing. Karl-Otto Edel Exists only in German DT 183 01/01/1987 Die Festlegung zulssiger Rissgrssen mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 209 of 330 Project C 163 Price Code Title Approved RAILWAY NOISE Document C standard for ERRI Project C 163. Origin number: RR-SPS-97-012 Issue 1 SP 1 27/03/1999 Draft proposal for noise measurement B of railway traffic noise and railway noise compared with the noise from other traffic sources RP 1 01/04/1985 Literature survey concerning the effect C railway traffic noise RP 2 01/04/1985 Directives for the measurement of B cation of noise sources on wagon and their running gear RP 3 01/04/1985 Experimental study on the identifi- B units and recommendations regarding solutions to the problems of noise suppression RP 4 01/04/1986 Noise from electric and diesel traction B Existing mathematical models and research prospects RP 5 01/09/1985 Wheel/rail contact noise - B tion of noise sources on wagons and their running gear (Part 2) RP 6 01/04/1986 Experimental study on the identifica- B study between theoretical model and measured results RP 7 01/04/1986 Wheel/rail contact noise - Comparative B comparative analysis of noise, vibration and roughness data RP 8 01/09/1987 Wheel/rail contact noise - further B experimental comparison of various systems for measuring the rail roughness RP 9 01/04/1988 Wheel/rail contact noise - an B for traffic and industrial noise RP 10 01/09/1988 Laws, rules and calculation methods B Investigation into the application of a one-eight scale wheel-rail roughness test rig RP 11 01/09/1988 Wheel/rail contact noise B wheel/rail system of freight wagons RP 12 01/09/1988 Analysis of noise emission of the B mounted devices - laminated absorbers "A" - steel-shot absorbers "B" RP 13 26/09/1989 Reduction of running noise by wheel- B reduction of rolloing noise - Working plan RP 14 26/09/1989 Fundamental study to achieve the mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 210 of 330 Project C 163 Price Code Title Approved RAILWAY NOISE Document B wheel/rail system of freight wagons - Additional measurements RP 15 25/10/1990 Analysis of noise emission of the B development of a 1/8th scale wheel/rail roughness test rig RP 16 25/10/1990 Wheel/rail contact noise - Further B noise RP 17 04/04/1991 Level and nuisance of railway traffic B reduction of rolling noise Progress Report, mid-1990 - Current level of knowledge regarding excitation and vibratory and acoustic response of wheel and rail RP 18 25/10/1990 Fundamental study to achieve the C barriers in Europe RP 20 01/07/1997 State of the art of railway noise B Validation of the model versus experimental data. RP 21 01/12/1996 Description of the TWINS model. C Track Final Report. RP 22 01/01/1998 OFWHAT - Optimised Freight Wheel And B of railway noise alone and railway noise compared with the noise from other traffic sources, by U. Mhler and A. Schmer-Kohrs DT 170 01/04/1985 Literature survey concerning the effect B ausgewhlten Triebfahrzeugen von J. Berndt (DR) Exists only in German DT 175 01/12/1985 Zusammenstellung von Lrmmessungen an B produced by railway wheels, by Mr. Reybardy (SNCF) and Mr. Zach (CFF) DT 180 01/03/1989 Methods of reducing the running noise B produced by various modes of transport - Air - Road - Rail by Jean Reybardy (SNCF) DT 186 01/10/1986 Compilation of information on the noise B ment methods - by M. Westcott and A.P. Bloomfield DT 193 01/12/1986 Assessment of rail roughness measure- B and detailed evaluation of a theoreti- cal model for the generation of wheel and rail vibration due to surface roughness - by D.J. Thompson DT 204 01/06/1988 Wheel/rail contact noise: Development mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 211 of 330 Project C 163 Price Code Title Approved RAILWAY NOISE Document C Laboratory measurements of 5 types of wheel and comparisons with theory by D.J. Thompson and M.G. Dittrich DT 248 * 01/06/1991 Wheel response and radiation - mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 212 of 330 Project B 164 Price Code Title Approved ADHESION DURING BRAKING, AND ANTI-SKID DEVICES Document B concerning adhesion RP 1 01/09/1985 Synthesis of current knowledge C RP 2 18/04/1990 Fundamental laws of adhesion in braking B knowledge of poor adhesion conditions acquired since publication of B 164/RP 2 DT 257 01/07/1992 Summary of theoretical and practical mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 213 of 330 Project B 165 Price Code Title Approved DYNAMIC RESISTANCE OF DRIVERS' CABS TO FRONTAL IMPACTS Document D methods RP 1 01/04/1985 Structure impact resistance calculation ND structural design principles for driving cabs RP 2 01/04/1986 Analysis of accidents and present ND RP 3 01/09/1987 Tests on panelling ND to analysis of rail vehicle impacts RP 4 01/09/1987 Applications of mathematical modelling ND design of drivers' cabs RP 5 01/09/1987 A proposed philosophy for structural B RP 6 01/09/1988 Energy absorbing components G RP 7 04/04/1991 Study on obstacle deflectors ND design RP 8 04/04/1991 Technical description of the vehicle G of the test site and test procedures RP 9 04/04/1991 Full-scale collision tests. Description G with predictions RP 10 01/10/1991 Results of impact test and comparison B amendments to UIC Leaflets RP 12 01/10/1992 Summary of work and recommendations for B frontaux des postes de conduite Rsultats des calculs par les membres du GT B 165/5 prsid par M. Lagneau (SNCF) corrig par M. Kaminski (ORE) Exists only in French DT 242 01/04/1991 Rsistance dynamique aux impacts B cabs with improved resistance to frontal impacts by Mr. J.H. Lewis (BR), Dr. J. Pawlus (PKP) DT 245 01/10/1991 Detailed results of tests of drivers' mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 214 of 330 Project B 166 Price Code Title Approved FAULT DIAGNOSTICS FOR AND ON TRAINS Document B to railway vehicles (Survey report) RP 1 01/04/1987 Application of diagnostic techniques B coaches (2nd edition) RP 2 01/09/1991 Specification for diagnostics on C diagnostics on coaches RP 3 01/09/1995 Specification for the application of B multiple units (Literature survey and results of questionnaire) RP 4 01/09/1993 Use of diagnostics on tractive and B DT 200 01/06/1988 Diesel engine diagnosis by oil analysis B DT 206 01/06/1988 Methods of wheelset diagnosis B electric tractive units DT 207 01/11/1989 On-board diagnosis of diesel and B DT 208 01/09/1991 On-board diagnosis of coaches B and motor sets - experience of the railways DT 333 01/12/1995 Technical diagnostics in traction units mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 215 of 330 Project C 167 Price Code Title Approved TRAINS RUNNING AT HIGH SPEED IN TUNNELS Document C through tunnels: Tests in the Costa dei Rosi tunnel RP 1 01/04/1985 Thermal phenomena of trains passing B through tunnels: Resistance to forward movement. Tests in the tunnels Costa dei Rosi, Castiglione and Pizzi di Foglia RP 2 01/09/1985 Aerodynamic phenomena of trains passing B trains pass through tunnels. Slipstream measurements: Tests on dummies in the Costa dei Rosi tunnel. Trackside measurements of air velocity and pressure RP 3 01/04/1986 Aerodynamic phenomena occurring when B through tunnels: Transient pressures produced by two passenger trains passing and running singly in Costa dei Rosi tunnel RP 4 01/04/1986 Aerodynamic phenomena of trains passing D and their loads when trains pass in tunnels; tests carried out on the FS "Direttissima" line in Oct. 1984 RP 5 01/04/1986 Pressure changes and forces on wagons B trains pass through tunnels: Tests carried out on the Direttissima line in the Costa dei Rosi, Castiglione and Pizzi di Foglia tunnels RP 6 01/09/1985 Aerodynamic phenomena occurring when B outside of coaches and at the tunnel mouth RP 7 01/09/1985 Acoustic measurements on the inside and C noise into railway vehicles RP 8 01/09/1986 Test rig study on the penetration of C effects produced by the transit of a single train through a tunnel (Patchway Tunnel) RP 9 01/04/1987 An investigation into the thermal B trains pass through tunnels Schlchtern tunnel: pressure changes with open and closed ventilation shaft RP 10 01/09/1986 Aerodynamic phenomena occurring when B trains passing at speeds close to 200 km/h in a tunnel with air-shafts (Chipping Sodbury Tunnel) RP 11 01/04/1987 Pressure transients produced by two E the aerodynamic - acoustic and thermal fields (Final Report) RP 12 01/04/1987 Synthesis of the results obtained in mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 216 of 330 Project C 167 Price Code Title Approved TRAINS RUNNING AT HIGH SPEED IN TUNNELS Document B organised by ORE on the subject of problems caused by trains running at high speed in tunnels, by Messrs. Gawthorpe, Glckle, Hlzl DT 188 01/12/1986 Report on a study trip to Japan mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 217 of 330 Project A 168 Price Code Title Approved RAILWAY ENERGY PROBLEMS Document B ways to the survey concerning energy consumption RP 1 01/04/1987 Analysis of the replies of the rail- C of technical aids for ensuring as energy-optimum a driving mode as possible RP 2 01/09/1987 Investigations into the effectiveness B connection with the reduction of the arodynamic resistance of freight wagons RP 3 01/04/1988 Model tests in the wind tunnel in B the aerodynamic drag of freight wagons RP 4 01/09/1988 Track tests with a view to reducing B the questionnaire concerning the use of technical measures for achieving optimum driving from the point of view of energy consumption RP 5 26/09/1989 Analysis of the railways' replies to B of the railways RP 6 25/10/1990 Economic aspects of the energy policy B view to the reduction of the aerodyna- mic drag of freight wagons RP 7 01/10/1991 Model tests in the wind tunnel with a D aerodynamic drag of freight vehicles RP 8 01/07/1992 Line tests with a view to reducing the mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 218 of 330 Project B 169 Price Code Title Approved STANDARDIZATION OF WHEELSETS Document B thermal limits of wheels and brake blocks RP 1 01/09/1987 Selection of parameters for testing B dual stress field in the wheel rim RP 2 26/09/1989 Effect of frequent braking on the resi- E RP 3 01/10/1991 Research into the fracture threshold B wheel (rim diameter 920 mm) for coaches with a maximum speed of 160 km/h Standard wheelsets for block brakes RP 4 01/11/1993 Standardization of a block-braked solid C (immediate measures to avoid wheel fractures) RP 5 01/08/1993 Methods of monitoring solid wheelsets C Non-destructive ultrasonic determina- tion of the residual stresses in the rims of solid wheels RP 6 01/02/1996 Monitoring of solid wheels in service C blocks - monitoring of solid wheels in service - Non-destructive method of detecting cracks in wheel rims RP 7 01/06/1995 Thermal limits for wheels and brake D of solid wheels made of R7 steel Definition of a test method and an acceptance criterion RP 8 01/01/1995 Determination of the fracture toughness E dimensions; fatigue strength RP 9 01/11/1997 Specification for wheels. Mechanical F axisymmetrical wheels Verification of mechanical design: fatigue strength Towards a better shape for the wheel centre RP 10 01/01/1999 Definition of a specification for solid D wheels. Thermomechanical dimensioning. RP 11 01/11/1998 Definition of a Specification for solid E representative of damage to a railway component with a view to performing fatigue tests RP 12 01/10/1997 Production of a universal matrix D Regeneration of solid wheels exhibiting thermal damage RP 13 13/01/2001 Standardisation of wheelsets. mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 219 of 330 Project B 169 Price Code Title Approved STANDARDIZATION OF WHEELSETS Document F Improving the mechanical resistance of wheel materials for increased axleloads Study of steel grade R7T UCS RP 14 01/11/2001 Standardisation of wheelsets - F Increasing axle to more than 22,5 t for wheels with a diameter of 920 mm. Study on the detection of tread defects in wagon wheels. RP 15 01/05/2003 Standardisation of wheelsets. F measurements during the passage of a test train fitted with cast-iron and composite brake shoes. RP 16 01/12/2002 Standardisation of wheelsets. Sound F Definition parameters for the thermomechanical calculation of wheels Correlation between calcultions and tests RP 17 01/06/2006 Standardisation of wheelsets - F Vrification du comportement acoustique de nouvelles formes de roues - Base pour la partie 4 de la fiche UIC 510-5 Exists only in French and German RP 18 01/03/2005 Standardisation des essieux. F Critres de fatigue multiaxial. Rapport final Exists only in French and German RP 19 01/10/2004 Roues - Dimensionnement des roues. D Dtermination de la rpartition de l'nergie dissipe par le freinage, entre la roue et des semelles composites Exists only in French and German RP 20 01/06/2006 Standardisation des essieux. C d'essais de freinage pour l'homologation technique des roues selon la fiche UIC 510-5 - Vrification du comportement thermomcanique Exists only in French and German RP 21 07/03/2005 Roues - Exigences requises des bancs D rsiduelles et de leur rpartition dans la jante des roues monobloc suivant la Fiche UIC 510-5 Exists only in French and German RP 22 01/02/2007 Roues - Dtermination des contraintes D thermomechanical stresses on wheels due to composite brake blocks RP 23 01/02/2007 Wheels. Definition of the extraordinary mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 220 of 330 Project B 169 Price Code Title Approved STANDARDIZATION OF WHEELSETS Document G roues et des semelles de frein composites (K) Exists only in French and German RP 24 01/02/2007 Roues - Expriences en service avec des F conditions de shuntage des circuits de voie des vhicules quips de roues freines par semelles en composite Exists only in French and German RP 25 01/01/2006 Suntage de la voie. Dfinition des C programme, using simulation of a service braking spectrum to determine the behaviour under wear of the wheel and brake block RP 26 01/02/2007 Wheels. Preparation of a rig test C des moyens de prslection des semelles composites vis vis de l'usure des roues et des sollicitations thermiques exceptionnelles Exists only in French and German RP 27 01/07/2006 Optimisation Roues / semelles. Etudes E defects in wheel running surfaces on noise emitted into the environment RP 28 01/02/2007 Optimisation of wheels. Effect of C passage de wagons quips de semelles en matriau composite de type "LL" Exists only in French and German RP 32 01/02/2007 Roues - Bruit en environnement au F composite sur le shuntage en ligne. Caractrisation physico-chimique et lectrique des semelles de frein en matriau composite vis--vis du shuntage en ligne en laboratoire. Exists only in French and German RP 33 01/11/2007 Influence des matriaux de freinage E d'essais de freinage au banc pour l'homologation technique des roues de diamtre nominal 680 mm selon la fiche UIC 510-5 Exists only in French and German RP 38 01/03/2008 Roues - Dfinition des paramtres B viaires; mthodes de dtermination Auteurs: Markus Diener, Dr. sc. techn. Wolfgang Kunnes, Dr.-Ing. Roland Mller, Dipl.-Ing. Exists only in French and German DT 251 01/10/1991 Tenacit la rupture des roues ferro- A dcomposition des semelles composites sur la qualit de l'air Exists only in French and German DT 397 01/02/2007 Matriel fret. Influence de la mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 221 of 330 Project B 169 Price Code Title Approved STANDARDIZATION OF WHEELSETS Document E cadre du groupe UIC 5T53-1 avec des semelles de frein en matriau composite (K) montes sous wagons. Etude des endommagements des roues monobloc observes en rapport avec l'admission RIV des semelles de frein K pendant la surveillance de 3 ans en service commercial Exists only in French and German DT 398 01/03/2005 Essais en service effectus dans le B circuits de voies en Europe Exists only in French and German DT 399 01/10/2004 Roues - Suntage. Recensement des E Etude de l'influence des semelles en matriau composite sur l'adhrence roue/rail Exists only in French and German DT 401 01/03/2005 Optimisation roues/semelles E /wheelsets. Part 1: introductions, terminology, classification of defects, types of defects on wheelsets DT 405 01/06/2006 Catalogue of defects on wheels / axles B wheels / axles / wheelsets. Summarised results of the questionnaire on wheelset defects DT 406 01/10/2004 Supplement to catalogue of defects on E texture and geometry of wheels after shuntage testing DT 409 01/08/2006 Wheels. Characterisation of the surface mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 222 of 330 Project B 169.4 Price Code Title Approved ANALYSIS OF INTERNATIONAL REPORTS ON BLOCK-BRAKED MONOBLOC WHEELS Document C measurements R7 grade soloid wheels DT 372 01/10/1998 Statistical study of toughness B Residual stress measurements on block-braked solid wheels. DT 378 01/08/1999 Statistical analysis mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 223 of 330 Project B 169.5 920 MM Price Code Title Approved INCREASING AXLE LOADS BEYOND 22.5 T FOR WHEELS WITH A DIAMETER OF Document C ratio of wheel load to wheel diameter. DT 375 01/08/1999 Literature study on increasing the P/D mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 224 of 330 Project D 170 STANDARDIZATION OF CHARACTERISTICS AND ACCEPTANCE TESTS Price Code Title Approved TRACK COMPONENT DIMENSIONS. Document B fastening systems and concrete sleepers RP 1 01/04/1988 Current test methods and loads for B methods on fastenings RP 2 26/09/1989 Comparison of various current test C procedure and formulation of recommen- dations RP 3 18/04/1990 Development of a standardised test E to be taken into account with respect to the definition of the properties of concrete sleepers, and comparison of current testing methods. Determination of a unified test method and formula- tion of recommendations RP 4 04/04/1991 Studies of different values which need B teristics and test methods RP 5 01/09/1994 Study of fastening system charac- C elements by Messrs Cervi et Fumey (SNCF) edited by Mr Kaminski (ERRI) DT 276 01/09/1994 Linear calculation using finite B in UIC 60 rail using rail fastening system W and rail pads Zw 687a AND Zw 700 by Dr.-Ing. Johannes Franz (DB AG) DT 282 01/09/1994 Calculation of twist and displacements C by wheel forces by Josef Turek (CD) Edited by Mr A. Kaminski (ERRI) DT 283 01/09/1994 Stresses in a fastening system caused G zur Bewertung von Schienenbefestigungen auf Betonschwellen Messergebnisse zusammengefasst bei Dr.-Ing. Johannes Franz (DB AG) ausgearbeitet bei Dr.-Ing. Andrej Kaminski (ERRI) Exists only in German DT 285 01/05/1995 Zustzliche Labor- und Streckenversuche C of pad stiffness by Mr Fumey (SNCF) edited by Mr Kaminski (ERRI) DT 302 01/09/1994 Characterization of the non-linearity B under the effect of wheel loads Test specification by Mr Fumey (SNCF) edited by Mr Kaminski (ERRI) DT 303 01/09/1994 Stressing of the rail fastening system mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 225 of 330 Project D 170 STANDARDIZATION OF CHARACTERISTICS AND ACCEPTANCE TESTS Price Code Title Approved TRACK COMPONENT DIMENSIONS. Document C tion tests on rail fastenings Dr.-Ing. Johannes Franz (DB AG) DT 304 01/09/1994 Conclusions for the execution of vibra- mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 226 of 330 Project A 171 LATIONS Price Code Title Approved CALCULATION METHODS FOR DETERMINING INTERFERENCE WITH LIGHT CURRENT INSTAL- Document B RP 1 01/04/1988 Literature study B Velim RP 2 26/09/1989 Parameters of the test installation in B transverse noise (psophometric) voltage and its application to the locomotive test in Velim RP 3 04/04/1991 Rule-of-thumb method for estimation of mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 227 of 330 Project C 172 Price Code Title Approved IMPROVED CURVE NEGOTIATION Document B (Final report for Phase 1) RP 1 18/04/1990 Improved curve negotiation mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 228 of 330 Project D 173 Price Code Title Approved ROLLING CONTACT FATIGUE Document C rails RP 1 18/04/1990 Review of rolling contact fatigue in B 900 A rails and on 340/370 BHN head-hardened rails RP 2 18/04/1990 Laboratory tests on as-rolled grade E Track tests on naturally-hard and head- hardened test rails RP 3 01/01/1993 (Interim report) E naturally hard and two head-hardened rails by neutron diffraction RP 4 01/01/1993 Residual stress measurements on G and fatigue strength of naturally hard UIC 860 grade 900 A and two head- hardened rails (340 and 370 HB) RP 5 01/11/1996 The rolling contact fatigue performance B service performance predictions RP 6 01/12/1993 Fatigue tests on head-checked rails and B recommended limits RP 7 01/02/1994 Rail steel cleanness assessment and D high strength rail steels RP 8 01/10/1995 Review of the development and use of B Tolerances RP 9 01/06/1994 Definition of Rail Head Profiles and B tion and wear in rails RP 10 01/12/1993 Energy studies concerning crack forma- C fatigue cracks Interim report (1988-1992) RP 11 01/06/1995 Stress analysis of rail rolling contact C tudinal residual stresses in rails using ultrasonic methods RP 12 01/02/1995 Non-destructive measurement of longi- C hardened test rails (2nd Interim Report) RP 13 01/06/1994 Track tests on naturally-hard and head- C edition of the UIC Catalogue of Rail Defects RP 15 01/02/1997 A proposal for a revision of the 1979 D in-service rail head grinding RP 16 01/06/1996 Control of rolling contact fatigue by C fatigue damage: site trial RP 17 01/08/1996 Effect of lubrication on rail head C naturally-hard and head-hardened rails RP 18 01/06/1996 Final report of track tests on mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 229 of 330 Project D 173 Price Code Title Approved ROLLING CONTACT FATIGUE Document C fatigue cracks - Final Report RP 19 01/06/1997 Stress analysis of rail rolling contact E Final Report RP 20 01/06/1997 Rail rolling contact fatigue C for different wheel/rail profile combi- nations DT 336 01/05/1996 Variation of normal contact stresses mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 230 of 330 Project A 174 Price Code Title Approved TRAIN DETECTION Document B and methods RP 1 01/01/1993 Review of train detection functions B "Improved immunity to electromagnetic interference" RP 2 01/03/1993 Analysis of replies to questionnaire B RP 3 01/12/1993 Final report mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 231 of 330 Project A 175 INFORMATION Price Code Title Approved RAILWAY RADIO PROPAGATION, INCLUDING ASPECTS OF TRANSMISSION OF SAFETY Document D railway lines and in tunnels in the 900 MHz band RP 1 01/06/1993 Radio wave propagation in stations, on C (Final report) RP 2 01/07/1992 Transmission of safety information B in the 900 MHz Band DT 226 01/04/1990 Literature report "Radio transmission B aspects of transmission of safety information Description of the 900 MHz measuring system DT 256 01/07/1992 Railway radio propagation, including mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 232 of 330 Project B 176 Price Code Title Approved BOGIES WITH STEERED OR STEERING WHEELSETS Document C specifications Volume 2: Specification for a bogie with improved curving characteristics Volume 3: Specifications for a bogie with improved curving characteristics designed for body tilt RP 1 26/09/1989 Volume 1: Preliminary studies and C prototypes RP 2 25/10/1990 Invitation to tender and selection of ND RP 3 01/10/1991 Test execution and results ND ride studies RP 4 01/06/1993 Assessment of the results of vehicle- ND the service tests and Final Report Volume 2: Reports from the Service Test Managers on the service tests on FS, BB, SBB and DB - Final Report - RP 5 01/10/1993 Volume 1: Assessment of the results of ND tiveness analysis (cost-efficiency analysis) DT 232 01/06/1991 Description of computer-aided effec- ND DT 233 01/06/1991 Contract negotiations and contracts ND of test centres and test sections DT 247 01/06/1991 Specifications for tests and selection ND applied to bogies DT 259 01/11/1991 Failure mode and effect analysis B on vehicle profiles DT 278 01/05/1993 Influence of lateral swing bolster play B applied to the Fiat Y0270 S (Eurofima) bogies DT 287 01/07/1993 Failure mode and effect analysis B Results and assessment DT 290 01/08/1993 B 176/3 Benchmark problem B und der Kraftschlussverhlt- nisse auf das Bogenlaufver- halten von radial einstellbaren Radstzen Theoretische Grundlagen Exists only in German DT 292/1 01/10/1993 Band 1: Einfluss der Berhrgeometrie mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 233 of 330 Project B 176 Price Code Title Approved BOGIES WITH STEERED OR STEERING WHEELSETS Document B und der Kraftschlussverhlt- nisse auf das Bogenlaufver- halten von radial einstellbaren Radstzen Messen der Ausdrehwinkel an einem 2-achsigen Gterwagen auf Strecken der SBB und BB Exists only in German DT 292/2 01/10/1993 Band 2: Einfluss der Berhrgeometrie B und der Kraftschlussverhlt- nisse auf das Bogenlaufver- halten von radial einstellbaren Radstzen Schienenprofilmessungen in Bgen auf den Netzen der BB und SBB Exists only in German DT 292/3 01/10/1993 Band 3: Einfluss der Berhrgeometrie B und der Kraftschlussverhlt- nisse auf das Bogenlaufver- halten von radial einstellbaren Radstzen Untersuchungen des Schmierzu- standes und Kraftschlusses in Bgen der Netze der BB und SBB Exists only in German DT 292/4 01/10/1993 Band 4: Einfluss der Berhrgeometrie B und der Kraftschlussverhlt- nisse auf das Bogenlaufver- halten von radial einstellbaren Radstzen Beurteilung der Ergebnisse, Schlussfolgerungen und Empfehlungen Exists only in German DT 292/5 01/10/1993 Band 5: Einfluss der Berhrgeometrie B l'usure des roues sur des objets d'essais (Document comportant 6 parties) Exists only in French DT 294 01/10/1993 Etudes de la gomtrie de contact et de mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 234 of 330 Project B 177 700 M LONG, OPERATED USING THE P-BRAKE POSITION Price Code Title Approved PROBLEMS CONNECTED WITH THE BRAKING AND DYNAMICS OF GOODS TRAINS UP TO Document ND parameters and presentation of recommendations RP 2 18/04/1990 Calculations and tests using selected ND reducing longitudinal compressive forces for future services using long P-braked goods trains for international transport RP 3 01/03/1993 Research into technical measures for D measures aimed at reducing the longitudinal compressive forces in long P-braked trains in the future basic international freight service. Effects of using brake position P on the braking of long trains of wagons during shunting RP 4 01/03/1995 Study of technical and operating ND forces in customer-related service freight trains RP 5 01/11/1997 Study of the longitudinal compressive ND the longitudinal compressive forces in freight trains in the High-Quality Service RP 6 01/11/1997 Study of technical measures to reduce B programme de calcul B 36/RP 22 dition 2 Exists only in French and German DT 178 01/01/1997 Instructions pour l'utilisation du mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 235 of 330 Project B 177.1 TRAINS UP TO 700 M LONG, OPERATED USING THE P-BRAKE POSITION Price Code Title Approved RISK OF DERAILMENT DUE TO HIGH LONGITUDINAL COMPRESSIVE FORCES IN GOODS Document ND mass restrictions according to B 177 RP 1 01/03/1993 Probability of derailment when applying ND variant restrictions to the mass restrictions according to B 177 RP 2 01/11/1993 Probability of derailment when applying ND draillement de wagons critiques situs dans des rames d'une longueur jusqu' 700 m, par suite d'efforts longitudi- naux de compression levs Exists only in French and German DT 284 01/01/1993 Dtermination de la probabilit de mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 236 of 330 Project B 177.4 Price Code Title Approved COMPUTER PROGRAM RELATING TO THE LONGITUDINAL DYNAMICS OF TRAINS Document B longitudinal dynamics processes in trains RP 1 * 01/05/1999 E-TRAIN simulation program for studying mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 237 of 330 Project B 177.5 TRAINS WITH SCREW COUPLINGS AND WITH AUTOMATIC DRAW-ONLY COUPLERS Price Code Title Approved DERAILMENT RISK FROM HIGH LONGITUDINAL COMPRESSIVE FORCES FOR FREIGHT Document ND compressive forces for freight trains with screw couplings and with automatic draw-only couplers RP 1 01/09/1999 Derailment risk from high longitudinal mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 238 of 330 Project C 178 MICALLY LOADED COMPONENTS Price Code Title Approved STANDARDIZATION OF THE METHODS FOR THE DETERMINATION OF THE LIFE OF DYNA- Document C representative service stresses RP 1 01/08/1992 Handbook for the measurement of C the fatigue life of components RP 2 01/07/1993 Comparison of methods for determining B SNCF during tests on the Z 7300 bogie using the PKP method DT 269 01/07/1993 An analysis of signals recorded by D Measurement of stresses on the under- frame DT 270 01/06/1993 Z 7300 (Z2) motor bogie B during tests on the Z 7300 bogie using the BR method DT 271 01/07/1993 An analysis of signals recorded by SNCF mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 239 of 330 Project C 179 Price Code Title Approved RAILWAY AERODYNAMICS Document B Dynamics to railway aerodynamic problems RP 1 25/10/1990 Applicability of Computational Fluid B the open air over typical track, using the coasting method (BR Analysis) RP 2 01/10/1991 Determination of train resistance in C relating to problems of strong winds, load displacement and aerodynamic effects in the vicinity of the track RP 3 * 25/10/1990 Summary of replies to the questionnaire C graphs in strong cross winds (tests in Emmen wind tunnel - Switzerland) Part 2: Tables and figures to Part 1 RP 4 * 01/10/1991 Part 1: Aerodynamic behaviour of panto- B behaviour on a train in the open air by pressure tube techniques RP 5 01/10/1991 Measurements of the boudary layer B on open track using techniques adopted by DB RP 6 01/05/1992 The determination of train resistance B train in the open air using the coasting method (FS and SNCF Analysis) RP 7 01/09/1992 Determination of the resistance of a E using on-board laser anemometers to measure the velocities of airflows around a train RP 8 01/04/1993 Tests to determine the feasibility of D aerodynamic drag of a train in the open air RP 9 01/04/1993 Rsum of test methods to determine the C techniques and of their applicability in the field of railway aerodynamics by Paul Caille SNCF - Department of cybernetic research and technology DT 228 01/02/1990 Review of computational flow dynamics B CFD approaches to the modelling of two complex train airflow situations, by C.W. Pope and T. Johnson - British Rail Research Aerodynamic Unit - Derby DT 229 01/04/1990 Critical appraisal of 3 independent C abnehmern bei starken Seitenwinden Windkanalversuche im Emmen (Schweiz) am Dornier-Stromabnehmer Exists only in German DT 236 * 01/10/1990 Aerodynamisches Verhalten von Strom- mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 240 of 330 Project C 179 Price Code Title Approved RAILWAY AERODYNAMICS Document C nehmern bei starken Seitenwinden Windkanalversuche in Emmen (Schweiz) am Schunk-Stromabnehmer Exists only in German DT 237 * 01/10/1990 Aerodynamisches Verhalten von Stromab- C A.P. Gaylard and T. Johnson DT 258 01/07/1992 CFD Investigation of train roof flows mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 241 of 330 Project B 180 Price Code Title Approved SYSTEM FOR OVERRIDING THE EMERGENCY BRAKE Document C main brake pipe during emergency braking and the possibility of over- riding the braking process once initiated RP 1 26/09/1989 Study of the pressure conditions in the D RP 2 01/02/1992 Emergency brake over-ride systems mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 242 of 330 Project D 181 Price Code Title Approved LATERAL FORCES ON RAILWAY BRIDGES Document B literature survey RP 1 04/04/1991 Summaries of national standards and B application RP 2 01/03/1992 Submitted programs and example of B bridge over the Brenta river on the Milan-Venice line at 234 + 0.963 km RP 3 01/09/1993 Dynamic measurements on the steel B over the Vh river by Sala on the Marchegg-Szob line at 117 748 km RP 4 01/07/1994 Dynamic measurements on steel bridges B arched bridge on PKP RP 5 01/12/1994 Dynamic measurements on the metal C RP 6 01/06/1996 Final Report B filtre sur les valeurs mesures des forces verticales et latrales sur les rails Exists only in French DT 312 01/09/1994 Etude de l'influence de la frquence du B pont souple (cas du PONT de LIXHE) - Ligne SNCB de TONGRES-MONTZEN - par J.J. REBER SBB - Bau GD Exists only in French DT 313 * 01/12/1994 Analyse des dformations latrales d'un E Part 1: Parametric study - Initial phase (September 1994) Part 2: Parametric study - Phase 2 (February 1995) Authors: L.T. James and G.A. Scott DT 329 01/06/1995 Parametric study mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 243 of 330 Project D 182 THE BALLAST CONDITION IN THE TRACK Price Code Title Approved UNIFIED ASSESSMENT CRITERIA FOR BALLAST QUALITY AND METHODS FOR ASSESSING Document E and acceptance conditions RP 1 01/10/1991 Studying the current quality of ballast D track RP 2 01/10/1991 Assessment of ballast condition in the C durability using triaxial tests RP 3 01/09/1994 Determining the criteria for ballast B and description of the quality assurance system for railway ballast RP 4 01/03/1995 Standardized technical specifications B material using a simulation test with Vibrogir by Mr Blanc, SNCF DT 289 01/07/1993 Determining the properties of ballast B the grain size distribution on the physical-mechanical engineering pro- perties of coarse grained materials by ir. P. Lubking DT 315 01/01/1995 Literature Study on the influence of mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 244 of 330 Project D 183 RAILWAY BRIDGES Price Code Title Approved STRESSES AND STRENGTH OF REINFORCED AND PRESTRESSED CONCRETE DECKS ON Document B reinforced and prestressed concrete decks on railway bridges. State of the art in 1990 on 16 railways RP 1 01/11/1992 Loads, dimensioning and construction of B ballasted and direct fastening rein- forced and prestressed concrete deck bridges RP 2 04/04/1991 Details of strain gauge measurements on C of the measured bridges RP 3 01/05/1996 Summary of technical data and figures C RP 4 01/11/1996 Evaluation of static measurements C RP 5 01/12/1996 Evaluation of dynamic tests C RP 6 01/11/1996 Evaluation of fatigue measurements B Formulae for ENV 1992-2 DT 346 01/06/1997 Loading, Resistance, Verification mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 245 of 330 Project D 184 SPEEDS AND AXLE LOADS Price Code Title Approved IMPROVED DURABILITY OF SWITCHES AND CROSSINGS SUBJECTED TO INCREASED Document B to be tested, the test conditions and test methods RP 1 01/10/1992 Summary of the common crossing designs B design RP 2 01/07/1996 Optimization of check rail geometry and C RP 3 01/10/1996 Switch blades C Presentation of results, conclusions and recommendations for improving the geometry of crossings RP 4 01/10/1996 Tests on different types of crossings. mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 246 of 330 Project D 185 Price Code Title Approved REDUCTION IN CORRUGATION OF RAILS Document C Comparison of results obtained using the Berlin Technical University and British Rail methods RP 1 01/01/1993 Rail corrugation models. C rail corrugation and metallurgical examinations carried out on the CFF, DB and NS corrugation test tracks RP 2 01/02/1997 Analysis of geometric measurements of C tions and validation by measurement RP 3 01/02/1997 Theoretical modelling of rail corruga- C RP 4 01/02/1997 Summary of the studies: Final Report C DT 265 01/06/1992 Rail corrugation measuring instruments ND DB and NS corrugation test tracks Description of initial situations: tests tracks, grinding methods, measuring techniques DT 298 01/07/1995 Grinding tests and measurements on CFF, mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 247 of 330 Project A 186 Price Code Title Approved PANTOGRAPH/OVERHEAD LINE INTERACTION Document E the overhead/pantograph system (two pantograph raised) RP 1 01/04/1996 Simulation of the dynamic behaviour of D pantograph contact point, when stationary and when starting RP 2 01/01/1996 Maximum current at contact wire/ E for four raised pantographs RP 3 01/04/1995 Pantograph/overhead dynamic simulations E contact strips and contact wires RP 4 01/06/1996 Study of the technical compatibility of E graph contact point, at high speed RP 5 01/09/1996 Maximum current at contact wire/panto- D of the wire-strip system RP 6 01/05/1996 Measurement of the contact resistance G simulations. Stage 3: Pantograph optimisation RP 8 01/09/1996 Pantograph/overhead dynamic E electrical and thermal contact between contact wire and contact strip RP 9 01/09/1996 Parameter study by simulation of the G RP 10 01/02/1997 Final Report ND and B&W pantographs on the Munich Freimann vibration rig DT 343 01/07/1996 Comparison between ATR 90, DSA 350 S ND trains DT 348 01/06/1996 Compilation of test data from ICE mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 248 of 330 Project D 187 Price Code Title Approved DECISION SUPPORT SYSTEM FOR PERMANENT WAY MAINTENANCE AND RENEWAL Document ND expert systems RP 1 01/01/1993 Specification for a prototype based on ND RP 2 01/09/1995 The ECOTRACK prototype ND DT 299 01/04/1994 Decision rules and data requirements ND DT 330 01/11/1995 Test of ECOTRACK Prototype mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 249 of 330 Project A 188 Price Code Title Approved AUTOMATIC VEHICLE IDENTIFICATION Document ND RP 5 04/04/1991 Comparison of different AVI systems ND Identification Equipment RP 6 01/04/1992 Recommendations for Automatic Vehicle B Identification (AVI) DT 241 01/06/1991 Laboratory tests of Automatic Vehicle ND DT 266 01/09/1992 Final report on AVI tests mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 250 of 330 Project D 189 Price Code Title Approved LOADING DUE TO DYNAMIC PRESSURE AND SUCTION FROM RAILWAY TRAFFIC Document B trains on structures adjacent to the track RP 1 01/01/1994 Effect of the slipstream of passing mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 251 of 330 Project D 190 VELOCITIES V > 160 KM/H Price Code Title Approved PERMISSIBLE DEFLECTION OF STEEL AND COMPOSITE BRIDGES FOR Document C RP 1 01/07/1993 Bridges-vehicles-computer programs B series of simply-supported spans RP 2 01/05/1994 Tests on viaducts consisting of a B continuous-span bridges RP 3 01/09/1994 Results of the dynamic tests on B RP 4 01/12/1995 Comparison: test/calculations E recommendations Final Report RP 5 01/12/1995 Parametric studies - summary and B vertical vibration on discomfort DT 307 01/07/1994 The effects of 1 and 2 Hz transient mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 252 of 330 Project D 191 Price Code Title Approved FATIGUE LIFE OF AN ORTHOTROPIC DECK WITH OPEN RIBS OF ROLLED STEEL Document B tropic decks with open and closed longitudinal ribs, based on literature RP 1 01/09/1992 Evaluation of fatigue tests on ortho- B from orthotropic decks under static loads RP 2 01/09/1993 Theoretical studies on test specimens B mechanics of orthotropic plates on railway bridges RP 3 01/06/1995 Statics, dynamics and fracture B with orthotropic decks stiffened by open ribs Final Report RP 4 01/01/1996 Fatigue strength of railway bridges B nervures ouvertes en tle plate effectus l'ICOM Kim JENT (ICOM) Rolf BEZ (ICOM) Exists only in French DT 322 01/05/1995 Essais de fatigue des entretoises avec mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 253 of 330 Project D 192 RAIL-CARRYING STRUCTURES ON LINES USED BY INTERNATIONAL SERVICES Price Code Title Approved LOADING DIAGRAM TO BE TAKEN INTO CONSIDERATION FOR THE CALCULATION OF Document B present UIC 71 loading RP 1 01/03/1993 Theoretical basis for verifying the B traffic on international lines with UIC 71 loading based on deterministic calculation RP 2 01/04/1994 Comparison of present and future rail B and future rail traffic on internatio- nal lines with the effects from UIC 71 loading on a probabilistic basis RP 3 01/12/1994 Comparison of the effects of current C railway bridges with consideration of the live load diagram RP 4 01/05/1996 Study of the construction costs of C consideration for the calculation of rail-carrying structures on lines used by international services RP 5 01/11/1996 Loading diagram to be taken into mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 254 of 330 Project A 201 Price Code Title Approved HARMONIZATION OF FUNCTIONAL CONDITIONS OF SIGNALLING SYSTEMS Document C functional requirements - monitoring (interlocking function 3) RP 1 01/04/1997 Analysis of the specification of C selected aspects of the development of interlocking and its future performance requirements RP 2 01/12/1997 Background to the analysis stage and C RP 3 01/12/1997 Common Core Specification C RP 4 01/12/1997 Final Report C of a signalling interlocking: Interlocking functions 4 and 5 DT 323 01/12/1997 Analysis of the functional requirements C of a signalling interlocking: Interlocking functions 7, 8 and 9 DT 332 01/12/1997 Analysis of the functional requirements C functions by Yuji Hirao, Railway Technical Research Institute Editor: Bogdan Godziejewski, ERRI DT 334 01/08/1996 Japan Railways interlockings and their D of a signalling interlocking: Interlocking functions 1, 2, 6, 10, 11 and 12 DT 345 01/12/1997 Analysis of the functional requirements C of a signalling interlocking: Interlocking functions 13-21 DT 347 01/12/1997 Analysis of the functional requirements C functional requirements DT 355 01/12/1997 Presentation of discrepancies in the E ERTMS/ETCS DT 356 01/12/1997 Functional interface: Interlocking - mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 255 of 330 Project D 202 Price Code Title Approved IMPROVED KNOWLEDGE OF FORCES IN CWR TRACK (INCLUDING SWITCHES) Document C Investigations concerning CWR RP 1 01/08/1994 Proposals for theoretical model C in behaviour of CWR track RP 2 01/11/1995 Review of existing experimental work C RP 3 01/02/1995 Theory of CWR track stability C RP 4 01/03/1999 Stability of continuous welded track C RP 5 01/04/1999 Creep behaviour of CRW track C adjoining CWR track zones TURN program and analysis of factors that influence turnout response under a thermal load RP 6 01/03/1999 Interaction between welded turnouts and C measurements: synthesis report RP 7 01/04/1999 Lateral and longitudinal resistance C Track behaviour (prepared on the basis of PKP, MV und der TU Krakw research) RP 8 01/04/1999 Long-term investigations of CWR. C measurement of forces in CWR track. Summary RP 9 01/04/1999 Methods for the non-destructive C Laying and Maintenance of CWR Track RP 10 01/04/1999 Leaflet 720 R C analysis of CWERRI Verification of a FEM for the buckling resistance of tracks with continuous welded rails (CWR) RP 11 01/04/1999 Parametric study and sensitivity D RP 12 01/04/1999 Final Report D DT 360 01/10/1999 Lateral Resistance Tests E characteristics for ballasted track DT 361 01/02/1998 Measurement of lateral resistance D dimensional loading DT 362 01/04/1997 Ballast resistance under three- D longitudinal resistance and change of neutral rail temperature (NRT) for ballasted track Volume 1 Rail creep due to traction/braking Change of NRT due to Movement of sharp curves DT 363/1 01/10/1997 Measurements of lateral resistance, mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 256 of 330 Project D 202 Price Code Title Approved IMPROVED KNOWLEDGE OF FORCES IN CWR TRACK (INCLUDING SWITCHES) Document D longitudinal resistance and change of neutral rail temperature (NRT) for ballasted track Volume 2 Determination of lateral and longitudinal ballast resistance of a railway track by experimental tests DT 363/2 01/10/1997 Measurements of lateral resistance, D behaviour for ERRI D 202/3 DT 364 01/11/1997 Emperical research of CWR long-term mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 257 of 330 Project B 203 Price Code Title Approved TRANSMISSION OF INFORMATION IN THE TRAIN BY A CENTRAL DATA LINE Document D brake coupling Determination of the physical characteristics of the carrier and its capacity to transmit data RP 1 01/08/1996 Central data line via electropneumatic C (train bus tests) RP 2 01/08/1996 In-train data communication test B Programme and equipment DT 341 01/11/1996 On-train data communication tests B (train bus tests). Execution and results DT 342 01/11/1996 On-train data communication tests mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 258 of 330 Project C 204 Price Code Title Approved IMPROVEMENT OF THE PROTECTION AGAINST FIRE OF PASSENGER ROLLING STOCK Document B out using a cone calorimeter and on the calculations with the HAZARD 1.1 software package RP 1 * 01/06/1994 Progress report on the tests carried mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 259 of 330 Project C 204.1 Price Code Title Approved IMPROVEMENT OF THE FIRE PROTECTION OF PASSENGER ROLLING STOCK Document C into computer modelling of a fire in a railway vehicle RP 3 * 01/06/1997 Final report on the feasibility study B cone calorimeter to provide input data for computations by Mr Roy Young (British Rail) DT 301 * 01/05/1994 Results of laboratory tests using a B tests on seat materials and furniture calorimeter tests on mock-up seats by Roy Young (Scientifics, a business within the British Railways Board) Edited by Andrzej Kaminski, ERRI Technical Adviser DT 319 01/06/1995 Results of additional cone calorimeter E within railway passenger coaches using the HAZARD 1.2 software DT 358 01/11/1997 Computer simulation of the fire process mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 260 of 330 Project B 205.1 Price Code Title Approved ANALYSIS OF COLLISION ACCIDENTS Document D base. Definition of reference accident scenarios RP 1 01/04/1998 Statistical analysis of accident data- C accidents in Europe, during 1991-1995 DT 357 01/11/1997 Statistical analysis of collision mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 261 of 330 Project C 206.2 Price Code Title Approved EFFECTS OF AERODYNAMIC PHENOMENA ON WAGONS AND THEIR LOADS Document B Gterfahrzeugen im Mischverkehr Verfasser: H. Glckle (DB) H.-J. Wormstall-Reitschuster (DB) Herausgegeben von M. Kaminski, ERRI-Ingenieur Exists only in German DT 327 01/12/1995 Aerodynamische Belastungen von B tions sur les wagons lors des croise- ments avec des trains de voyageurs dans les tunnels Auteur: M. MALFATTI (FS) dit par M. Kaminski, Conseiller Technique l'ERRI Exists only in French DT 328 01/10/1995 Variations de pression et sollicita- C when encountering high-speed passenger trains in tunnels. Assessment of the actual situation DT 352 01/08/1997 Aerodynamic stress on freight wagons mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 262 of 330 Project B 207 AND CEN STANDARDS CONCERNED Price Code Title Approved EFFECTS OF VIBRATIONS ON PASSENGERS AND DRIVERS. APPLICATIONS OF THE ISO Document B RP 1 01/12/1996 Vibrations in drivers' cabs C in tilting and non-tilting vehicles on curved track RP 2 01/03/1997 Comfort evaluation of passengers seated mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 263 of 330 Project B 208P Price Code Title Approved DIESEL ENGINES Document C alternative fuel for railway vehicles RP 1 01/11/1997 Vegetable oil methyl ester as an C railway vehicles RP 2 01/03/1998 Natural gas as an alternative fuel for C RP 3 01/11/1997 In-service exhaust gas measurements C currently in service. RP 4 01/02/2000 Exhaust emissions from diesel engines D of in-service emission control of railway diesel engines. RP 5 01/01/2004 Diesel Engines. Evaluation of methods ND engines. UIC exhaust emission test performed on diesel engine MAN D 2876 LUE 601 against UIC Leaflet 624 <i>This report is the property of MAN Nutzfahrzeuge AG. It may not be released to third parties without the permission of that firm</i> RP C1 01/05/2003 Exhaust emission testing of diesel ND engines. UIC exhaust emission test performed on diesel engine MAN D 2876 LUE 602 against UIC Leaflet 624 <i>This report is the property of MAN Nutzfahrzeuge AG. It may not be released to third parties without the permission of that firm</i> RP C2 01/05/2003 Exhaust emission testing of diesel ND engines. UIC exhaust emission test performed on diesel engine MAN D 2876 LUE 603 against UIC Leaflet 624 <i>This report is the property of MAN Nutzfahrzeuge AG. It may not be released to third parties without the permission of that firm</i> RP C3 01/05/2003 Exhaust emission testing of diesel ND engines. UIC exhaust emission test performed on diesel engine MAN D 2876 LUE 604 against UIC Leaflet 624 <i>This report is the property of MAN Nutzfahrzeuge AG. It may not be released to third parties without the permission of that firm</i> RP C4 01/05/2003 Exhaust emission testing of diesel ND engines. UIC exhaust emission test performed on diesel engine MAN D 2876 LUE 605 against UIC Leaflet 624 <i>This report is the property of MAN Nutzfahrzeuge AG. It may not be released to third parties without the permission of that firm</i> RP C5 01/05/2003 Exhaust emission testing of diesel mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 264 of 330 Project B 208P Price Code Title Approved DIESEL ENGINES Document ND engines. UIC exhaust emission test performed on diesel engine MAN D 2876 LUE 606 against UIC Leaflet 624 <i>This report is the property of MAN Nutzfahrzeuge AG. It may not be released to third parties without the permission of that firm</i> RP C6 01/05/2003 Exhaust emission testing of diesel ND UIC approval test according to UIC Leaflet 623 of the MAN B&W 16 Rk 215 locomotive engine. <i>This report is the property of MAN B&W LtD. It may not be released to third parties without the permission of that firm</i> RP C7 01/01/2005 Acceptance testing of diesel engines. ND Approval against UIC Leaflet 623 of the MAN Railway Diesel Engine D2842 LE 622 as "derivative" engine to the approved engine D 2842 LE 606 <i>This report is the property of MAN Nutzfahrzeuge AG. It may not be released to third parties without the permission of that firm</i> RP C9 01/01/2007 Acceptance testing of diesel engines. ND CUMMINS NTA 855 R4 RAIL ENGINE in accordance with UIC Leaflet 623 (In-line 6 cylinder turbocharged horizontal engine, 310 kW @ 2100 rpm). <i>This report is the property of CUMMINS ENGINE LTD. It may not be released to third parties without the permission of that firm</i> RP D 30/09/1994 Report on the UIC approval test of the ND Report on the approval tests carried out in accordance with UIC Leaflet 623 (In-line 6 cylinder turbocharged horizontal engine, 298 kW @ 1800 rpm). <i>This report is the property of Socit IVECO-AIFO S.p.A. It may not be released to third parties without the permission of that firm</i> RP E 31/03/1995 IVECO-AIFO 8217 SRI Rail Engine ND Report on the approval tests carried out in accordance with UIC Leaflet 623 (In-line 6 cylinder turbocharged horizontal engine, 206 kW @ 2000 rpm). <i>This report is the property of IVECO-AIFO S.p.A. It may not be released to third parties without the permission of that firm</i> RP F 31/03/1997 IVECO-AIFO 8217 SI Rail engine mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 265 of 330 Project B 208P Price Code Title Approved DIESEL ENGINES Document ND (90-V12 turbocharged engine, 1400 kW @ 1800 rpm). <i>This report is the property of Socit ISOTTA FRASCHINI MOTORI S.p.A. It may not be released to third parties without the permission of that firm</i> RP H 31/07/1997 ISOTTA FRASCHINI V 1712 T2F rail engine ND (In-line 6 cylinder turbocharged vertical engine, 1150 kW @ 10000 rpm). <i>This report is the property of Socit ANGLO BELGIAN CORPORATION It may not be released to third parties without the permission of that firm</i> RP J 30/04/1998 ABC 6DZC-1000-144 rail engine ND V 1712 NF as a "derivative engine" of the V 1712 T2F (90-V12 naturally aspirated engine, 412 kW @ 1500 rpm). <i>This report is the property of Socit ISOTTA FRASCHINI MOTORI S.p.A. It may not be released to third parties without the permission of that firm</i> RP L 30/11/1999 ISOTTA FRASCHINI railway engine ND Carterpillar E3412 E-2T-JWAC (90-V12 turbocharged engine, 746 kW @ 2100 rpm). <i>This report is the property of Caterpillar E.A.M.E. It may not be released to third parties without the permission of that firm</i> RP M 01/11/2001 UIC acceptance of Diesel Engine ND engines. UIC emission test according to Leaflet 624 of the CATERPILLAR 3508 locomotive engine <i>This report is the property of CATERPILLAR Inc. It may not be released to third parties without the permission of that firm</i> RP M2 01/11/2005 Exhaust emission testing of diesel ND UIC approval test according to Leaflet 623 of the Caterpillar 3512 SCAC locomotive engine <i>This report is the property of CATERPILLAR S.A.R.L. It may not be released to third parties without the permission of that firm</i> RP M3 01/12/2007 Acceptance testing of diesel engines. mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 266 of 330 Project B 208P Price Code Title Approved DIESEL ENGINES Document ND Engine D 2842 LE 606 (90-V12 turbocharged engine, 662 kW @ 2100 rpm). <i>This report is the property of MAN Nutzfahrzeuge Aktiengesellschaft. It may not be released to third parties without the permission of that firm</i> RP N 31/12/2000 UIC Approval of the MAN Railway Diesel ND Engine D 2842 LE 602 as a "derivative engine" to D 2842 LE 606. (90-V12 turbocharged engine, 558 kW @ 2100 rpm). <i>This report is the property of MAN Nutzfahrzeuge Aktiengesellschaft. It may not be released to third parties without the permission of that firm</i> RP N1 01/12/2000 UIC Approval of the MAN Railway Diesel ND Engine D 2842 LE 603 as a "derivative engine" to D 2842 LE 606. (90-V12 turbocharged engine, 500 kW @ 2100 rpm). <i>This report is the property of MAN Nutzfahrzeuge Aktiengesellschaft. It may not be released to third parties without the permission of that firm</i> RP N2 01/11/2001 UIC Approval of the MAN Railway Diesel ND Engine D 2842 LE 604 as a "derivative engine" to D 2842 LE 606. (90-V12 turbocharged engine, 480 kW @ 1550 rpm). <i>This report is the property of MAN Nutzfahrzeuge Aktiengesellschaft. It may not be released to third parties without the permission of that firm</i> RP N3 01/11/2001 UIC Approval of the MAN Railway Diesel ND Engine D 2842 LE 607 as a "derivative engine" to D 2842 LE 606 (90-V12 turbocharged engine, 500 kW @ 2100 rpm). <i>This report is the property of MAN Nutzfahrzeuge Aktiengesellschaft. It may not be released to third parties without the permission of that firm</i> RP N4 01/11/2001 UIC Approval of the MAN Railway Diesel ND MAN Railway Diesel Engine D 2842 LE 609 as "derivative engine" to the approved engine D 2842 LE 606 (90-V12 turbocharged engine, 635 kW @ 1900 rpm). <i>This report is the property of MAN Nutzfahrzeuge Aktiengesellschaft. It may not be released to third parties without the permission of that firm</i> RP N5 01/04/2002 Approval against UIC Leaflet 623 of the mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 267 of 330 Project B 208P Price Code Title Approved DIESEL ENGINES Document ND Supplementary report on exhaust emission measurements against UIC Leaflet 624 (90-V12 turbocharged engine, 662 kW @ 2100 rpm). <i>This report is the property of MAN Nutzfahrzeuge Aktiengesellschaft. It may not be released to third parties without the permission of that firm</i> RP N6 01/04/2002 MAN Railway Diesel Engine D 2842 LE 606 ND CUMMINS QSK19R <i>This report is the property of CUMMINS Engine Company Ltd. It may not be released to third parties without the permission of that firm</i> RP O 01/11/2000 Acceptance testing of diesel engines. ND Supplementary report on exhaust emission measurements against UIC Leaflet 624 (In-line 6 cylinder turbocharged horizontal engine, 559/565 kW @ 2100 rpm). <i>This report is the property of Cummins Engine Company Ltd. It may not be released to third parties without the permission of that firm</i> RP O1 30/09/2002 Cummins QSK 19 R Railway Diesel Engine ND 4000 R 41 (90-V16 turbocharged engine, 2100 kW @ 1800 rpm). <i>This report is the property of MTU-Motoren- und Turbinen-Union Friedrichshafen GmbH. It may not be released to third parties without the permission of that firm</i> RP P 01/07/2002 UIC Approval Report for engine MTU 16V ND Approval against UIC Leaflet 623 of MTU railway diesel engine 16 V 4000 R 41 L as "derivative" engine to the approved engine 16 V 4000 R 41. <i>This report is the property of MTU-Motoren- und Turbinen-Union Friedrichshafen GmbH. It may not be released to third parties without the permission of that firm</i> RP P1 01/10/2003 Acceptance testing of diesel engines. ND Approval against UIC Leaflet 623 of MTU 8V 4000 R43 (L) rail diesel engine as a "derivative" of the approved 20V 4000 R42 engine. <i>This report is the property of MTU Friedrichshafen GmbH. It may not be released to third parties without the permission of that firm</i> RP P10 01/09/2008 Approval of diesel engines. mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 268 of 330 Project B 208P Price Code Title Approved DIESEL ENGINES Document ND engines. UIC exhaust emission test performed on diesel engine MTU 6H 1800 R 80/81 against UIC Leaflet 624. <i>This report is the property of MTU-Motoren- und Turbinen-Union Friedrichshafen GmbH. It may not be released to third parties without the permission of that firm</i> RP P2 01/02/2004 Exhaust emission testing of diesel ND engines. Approval against UIC Leaflet 623 of MTU railway diesel engine 12 V 4000 R 41 R as "derivative" engine to the approved engine 16 V 4000 R 41 <i>This report is the property of MTU-Motoren- und Turbinen-Union Friedrichshafen GmbH. It may not be released to third parties without the permission of that firm</i> RP P3A 01/04/2004 Exhaust emission testing of diesel ND engines. Approval against UIC Leaflet 623 of MTU railway diesel engine 12 V 4000 R 41/R 41 L as "derivative" engine to the approved engine 16 V 4000 R 41 <i>This report is the property of MTU-Motoren- und Turbinen-Union Friedrichshafen GmbH. It may not be released to third parties without the permission of that firm</i> RP P3B 01/04/2004 Exhaust emission testing of diesel ND UIC approval report of MTU engine 20V 4000 R42 <i>This report is the property of MTU-Motoren- und Turbinen-Union Friedrichshafen GmbH. This document is confidential and distribution to third parties is not permitted.</i> RP P4 01/06/2006 Approval of diesel engines. ND against UIC Leaflet 623 of the MTU 8 V 4000 R41 L as a "derivative" of the approved 16 V 4000 R41 engine <i>This report is the property of MTU Friedrichshafen GmbH. It may not be released to third parties without the permission of that firm</i> RP P5 01/10/2006 Approval of diesel engines. Approval ND Approval against UIC Leaflet 623 of the MTU 20 V 4000 R 42 L rail diesel engine as a "derivative" of the approved 20 V 4000 R 42 engine <i>This report is the property of MTU Friedrichshafen GmbH. It may not be released to third parties without the permission of that firm</i> RP P6 01/11/2006 Approval of diesel engines. mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 269 of 330 Project B 208P Price Code Title Approved DIESEL ENGINES Document ND Approval against UIC Leaflet 623 of the MTU 16 V 4000 R43 L / R rail diesel engine of the approved 20V 4000 R42 engine. <i>This report is the property of MTU Friedrichshafen GmbH. It may not be released to third parties without the permission of that firm</i> RP P8 01/08/2008 Approval of diesel engines. ND UIC Leafet 624 of the GENERAL ELECTRIC 7FDL12 locomotive engine (45-V12 turbocharged engine, 2461 kW @ 1050 rpm). <i>This report is the property of GENERAL ELECTRIC TRANSPORTATION It may not be released to third parties without the permission of that firm</i> RP R1 01/11/2001 Exhaust emission test against ND UIC Leafet 624 of the GENERAL ELECTRIC 7FDL12 locomotive engine (45-V12 turbocharged engine, 2461 kW @ 1050 rpm). <i>This report is the property of GENERAL ELECTRIC TRANSPORTATION It may not be released to third parties without the permission of that firm</i> RP R2 01/11/2001 Exhaust emission test against ND engines. UIC emission test according to UIC Leaflet 624 of the GENERAL ELECTRIC 7FDL12 M1 locomotive engine <i>This report is the property of GENERAL ELECTRIC TRANSPORTATION It may not be released to third parties without the permission of that firm</i> RP R3 01/05/2005 Exhaust emission testing of diesel ND engines. UIC emission test according to Leaflet 624 of the General Electric CIS GEVO V12 3a locomotive engine. <i>This report is the property of GENERAL ELECTRIC TRANSPORTATION It may not be released to third parties without the permission of that firm</i> RP R4 01/12/2008 Exhaust emission testing of diesel ND UIC emission test according to UIC Leafet 624 of the GENERAL MOTERS EMD 12N-710G3B-T1 locomotive engine <i>This report is the property of GENERAL MOTORS CORPORATION ELECTRO MOTIVE DIVISION. It may not be released to third parties without the permission of that firm</i> RP S1 01/01/2003 Acceptance testing of diesel engines mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 270 of 330 Project B 208P Price Code Title Approved DIESEL ENGINES Document ND engines. UIC emission test according to UIC Leaflet 624 of the GENERAL MOTORS EMD 12N-710G3B-U2 locomotive engine <i>This report is the property of GENERAL MOTORS CORPORATION ELECTRO MOTIVE DIVISION. It may not be released to third parties without the permission of that firm</i> RP S2 01/06/2004 Exhaust emission testing of diesel C engines. DT 369 01/07/1998 Operating tests on natural gas railway B natural gas powering of railway vehicles. DT 380 01/04/2002 Feasibility study in respect of the mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 271 of 330 Project C 209 BEHAVIOUR, SAFETY, TRACK FATIGUE AND RIDE QUALITY Price Code Title Approved TEST AND APPROVAL OF RAILWAY VEHICLES FROM THE POINTS OF VIEW OF DYNAMIC Document C UIC Leaflet 518. Progress report as per 1 July 1997 RP 1 01/07/1997 Verification of the applicability of B UIC Leaflet 518 Final Report RP 2 01/07/1999 Verification of the applicability of C draft UIC Leaflet 518 to rolling stock for speeds above 200 km/h DT 337 01/05/1997 Verification of the applicability of C UIC Leaflet 518 concerning rolling stock for operating speeds of 140 km/h - 200 km/h DT 338 01/05/1997 Verification of the applicability of C UIC Leaflet 518 concerning rolling stock for speeds below 140 km/h DT 339 01/05/1997 Verification of the applicability of C the simplified method of UIC Leaflet 518 DT 370 01/12/1998 Verification of the applicability of mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 272 of 330 Project C 210 ANALYSING DYNAMIC VEHICLE BEHAVIOUR Price Code Title Approved DEVELOPMENT OF METHODS TO DESCRIBE GEOMETRIC TRACK QUALITY, WITH THE AIM OF Document C RP 1 01/07/1999 Summary Report mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 273 of 330 Project A 211 Price Code Title Approved SYSTEM FOR THE DETECTION OF IRREGULARITIES ON RUNNING TRAINS Document B hot-box detectors DT 321 01/12/1995 Specification for laboratory tests with B Part 1: General description of tests \carried out. DT 353 01/04/1997 Testing of hot box detectors mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 274 of 330 Project D 214 Price Code Title Approved RAIL BRIDGES FOR SPEEDS > 200 KM/H Document C Dynamic behaviour of railway bridges RP 1 01/11/1999 Literature Summary C bridge deck stiffness RP 2 01/12/1999 Recommendations for calculation of D in rail bridge decks RP 3 01/11/1999 Recommendations for calculating damping C RP 4 01/12/1999 Train-bridge interaction B of track irregularities at bridge resonance RP 5 01/12/1999 Numerical investigation of the effect G simply-supported beams during the passage of a train. RP 6 01/12/1999 Calculation for bridges with C structure for the passage of traffic Computer programs for dynamic cal- culations RP 7 01/12/1999 Calculation of bridges with a complex D mental data Part A: Rig tests to investigate ballast behaviour on bridges due to high acceleration levels - Confirmation of the acceleration limit for the ballast Part B: Comparison of calculations and measurements using simplified models of rail bridges - Confirmation of the validity of the calculated values RP 8 01/12/1999 Confirmation of values against experi- E Part A: Synthesis of the results of D 214 research Part B: Proposed UIC Leaflet RP 9 01/12/1999 Final Report mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 275 of 330 Project D 214.2 Price Code Title Approved USE OF UNIVERSAL TRAINS FOR THE DYNAMIC DESIGN OF RAILWAY BRIDGES Document C (Final Report) RP 1 30/09/2000 Summary of results of D 214.2 mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 276 of 330 Project D 216 Price Code Title Approved FATIGUE IN CONCRETE RAIL WAY BRIDGES Document C RP 1 24/05/2002 State of the art report C RP 2 24/05/2002 Tests using models C RP 3 31/01/2002 Final report C industrielles prcontraintes pour tabliers de ponts-rails. Exists only in French DT 377 01/12/1999 Comportement la fatigue de poutres C concrete bridges - Prevision of the results of Swedish full-scale tests - Comparison and analyses DT 384 01/03/2000 Fatigue capacity of small railway C correction factors used in the fatigue design in Eurocode 2, Part 2 DT 386 01/06/2000 Independent verification of the mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 277 of 330 Project C 218 Price Code Title Approved PRESSURE VARIATIONS IN TUNNELS Document D A "Base-line" pressure comfort criterion for unsealed and sealed train operation in tunnels RP 1 01/03/1999 Base-line Comfort Criteria - C operations. Determination of Railway Tunnel Cross-sectional Areas for Sealed Trains on the Basis of Aerodynamics Considerations RP 2 01/11/1998 Draft UIC leaflet for sealed train D alleviation devices RP 4 01/11/1998 Technical review of tunnel pressure C borne pressure changes of incorporating airshafts into railway tunnels. RP 6 01/09/1999 Trends and benefits based on train B User manual for the CD-ROM accompanying the UIC fiche on aerodynamic sizing of railway tunnels for sealed train operation RP 8 01/01/2001 PC Program SEALTUN 2.0 C Bibliography DT 367 01/12/1999 Tunnel Pressure Alleviation Systems mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 278 of 330 Project D 221 Price Code Title Approved THEORETICAL DETERMINATION OF PARTIAL AND COMBINATION FACTORS Document C actions RP 1 01/12/1999 Background document for rail traffic B and combination factors RP 2 01/12/1999 Theoretical determination of partial C between LM71 and LM2000 and between Eurocode requirements and probabilistic approach for gamma and psi RP 3 Comparative calculations (comparison C transverse floor/deck members generated by LM2000 and LM71 and the real vehicles used to develop LM2000 and LM71 Theoretical basis for verifying the future LM2000 loading RP 5 Comparison study of local effects on mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 279 of 330 Project C 223.1 Price Code Title Approved THE MANAGEMENT OF PRESSURE VARIATIONS INSIDE COACHES Document B RP 1 # Literature study B industry RP 2 # Analysis of the needs of operators and B RP 3 # Summary report mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 280 of 330 Project C 224 Price Code Title Approved BASNOISE Document C RP 1 01/03/2000 Summary of BASNOISE Investigations mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 281 of 330 Project D 229 Price Code Title Approved RAIL DEFECT MANAGEMENT Document E Research Project, second edition. RP 2 01/08/2000 State of the art report. UIC WEC Joint mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 282 of 330 Project D 230.1 Price Code Title Approved BRIDGE ENDS Document A RP 1 01/01/1999 Embankment structure transition B RP 2 01/05/1999 Description of Phase II work C Only available in English RP 3 01/11/1999 State of the Art Report mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 283 of 330 Project D 251 ECOSWITCH Price Code Title Approved SWITCHES AND CROSSINGS MANAGEMENT SYSTEM: Document C RP 1 01/08/2002 Feasibility Study mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 284 of 330 Project EU 921 Price Code Title Approved SILENT FREIGHT PROJECT Document C Reference: 5EOU15T1.DB BRITE-EURAM PROJECT BE 95-1238 SP 1 05/09/2000 Final report. Technical Document. mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 285 of 330 Project EU 922 Price Code Title Approved SILENT TRACK PROJECT Document C Reference: 00615/7ERRI/T/A BRITE-EURAM PROJECT BE 96-3017 SP 1 05/09/2000 Final report. Technical Document. mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 286 of 330 Project C 926 Price Code Title Approved RENVIB II, PHASE 1 Document B Task 1: State of the art review UIC Railway Vibration Project SP 1 01/04/1999 RENVIB II C Studies for Phase 1 RP 1 01/06/1998 Summary Report of State of the Art B Task 2: State of the art review Empirical Prediction Methods SP 2 01/04/1999 RENVIB II B Task 3: State of the art review Mathematical modelling of railway vibration SP 3 01/04/1999 RENVIB II B Task 4: State of the art review Reduction measures for tunnel lines SP 4 01/04/1999 RENVIB II B Task 5: State of the art review Mitigation measures for surface railways SP 5 01/04/1999 RENVIB II C Summary report of State of the art studies for Phase 1 SP 6 01/04/1999 RENVIB II mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 287 of 330 Project C 926.2 Price Code Title Approved RENVIB II PHASE 2 Document C Studies for Phase 2 RP 1 01/04/2000 Summary Report mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 288 of 330 Project EU 950 Price Code Title Approved COST, RELIABILITY, MAINTENANCE AND AVAILABILITY (CRMA) Document P Final Report/Summary Report/ Final Consolidated Progress Report RA-97-RS-2156 SP 1 31/12/1998 CRMA: mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 289 of 330 Project EU 953 Price Code Title Approved FUEL CELL LOCOMOTIVE Document P Locomotive (DG X11) Contract No. JOE3-CT98-2002 by B. Perniceni, B. Steele, M. Venturi SP 1 31/07/2000 Feasibility Study on Fuel Cell mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 290 of 330 Project S 1001 Price Code Title Approved PROBLEMS RAISED BY THE APPLICATION OF THE AUTOMATIC COUPLER TO LOCOMOTIVES Document B RP 2 01/07/1972 Enquiry report B automatic coupler to locomotives (in service or to be built) RP 3 01/10/1973 Examples of the application of the mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 291 of 330 Project S 1002 Price Code Title Approved STANDARDISATION OF WHEEL PROFILE Document B RP 1 01/04/1971 Tyre profiles B wheel profle adapted to wear (UIC/ORE profile) valid regardless of the wheel diameter and the type of vehicle RP 2 01/04/1973 Recommendations concerning an universal mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 292 of 330 Project S 1003 COUPLER Price Code Title Approved CONSTRUCTIONAL MODIFICATION OF BUFFER STOPS FOR USE WITH THE AUTOMATIC Document B RP 1 01/10/1971 Enquiry report mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 293 of 330 Project S 1004 Price Code Title Approved MAXIMUM SPEED ATTAINABLE ON WHEEL/RAIL SYSTEMS Document B RP 1 01/04/1972 Report on preliminary investigations B RP 2 01/04/1973 Preliminary investigation (Supplement) mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 294 of 330 Project S 1005 Price Code Title Approved SIMPLIFIED VARIANTS OF THE LINEAR TRAIN CONTROL SYSTEM Document B integrated system - Simplified variants of the integrated linear train control system RP 1 01/10/1974 - Interface conditions of the B Reliability in service of the continuous train control system described in ORE A 46/RP 6, Appendix 6A Part II - Appendixes RP 2 01/09/1980 Part I - Final report B of reliability data, prepared by WP S 1005 DT 109 01/09/1980 Statistical techniques for the analysis mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 295 of 330 Project S 1010 Price Code Title Approved AUTOMATIC VEHICLE IDENTIFICATION Document B Draft contract covering the granting of licences for responders RP 1 * 01/10/1976 Automatic identification of vehicles B RP 3 * 01/10/1979 Draft leaflet UIC-916-1 O.R. B Vehicle Identification (AVI) RP 4 * 18/04/1990 Current state of the art of Automatic B vehicle identification (AVI) DT 231 01/01/1991 Technical Specification for automatic mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 296 of 330 Project S 1015 P Price Code Title Approved ACCEPTANCE TESTING OF DIESEL ENGINES Document C MIHR 06.20.45 - Bericht ber UIC- Typenprfung (6 Zylinder liegend aufgeladen aufgeladen, 249 kW @ 2000 rpm) Dieses Dokument is Eigentum des ERRI und der Firma Renault Vhicules Industriels. Ohne das Einverstndnis der beiden Parteien ist es Dritten nicht zugnglich. Exists only in German RP A 30/03/1992 Zulassung der Dieselmotoren C selon la fiche UIC 623 du moteur FIAT-IVECO AIFO 8297 SRI 10.00 (90-V12 avec turbocompresseur, 698 kW @ 2100 rpm). Ce document est la proprit de l'ERRI et de la socit FIAT-IVECO Il ne doit pas tre communiqu des tiers sans l'accord des deux parties Exists only in French and German RP B 30/11/1993 Rapport d'essais de l'homologation C Rapport d'essai de type UIC et fiche 623 6 cylindres, couchs avec turbocompresseur, 300 kW @ 2100 rpm). Ce document est la proprit de l'ERRI et de la socit MAN Nutzfahrzeuge AG. Il ne doit pas tre communiqu des tiers sans l'accord des deux parties. Exists only in French and German RP C 28/02/1994 MAN D 2866 LUE 602 C RP 1 01/10/1991 Air pollution caused by exhaust fumes C and outlook RP 2 01/10/1992 State of the art for diesel traction mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 297 of 330 Project S 1017 Price Code Title Approved FIBRE COMMUNICATIONS SYSTEMS Document B optical fibre communications Technological Assessment Report by Dr. Ing. E.F. Gelbstein DT 76 01/04/1978 Possible railway applications of B fibres and their use in railways, by Dr.-Ing. E.E. Gelbstein (ORE) DT 100 01/04/1980 Optical communications based on optical mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 298 of 330 Project S 1019 Price Code Title Approved TRANSMISSION OF SAFETY INFORMATION Document B Assessment of recent technological progress relevant to the transmission of safety information, by Dr.-Ing. E.E. Gelbstein, Conseiller Technique ORE DT 95 01/10/1979 Transmission of safety information mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 299 of 330 Project S 1028 Price Code Title Approved ELECTRIC ENERGY FOR TRACTION PURPOSES Document B for traction purposes DT 162 01/08/1984 Rational utilisation of electric energy mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 300 of 330 Project S 1035 Price Code Title Approved CURRENT COLLECTION AT HIGH SPEED Document B at high speed (V >= 200 km/h) RP 1 01/04/1986 Enquiry report on current collection mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 301 of 330 Project S 1037 Price Code Title Approved BODY TILT COACHES Document B coaches (BT) RP 1 01/09/1985 Operationel experience with body tilt mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 302 of 330 Project S 1071 Price Code Title Approved PRINCIPLES FOR SECURING BOLTED JOINTS Document B tions RP 1 01/03/1992 General points and safety recommenda- mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 303 of 330 Project S 1079 Price Code Title Approved DETECTION SYSTEMS FOR LOCATING IRREGULARITIES ON RUNNING TRAINS Document E and presentation and evaluation of the answers to the detection systems questionnaire RP 1 01/05/1995 State of the art on selected railways mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 304 of 330 Project S 1081 Price Code Title Approved THE BEHAVIOUR OF WAGONS LOADS AT HIGHER SPEEDS Document ND Line tests Synthesis of results RP 1 01/02/1995 Dynamic roller rig tests mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 305 of 330 Project AZ 12.03/1 OCCASION OF THE VISIT TO THE "INTERNATIONAL INTERMODAL EXPO 90" IN ATLANTA USA Price Code Title Approved VISIT OF THE UIC/ORE DELEGATION OF THE JOINT 45C SUBCOMMITTEE ON THE Document B joint 45C Subcommittee on the occasion of the visit to the "International Intermodal Expo '90" in Atlanta USA RP 1 01/05/1991 Visit of the UIC/ORE delegation of the mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 306 of 330 Project AZ 12.03/2 FREIGHT TRAINS IN THE 21ST CENTURY Price Code Title Approved FUNCTIONING, MAINTENANCE AND ECONOMIC ASPECTS OF BRAKING SYSTEMS FOR Document B aspects of braking systems for freight trains in the 21st Century RP 2 01/02/1992 Functioning, maintenance and economic mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 307 of 330 Project AZ 30 Price Code Title Approved VIENNA-ARSENAL VEHICLE TESTING STATION Document ND in the Vienna-Arsenal testing station during 1963 RP 3 01/06/1964 Tests carried out on passenger coaches ND testing station during 1964 RP 4 01/06/1965 Tests carried out in the Vienna Arsenal ND testing station during 1965 RP 5 01/10/1966 Tests carried out in the Vienna Arsenal ND testing station during 1966 RP 6 01/11/1967 Tests carried out in the Vienna Arsenal ND testing station during 1967 RP 7 01/10/1968 Tests carried out in the Vienna Arsenal ND RP 8 01/10/1969 Annual report 1968 ND RP 9 01/06/1970 Annual report 1969 B RP 10 01/04/1971 Annual report 1970 B presented at the ceremony in connection with the tenth anniversary of the establishment of the testing station (22 april 1971) RP 11 01/05/1971 Review of the technical papers B RP 12 01/04/1972 Annual report 1971 B before reconstruction RP 13 01/10/1973 Report on tests during 1972 and 1973 B RP 14 01/04/1974 The modernisation of Vienna Arsenal B in the year 1973/74 RP 15 01/04/1975 Report on teh activities of the station B Arsenal Vehicle Testing Station in the year 1975 RP 16 01/04/1976 Report on the activities of Vienna B Arsenal Vehicle Testing station in the year 1976 RP 17 01/04/1977 Report on the activities of the Vienna B Arsenal Vehicle Testing Station in the year 1977 RP 18 01/04/1978 Report on the activities of the Vienna B Arsenal Vehicle Testing Station in the year 1978 RP 19 01/04/1979 Report on the activities of the Vienna B Arsenal Vehicle Testing Station during 1979 RP 20 01/04/1980 Report on the activities of the Vienna B Arsenal Vehicle Testing Station during 1980 RP 21 01/06/1981 Report on the activities of the Vienna mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 308 of 330 Project AZ 30 Price Code Title Approved VIENNA-ARSENAL VEHICLE TESTING STATION Document B Vienna Arsenal Vehicle Testing Station during 1981 RP 22 01/06/1982 Report on the activities of the B Arsenal Vehicle Testing Station during 1982 RP 23 01/06/1983 Report on the activities of the Vienna B Arsenal Vehicle Testing Station during 1983 RP 24 01/06/1984 Report on the activities of the Vienna B Arsenal Vehicle Testing Station during 1984 RP 25 01/06/1985 Report on the activities of the Vienna B Arsenal Vehicle Testing Station during 1985 RP 26 01/06/1986 Report on the activities of the Vienna B Arsenal Vehicle Testing Station during 1986 RP 27 01/06/1987 Report on the activities of the Vienna B Arsenal Vehicle Testing Station during 1987 RP 28 01/07/1988 Report on the activities of the Vienna B Arsenal Vehicle Testing Station during 1988 RP 29 01/11/1989 Report on the activities of the Vienna B Arsenal Vehicle Testing Station during 1989 RP 30 01/06/1990 Report on the activities of the Vienna B Arsenal Vehicle Testing Station during 1990 RP 31 01/11/1991 Report on the activities of the Vienna B Arsenal Vehicle Testing Station during 1991 RP 32 01/10/1992 Report on the activities of the Vienna B Arsenal Vehicle Testing Station during 1992 RP 33 01/10/1993 Report on the activities of the Vienna B Arsenal Vehicle Testing Station during 1993 RP 34 01/07/1995 Report on the activities of the Vienna B d'essais de vhicules de Vienne- Arsenal en 1994 Exists only in French and German RP 35 01/10/1997 Rapport sur les activits de la station B Arsenal fr das Jahr 1995 Exists only in German RP 36 01/10/1997 Ttigkeitsbericht der Fahrzeugversuchsanlage mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 309 of 330 Project AZ 30 Price Code Title Approved VIENNA-ARSENAL VEHICLE TESTING STATION Document B Arsenal fr die Jahre 1996-1999 Exists only in German RP 37 01/03/2000 Ttigkeitsbericht der Fahrzeugversuchsanlage ND Vehicle Testing Station (2nd issue) DT 131 01/02/1991 Documents - Vienna-Arsenal mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 310 of 330 Project AZ 32 Price Code Title Approved ELECTRONICS TEST STATION (VIENNA-ARSENAL) Document ND testing data transmission equipment from 4th October 1967 to 31st August 1968 RP 1 01/10/1969 Tests made in the installaiotn for ND testing data transmission equipment from 1st September 1968 to 31st August 1969 RP 2 01/07/1970 Tests made in the installation for ND testing data transmission equipment from 1st September 1969 to 31st August 1970 RP 3 01/08/1972 Tests made in the installation for ND installation from 1st September 1970 to 31st August 1971 RP 4 01/04/1973 Tests made in the electronic test ND installation at Vienna Arsenal during the time from 1st September 1971 to 31st August 1972 RP 5 01/11/1973 Tests made by the electronic test ND installation in the year 1972/73 (from 1st September 1972 to 31st August 1973) RP 6 01/04/1974 Tests made at the electronic test ND installation in the year 1973/74 (from 1st September 1973 to 31st August 1974) RP 7 01/04/1975 Tests made at the electronic test ND installation in the year 1974/75 (from 1.9.1974 to 31.8.1975) RP 8 01/04/1976 Tests made at the electronic test ND Installation in the year 1975/76 (from 1st September 1975 to 31st August 1976) RP 9 01/04/1977 Tests made at the Electronic Test ND installation in the year of 1976/77 (from 1st September 1976 to 31st December) RP 10 01/10/1978 Work done at the electronics test ND Test Installation in the year of 1978 (from 1st September 1978 to 31st December 1978) RP 11 01/10/1979 Work carried out at the Electronics ND station during 1979 (from 1.1.1979 to 31.12.1979) RP 12 01/09/1980 Activities of the electronics test ND station during 1980 RP 13 01/09/1981 Activities of the electronics test ND testing installation in 1981 RP 14 01/06/1982 Work carried out by the electronics mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 311 of 330 Project AZ 32 Price Code Title Approved ELECTRONICS TEST STATION (VIENNA-ARSENAL) Document ND installation in 1982 RP 15 01/03/1983 Activities of the electronics testing ND installation (ETI) in 1983 RP 16 01/06/1984 Activities of the electronics testing ND installation in 1984 RP 17 01/06/1985 Activities of the electronics testing ND station in 1985 RP 18 01/10/1986 Activities of the electronics testing ND installations in 1986 RP 19 01/04/1987 Activities of the electronics testing ND installation in 1987 RP 20 01/02/1988 Activities of the electronics testing ND lines, prepared by the Electronic Testing Installation at Vienna Arsenal DT 112 01/09/1980 Data transmission equipment for local ND electronic installations by the Vienna Arsenal research and testing station for railway electronics DT 151 01/03/1983 Quantification of the error rates of B by Dipl.-Ing. M. Geiger DT 169 01/07/1986 Methods for testing software safety mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 312 of 330 Project AZ 40 Price Code Title Approved SEMINAR Document A railway technology (5th International Colloquium of ORE/BVFA on railway vehicle technology, held at Vienna, Austria, from 6th to 8th May, 1969) RP 1 01/10/1969 Measurements and their analysis in A traffic control systems (First International computer programme Colloquium in Derby from 16th to 18th September 1969) RP 2 01/09/1970 Control and optimisation techniques for A "High speeds" held at Vienna Arsenal on 23 April 1971 RP 3 01/05/1971 Proceedings of the ORE Colloquium on A "Technical computer programs" (BR Research Department Derby, 16th to 18th May 1972) RP 4 01/10/1972 Report on the second Colloquium A "Technical computer programs" Amsterdam, 8th to 10th May 1973 RP 5 01/06/1973 Report on the third Colloquium A "Technical computer programs" Munich, May 28th - 30th, 1974 RP 6 01/09/1974 Report on the fourth ORE Colloquium A "Technical computer programs" Vienna, June 3rd - 5th, 1974 RP 7 01/09/1975 Report on the fifth ORE Colloquium A "Technical computer Programs" Lyon, 1st to 3rd June 1976 RP 8 01/10/1976 Report on the sixth ORE Colloquium A "Technical Computer Programs" Dresden, 26th to 28th September 1978 RP 9 01/10/1978 Report on the seventh ORE Colloquium A - A review of the technology, by R & D Division, BR DT 118 01/04/1981 Railway applications of microprocessors mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 313 of 330 Project AZ 40.8 Price Code Title Approved SEMINAR Document A "Railway applications of micro- processors", held in Madrid on 5th and 6th May 1981 DT 130 01/03/1982 Proceedings of the ORE Colloquium mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 314 of 330 Project AZ 41.1 Price Code Title Approved SEMINAR Document A "Safe electronic systems", held in Paris on 23rd and 24th September 1980 DT 129 01/09/1981 Proceedings of the ORE Colloquium mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 315 of 330 Project AZ 42 Price Code Title Approved SEMINAR Document A programs - Catalogue of programs available - First issue, December 1983 by W.R. Smith DT 161 01/12/1983 ORE Information centre on computer mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 316 of 330 Project AZ 43 Price Code Title Approved SEMINAR Document A "Rational use of electric traction energy", held in Vienna Arsenal on 21st and 22nd October 1981 DT 139 01/04/1982 Proceedings of the ORE Colloquium mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 317 of 330 Project AZ 44 Price Code Title Approved SEMINAR Document A "Railway operating in winter condi- tions" held in Basel on 2nd and 3rd November 1982 Part I: Contributions Part II: Summaries of the discussion DT 145 01/04/1983 Proceedings of the ORE Colloquium mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 318 of 330 Project AZ 45 Price Code Title Approved SEMINAR Document A in the diagnostic systems of railway equipment", held in Budapest, 23 - 24.5.1984 DT 163 01/09/1984 ORE Colloquium "Use of micro-processors mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 319 of 330 Project AZ 46 Price Code Title Approved SEMINAR Document A low cost solutions for lines carrying low traffic volumes", Paris, 19/20.6.86 DT 189 01/05/1986 ORE Colloquium "Technical aspects of mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 320 of 330 Project AZ 47 Price Code Title Approved SEMINAR Document A introduction and operation of high and very high speed lines" held in Arezzo, 26-27(28).10.1987 DT 199 01/09/1987 ORE Colloquium "Experience with the mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 321 of 330 Project AZ 48 Price Code Title Approved SEMINAR Document A ment", Rotterdam, 4-5-(6) July 1989 DT 220 01/07/1989 ORE-Colloquium "Railways and Environ- mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 322 of 330 Project AZ 49.01 Price Code Title Approved SEMINAR Document A Nrnberg, 6-7-(8) November 1990 DT 240 01/11/1990 ORE-Colloquium "Vehicle maintenance" mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 323 of 330 Project AZ 49.02 Price Code Title Approved SEMINAR Document A Seminar ORE/CSD Jiloviste, 11, 12 September 1991 DT 264 01/09/1991 Designing new lines with CAD mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 324 of 330 Project AZ 49.03 Price Code Title Approved SEMINAR Document A St. Louis, Miss., March 24-26, 1992 DT 275 01/03/1992 Report on the AAR-Seminar 1992, mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 325 of 330 Project AZ 49.04 Price Code Title Approved SEMINAR Document A "Maintenance of railway bridges and civil engineering structures" Congrescentrum De Reehorst Ede, The Netherlands, 4-6 October 1995 DT 331 01/10/1995 ERRI Conference mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 326 of 330 Project AZ 60 Price Code Title Approved RESEARCH PROGRAMME Document ND RP 1 01/04/1982 Role and methods of work of ORE ND programme for the period 1984 - 1985 RP 2 01/04/1984 Updating of the framework research ND programme for the period 1987 - 1990 RP 3 01/09/1986 Updating of the framework research ND DT 137 01/05/1981 Role and methods of work of ORE mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 327 of 330 Project X Price Code Title Approved MISCELLANEOUS Document ND liers du mouvement du lacet d'un vhi- cule ferroviaire, par M. le Prof. R. de Possel Exists only in French DT 1 01/11/1962 Etudes sur quelques problmes particu- ND gestell-Lokomotive, von Dr. G. Borgeaud Exists only in German DT 2 01/01/1963 Zur Laufmechanik der elektrischen Dreh- B entre la voie et le vhicule de chemin de fer Mouvement sur une voie en alignement droit, par M. le Prof. A.D. de Pater Exists only in French DT 3 01/03/1963 Expos de la thorie de l'interaction ND horizontal plane upon elastic ballast, by Mr. F. Bijl, Engineer DT 4 01/01/1957 Document I: Buckling of track in ND of long welded tracks, by Mr. F. Bijl, Engineer DT 5 01/01/1958 Document II: The horizontal buckling ND buckling force of long welded rails (NS-63 type) in crushed stone ballast, by Mr. F. Bijl, Engineer DT 6 01/01/1958 Document III: Determination of the B tions DT 11 * 01/07/1969 Descriptions of special test installa- B vhicule ferroviaire circulant grande vitesse, par M. R. Joly Exists only in French DT 16 01/10/1970 Etude de la stabilit transversale d'un B DT 24 01/01/1972 Wheels of railway trailer stock B noise and vibration abatement for railway vehicles, by Mr. R. Lutz DT 25 01/04/1976 Theory and practical application of B vhicule ferroviaire deux essieux, par M. R. Joly Exists only in French DT 30 01/01/1974 Etude de la stabilit transversale d'un ND geometric condition of ORE test sections using topograhical measure- ments, by Messrs. Toegel, Birmann, Dogneton, Hlasny, Shenton and Towpik DT 33 01/12/1974 Typical representations of the B facilities of the ORE Administrations (2nd Edition) DT 35 * 01/04/1981 A survey of the most important testing mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 328 of 330 Project X Price Code Title Approved MISCELLANEOUS Document B vehicles dynamics from normal operating records, by Mr. P.M.T. Broersen DT 36 01/10/1974 Estimation of multivariable railway B A. Semrau et al. DT 46 * 01/06/1982 Railway technology 20 years hence, by ND DT 52 01/06/1976 Shinkansen Noise, by JNR B by Prof. Ir. N.H.C.E. Zeevenhooven comp. S. Mech. Eng. AMg. DT 211 01/07/1988 Railway, technology and environment B Europe and North America DT 221 01/06/1989 Automatic train control systems in ND - Presentations and discussion DT 234 01/10/1990 Future Development of goods wagons B the Association of American Railroads and the U.S. Railway Industry by G.H. Way (AAR) DT 235 01/10/1990 Cooperative research efforts between mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 329 of 330 Project X Price Code Title Approved MISCELLANEOUS Document B Testing Centres, Institutes, Universities and Laboratories ERRI AZ 14.00 SP 7 * 01/04/1993 European Railway Research and B SP 8 01/01/2000 INTELFRET Final Report D Incidence and management of gauge corner cracking SP 9 01/01/2003 X 1003/RP 1 (2nd Edition, Survey) mercredi 13 mai 2009 All Rights Reserved This publication was until recently only available to UIC member railways, but is now for sale to third parties. * Page 330 of 330
(Notes on Numerical Fluid Mechanics and Multidisciplinary Design 126) Jens C.O. Nielsen, David Anderson, Pierre-Etienne Gautier, Masanobu Iida, James T. Nelson, David Thompson, Thorsten Tielkes, David.pdf