The document discusses the ball mill, which is a steel cylinder partially filled with grinding media like balls. Material is ground within the mill as the media cascades and tumbles due to rotation. Key parameters of ball mills include diameter, length, volume, volume loading, media size, mill speed, power, and temperature control. Volume loading is typically 25-35% and is important for determining media charge and performance.
The document discusses the ball mill, which is a steel cylinder partially filled with grinding media like balls. Material is ground within the mill as the media cascades and tumbles due to rotation. Key parameters of ball mills include diameter, length, volume, volume loading, media size, mill speed, power, and temperature control. Volume loading is typically 25-35% and is important for determining media charge and performance.
The document discusses the ball mill, which is a steel cylinder partially filled with grinding media like balls. Material is ground within the mill as the media cascades and tumbles due to rotation. Key parameters of ball mills include diameter, length, volume, volume loading, media size, mill speed, power, and temperature control. Volume loading is typically 25-35% and is important for determining media charge and performance.
The document discusses the ball mill, which is a steel cylinder partially filled with grinding media like balls. Material is ground within the mill as the media cascades and tumbles due to rotation. Key parameters of ball mills include diameter, length, volume, volume loading, media size, mill speed, power, and temperature control. Volume loading is typically 25-35% and is important for determining media charge and performance.
C E M E N T T E C H N O L O G Y N O T E S 2 0 0 4 43 4 . 1 I NT R ODUC T I ON 4 . 2 T E R MI NOL OGY 4 . 3 P R I NC I P A L P A R A ME T E R S 4 . 3 . 1 I NT R ODU C T I ON 4 . 3 . 2 DI A ME T E R 4 . 3 . 3 L E NGT H 4 . 3 . 4 V OL U ME 4 . 3 . 5 V OL U ME L OA DI NG 4 . 3 . 6 ME DI A C HA R GE 4 . 3 . 7 MI L L S P E E D 4 . 3 . 8 MI L L P OWE R 4 . 3 . 9 L I NI NG 4 . 3 . 1 0 DI A P HR A GM 4 . 3 . 1 1 ME DI A S I Z E S 4 . 3 . 1 2 ME DI A WE A R 4 . 3 . 1 3 P OWDE R L OA DI NG A ND R E S I DE NC E T I ME 4 . 3 . 1 4 MI L L A I R F L OW 4 . 3 . 1 5 MI L L T E MP E R AT U R E , C OOL I NG A ND WAT E R I NJ E C T I ON contents chapter 5 C E M E N T T E C H N O L O G Y N O T E S 2 0 0 5 44 4.1 INTRODUCTION The ball mill, or tube mill, is essentially a lined steel tube, which is partially filled with grinding media (usually balls). The tube rotates, thereby causing a cascading action of the media, which the feed material passes through. Comminution takes place within the cascading, cataracting and attrition actions of the media. The ball mill is used in conjunction with other equipment to form a range of different mill circuits. These are discussed in Section 5. Figure 45. Ball Mill. 4. THE BALL MILL Inlet Trunnion Step Lining Plates First Chamber Intermediate Diaphragm Second Chamber Classifying Lining Plates Outlet Trunnion Mill End Wall Coarse Grinding Media Fine Grinding Media Outlet Diaphragm contents chapter 4 chapter 5 C E M E N T T E C H N O L O G Y N O T E S 2 0 0 5 45 4.2 TERMINOLOGY For simplicity, the ball mill can best be described by reference to the main parts involved. (See Figure 45). Mill Shell: The cylindrical tube (usually rolled from steel plate) Mill Ends: The circular castings bolted to the mill shell Trunnions: The smaller cylinders at each end of the mill which provide the inlet, outlet and main bearing support Liners: The metal plates, usually bolted, to the mill shell and ends for wear protection Mill Hood: The chamber between the mill exhaust ducting and the mill end which is around the outlet trunnion Chamber: Compartment in the mill created from the division of the mill by diaphragms Diaphragm: The slotted plate which divides the mill tube into chambers. Between chambers is the intermediate whilst at the mill end is the outlet diaphragm Grinding Media: The steel balls (or cylpebs) which partially fill the chamber and tumble with mill rotation to achieve crushing and grinding Mill Speed: Rotational speed (rpm) of the mill (rpm) Critical Speed: Mill speed at which particles just remain at (rpm) mill liners as a result of centrifugal force Volume Loading: The percentage of the mill volume (inside (Vol%) liners) occupied by media Powder Loading: A measure of the volume or weight of material (not media) in the mill (See later) Mill diameter: The diameter of the mill tube, either inside (D) (m) the shell, or more usefully, inside the liner Mill length: The length of the mill tube, either in total (L) (m) (between mill ends) or a summation of the effective chamber length Chamber diameter: The diameter inside the lining in each (D) (m) chamber Chamber length: The effective length of each chamber (i.e. (L) (m) between diaphragms, or mill end and diaphragm, in chamber 1) Mill Power: The installed power relates to the motor size (kW) The gross drawn power relates to the actual consumed power The net power refers to either the gross power less gearbox and motor losses, or an estimate of power from the mill parameters Specific Power The mill gross power divided by the product Consumption: tonnes/hour (kWh/t) Slot Size: The average opening of the slots in the (mm) diaphragms Ball Size (mm): Ball diameter Media density: The bulk density of the media in the mill (t/m 3 ) Media charge (t): Usually the weight of media in the mill Mill airflow: The volume of air passing through the mill (m 3 /hr) (mill NOT filter) Height above The distance from the liner to the media charge: level (HAC) (m) Height above The distance from the liner to the material powder: level (HAP) (m) Liner Step: Usually the depth of the protruding part of (mm) the liner plate (in chamber 1) Diaphragm The % diaphragm area that is open (i.e. slot active area (%): area) Diaphragm The % of the slot area blocked (usually by blockages: nibs) Media Grading: The size distribution of the balls Mean Media The average ball size (usually on a weight (mm): Size basis) Clinker nibs: Usually the oversize clinker particles that escape chamber 1 and build-up in chamber 2 (or the last chamber) or the diaphragm slots Axial Samples: Material samples taken from inside the mill (when stopped!) Drum feeder: The large diameter drum, fitted externally to the mill feed trunnion, with scoops and lifters to pass material into the mill Feed chute: A simple lined chute fitted into the trunnion scrolls on the trunnion that assists material into the mill Coating: The adhesion of fine particles to the mill internals, particularly to the balls and liners 4. THE BALL MILL contents chapter 4 chapter 5 C E M E N T T E C H N O L O G Y N O T E S 2 0 0 5 46 4.3 PRINCIPAL PARAMETERS 4.3.1 INTRODUCTION The preceding section attempted to list the most important terminology involved in a ball mill. Below is additional information concerning the principal parameters that are involved in the evaluation of mill performance. Further details are discussed in section 11 on mill testing. 4.3.2 DIAMETER In most cases the most practical diameter will be the effective diameter inside the lining. However in many manuals providing basic mill data, the diameter will be inside the shell, thus there is a single diameter for a given mill. For the diameter inside the liner there will be a diameter for each chamber depending on the thickness of the lining (often 50-80mm). 4.3.3 LENGTH Like the diameter, the length is most useful when it is the effective length of each chamber. 4.3.4 VOLUME The effective volume of each chamber can be calculated using the effective chamber diameter and length. 4.3.5 VOLUME LOADING The chamber volume loading can be determined from knowledge of the chamber volume, tonnes of media and media density. e.g. assuming a chamber volume of 77.14m 3 , a media weight of 101 tonnes and a media density of 4.3 tonnes/m 3 , the volume loading would be :- Bulk media volume = 101 = 23.49m 3 4.3 Volume Loading = 23.49 = 30.4% 77.14 However, more typically, the volume loading is measured directly from an internal examination of the mill. (See Section 11). The volume loading is calculated from the measured diameter and the height above the charge. There are a number of empirical formulae, which can be used very easily, although the volume loading can be best determined from first principles. Figure 46. Example of Mill Data. 4. THE BALL MILL Chamber: 1 Mill rpm: 14.6 Diameter: 4.45 HAC: 2.92 Length: 4.96 HAP: 3.17 Volume: 77.14 Media t/m 3 : 4.30 %Nc: 72.8 Vol Loading,% 30.4 Tonnes: 101.0 Powder, U 0.78 Net kW: 1435 Chamber %L: 38.4 Ball Piece No. Wt Tonnes Size Wt. (%) 90 3015 5 25.4 25.6 80 2118 10 35.7 36.0 70 1419 10 23.9 24.1 60 893 10 15.0 15.2 0 0 0 0.0 0.0 0 0 0 0.0 0.0 0 0 0 0.0 0.0 Mean Size 77.1 mm 100 101.0 Chamber: 2 Mill rpm: 14.6 Diameter: 4.50 HAC: 3.05 Length: 7.95 HAP: 2.98 Volume: 126.44 Media t/m 3 : 4.50 %Nc: 73.2 Vol Loading,% 27.9 Tonnes: 158.5 Powder, U 1.16 Net kW: 2354 Ball Piece Average Pos 1 Pos 2 Pos 3 Size Wt. Wt Tonnes No. Wt No. Wt No. Wt (%) (%) (%) (%) 60 893 2.2 3.5 1 6.7 0 0.0 0 0.0 50 517 4.2 6.6 2 7.8 1 4.7 0 0.0 40 265 9.3 14.7 8 15.9 5 12.0 0 0.0 30 112 6.4 10.1 12 10.1 8 8.1 1 1.0 25 65 17.9 28.4 50 24.3 40 23.5 10 6.0 20 33 30.8 48.8 90 22.4 80 24.0 150 46.0 17 20 29.2 46.3 85 13.0 150 27.7 250 47.0 100 158.5 100 100 100 Mean 24.7 30.0 25.0 19.0 Size Summary Feed T/hr 110.0 Total T/hr 330.0 T/hr/m 2 21.0 Chamber Volume Media Media Mill Mill kWh/t Powder Powder Residence Loading Tonnes Mean Power Power U Tonnes Time Size Net Gross Mins 1 30.4 101.0 77.1 1435 1538 14.0 0.78 11.7 2.1 2 27.9 158.5 24.7 2354 2522 22.9 1.16 24.5 4.5 Total 259.4 3789 4060 36.9 36.2 6.6 Average 28.8 45.1 1.01 Gross/Net Factor: 1.07 contents chapter 4 chapter 5 C E M E N T T E C H N O L O G Y N O T E S 2 0 0 5 47 According to FLS, the volume loading is determined from:- Vol % = 50 - 125 x (h - D/ 2 ) D Where h is the height above the charge and D is the diameter. For the data given in Figure 46, the volume loadings are calculated to be 30.5% and 27.8%. From trigonometry it is possible to use the height above the charge to calculate the area of the segment less the area of the triangle to determine the area of the media. (See TIS MS007). From this calculation the volume loadings are correctly determined to be 30.4% and 27.9%. (See Figure 46). Volume loadings are typically in the range 25-35%, but can be 20-45%. TIS MS007. Volume Loading. Area of Segment = r 2 Area of Triangle = 1 / 2 * r cos * 2 r sin = r 2 cos sin Area below level = a r 2 - r 2 cos sin = r 2 ( - cos sin) Area of circle = ! r 2 Volume occupied = r 2 ( - cos sin) / ! r 2 = ( - cos sin) / ! 4.3.6 MEDIA CHARGE Based on the measured volume loading the media tonnage is determined using the media density. This is usually assumed to be in the range 4.3 - 4.7 tonnes/m 3 . 4.3.7 MILL SPEED The critical speed is where particles just centrifuge (See TIS MS008). The equations can be shortened to:- Nc = 42.3 "D Where D is the effective diameter. TIS MS008. Mill Speed. Critical Speed when mv 2 /r = mg v 2 /r = g or v 2 = rg v 2 = D/2g or v = (D/2 * g) 0.5 Also = (2 ! N)/60 N = (60 ) / (2 !) Also v = r = v/r N c = (60 v)/(2 ! r) N c = (60 v) / ( ! D) N c = {60 (D/2 * g) 0.5 } / ( ! D) N c = 42.3 / D 0.5 Where m = mass g = gravity D = mill diameter v = tangential velocity = angular velocity N = mill speed (rpm) N c = mill critical speed (rpm) Thus for the data shown in Figure 46 the critical speed is 20.00 rpm (using average of chamber 1 and 2 diameters) and thus the actual speed of 14.60 rpm represents 73.0% of critical speed. Typical mill speeds are in the range 65-80% although 75% represents a typical average. Most mills have a fixed speed although mills with variable speed drive do exist. This, in theory, at least provides the option of obtaining the optimum profile of cascading media as the liner wears or as the media volume loading changes. Since it is very easy to determine the mill speed (visually time 10 revolutions), it is recommended that this is done when appropriate (relying on recorded data can sometimes lead to errors). 4.3.8 MILL POWER The gross drawn power of a mill can normally be measured from the kWh meter. Often, average values are based on the kWh totaliser readings together with run hours. However in most cases it is better to take a spot reading or readings directly from the kWh meter. This involves timing the dial on the kWh meter to determine the number of revolutions in 1 hour, and then using the kWh/rev factor on the meter to calculate the kW. (i.e. time 10 revolutions of the dial). For example: Meter factor = 3.210 kWh/rev Time for 10 revs = 28.46 seconds Therefore revs/hour = 1264.9 Therefore mill power = 4060 kW (revs x kWh) hr revs The net power of the mill can be estimated from the charge weight, arm of torque and the angular velocity. Most plant suppliers have their own formulae. 4. THE BALL MILL r cos = h - r = cos -1 {(h - r)/r} Height Above Charge r h a mv 2 /r o
contents chapter 4 chapter 5
C E M E N T T E C H N O L O G Y N O T E S 2 0 0 5 48 One empirical formula which has been used is:-(See also TIS MS009) kW = 0.2846 x D x (1.073 - VOL%) x W x N 100 where D = effective chamber diameter (m) Vol% = chamber volume loading (%) W = chamber media weight (tonnes) N = mill speed (rpm) The formula is used to calculate the net power of each chamber. For the data in Figure 46, these are 1435 kW and 2354 kW. The gross power is seen to be some 7% higher than this, i.e. the gross kW/net kW ratio is 1.07, (4060/3789). This factor is usually in the range 1.05 - 1.10. Values outside this range can be indicative of measurement errors or operating and design problems. 4.3.9 LINING The liner plates are either bolted or sometimes boltless, relying on fixing by key from one plate to another. Bolted plates can lead to individual fixing problems and leakage at bolt holes. Boltless fixing avoids this problem, although replacement due to damage or wear can become a major job. The liner plate profiles vary according to the chamber in which they are used since the aim is to promote a different movement of media in each chamber (given that mill speed is fixed for each chamber). In chamber 1 the aim is to expand the charge to promote a "cataracting" action for crushing of larger clinker pieces. Thus the liner plates are stepped (See Figure 47), the step design typically being 75-90mm. For efficient action, a minimum step of 40mm is normally recommended. On average, the lining thickness is typically around 75mm. Hence the difference between inside shell diameter and effective diameter is usually 0.15m. (See Figure 46). In subsequent chambers a "cascading" type of action is required and smoother profile linings are used to promote a more compact grinding. (See Figure 47). In the second chamber of a 3 chamber mill a ripple lining is often used with an effect someway between chamber 1 and 3. Figure 47. Lining Plate Profiles. In chamber 2 of 2 chamber mills it is often practised to have a classifying lining to promote the classification of ball sizes, so that the larger sizes remain near to the intermediate diaphragm (See Figure 48) and the small sizes are displaced to the outlet end. Smoother profiles tend to have a thickness of around 50mm thus reducing the inside shell diameter by around 0.1m. Figure 48. Classifying Liner Plate Profiles. 4.3.10 DIAPHRAGM The diaphragm plates divide the mill into chambers. They can be of single plate type but more often are of double plate design (See Figure 49). The plates are slotted with radial or more usually circumferential slots, which retain the media within the chambers and allow passage of material and air (See Figure 50). Figure 49. Diaphragm Double Plate Designs. 4. THE BALL MILL Carmen F L Smidth Pfeiffer Slegten, Adjustable Slegten-Magotteaux contents chapter 4 chapter 5 C E M E N T T E C H N O L O G Y N O T E S 2 0 0 5 49 Figure 50. Diaphragm Slot Arrangements. The active or open area of the diaphragm as a result of the slots is typically around 5-10% of the total diaphragm area. Slot sizes (widths) are ideally around 6mm for intermediate and 8mm for the outlet. The outlet slots should always be marginally larger than those of the intermediate diaphragm to avoid the build-up of nibs (e.g. large clinker pieces) in the last chamber and the outlet diaphragm. Double plate diaphragms have lifter plates between the plates (See Figure 49) to promote material transport through the diaphragm. Naturally the flow rate of material through the diaphragm is only a function of the total feed rate (assuming a steady-state) and so the lifter action effectively controls the filling level in the preceding chamber. In some cases the lifting action can be too powerful and thus 1st chambers are often operating with a low level of material. As a result of this the so-called variable (or adjustable) diaphragm was developed (See Figure 49), to provide a degree of adjustment of the material filling level. 4.3.11 MEDIA SIZES Media is used in a range of sizes in each chamber to provide:- - a range of desired impact energies - an element of charge densification - a degree of stability of media grading when allowing for wear (i.e. equilibrium charge) - the ability to deal with a range of feed material properties Chamber 1 Here media is nearly always in the range 90 to 60mm. Sizes above 90mm are rarely required and in any case risk breakage of liners. Sizes below 60mm are often too small, and therefore impact energy is too small, for sufficient preparation of clinker in chamber 1. Mean size is typically in the range 75-78mm. Chamber 2 Here media is often in the range 60-16mm depending on many factors including overall mill design and manufacturers philosophy. When a wide range of sizes are deemed to be necessary then a classifying liner is required to classify the media so that the coarser sizes remain at the inlet end of the mill. It is often noted that, particularly where there is no classifying liner, media becomes naturally reverse classified, i.e. coarse sizes concentrate at the mill outlet. If nibs are a problem, these can often be classified to the mill outlet with the small media thereby not being subjected to the larger balls necessary for their breakage. Mean media sizes are typically in the range 20-40mm The influence of media sizes on mill performance is discussed further in section 6. 4.3.12 MEDIA WEAR The wear of media has significantly reduced in the last 10-20 years as a result of the developments in metallurgy. Typically, wear rates are around 10-100g/tonne of cement ground. Although wear is often quoted as g/t of cement it is more likely that the majority of wear is a result of run hours or kWh. Hence wear in terms of g/kWh is also used. An example of the effect of media wear on annual media consumption is shown in Figure 51. Figure 51. Media Wear. 4. THE BALL MILL Circumferential Radial Mill Power Mill Production Annual production Run Hours Media Wear Chamber 1 Chamber 2 4060 kW 110 tonnes/hour 800,000 tonnes 7,273 50 g/tonne 101.0 tonnes 77.1 mm Mean size 158.5 tonnes 24.7 mm Mean Size Calculations: Annual Media Consumption = 40 tonnes Media Wear = 1.35 g/kWh Reduction in Mean Media Size (assuming no top-up): Chamber 1 Media Wear = 77.1 mm = New weight = New mean size = Chamber 2 Media Wear = 24.7 mm = New weight = New mean size = Reduction in Volume Loading: Chamber 1 From To Chamber 2 From To (50 * 800000) 15.6 tonnes 15.4% 1899 g 1606 g 73.0 mm 24.4 tonnes 15.4% 62 g 52 g 23.3 mm 30.4 % 25.7 % 27.9 % 23.6 % contents chapter 4 chapter 5 C E M E N T T E C H N O L O G Y N O T E S 2 0 0 5 50 For an annual production of 800,000 tonnes the media consumption for 50g/t is 40 tonnes. In the example this equates to 1.35g/kWh. Mean media sizes (assuming no top-up) are seen to reduce to 73.0mm (from 77.1) and to 23.3mm (from 24.7) respectively. 4.3.13 POWDER LOADING AND RESIDENCE TIME Cement grinding in a ball mill essentially involves the transport of material through a rotating cylinder. In the simplest case where there is no mixing as particles pass through the mill the type of flow is referred to as "plug flow" and all the particles have the same residence time in the mill. Conversely, in the case where the contents of the mill are well mixed and uniform in composition, such that the exit from the mill has the same composition as the contents of the mill, the flow is referred to as "back-mix" of "fully-mixed" flow. In both cases, for steady-state conditions, the residence time is simply defined as the ratio of the mass of material in the mill to the feed rate, i.e. Residence Time = W/F Where W = hold-up of material in the mill (tonnes) F = feed rate to the mill (tonnes/hour) In practice however, the flow of cement through mills is non- ideal (plug flow and fully-mixed flow being "ideal") because of partial back mixing as a result of the mill internals (e.g. media, diaphragms). Hence in reality there is a distribution of residence times for particles in the mill with an overall mean residence time, i.e. some particles remain in the mill for only a short time, whilst others remain for a very long period. The residence time distribution (RTD) and mean residence time (MRT) can be determined in practice using tracer techniques, such as that proposed by Frank Mardulier and details of the test method can be found in his published articles. The Grace method of Frank Mardulier involved the use of sodium fluorescein as a pulse tracer added to the feed of the mill. The concentration of tracer in the mill product is then monitored starting at the time of addition and at regular intervals for up to 60 minutes (longer for open-circuit mills, shorter for closed-circuit mills). A typical tracer curve is shown in Figure 52 for an open and closed circuit mill. The trace from a closed-circuit mill is complicated by the presence of tracer in the rejects (hence the cyclic nature of the curve). It is possible to mathematically correct this curve to produce the equivalent of the open-circuit (Austin has a publication on this) but it is quite complex. The mean residence time can then be determined. It should be noted that this rarely coincides with the peak, as the distribution of residence times is usually skewed (See Figure 52). In most practical tests the peak of the curve was used to estimate the mean residence time, although in general this will be marginally shorter than the actual one. Figure 52. Residence Time Distribution. 4. THE BALL MILL contents chapter 4 chapter 5 C E M E N T T E C H N O L O G Y N O T E S 2 0 0 5 51 From knowledge of the feed rate and the MRT, the hold-up can be determined. For example, from the data in Figures 46 and 51, we had a feed rate of 110 tonnes/hour and say a circulating load (total feed divided by fresh feed) of 300%. For a MRT of 6.8 minutes determined by fluorescein tracer, we would calculate a hold-up of 37.4 tonnes (See Figure 53). Figure 53. Residence Time/Hold-Up/Void Filling Fluorescein Tracing. As a result of this, the steel/clinker ratio is 6.9. Typical ratios are between 6 and 10, with the optimum around 8 (See section 6). The determination of hold-up in this way, whilst accurate, is somewhat involved and can be time consuming. Furthermore the value of tonnes hold-up is not a very practical value unless qualified by knowledge of other data such as feed rate, circulating load and media charge. A more useful value is the volume of material in the mill compared to the volume of media. The steel/clinker ratio goes someway to provide this, although can only be used to relate to volume if densities are known and remain constant. This is more or less true for the media but not so for the material (the bulk density of clinker/cement can be anywhere between 1000 and 1700 kg/m 3 ). One means of relating volumes is to refer the volume of material to the volume of voidage in the media charge, i.e. void filling. This is a key parameter in the "Grace Factor" approach. The media voidage will depend on the packing of the balls. For dense packing the voidage can be as low as 40%, however when allowing for end effects (i.e. the constraints of a chamber - sides and ends) and a degree of charge expansion due to the material, the value is typically in the range of 42-45%. In our example (See Figure 53) the volume of voids for the media in the mill is 25.86m 3 . For a bulk density of say 1400 kg/m 3 for the material in the mill we have a material volume of 26.7m 3 . Hence the percentage void filling is 103%. We shall see later that this is on the high side for optimum grinding. Another approach for assessing the powder loading is to directly estimate during a mill internal inspection following a crash stop (i.e. a mill stop with feed on). This involves an estimation of the mean level of material relative to the media level and then the combination of this with the height above charge measurement to produce the effective height above powder (HAP) value. Where the powder level is below the media level, the void filling is simply the volume to the powder level divided by the volume to the media level. In the example (Figures 46, 51, 53), in chamber 1 we have HAC = 2.92, HAP = 3.17 (Powder was 250mm below media) and equivalent volume loadings of 30.4% and 23.8%. Hence the percentage void filling is 78%. Where the powder level is above the media level the void filling is:- the volume to the powder level less the volume of media steel (e.g. 0.57 * volume loading) divided by the volume of voidage (i.e. 0.43 * volume loading). In the example, in chamber 2 we have HAC = 3.05, HAP = 2.98 (powder was 70mm above media) and equivalent volume loadings of 27.9% and 29.7%. Hence the percentage void filling is 116% (not simply 106%). See also TIS MS010. From the void fillings it is of course then possible to estimate the hold-up in tonnes using an assumed material density of say 1400 kg/m 3 . This is seen to be 36.2 tonnes from Figure 53. Figure 53 (cont). Residence Time/Hold-Up/Void Filling Mill Inspection Data. 4. THE BALL MILL Data (Fluorescein Tracer): Feed Rate = Circulating Load = Mean Residence Time (tracer) = Media, Chamber 1 = Media, Chamber 2 = Volume, Chamber 1 = Volume, Chamber 2 = Volume Loading, Chamber 1 = Volume Loading, Chamber 2 = 110 Tonnes/hour 300 % 6.8 Minutes 101.0 Tonnes 158.5 Tonnes 77.14 m 3 126.44 m 3 30.4 % 27.9 % Calculations MRT = Hold-Up/Feed rate or Hold-Up = MRT * Feed Rate Circulating Load = Total Feed rate/Fresh Feed rate Total Feed rate = (300/100 * 110) = Hold-Up = (6.8/60 * 330) = Steel/Clinker Ratio = Media Volume, Chamber 1 = Media Volume, Chamber 2 = Void Volume, Chamber 1 = Void Volume, Chamber 2 = Void Volume, Total = Cement Volume (assuming 1.4t/m 3 ) = Void Filling = 330 Tonnes/hour 37.4 Tonnes/hour 6.9 23.48 m 3 35.21 m 3 10.70 m 3 15.16 m 3 25.86 m 3 26.7 m 3 103 % Data (Mill Internal Inspection): Height above powder, Chamber 1 = 3.17 m Height above powder, Chamber 2 = 2.98 m Volume to powder level, Chamber 1 = 23.8 % Volume to powder level, Chamber 2 = 29.7 % Void Filling, Chamber 1 = 78 % Void Filling, Chamber 2 = 116 % Void Filling, Mill = 101 % Hold-Up, Chamber 1 = 11.7 tonnes Hold-Up, Chamber 2 = 24.5 tonnes Hold-Up, Total = 36.2 tonnes MRT = 6.6 Minutes contents chapter 4 chapter 5 C E M E N T T E C H N O L O G Y N O T E S 2 0 0 5 52 Rarely will both methods (i.e. fluorescein tracing or mill inspection) give the same results (or indeed be carried out at the same time). The advantages and disadvantages are:- Fluorescein Tracing: Advantages: Theoretically more accurate for tonnes hold-up Provides additional RTD data No need to stop the mill Impressive technical service Disadvantages: Involved procedure Short-cuts will reduce accuracy (i.e. no allowance for recycle and using peak concentration only) Mill operating tests only Void filling relies on good estimate of material bulk density Mill Inspection: Advantages: Direct measurement for void filling Can be carried out in conjunction with a wider mill inspection or audit Provides individual chamber information Disadvantages: Hold-up requires good estimate of material bulk density Needs mill stop (can be advantageous if in conjunction with a wider inspection) Can be difficult to estimate (See Section 11) Often, in discussion with cement plants, it will be possible to acquire an understanding of the typical or characteristic void filling in a mill since they will undertake relatively frequent stops on the mill (although the majority will be with the feed run out). Knowledge like, "well below the media level" or "about the same level" or "50mm" deep of material above the media" will often be quoted. These could equate to "low void filling"(say 80%), "100% void filling" and "110% void filling" respectively. Further information is provided in sections 6 and 11. 4.3.14 MILL AIRFLOW The mill airflow refers to the volume of air passing the mill. However much available data will refer to the air passing the filter and exhaust. In-leaks, for example at the mill end, are important and thus sometimes only 50% (or even less) of the exhaust air will have passed through the mill. In the past, where the average mill size was somewhat smaller than today, mill airflows were often targeted at around 2-3 volume changes per minute (where the volume is the free volume above the charge). More often the air requirement, which is principally for heat and moisture removal, will be designed in terms of kg/kg of air to cement. A typical design value of 0.4 kg/kg will often be used, although the majority of mills will operate below this at 0.1 to 0.3 kg/kg. The airflow can be measured by: - pitot (at the mill filter exhaust). Then make allowances for the in-leaks - anemometer (e.g. vane or hot wire) - gas tracing One practical method is to determine the volume of air at the filter exhaust (usually by pitot) and then carry out a temperature balance. Details are provided in TIS MS011. This involves:- - measure filter exhaust gas temperature and airflow (correct to STP conditions) - measure the temperature of the mill exit airflow (mill exit cement temperature can be used) - measure the ambient air temperature - carry out a temperature balance to determine the volume of air passing the mill In the example in TIS MS011 for a filter airflow of 55,000 Nm3/hr at 74C, a mill exit temperature of 118C and an ambient temperature of 15C, the mill airflow is estimated to be only 31,500 Nm 3 /hr. 4.3.15 MILL TEMPERATURE, COOLING AND WATER INJECTION The majority of the kWh/tonne appear as heat, which results in a rise in temperature of the material leaving the mill. High milling temperatures result in a deterioration of the grinding efficiency as a result of an increased tendency for agglomeration and coating. Also a greater proportion of the added gypsum will be dehydrated to hemihydrate and/or soluble anhydrite (See Section 1). For these reasons milling temperature is controlled by one or more of the following:- - airflow through the mill - external water sprays - internal water injection - cooling air to the separator - direct cooling of the separator rejects In practice, all mills have some cooling from airflow whilst some have additional water injection for cooling. External water sprays are only usually found on smaller older mills. Modern separators (See Section 5) often have a "straight through" air circuit which provides significant cooling to the mill returns. Separators have also been cooled by water jackets on occasion. For correct mill cooling it is necessary to determine a mill heat balance which assesses the sources of heat and the removal of heat. A summary of these is shown in Figure 54. Water injection either to the first chamber or both chambers generally offers the most controllable form of mill cooling. As an overall guide water injection should be limited to around 3% by mass of fresh feed to the mill - 1% in chamber 1 and 2% in chamber 2. 4. THE BALL MILL contents chapter 4 chapter 5 C E M E N T T E C H N O L O G Y N O T E S 2 0 0 5 53 Figure 54. Mill Heat Balance. Potential problems of internal water can occur, such as:- - In chamber 1, localised cooling resulting in hydration and blockages and coating of the intermediate diaphragm - In chamber 2, inadequate dispersion or targeting of the water such that cement pre-hydration can occur resulting in a reduction in strength levels. The water should be dispersed into the media charge. Dispersion is usually achieved by atomisation with air. However a very fine atomised water spray can be directly taken by the mill venting airflow, and therefore be less effective. Second chamber injection at the intermediate diaphragm is the most beneficial point of injection, although requires well maintained equipment. When using internal water any other sources of water should also be taken into account, e.g. raw materials, air. One method of assessing the maximum water input is to assess the dew-point temperature of the mill exhaust. Ellerbrock (ZKG 1/88 pp1-12) has suggested a maximum dew point temperature of 70C to avoid any deterioration of cement characteristics. Mills typically operate with dew-point temperatures of 40C. Details are provided in TIS MS012. 4. THE BALL MILL HEAT INPUT HEAT OUTPUT Mill Power 1 Clinker1 Gypsum Other Feed Rejects Water, injection 2 Water, air Air Chemical Reaction Cement Water (evaporation) Convection Airflow Gypsum Dehydration Dust Comments: (1) Principal heat input (2) Typical Water Injection 0 - 3% Chamber 1: 0 - 1% Chamber 2: 0 - 2% Dew Point Temperature 70C maximum 40C typical contents chapter 4 chapter 5