Job Safety Analysis

This document outlines a job safety analysis for work taking place at the Vung Ang thermal power plant 1200mw site. It identifies potential hazards associated with the task being assessed and required control measures. The analysis lists steps of the task, associated hazards, required actions, consequence classification, and personnel responsible. Potential hazards addressed include falls, dropped objects, slipping, tripping, caught between, and more. Required safety equipment and documentation are also noted.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
73 views6 pages

Job Safety Analysis

This document outlines a job safety analysis for work taking place at the Vung Ang thermal power plant 1200mw site. It identifies potential hazards associated with the task being assessed and required control measures. The analysis lists steps of the task, associated hazards, required actions, consequence classification, and personnel responsible. Potential hazards addressed include falls, dropped objects, slipping, tripping, caught between, and more. Required safety equipment and documentation are also noted.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 6

Job Safety Analysis

THINK
Before you
CHECK
Before you
PROCEED
Task Being Assessed
Site Vung Ang thermal power plant 1200mw JSA No. P-00
!e"orded B# $ate Time Sheet No.
Consequence: Class1 Extreme: Death or Permanent Disability. Class 2 Major: Serious Bodily Injury. Class3 Moderate: Casualty Treatment.
Class4 Minor: First Aid No LTI
Personnel Attending JSA or Performing Task
Name Signature Discipline Company
P.P.E. Reuirements !indicate by marking "#$ or "N$% Note& T'is list is for selection of PPE abo(e t'e minimum reuirements specified by TPC
%oggles & ' (a"e Shield & ' So)t *ask P1 or P2 & ' !espirator-1+, or 1+2 or )ull )a"e & ' Airline+-ood & ' S.BA & '
Sa)et#
-arness
& '
$isposa/le "hemi"al suits & ' PV. Splash Suit+-ood & ' .hemi"al Apron & ' .hemi"al !esistant %lo0es & ' .hemi"al Boots & '
1ar *u))s & ' 2V Prote"tion .ream & '
)eig't Safety Reuirements An"hor Strap & ' !es"ue Plan-Suspended Person & ' S"a))old 1re"tion & ' 3ork Vest & &
(ull Bod# -arness & ' !etra"ta/le 4an#ard & ' 5nertia !eel & ' Stati" line & ' *an Basket & ' 13P & ' %ondola & '
Confined Space Entry
Reuirements
Vent+Purge & ' %as Test+4og & ' Personal *onitor & ' !es"ue plan & '
-arness )or top
entr#
& '
Documentation
.lient
PT3
& ' PT3 & ' 5solation-4o"kout+Tag out & ' 5solation 4ist & ' 3ork Pro"edure & ' P65$ & '
Prepared By: Name:
Date:
Position:
Signature:
Reviewed By Name: Date:
/ /
Signature
Approved By Name:
Date: / /
Signature
*+,DE-.RDS/)A0ARD ,DENT,1,CAT,.N
Sa)e A""ess+1gress (all (rom 72m $ropped 8/9e"ts 4oose 8/9e"ts Slip+Trip.rush+.aught Between (all 80er/oard
!otation+Spin !esidual Tor:ue 1ntanglement4i)t+.arr#+Push+Pull Sharp 1dges Pollution PT3 !e:uired
.hemi"als PP1 -eat+(ire+1;plosion-eat Stress 80er-Pressure Va"uum .hange .ontrol
80erload Bend+$istort (ail+(ra"ture+Break.ollision 4oss o) Position .ommuni"ations .on)ined Spa"e
Job Safety Analysis
THINK
Before you
CHECK
Before you
PROCEED
Task Being Assessed
Site Vung Ang thermal power plant 1200mw JSA No. P-00
!e"orded B# $ate Time Sheet No.
Consequence: Class1 Extreme: Death or Permanent Disability. Class 2 Major: Serious Bodily Injury. Class3 Moderate: Casualty Treatment.
Class4 Minor: First Aid No LTI
ID
KEYS STE I! T"SK
Ca#c $%&#c tie'n
(a)n( co*n+ ,ie-c
."/"0DS IDE!TI1IED Ca#c
mo'i n+u2 (ie3m se4 xa52 ra
C6!T067 ME"S80ES 0E98I0ED Ca#c $ie-n :(a#:
;(a<c :(u=c ,a) ;ie3m soa#t mo'i n+u2 (ie3m
0is; ratin+
class
1>2>3>4 .e-
so' ru5i ro
PES!N
ESP!NSIBLE
N"#$%i &h'u
tra(&h
nhie)m


*+,DE-.RDS/)A0ARD ,DENT,1,CAT,.N
Sa)e A""ess+1gress (all (rom 72m $ropped 8/9e"ts 4oose 8/9e"ts Slip+Trip.rush+.aught Between (all 80er/oard
!otation+Spin !esidual Tor:ue 1ntanglement4i)t+.arr#+Push+Pull Sharp 1dges Pollution PT3 !e:uired
.hemi"als PP1 -eat+(ire+1;plosion-eat Stress 80er-Pressure Va"uum .hange .ontrol
80erload Bend+$istort (ail+(ra"ture+Break.ollision 4oss o) Position .ommuni"ations .on)ined Spa"e
Job Safety Analysis
THINK
Before you
CHECK
Before you
PROCEED
Task Being Assessed
Site Vung Ang thermal power plant 1200mw JSA No. P-00
!e"orded B# $ate Time Sheet No.
Consequence: Class1 Extreme: Death or Permanent Disability. Class 2 Major: Serious Bodily Injury. Class3 Moderate: Casualty Treatment.
Class4 Minor: First Aid No LTI
ID
KEYS STE I! T"SK
Ca#c $%&#c tie'n
(a)n( co*n+ ,ie-c
."/"0DS IDE!TI1IED Ca#c
mo'i n+u2 (ie3m se4 xa52 ra
C6!T067 ME"S80ES 0E98I0ED Ca#c $ie-n :(a#:
;(a<c :(u=c ,a) ;ie3m soa#t mo'i n+u2 (ie3m
0is; ratin+
class
1>2>3>4 .e-
so' ru5i ro
PES!N
ESP!NSIBLE
N"#$%i &h'u
tra(&h
nhie)m
*+,DE-.RDS/)A0ARD ,DENT,1,CAT,.N
Sa)e A""ess+1gress (all (rom 72m $ropped 8/9e"ts 4oose 8/9e"ts Slip+Trip.rush+.aught Between (all 80er/oard
!otation+Spin !esidual Tor:ue 1ntanglement4i)t+.arr#+Push+Pull Sharp 1dges Pollution PT3 !e:uired
.hemi"als PP1 -eat+(ire+1;plosion-eat Stress 80er-Pressure Va"uum .hange .ontrol
80erload Bend+$istort (ail+(ra"ture+Break.ollision 4oss o) Position .ommuni"ations .on)ined Spa"e
Job Safety Analysis
THINK
Before you
CHECK
Before you
PROCEED
Task Being Assessed
Site Vung Ang thermal power plant 1200mw JSA No. P-00
!e"orded B# $ate Time Sheet No.
Consequence: Class1 Extreme: Death or Permanent Disability. Class 2 Major: Serious Bodily Injury. Class3 Moderate: Casualty Treatment.
Class4 Minor: First Aid No LTI
ID
KEYS STE I! T"SK
Ca#c $%&#c tie'n
(a)n( co*n+ ,ie-c
."/"0DS IDE!TI1IED Ca#c
mo'i n+u2 (ie3m se4 xa52 ra
C6!T067 ME"S80ES 0E98I0ED Ca#c $ie-n :(a#:
;(a<c :(u=c ,a) ;ie3m soa#t mo'i n+u2 (ie3m
0is; ratin+
class
1>2>3>4 .e-
so' ru5i ro
PES!N
ESP!NSIBLE
N"#$%i &h'u
tra(&h
nhie)m
*+,DE-.RDS/)A0ARD ,DENT,1,CAT,.N
Sa)e A""ess+1gress (all (rom 72m $ropped 8/9e"ts 4oose 8/9e"ts Slip+Trip.rush+.aught Between (all 80er/oard
!otation+Spin !esidual Tor:ue 1ntanglement4i)t+.arr#+Push+Pull Sharp 1dges Pollution PT3 !e:uired
.hemi"als PP1 -eat+(ire+1;plosion-eat Stress 80er-Pressure Va"uum .hange .ontrol
80erload Bend+$istort (ail+(ra"ture+Break.ollision 4oss o) Position .ommuni"ations .on)ined Spa"e
Job Safety Analysis
THINK
Before you
CHECK
Before you
PROCEED
Task Being Assessed
Site Vung Ang thermal power plant 1200mw JSA No. P-00
!e"orded B# $ate Time Sheet No.
Consequence: Class1 Extreme: Death or Permanent Disability. Class 2 Major: Serious Bodily Injury. Class3 Moderate: Casualty Treatment.
Class4 Minor: First Aid No LTI
ID
KEYS STE I! T"SK
Ca#c $%&#c tie'n
(a)n( co*n+ ,ie-c
."/"0DS IDE!TI1IED Ca#c
mo'i n+u2 (ie3m se4 xa52 ra
C6!T067 ME"S80ES 0E98I0ED Ca#c $ie-n :(a#:
;(a<c :(u=c ,a) ;ie3m soa#t mo'i n+u2 (ie3m
0is; ratin+
class
1>2>3>4 .e-
so' ru5i ro
PES!N
ESP!NSIBLE
N"#$%i &h'u
tra(&h
nhie)m
*+,DE-.RDS/)A0ARD ,DENT,1,CAT,.N
Sa)e A""ess+1gress (all (rom 72m $ropped 8/9e"ts 4oose 8/9e"ts Slip+Trip.rush+.aught Between (all 80er/oard
!otation+Spin !esidual Tor:ue 1ntanglement4i)t+.arr#+Push+Pull Sharp 1dges Pollution PT3 !e:uired
.hemi"als PP1 -eat+(ire+1;plosion-eat Stress 80er-Pressure Va"uum .hange .ontrol
80erload Bend+$istort (ail+(ra"ture+Break.ollision 4oss o) Position .ommuni"ations .on)ined Spa"e
Job Safety Analysis
THINK
Before you
CHECK
Before you
PROCEED
Task Being Assessed
Site Vung Ang thermal power plant 1200mw JSA No. P-00
!e"orded B# $ate Time Sheet No.
Consequence: Class1 Extreme: Death or Permanent Disability. Class 2 Major: Serious Bodily Injury. Class3 Moderate: Casualty Treatment.
Class4 Minor: First Aid No LTI
ID
KEYS STE I! T"SK
Ca#c $%&#c tie'n
(a)n( co*n+ ,ie-c
."/"0DS IDE!TI1IED Ca#c
mo'i n+u2 (ie3m se4 xa52 ra
C6!T067 ME"S80ES 0E98I0ED Ca#c $ie-n :(a#:
;(a<c :(u=c ,a) ;ie3m soa#t mo'i n+u2 (ie3m
0is; ratin+
class
1>2>3>4 .e-
so' ru5i ro
PES!N
ESP!NSIBLE
N"#$%i &h'u
tra(&h
nhie)m
*+,DE-.RDS/)A0ARD ,DENT,1,CAT,.N
Sa)e A""ess+1gress (all (rom 72m $ropped 8/9e"ts 4oose 8/9e"ts Slip+Trip.rush+.aught Between (all 80er/oard
!otation+Spin !esidual Tor:ue 1ntanglement4i)t+.arr#+Push+Pull Sharp 1dges Pollution PT3 !e:uired
.hemi"als PP1 -eat+(ire+1;plosion-eat Stress 80er-Pressure Va"uum .hange .ontrol
80erload Bend+$istort (ail+(ra"ture+Break.ollision 4oss o) Position .ommuni"ations .on)ined Spa"e

You might also like