This document provides the design of three sediment basin sections. For each section, it sizes the sediment basin based on catchment area and guidelines. It then designs the settling and storage zones within dimensions and ratios. Overall basin dimensions, outlet pipes, and emergency spillways are also sized to meet flow requirements. Design considerations include volumes, depths, slopes, dimensions, and hydraulic capacities.
This document provides the design of three sediment basin sections. For each section, it sizes the sediment basin based on catchment area and guidelines. It then designs the settling and storage zones within dimensions and ratios. Overall basin dimensions, outlet pipes, and emergency spillways are also sized to meet flow requirements. Design considerations include volumes, depths, slopes, dimensions, and hydraulic capacities.
Original Description:
Sizing calculation for sediment pond in earthworks
This document provides the design of three sediment basin sections. For each section, it sizes the sediment basin based on catchment area and guidelines. It then designs the settling and storage zones within dimensions and ratios. Overall basin dimensions, outlet pipes, and emergency spillways are also sized to meet flow requirements. Design considerations include volumes, depths, slopes, dimensions, and hydraulic capacities.
This document provides the design of three sediment basin sections. For each section, it sizes the sediment basin based on catchment area and guidelines. It then designs the settling and storage zones within dimensions and ratios. Overall basin dimensions, outlet pipes, and emergency spillways are also sized to meet flow requirements. Design considerations include volumes, depths, slopes, dimensions, and hydraulic capacities.
Download as XLS, PDF, TXT or read online from Scribd
Download as xls, pdf, or txt
You are on page 1of 8
DESIGN OF SEDIMENT BASIN SECTION 1
STEP 1 Sizing of Sediment Basin
Table 39.4 - Sediment Basin Type Table 39.5 - Dry Sediment Basin sizing Guidelines A (catchment area) = 0.401 in hacres tc = 20 minutes Required surface area = 100.25 refer table 39.5 ( m 2 ) Total volume required = 120 refer table 39.5 ( m 3 ) Settling zone reqiured, V 1 = 60.15 m 3 (half of Total volume) Settling zone depth, y 1 = 1 from table 39.5 ( m ) Try settling zone width, w 1 = 7 m Required settling zone length, L 1 = 15 m Average surface area = 105 m 2 > 100.25 OK ! L 1 / y 1 ratio = 15.00 m < 200 OK ! L 1 / w 1 ratio = 2.14 m > 2 OK ! STEP 2 Sediment storage zone Z = 2 Required sediment storage, V 2 = 60.15 depth storage, d 1 = 1 For slide slope, Z = 2(H) : 1(V) w 2 = 5 L 2 = 13.0 from equation V 2
new = 63 V 2 new > V 2 OK ! y2 = 7 y 2 > 0.3 m OK ! STEP 3 Overall basin dimensions At top water level Width, W TWL = 9 m Length, L TWL = 13 m Base Width, W B = -23 m Length, L B = -15 m Depth : Settling zone, y1 = 1 m Sediment Storage zone, y2 = 7 m Total depth = 8 m Side Slope Z = 2(H) : 1(V) STEP 4 Sizing of outlet pipe Outlet riser : 900 mm dia perforted MS pipe Average surface area, A av = 231.000 m 2 Orifice area, A total = 0.01 m 2 Using An orifice size of 50mm, the area of each orifice is, Ao =1.96 x 10 -3 m 2 Ao = 0.00196 m 2 Total number of orifice required = A total / 1.96 x 10 -3 = 3 STEP 5 Sizing of emergency spilway Minimum primary outlet diameter = 300 mm The 10 year ARI rainfall intensity is derived from equation 13.3 and Table 13.3 ln 10 I 30 = a + b ln t + c ln (t 2 ) + d ln (t 3 ) equation 13.2 P d = P 30 - F D (P 60 -P 30 ) equation 13.3 * Value F D derived from Table 13.3 & Figure 13.3 (Volume 4-MSMAM) I = P d /d equation 13.4 Equation 13.3,13.4 & Figure 13.3 for short duration storms (IDF values) ln 10 I 30 = 129.15 mm/hr Runoff Coefficient, C = 0.84 Post-development (Chart 14.4) 0.77 Pre-development Q 10 = C. 10 I 30 .A /360 equation 14.7 For Post-development, Q 10 = 0.12 m 3 /s For Pre-development, Q 10 = 0.11 m 3 /s Q riser = C O A O (2gH O ) 1/2 C O = 0.6 = 0.93 m 3 /s Q spillway = Q 10 - Q riser = -0.81 m 3 /s From Equation 20.9, Q spillway = C SP B H P 1.5 = 3.95 m 3 /s > 2.97 m 3 /s OK ! Try C SP = 1.7 B = 5 m H P = 0.6 m Design Chart 20.2 Total depth including spillway = 8.9 m DESIGN OF SEDIMENT BASIN SECTION 2 STEP 1 Sizing of Sediment Basin Table 39.4 - Sediment Basin Type Table 39.5 - Dry Sediment Basin sizing Guidelines A (catchment area) = 13.105 in hacres tc = 30 minutes Required surface area = 3276.25 refer table 39.5 ( m 2 ) Total volume required = 3932 refer table 39.5 ( m 3 ) Settling zone reqiured, V 1 = 1965.75 m 3 (half of Total volume) Settling zone depth, y 1 = 0.6 from table 39.5 ( m ) Try settling zone width, w 1 = 40 m Required settling zone length, L 1 = 82 m Average surface area = 3276.25 m 2 > 3276.25 OK ! L 1 / y 1 ratio = 136.51 m < 200 OK ! L 1 / w 1 ratio = 2.05 m > 2 OK ! STEP 2 Sediment storage zone Z = 2 Required sediment storage, V 2 =V 1 = 1965.75 depth storage, d 1 = 0.6 For slide slope, Z = 2(H) : 1(V) w 2 = 38.8 L 2 = 80.7 from equation V 2
new = 2076 V 2 new > V 2 OK ! y2 = 0.7 y 2 > 0.3 m OK ! STEP 3 Overall basin dimensions At top water level Width, W TWL = 41 m Length, L TWL = 81 m Base Width, W B = 36 m Length, L B = 78 m Depth : Settling zone, y1 = 0.6 m Sediment Storage zone, y2 = 0.7 m Total depth = 1.3 m Side Slope Z = 2(H) : 1(V) STEP 4 Sizing of outlet pipe Outlet riser : 900 mm dia perforted MS pipe Average surface area, A av = 3064.861 m 2 Orifice area, A total = 0.030 m 2 Using An orifice size of 50mm, the area of each orifice is, Ao =1.96 x 10 -3 m 2 Ao = 0.00196 m 2 Total number of orifice required = A total / 1.96 x 10 -3 = 16 STEP 5 Sizing of emergency spilway Minimum primary outlet diameter = 300 mm The 10 year ARI rainfall intensity is derived from equation 13.3 and Table 13.3 ln 10 I 30 = a + b ln t + c ln (t 2 ) + d ln (t 3 ) equation 13.2 P d = P 30 - F D (P 60 -P 30 ) equation 13.3 * Value F D derived from Table 13.3 & Figure 13.3 (Volume 4-MSMAM) I = P d /d equation 13.4 Equation 13.3,13.4 & Figure 13.3 for short duration storms (IDF values) ln 10 I 30 = 129.15 mm/hr Runoff Coefficient, C = 0.84 Post-development (Chart 14.4) 0.77 Pre-development Q 10 = C. 10 I 30 .A /360 equation 14.7 For Post-development, Q 10 = 3.95 m 3 /s For Pre-development, Q 10 = 3.62 m 3 /s Q riser = C O A O (2gH O ) 1/2 C O = 0.6 = 0.93 m 3 /s Q spillway = Q 10 - Q riser = 3.02 m 3 /s From Equation 20.9, Q spillway = C SP B H P 1.5 = 4.60 m 3 /s > 3.02 m 3 /s OK ! Try C SP = 1.65 B = 6 m H P = 0.6 m Design Chart 20.2 Total depth including spillway = 2.2 m DESIGN OF SEDIMENT BASIN SECTION 3 STEP 1 Sizing of Sediment Basin Table 39.4 - Sediment Basin Type Table 39.5 - Dry Sediment Basin sizing Guidelines A (catchment area) = 15.575 in hacres tc = 30 minutes Required surface area = 3893.75 refer table 39.5 ( m 2 ) Total volume required = 4673 refer table 39.5 ( m 3 ) Settling zone reqiured, V 1 = 2336.25 m 3 (half of Total volume) Settling zone depth, y 1 = 0.6 from table 39.5 ( m ) Try settling zone width, w 1 = 30 m Required settling zone length, L 1 = 30 m Average surface area = 900 m 2 > 3893.75 OK ! L 1 / y 1 ratio = 50.00 m < 200 OK ! L 1 / w 1 ratio = 1.00 m > 2 OK ! STEP 2 Sediment storage zone Z = 2 Required sediment storage, V 2 =V 1 = 2336.25 depth storage, d 1 = 0.6 For slide slope, Z = 2(H) : 1(V) w 2 = 28.8 L 2 = 28.8 from equation V 2
new = 526 V 2 new > V 2 OK ! y2 = 0.7 y 2 > 0.3 m OK ! STEP 3 Overall basin dimensions At top water level Width, W TWL = 31 m Length, L TWL = 29 m Base Width, W B = 26 m Length, L B = 26 m Depth : Settling zone, y1 = 0.6 m Sediment Storage zone, y2 = 0.7 m Total depth = 1.3 m Side Slope Z = 2(H) : 1(V) STEP 4 Sizing of outlet pipe Outlet riser : 900 mm dia perforted MS pipe Average surface area, A av = 787.280 m 2 Orifice area, A total = 0.008 m 2 Using An orifice size of 50mm, the area of each orifice is, Ao =1.96 x 10 -3 m 2 Ao = 0.00196 m 2 Total number of orifice required = A total / 1.96 x 10 -3 = 4 STEP 5 Sizing of emergency spilway Minimum primary outlet diameter = 300 mm The 10 year ARI rainfall intensity is derived from equation 13.3 and Table 13.3 ln 10 I 30 = a + b ln t + c ln (t 2 ) + d ln (t 3 ) equation 13.2 P d = P 30 - F D (P 60 -P 30 ) equation 13.3 * Value F D derived from Table 13.3 & Figure 13.3 (Volume 4-MSMAM) I = P d /d equation 13.4 Equation 13.3,13.4 & Figure 13.3 for short duration storms (IDF values) ln 10 I 30 = 129.15 mm/hr Runoff Coefficient, C = 0.84 Post-development (Chart 14.4) 0.77 Pre-development Q 10 = C. 10 I 30 .A /360 equation 14.7 For Post-development, Q 10 = 4.69 m 3 /s For Pre-development, Q 10 = 4.30 m 3 /s Q riser = C O A O (2gH O ) 1/2 C O = 0.6 = 0.93 m 3 /s Q spillway = Q 10 - Q riser = 3.77 m 3 /s From Equation 20.9, Q spillway = C SP B H P 1.5 = 3.95 m 3 /s > 3.77 m 3 /s OK ! Try C SP = 1.7 B = 5 m H P = 0.6 m Design Chart 20.2 Total depth including spillway = 2.2 m V1 153.12 Y1 1 W1 8 L1 19.14 19 L1/Y1 19.14 < 200 L1/W1 2.3925 > 2 Y2 0.6 V2 54.2376 d1 1 z 2 w2 6 L2 17.14 W2+L2 23.14 W2L2 102.84 > 51.04 1 2 3