This document outlines a standard operating procedure for reworking in-process or finished goods. It defines the scope and responsibilities for rework approval, scheduling, protocol preparation and approval. It specifies that a rework protocol must be prepared for quality assurance approval before any rework activity. The protocol must include details of the rework process, materials used, and inspection criteria. For reworks that change the batch number, a new reworked batch production number is created.
This document outlines a standard operating procedure for reworking in-process or finished goods. It defines the scope and responsibilities for rework approval, scheduling, protocol preparation and approval. It specifies that a rework protocol must be prepared for quality assurance approval before any rework activity. The protocol must include details of the rework process, materials used, and inspection criteria. For reworks that change the batch number, a new reworked batch production number is created.
This document outlines a standard operating procedure for reworking in-process or finished goods. It defines the scope and responsibilities for rework approval, scheduling, protocol preparation and approval. It specifies that a rework protocol must be prepared for quality assurance approval before any rework activity. The protocol must include details of the rework process, materials used, and inspection criteria. For reworks that change the batch number, a new reworked batch production number is created.
This document outlines a standard operating procedure for reworking in-process or finished goods. It defines the scope and responsibilities for rework approval, scheduling, protocol preparation and approval. It specifies that a rework protocol must be prepared for quality assurance approval before any rework activity. The protocol must include details of the rework process, materials used, and inspection criteria. For reworks that change the batch number, a new reworked batch production number is created.
The key takeaways are that the document outlines a standard operating procedure for reworks, including responsibilities, types of reworks covered, and requirements for rework protocols.
The purpose of the SOP is to contain the steps to be followed when a rework of an in-process or completed finished good is required due to a possible defect.
The different types of reworks covered are in-process manufactured goods rework, manufactured finished good rework, and rework of products at a contract manufacturer site.
Document Owner Quality Assurance Manager Affected Parties All Quality Assurance Staffs and Operati on s Colleagues Purpose This SOP contains the steps to be followed when the Rework of an in -process or completed Finished Good
is required.
This SOP covers the following Reworks: i In-
Process Manufactured Goods Rework . (Reworking of a complete or partial BP
N) i Manufactured Finished Good Rework i Specific in-process procedures Scope
Responsibility for the procedures set out in this SOP is as follows :
Approval for Rework Quality Assurance Scheduling Production Planner Rework Protocol Preparation Operations or Quality Assurance Rework Protocol Checking Operations Rework Protocol Approval Quality Assurance Creation of Rework BPN Production Planner Returning Finished Goods to Production Warehouse Staff
Scope of Rework In-Process Manufactured Goods
(IPMG) Re
inspection / Rework of In -Process Manufactured Good due to a possible
defect in all or part of the BPN . Batch number will not be changed . Manufactured Finished Goods
(MFG) Rework
Conversion of a product from one Batch Number to another .
Reinspection / Rework of Manufactured Finished Good due to a possible
defect in all or part of the BPN . Rework of Product at
Contract Manufacturer .
Reinspection / Rework of Manufactured Finished Good due to a possible defect in all or part of the BPN at an External Contrac
Review Date: Standard Operating Procedure Title: Rework Procedure ______________________________________________________________________________________
File Location:
Date Printed : Page 3 of 12
1.3. Quality Assurance team must assess the Deviation Report and justify the defect category of
manufactured goods . QA Manager will review the product defect t ype and either reject the
batch or decide to rework of the full or part of the batch .
1.4. In the case of a critical product defect only the QA Manager can give approval for the
Rework. Critical product defects include defects that could potentially affect pr
oduct safety, purity and efficacy
1.5.
For rework of Manufactured Finished Goods (MFG) where batch number will be changed - Once approval for the Rework has been given the relevant Production team is to inform the Production Planner to raise a Reworked Batch Pr
oduction Number (RBPN), which
will segregate the reworked part of the batch from the original batch . For a complete rework
there will be nothing left from the original batch . The numbering format of BPN and RBPN will be same but the number must be kept dif
ferent. The original BPN and reworked RBPN
should be released separately by QA for sale after a successful rework has done . The
original Batch Production Number (BPN) and Reworked Batch Production Number (RBPN)
must be documented in the protocol . Both the original BPN and reworked RBPN batch
documents must be kept after rework, as both are GMP document .
1.6.
New Rework Batch Production Number (RBPN) does not need to be assigned for In-
Process Manufactured Goods (IPMG).
1.7. After a decision of the rework has been mad
e, QA has to raise a rework protocol according to
section 3
of this SOP before any activity can commence .
1.8.
When the protocol is ready and approved , hand it over to Area Manager where the rework
will be carried out . QA Staff should ensure that protocol is ag
reed and understood, as it will
be a part of batch document .
1.9.
Production operator receives the protocol along with all other relevant forms , Visual Displays
and documents.
1.10. Production operator contacts the Warehouse to determine the location of the manufac tured
product, which is already kept in the Finished Goods storage location in the warehouse . The storage type and the storage bin type of the manufactured goods can be found in the Goods
Booking Slip for the BPN.
1.11. Production operators print out a Goods Returns For Rework Form
(Form-
515) and fill up the Production To Fill Up section of the form leaving the Warehouse To Fill Up section
blank. The form should have the information as follows : i
Person requesting the goods return, name, sign and date. i WIP or designated area of the process line where the rework will be carried out i Product Code i Product Description i
Batch Production Number (BPN) i Expiry Date i Quantity to be returned i Number of shippers i Number of pallets i Destination Storage type i Destination Storage bin i Shipper labels involved Production operator has to sign the form and send to warehouse to arrange transfer of
goods.
1.12. Warehouse operator receives the form and pick up the requested stock from the source
storage bin . Warehouse operator has to fill up the warehouse section of the form before
sending the goods to be reworked , including source storage type and storage bins , number
of full shippers and partial shipper , Number of pallets. Standard Operating Procedure Title: Rework Procedure ______________________________________________________________________________________
File Location:
Date Printed : Page 5 of 12 i
Initial quantity of BPN received . i
Final quantity of RBPN required . i
Additional materials (components) required for the Rework. i The location in which the Rework is to b
e done. i
Procedure to be followed during the Rework . i
Criteria for inspection/rejection of goods.
3.2. Protocol for In-Process Manufactured Goods TEM-125 The following information is to be provided in the request for Rework Protocol for an In - Process Manufactur
ed Finished Good: i
Why the Rework is being done. i The related DR number i
Batch Production Number (BPN) and Expiry date i
Additional materials (components) required for the Rework. i
Initial quantity received (excluding original sample qty) i Final quantity produced. i
The location in which the Rework is to be done . i
Procedure to be followed during the Rework . i
Criteria for inspection/rejection of goods.
3.3.
The Protocol must include : i
Normal Line Clearance procedures. i Exact processing details including where Rework was condu
cted, when work
was done and a record of all staff involved . i
All component Code numbers and quantities required . i
Reconciliation of product and all printed components .
3.4.
The Protocol follows the path of any batch document in Production . It is kept with all o ther
batch documents pertaining to the Rework Process Order . Protocol is to be forwarded
including the retention samples to QA for assessment .
4. Exception to Use of Rework Protocol
4.1.
Where a controlled form has been created for a specific repeated procedure , this form may be used in place of a signed-
off Protocol Rework form (TEM-
115 or TEM-125).
4.2.
The procedure defined in this form is not to be changed without appropriate authorisation .
4.3. This form is to be signed -
off at the completion of the Protocol . All documentation relating to
the Protocol MUST be included with the Batch Documents .
Standard Operating Procedure Title: Rework Procedure ______________________________________________________________________________________
File Location:
Date Printed : Page 7 of 12
6. Summery of Changes
End of Procedure
Version # Revision History QMS-065 New Form-555 Issue date: Batch Documentation Checklist For Tablet Packing
(Ref. SOP QMS-
075; QMS-
085; QMS-
090)
File Location:
Date Printed : Page 11 of 12
Production is to compl
ete Sections 1 & 2
Quality Assurance Department is to complete Section 3
SECTION 1
PRODUCT NAME:
BPN:
CODE:
Tick appropriate boxes
Put a N/A against boxes which are NOT APPLICABLE
N/A
SECTION 2 The following manufacturing documents and samples must
accompany the checklist : Production
Prod Initial QA MI Sheets for all the process phases
Deviation Report Form (If any DR
raised)
Printed Material Sample Sheet /s
Bulk Tablet Sampling Form/s
(if applicable)
Line Clearance, Opening a
nd Cleaning Form/s
Finished Good Retention Samples
Material Transfer Order Form/s
Vacuum Leak Test - Hourly Form
Vacuum Leak Test - New Foil and PVC Roll Form
In-Process Check - Shipper Form
In-Process Check-Blister and Carton form
Batch Reconciliation Sheet for Tablet Packing
IBC Cleaning Tag/s
IBC Identification Label /s
Checkweigher Weight Record
(if applicable)
Pallet Booking Information
If any deviation raised write the DR Number /s:
(Attach the copy of de
viation report/s)
If any work-
order raised during the batch write the order number /s: