RCABC Roof Curb Pentrations and Openings

Download as pdf or txt
Download as pdf or txt
You are on page 1of 13
At a glance
Powered by AI
The document discusses roofing practices and standards for various penetrations, openings, and flashings.

It discusses curb openings, equipment sleepers, curbed multiple roof penetrations, roof drains, scuppers, and leaders.

Components included are gypsum overlay board, vapour retarder, insulation, insulation overlay, primary membrane, membrane flashing, and metal base flashing.

RGC ROOFING PRACTICES MANUAL UPDATED 00-01-25 REV 2 TAB 8.3.

5 PAGE 1


8.3.5 CURBS, PENETRATIONS AND OPENINGS: CURB OPENING
(AIR HANDLING UNITS)
























WORK INCLUDED
(1) Gypsum Overlay Board: If required by design authority.
(2) Vapour Retarder: If required by design authority.
(3) Insulation: See list of accepted materials in Tab 2.2.
(4) Insulation Overlay: Where required. See RGC Guarantee Standard B4.1, B4.2 and C4.1
(5) Primary Membrane and Membrane Protection
(6) Membrane Flashing: Lap one ply over top of each side of curb (C) and mechanically fasten.
(7) Metal Base Flashing: Mechanically fastened. Standing seam at corners of cant.
RELATED WORK BY OTHERS
(A) Acceptable Deck
(B) Air / Vapour Seal
(C) Wood Curb / Blocking: Minimum 200 mm (8") and maximum 300 mm (12") above finished roof surface.
NOTE: Refer to RGC Guarantee Standards for additional requirements

RGC ROOFING PRACTICES MANUAL UPDATED 06-01-30 REV 4 TAB 8.3.5 PAGE 2


8.3.5 CURBS, PENETRATIONS AND OPENINGS: EQUIPMENT SLEEPER
























WORK INCLUDED
(1) Gypsum Overlay Board: If required by design authority.
(2) Vapour Retarder: If required by design authority.
(3) Insulation
(4) Insulation Overlay: As required. See RGC Guarantee Standard B4.1, B4.2 and C4.1
(5) Primary Membrane and Membrane Protection
(6) Membrane Flashing: Lap one ply from each side over top of sleeper (C) and mechanically fasten.
(7) Alternate Cap Flashing: May be used instead of lapping membrane flashing over sleeper.
(8) Metal Base Flashing: Mechanically fasten to top of wood blocking, standing seam at corners, optional on
flexible membrane systems. Optional on flexible membrane systems. Required on assemblies using gravel
ballast filter mats. See RGC Guarantee Standard A6.9.1.2.
(9) Metal Cap Flashing: Flashings (8) and (9) may be one piece.
RELATED WORK BY OTHERS
(A) Acceptable Deck
(B) Air / Vapour Seal
(C) Wood Blocking / Sleeper: Minimum 150 mm (6") thick, minimum 100 mm (4") above finished roof surface.
NOTE: Refer to RGC Guarantee Standards for additional requirements

RGC ROOFING PRACTICES MANUAL UPDATED 00-01-25 REV 2 TAB 8.3.5 PAGE 3


8.3.5 CURBS, PENETRATIONS AND OPENINGS: CURBED MULTIPLE ROOF
PENETRATIONS























WORK INCLUDED
(1) Gypsum Overlay Board: If required by design authority.
(2) Vapour Retarder: If required by design authority.
(3) Insulation
(4) Insulation Overlay: Where required. See RGC Guarantee Standard B4.1, B4.2 and C4.1
(5) Primary Membrane and Membrane Protection
(6) Membrane Flashing: Mechanically fasten to top of curb (C).
(7) Metal Base Flashing: Mechanically fasten to top of curb, standing seam at corners of cant, optional on
flexible membrane systems. Optional on flexible membrane systems. Required on assemblies using gravel
ballast filter mats. See RGC Guarantee Standard A6.9.1.2.
(8) Metal Counter Flashing
(9) Metal Hood
RELATED WORK BY OTHERS
(A) Acceptable Deck
(B) Air / Vapour Seal
(C) Wood Blocking / Curb: Minimum 200 mm (8") and maximum 300 mm (12") above finished roof surface.
NOTE: Refer to RGC Guarantee Standards for additional requirements


RGC ROOFING PRACTICES MANUAL UPDATED 00-01-25 REV 2 TAB 8.3.5 PAGE 3


8.3.5 CURBS, PENETRATIONS AND OPENINGS: CURBED MULTIPLE ROOF
PENETRATIONS























WORK INCLUDED
(1) Gypsum Overlay Board: If required by design authority.
(2) Vapour Retarder: If required by design authority.
(3) Insulation
(4) Insulation Overlay: Where required. See RGC Guarantee Standard B4.1, B4.2 and C4.1
(5) Primary Membrane and Membrane Protection
(6) Membrane Flashing: Mechanically fasten to top of curb (C).
(7) Metal Base Flashing: Mechanically fasten to top of curb, standing seam at corners of cant, optional on
flexible membrane systems. Optional on flexible membrane systems. Required on assemblies using gravel
ballast filter mats. See RGC Guarantee Standard A6.9.1.2.
(8) Metal Counter Flashing
(9) Metal Hood
RELATED WORK BY OTHERS
(A) Acceptable Deck
(B) Air / Vapour Seal
(C) Wood Blocking / Curb: Minimum 200 mm (8") and maximum 300 mm (12") above finished roof surface.
NOTE: Refer to RGC Guarantee Standards for additional requirements


RGC ROOFING PRACTICES MANUAL UPDATED 07-01-12 REV 3 TAB 8.3.5 PAGE 4


8.3.5 CURBS, PENETRATIONS AND OPENINGS: GUM PANS (Pitch Pockets)






















WORK INCLUDED
(1) Gypsum Overlay Board: If required by design authority.
(2) Vapour Retarder: If required by design authority.
(3) Insulation: See list of accepted materials in Tab 2.2.
(4) Insulation Overlay: As required. See RGC Guarantee Standard B4.1, B4.2 and C4.1
(5) Primary Membrane and Membrane Protection
(6) Compatible Mastic: Use only the membrane manufacturers approved sealant.
(7) Metal Gum Pan or Pitch Pocket: Minimum 100 mm (4") flange onto roof membrane. All corners, with the
exception of one job-site formed double standing seam corner joint and adjoining lapped flange joining,
shall be closed and soldered. Minimum height of gum pan to be 100 mm (4"). See RGC Guarantee
Standard A6.2
(8) Membrane Flashing: Onto primed metal flashing flange.
(9) Packing: To prevent displacement of compatible mastic.
(10) Structural Sealant: Use only the membrane manufacturers approved proprietary polyurethane based
structural sealant.
(11) Back-up Storm Collar: To be installed whenever practical. Caulk at top of collar.
RELATED WORK BY OTHERS
(A) Acceptable Deck
(B) Protrusion
(C) Wood Blocking
NOTE: WARNING: DO NOT USE THIS DETAIL WITH HOT PIPES.
AVOID THIS DETAIL: Wherever possible use Flanged Metal Stack Flashing (See Tab 8.3.5 Page
5) or Curbed Opening (See Tab 8.3.5 Page 7).
Refer to RGC Guarantee Standards for additional requirements.

RGC ROOFING PRACTICES MANUAL UPDATED 06-01-30 REV 1 TAB 8.3.5 PAGE 5


8.3.5 CURBS, PENETRATIONS AND OPENINGS: METAL PLUMBING FLASHING

WORK INCLUDED
(1) Gypsum Overlay Board: If required by design authority.
(2) Vapour Retarder: If required by design authority.
(3) Insulation: See list of accepted materials in Tab 2.2.
(4) Insulation Overlay: As required. See RGC Guarantee Standard B4.1, B4.2 and C4.1
(5) Primary Membrane and Membrane Protection
(6) Mastic: As approved by manufacturer.
(7) Membrane Flashing: Onto primed metal flashing flange or adhesive coated for non-bituminous flexible
membrane systems.
(8) Storm Collar, Typical Lead Cap or Typical Aluminum Cap: Reroofing only. Non- bituminous flexible
membrane skirt collar, sealed with compatible sealant and stainless steel hose clamps for use with pipes
that extend above flashings.
RELATED WORK BY OTHERS
(A) Acceptable Deck
(B) Plumbing Stack: Extend to match top of metal flashing.
(C) Wood Blocking: Optional.
(D) Metal Flashing: Apply in a bed of mastic. Fastened over membrane to wood blocking or roof deck.
(E) Typical Aluminum Cap: For use with aluminum flashings.
(F) Typical Lead Cap: For use with lead flashings.
(G) Storm Collar: Non-Bituminous flexible membrane skirt collar, sealed with compatible sealant and stainless
steel hose clamp. Use with pipes that extend above flashings.
NOTE: Refer to RGC Guarantee Standards for additional requirements
Aluminum flashings required for torch-applied roof systems.

RGC ROOFING PRACTICES MANUAL UPDATED 00-01-25 REV 0 TAB 8.3.5 PAGE 6


8.3.5 CURBS, PENETRATIONS AND OPENINGS: MECHANICAL CURB OPENING























WORK INCLUDED
(1) Gypsum Overlay Board: If required by design authority.
(2) Vapour Retarder: If required by design authority.
(3) Insulation: See list of accepted materials in Tab 2.2.
(4) Insulation Overlay: As required. See RGC Guarantee Standard B4.1, B4.2 and C4.1
(5) Primary Membrane and Membrane Protection
(6) Membrane Flashing: Tuck under metal curb flange of each side of curb (C) and mechanically fasten.
(7) Metal Base Flashing: Mechanically fasten, standing seam at corners of cant.
RELATED WORK BY OTHERS
(A) Acceptable Deck
(B) Air / Vapour Seal
(C) Mechanical Curb: Minimum 200 mm (8") and maximum 300 mm (12") above finished roof surface. Keep
curb covered during construction to prevent water ingress.
(D) Rigid Insulation
NOTE: Refer to RGC Guarantee Standards for additional requirements

RGC ROOFING PRACTICES MANUAL UPDATED 00-01-25 REV 0 TAB 8.3.5 PAGE 7


8.3.5 CURBS, PENETRATIONS AND OPENINGS: TWO PART CABLE FLASHING
(RE-ROOFING DETAIL)























WORK INCLUDED
(1) Gypsum Overlay Board: If required by design authority.
(2) Vapour Retarder: If required by design authority.
(3) Insulation: See list of accepted materials in Tab 2.2.
(4) Insulation Overlay: As required. See RGC Guarantee Standard B4.1, B4.2 and C4.1
(5) Primary Membrane and Membrane Protection
(6) Mastic: As approved by manufacturer.
(7) Membrane Flashing: Onto primed metal flashing or adhesive coated for non-bituminous flexible membrane
systems.
RELATED WORK BY OTHERS
(A) Acceptable Deck
(B) Wood Blocking
(C) Two Piece Cable Flashing: Assembled around cables, which cannot be or are not disconnected, and laid in
bed of mastic (adhesive for single ply systems).
NOTE: Refer to RGC Guarantee Standards for additional requirements

RGC ROOFING PRACTICES MANUAL UPDATED 00-01-25 REV 3 TAB 8.3.6 PAGE 1


8.3.6 WATER CONTROL AND DRAINAGE: CAST IRON DRAIN























WORK INCLUDED
(1) Gypsum Overlay Board: If required by design authority.
(2) Vapour Retarder: If required by design authority.
(3) Insulation: See list of accepted materials in Tab 2.2.
(4) Insulation Overlay: Where required. See RGC Guarantee Standard B4.1, B4.2 and C4.1
(5) Primary Membrane and Membrane Protection
(6) Mastic: As approved by manufacturer.
(7) Membrane Flashing: As approved by membrane manufacturer (See (C) below).
RELATED WORK BY OTHERS
(A) Acceptable Deck
(B) Roof Drain Assembly
(C) Lead Flashing: Minimum 15 kg / m (3 lb / ft) weight lead sheet; flange extending minimum 25 mm (1") into
bowl to 150 mm (6") beyond perimeter of drain; embed in mastic (6) and prime top surface where required
by manufacturer or minimum 1 m x 1 m (39" x 39") 3 mm thick modified bituminous base sheet; to be
supplied by trade supplying roof drain. For asphalt and gravel built-up systems only.
NOTE: Refer to RGC Guarantee Standards for additional requirements
Leader size is determined by using the calculation found in the BC Building Code at Appendix
P.7.4.10 and Table 7.4.10.11 (Table 7.4.10.10 for gutters) in conjunction with the 15-minute rainfall
value from the National Building Code, Appendix C.

RGC ROOFING PRACTICES MANUAL UPDATED 00-01-25 REV 2 TAB 8.3.6 PAGE 2


8.3.6 WATER CONTROL AND DRAINAGE: SPUN COPPER ROOF DRAIN























WORK INCLUDED
(1) Gypsum Overlay Board: If required by design authority.
(2) Vapour Retarder: If required by design authority.
(3) Insulation: See list of accepted materials in Tab 2.2.
(4) Insulation Overlay: Where required. See RGC Guarantee Standard B4.1, B4.2 and C4.1
(5) Primary Membrane and Membrane Protection
(6) Mastic: As approved by manufacturer.
(7) Membrane Flashing: Onto primed drain flange or adhesive for non-bituminous flexible membrane systems.
RELATED WORK BY OTHERS
(A) Acceptable Deck
(B) Roof Drain Assembly
NOTE: Refer to RGC Guarantee Standards for additional requirements
Leader size is determined by using the calculation found in the BC Building Code at Appendix
P.7.4.10 and Table 7.4.10.11 (Table 7.4.10.10 for gutters) in conjunction with the 15-minute rainfall
value from the National Building Code, Appendix C.

RGC ROOFING PRACTICES MANUAL UPDATED 00-01-25 REV 0 TAB 8.3.6 PAGE 3


8.3.6 WATER CONTROL AND DRAINAGE: CLAMPING SPUN COPPER
ROOF DRAIN























WORK INCLUDED
(1) Gypsum Overlay Board: If required by design authority.
(2) Vapour Retarder: If required by design authority.
(3) Insulation: See list of accepted materials in Tab 2.2.
(4) Insulation Overlay: Where required. See RGC Guarantee Standard B4.1, B4.2 and C4.1
(5) Primary Membrane and Membrane Protection
(6) Mastic: As approved by manufacturer.
(7) Membrane Flashing: Onto primed drain flange or adhesive for non-bituminous flexible membrane systems.
RELATED WORK BY OTHERS
(A) Acceptable Deck
(B) Roof Drain Assembly
NOTE: Refer to RGC Guarantee Standards for additional requirements
Leader size is determined by using the calculation found in the BC Building Code at Appendix
P.7.4.10 and Table 7.4.10.11 (Table 7.4.10.10 for gutters) in conjunction with the 15-minute rainfall
value from the National Building Code, Appendix C.

RGC ROOFING PRACTICES MANUAL UPDATED 06-01-30 REV 5 TAB 8.3.6 PAGE 4


8.3.6 WATER CONTROL AND DRAINAGE: OPEN WALL SCUPPER WITH HOPPER


WORK INCLUDED
(1) Vapour Retarder: If required by design authority. (Optional terminations)
(2) Insulation: See list of accepted materials in Tab 2.2.
(3) Insulation Overlay: Where required. See RGC Guarantee Standard B4.1, B4.2 and C4.1
(4) Primary Membrane and Membrane Protection
(5) Metal Scupper with Hopper:: The outside face of scupper to be 37.7mm (1") lower than the box height
with a 12.7mm (") drip edge. Installed in a thin bed of compatible mastic. Interface between outside wall
and scupper should be caulked with appropriate sealant. Installed when wall finish is complete prior to
completion of roofing or sheet metal (e.g.: re-roofing).
(6) Scupper Membrane Flashing
(7) Membrane Flashing
(8) Metal Base Flashing: Mechanically fastened. Optional on flexible membrane systems. Required on
assemblies using gravel ballast filter mats. See RGC Guarantee Standard A6.9.1.2.
(9) Metal Cap Flashing: Fasten with continuous concealed clip-type fasteners or with 2 concealed discontinuous
clips or cladding screws evenly spaced between seams. See RGC Guarantee Standard A6.10.3 and
A6.10.4. Flashing 8 and 9 may be one piece.
RELATED WORK BY OTHERS
(A) Acceptable Deck
(B) Air / Vapour Seal
(C) Wood Blocking Assembly
(D) Plywood: If required by design authority. See RGC Guarantee Standard A1.5.1 and A1.5.3
(E) Exterior Wall Finish: Interface between outside wall and scupper to be caulked with appropriate sealant.
Installed by trade responsible for outside wall finish if roofing and metal flashing has been completed prior
to exterior wall finish.
NOTE: Refer to RGC Guarantee Standards for additional requirements

RGC ROOFING PRACTICES MANUAL UPDATED 06-01-30 REV 5 TAB 8.3.6 PAGE 5


8.3.6 WATER CONTROL AND DRAINAGE: THRU WALL SCUPPER WITH HOPPER

WORK INCLUDED
(1) Vapour Retarder: If required by design authority. (Optional terminations)
(2) Insulation: See list of accepted materials in Tab 2.2.
(3) Insulation Overlay: Where required. See RGC Guarantee Standard B4.1, B4.2 and C4.1
(4) Primary Membrane and Membrane Protection
(5) Membrane Flashing
(6) Metal Scupper with Hopper: The outside face of scupper to be minimum 37.7mm (1") lower than the box
height with a 12.7mm (") drip edge. Installed in a thin bed of compatible mastic. Interface between
outside wall and scupper should be caulked with appropriate sealant. Installed when wall finish is
complete prior to completion of roofing or sheet metal (e.g.: re-roofing).
(7) Mastic: Compatible with membrane
(8) Scupper Membrane Flashing:
(9) Metal Base Flashing: Mechanically fastened (optional on flexible membrane systems).
(10) Metal Counter Flashing: Into reglet approximately 30 mm (1 ").
RELATED WORK BY OTHERS
(A) Acceptable Deck
(B) Air / Vapour Seal
(C) Wood Blocking Assembly: Optional with insulation cant strips.
(D) Plywood: If required by design authority. See RGC Guarantee Standard A1.5.1 and A1.5.3
(E) Exterior Wall Finish: Interface between outside wall and scupper to be caulked with appropriate sealant.
Installed by trade responsible for outside wall finish if roofing and metal flashing has been completed prior
to exterior wall finish.
NOTE: Refer to RGC Guarantee Standards for additional requirements

You might also like