SWP 002 - Risk Assessment

This document provides a risk assessment and management plan for a construction project. It identifies 11 key hazards including contaminated ground, underground utilities, unsafe demolition, unauthorized entry, unsafe temporary structures, traffic issues, lack of welfare facilities, waste management, infestation, weather/climate, and failure to consider local weather conditions. For each hazard, it identifies who may be at risk, provides a risk rating, and lists necessary control measures and actions to mitigate the residual risk. The overall goal is to put controls in place to reduce risks and ensure site safety during all project activities.

Uploaded by

AbhinavBanerjee
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
1K views23 pages

SWP 002 - Risk Assessment

This document provides a risk assessment and management plan for a construction project. It identifies 11 key hazards including contaminated ground, underground utilities, unsafe demolition, unauthorized entry, unsafe temporary structures, traffic issues, lack of welfare facilities, waste management, infestation, weather/climate, and failure to consider local weather conditions. For each hazard, it identifies who may be at risk, provides a risk rating, and lists necessary control measures and actions to mitigate the residual risk. The overall goal is to put controls in place to reduce risks and ensure site safety during all project activities.

Uploaded by

AbhinavBanerjee
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 23

Project Risk Register & Management Programme:

Risk Assessment
Item Hazard Risk Who is at Risk Risk Rating Necessary Control Measures Action
y
Residual Risk
Rating
S L Rating S L Rating
!ite "sta#lishment
1 Contaminated ground Contact with hazardous chemicals
/ substances leading to illness & ill
health
General site
workers
General site
staff
Site visitors
3
!"
Carr# out site surve# in advance of occu$ation
%otif# Client / Clients &gent of an# hazardous contamination not $reviousl#
advised' %either ()* or the Contractor shall not take res$onsibilit# for
contaminated land unless contractuall# agreed in advance
Contractors to identif# and remove hazardous chemicals / substances in line
with the contract re+uirements ()* !WP $%& , C*S--'
.here deemed necessar# b# ()* contaminated ground shall be fenced off
to $revent inadvertent contact b# 3
rd
$arties whilst removal is in $rogress
&rrange occu$ational health screening for an# workers accidentall# coming
into contact with contaminated ground where it is confirmed that the
contamination is a significant health hazard
/0
3 1
!3
Contact with e1isting
services / utilities
during site grading and
clearance
)lectric shock / )lectrical fire
Gas leak / gas e1$losion
.ater leak / flooding
Sewage leak
2amage incident 3 financial
$enalt#
General site
workers
General site
staff
Site visitors
4 3
14
&c+uire current utilit# drawings
Carr# out surve# to confirm de$th and line of e1isting utilities 5utilize suitable
surve# e+ui$ment relevant to the sco$e and scale of the work' Surve#
e+ui$ment ma# include ground radar6 cable avoidance tools and accessories
5C&7 & Genn#8
&s necessar#6 dig trial $its to locate underground services
0ark the line of underground services to ensure visibilit# to all $ersons
working in the vicinit#
/re$are method statement for e1cavation of underground services
incor$orating the re+uirements of ()* !WP $$& 3 )1cavations & 7unneling
.here $ossible6 underground electrical services shall be de,energized $rior
to e1cavations'
.here services are to be re,routed6 no work shall commence until services
are confirmed as de,energized / inert
/ermits shall be secured in advance from the relevant utilit# / local authorit#
$rior to e1cavation in the vicinit# of e1isting underground services
/0
4 1
!4
3 9nsafe demolition of
e1isting structures
/ersonal in:ur# due to
uncontrolled colla$se or falling
ob:ects
2ust
;ire due to contact with
unidentified / unknown live
services or fuel stores
2amage to surrounding facilities
due to falling / fl#ing ob:ects
2amage to $lant & e+ui$ment 3
financial and $roduction loss
General site
workers
General site
staff
Site visitors
4 3
14
Carr# out building surve#
/re$are method statement
<m$lement e1clusion zones to $revent unauthorized access to work area
<nstall $rotection screens to $revent fl#ing ob:ects e1tending be#ond
e1clusion zones
<nstall signage to warn of work in $rogress / hazards
<nstall illumination / lighting as necessar#
/0
4 1
!4
= 9nauthorized entr# to
site
<n:ur# to 3
rd
$art# General site
workers 5other
= 3
1
-oarding / fencing shall be erected once the Contractor has taken
$ossession of the site
/0 = 1
!=



Project Risk Register & Management Programme:
Risk Assessment
Item Hazard Risk Who is at Risk Risk Rating Necessary Control Measures Action
y
Residual Risk
Rating
S L Rating S L Rating
contractors8
General $ublic
-oarding shall be at least " > tall and shall be sufficient to $revent
unauthorized access
Site access $oints shall include a boom gate 5or similar8 and securit# station
that is manned =/? for the duration of the $ro:ect
Securit# signage shall be erected
Site set u$ shall be in accordance with the re+uirements set out in ()* !WP
$$% 3 General -S) Re+uirements for Contractors
4 9nsafe tem$orar#
structures
;ire
)lectrical shock / electrical fire
Colla$se of tem$orar# structures
2amage to materials and
e+ui$ment 3 financial and
$roduction loss
General site
workers
General site
staff
Site visitors
= 3
1
7em$orar# buildings / structures 5e'g' site offices6 stores6 worksho$s and fuel
stores8 shall be structurall# sound and installed in line with the re+uirements
of ()* !WP $$% 3 General -S) Re+uirements for Contractors
)lectrical services to tem$orar# buildings / structures shall be installed in line
with the re+uirements of ()* !WP $%% 3 )lectricit#
/0
= 1
!=
" 7raffic Road traffic accident 3 vehicle
collision / $ersonal in:ur#
2amage to materials and
e+ui$ment 3 financial and
$roduction loss
General site
workers
General site
staff
Site visitors
General site
workers 5other
contractors8
General $ublic
%eighbors
4 3
14
7raffic management shall be in line with the re+uirements of ()* !WP $$% 3
General -S) Re+uirements for Contractors u$ and !WP $%' 3 0obile /lant
and @ehicles
& site logistics $lan shall be $re$ared' 7his shall detail the site boundar#6
$edestrian and vehicle access6 site roads6 $arking6 la# down areas and
tem$orar# structures
7raffic management signage and lighting shall be installed as necessar#
7raffic management arrangements for labour dro$ off / collection shall be
im$lemented' Labour shall not be $ut at risk from moving vehicles and
machiner#
7raffic 0arshalls or >;lagA men shall control heav# traffic routes and crossing
$oints' ;lag men shall be suitabl# trained
Barriers shall be installed to se$arate $edestrians from vehicle traffic'
/edestrian routes shall be clearl# marked and illuminated where necessar#'
Signage should be in a language understood b# the ma:orit# of the labour
/0
4
1!
? Lack of welfare and
medical facilities
;ood / drinking water
contamination
-uman waste contamination of
tem$orar# facilities and site
2isease and ill health due to lack
of washing facilities
)scalation of minor in:uries due to
lack of treatment 3 infection risk
<ll health due to lack of recognition
of medical conditions
/reventable fatalities due to lack
of first aid skills and e+ui$ment
General site
workers
General site
staff
Site visitors
= =
1"
Site welfare facilities shall be established in line with the re+uirements set
out in ()* !WP $$% 3 General -S) Re+uirements for Contractors'
Sufficient toilets6 washing facilities6 dr#ing facilities and mess facilities shall
be installed in line with man$ower levels' &s man$ower levels change6
welfare facilities shall be reviewed and altered accordingl#' 0ess and welfare
facilities shall be installed in a safe area where there is no risk from moving
vehicles or other site hazards
7em$orar# chemical toilets ma# be utilized in the earl# stages of a $ro:ect6
however6 these shall not be $ermitted in the long term' ;ull flushing .CAs
shall be installed
0edical facilities shall be established in line with the re+uirements set out in
()* !WP $$% 3 General -S) Re+uirements for Contractors' Sufficient first
aiders and / or a site nurse shall be a$$ointed for the $ro:ect
.here local regulations re+uire a different standard to that set out in the
()* S./ !!1 3 Site Set u$6 the higher standard shall be im$lemented
/0
= 1
!=



Project Risk Register & Management Programme:
Risk Assessment
Item Hazard Risk Who is at Risk Risk Rating Necessary Control Measures Action
y
Residual Risk
Rating
S L Rating S L Rating
C Lack of waste
management / waste
facilities
<ncrease in fire loading
General housekee$ing issues
Blockage of access routes
<nfestation of vermin / insects
General site
workers
General site
staff
Site visitors
%eighbors
3 =
1
.aste management arrangements shall be in line with the re+uirements of
()* !WP $$( 3 )nvironmental 0anagement
.aste collection $oints shall be installed and suitable and sufficient ski$s
and bins $rovided' .aste collection $oints shall be clearl# signed
-ousekee$ing teams shall be established to ensure the waste material is
removed from site at the earliest o$$ortunit#
.aste materials shall be segregated between general waste6 metals6 wood
and hazardous materials' 0ore detailed segregation ma# be re+uired where
contractual or national re+uirements s$ecif#
.aste shall not be buried or burned on site' & licensed waste management
$artner shall be engage to dis$ose of waste materials in line with contractual
re+uirements and / or national regulations
/0
3
!"
D <nfestation <nfestation 3 vermin
<nfestation 3 insects 5mos+uitoes /
cockroaches / ants etc8
2amage to installed materials
General site
workers
General site
staff
Site visitors
%eighbors
3 =
1
7em$orar# facilities shall be maintained in a clean and tid# manner
;ood $re$aration area shall be cleaned dail# and waste securel# stored in
closed bins' ;ood waste shall be secured against wild animals
/est control measures shall be im$lemented for tem$orar# facilities in
locations susce$tible to infestation b# cockroaches etc
.here vermin infestation is a common occurrence6 suitable $reventative
measures shall be taken' Relevant $ermits or $ermissions shall be secured
$rior to use of $oisons
.aste water shall be removed tanked and removed from site via tanker6 or
where $ermitted6 in e1isting waste water utilities' .aste water shall not be
allowed to $ool and become stagnant as this ma# encourage the breeding of
mos+uitoes
/0
3
!"
1! ;ailure to consider
weather / climate
<llness due to tem$erature
e1tremes e'g' deh#dration6 heat
stress
<rrational and / or violent behavior
General site
workers
General site
staff
Site visitors
= =
1"
<nstall and maintain heating / air conditioning / dehumidif#ing s#stems
<m$lement control measures in line with the $ro:ect heat stress management
$lan and ()* !WP $$% 3 General -S) Re+uirements for Contractors
<m$lement counter measures such as drinking $rograms6 use of electrol#tes
etc' Counter measures shall be medicall# $roven and shall be a$$ro$riate to
the location
/0
=
!C
Personal Protecti)e "*ui+ment
11 Lack of available
$ersonal safet#
e+ui$ment & //) or
Lack of $ersonal safet#
e+ui$ment & //)
disci$line 5failure to
use $ersonal safet#
e+ui$ment & //)8
-igh incidence of unsafe
conditions e'g' unsafe working at
height
-igh incidence of $ersonal head6
e#e6 hand and foot in:uries e'g'
cuts / lacerations6 abrasions6
$enetrating wounds6 e#e in:uries6
im$act wounds etc
<ncreased im$act of longer term
health hazards e'g' noise / dust
General site
workers
General site
staff
Site visitors
4 4
4
7he re+uirement volume of $ersonal safet# e+ui$ment and $ersonal
$rotective e+ui$ment 5//)8 shall be s$ecified at the $rocurement stage'
Sufficient s$ares shall be maintained in stores at all times
/ersonal safet# e+ui$ment and //) shall be maintained and re$laced if
damaged or in line with manufacturers recommendation life c#cle
/ersonal safet# e+ui$ment and //) re+uirements for s$ecified works shall
be detailed in the $ro:ect -S) $lan6 method statements and reinforced
through tool bo1 talks' /ersonal safet# e+ui$ment and //) disci$line shall
be $aramount and disci$linar# action taken against those failing to com$l#
/0
4
1!



Project Risk Register & Management Programme:
Risk Assessment
Item Hazard Risk Who is at Risk Risk Rating Necessary Control Measures Action
y
Residual Risk
Rating
S L Rating S L Rating
1 Lack of training in the
use of $ersonal safet#
e+ui$ment & //)
-igh incidence of unsafe
conditions e'g' incorrect fitting and
use of fall arrest e+ui$ment
5harness / shock absorber /
lan#ard8
-igh incidence of $ersonal in:ur#
due to lack of awareness of when
to use $ersonal safet# e+ui$ment
& //)
<ncorrect selection of //) e'g'
use of inade+uate gloves6 or
incorrect selection of e#e
$rotection leading to $ersonal
in:ur#
General site
workers
General site
staff
Site visitors
4 4
4
Site labour shall be trained in the use of $ersonal safet# e+ui$ment and //)
through onsite training and tool bo1 talks' 7raining shall include both the use
and $ur$ose of the $rotective e+ui$ment
Labour shall be $rovided with $ersonal safet# e+ui$ment and //) at no cost
to themselves and shall be $rovided with re$lacement $rotective e+ui$ment
on an old for new basis' Labour shall not be re+uired to utilize old or
damaged $rotective e+ui$ment in order to reduce costs
Some //) e'g' hard hats and high visibilit# vests are color coded to allow
eas# identification of trades' Riggers / Signalers will wear a red hard hat for
e1am$le'
/0
4
1!
13 /oor +ualit# /
substandard $ersonal
safet# e+ui$ment &
//)
;ailure of //) leading to $ersonal
in:ur# or longer term health
$roblems
General site
workers
General site
staff
Site visitors
4 4
4
7he standard of $ersonal safet# e+ui$ment and $ersonal $rotective
e+ui$ment 5//)8 shall be s$ecified at the $rocurement stage' &ll $ersonal
safet# e+ui$ment and //) shall be manufactured to )% 5)uro$ean %orms8
or e+uivalent standard e'g' &%S< 5&merican %ational Standards8' /rotective
e+ui$ment shall dis$la# an identif#ing s#mbol to confirm conformance'
/ersonal safet# e+ui$ment and //) failing to meet these standards shall be
removed from site'
/0
4
1!
Mo#ile Plant & ,ehicles
1= /rocurement of
substandard mobile
$lant & vehicles
;ailure during o$eration e'g'
during e1cavation o$erations
;inancial and $roduction loss due
to +uarantine of $lant / vehicle
General site
workers
General site
staff
Site visitors
4 =
!
Re+uest certificates of conformance and calibration at $rocurement stage
Check all mobile $lant and vehicles before allowing onto site
7horoughl# check incoming items to confirm no counterfeit or reconditioned
items have been sold as new
0aintain mobile $lant and vehicles with a$$roved s$are $arts and fittings not
alternative non a$$roved s$are $arts and fittings
/0
4 1
!4
14 Lack of e+ui$ment
maintenance &
certification
/ersonal in:ur# or damage due to
failure during o$eration e'g'
during lifting o$erations
;inancial and $roduction loss due
to damage
;inancial and $roduction loss due
to +uarantine of $lant / vehicle
General site
workers
General site
staff
Site visitors
4 =
!
&ll mobile $lant and vehicles shall be ins$ected $rior to entr# to site' 0obile
$lant and vehicles failing to meet the maintenance and certification
re+uirements of ()* !WP $%' 3 0obile /lant & @ehicles shall be re:ected
&ll mobile $lant & vehicles shall be routinel# maintained and serviced'
Records shall be retained on site for review on re+uest
/0
4 1
!4
1" *$eration of
e+ui$ment b#
incom$etent $ersons
/ersonal in:ur# or damage due to
o$erator error
2amage to e+ui$ment or
structures due to o$erator error
General site
workers
General site
staff
Site visitors
4 =
!
*nl# trained6 e1$erienced o$erators shall be $ermitted to use mobile $lant
and vehicles on site' Com$etence shall be in line with the re+uirements set
out in ()* !WP $%' 3 0obile /lant & @ehicles and the $ro:ect -S) $lan'
/0
4 1
!4
1? %oise Long term ill health 3 hearing loss General site
workers
General site
3 4
14
%oise assessments shall be carried for o$erators of mobile $lant' *$erators
e1$osed to continuous noise in e1cess of C4dB shall be re+uired to wear
hearing $rotection of at least S%R 5Sound noise reduction8 E3!' .here
/0 3
!"



Project Risk Register & Management Programme:
Risk Assessment
Item Hazard Risk Who is at Risk Risk Rating Necessary Control Measures Action
y
Residual Risk
Rating
S L Rating S L Rating
staff
Site visitors
%eighbors
national regulations or client re+uirements e1ceed this re+uirement6 the
higher re+uirement shall be im$lemented



Project Risk Register & Management Programme:
Risk Assessment
Item Hazard Risk Who is at Risk Risk Rating Necessary Control Measures Action
y
Residual Risk
Rating
S L Rating S L Rating
-i.ting /+erations
1C /rocurement of
substandard lifting
e+ui$ment & lifting
accessories
/ersonal in:ur# or damage due to
failure during o$eration e'g'
during lifting o$erations
;inancial and $roduction loss due
to damage
;inancial and $roduction loss due
to +uarantine of $lant / vehicle
General site
workers
General site
staff
Site visitors
4 =
!
Re+uest certificates of conformance and calibration at $rocurement stage
Check all mobile cranes before allowing onto site6 check all tower crane
sections and fittings before erection
7horoughl# check incoming items to confirm not counterfeit or reconditioned
items have been sold as new
0aintain lifting e+ui$ment with a$$roved s$are $arts and fittings not
alternative non a$$roved s$are $arts and fittings
0aintain accessories and remove from service if damaged' 2o not utilize
non a$$roved $arts / items to attem$t tem$orar# re$airs
/0
4 1
!4
1D Lack of e+ui$ment
maintenance &
certification
;inancial and $roduction loss due
to damage or +uarantine of
$lant / vehicle
General site
workers
General site
staff
Site visitors
4 =
!
Lifting e+ui$ment and accessories shall be fit for $ur$ose6 certified and
tested in line with the re+uirements set out in ()* S./ !!= 3 Lifting
*$erations
/0
4 1
!4
! *$eration of
e+ui$ment b#
incom$etent $ersons
/ersonal in:ur# or damage due to
o$erator error
2amage to e+ui$ment or
structures due to o$erator error
General site
workers
General site
staff
Site visitors
4 =
!
& com$etent lifting su$ervisor shall be a$$ointed to manage all lifting
o$erations
/0
4 1
!4
1 Lack of lifting
coordination
Collision
/ersonal in:ur# or damage due
colla$se / dro$$ed load
;inancial and $roduction loss due
to damage
General site
workers
General site
staff
Site visitors
4 =
!
& lifting $lan6 com$lete with a schedule of common lifts shall be $re$ared6 at
an earl# stage
& detail surve# for crane $ositioning and overla$$ing arcs shall be carried out
b# the com$etent lifting su$ervisor
&nti clash $recautions shall be designed and im$lemented
Communication between riggers / signalers and crane o$erators shall be
maintained at all time' .here $ossible two wa# radio shall be used' .here
local restrictions $revent the use of two wa# radio6 alternative arrangements
shall be devised and im$lemented'
/0
4 1
!4
Com$le1 Lifts / S$ecial
lifts 57andem Lifts /
Lifts over 1! tonnes8
<nade+uate $recautions / working
method leading to colla$se of
lifting e+ui$ment / failure of lifting
gear
;ailed lift due to lack of
e1$erienced riggers / signalers
leading to $ersonal in:ur# or
damage 3 financial and
$roduction loss
General site
workers
General site
staff
Site visitors
4 =
!
Com$le1 or s$ecial lifts ma# include ma:or items of $lant such as chillers6 air
handling units6 generators6 turbines6 $um$s6 $refabricated concrete or steel
structures6 $refabricated risers or $ods and cladding etc
& s$ecific method statement ma# be generated for com$le1 or s$ecial lifts
where deemed necessar# b# the com$etent lifting su$ervisor
-ighl# e1$erienced crane o$erators6 riggers and signalers a$$ointed for
com$le1 or s$ecial lifts
S$ecific method statements shall be mandator# for tandem lifts' 7andem lifts
shall not be $ermitted unless a client a$$roved s$ecialist contractor is
/0 4 1
!4



Project Risk Register & Management Programme:
Risk Assessment
Item Hazard Risk Who is at Risk Risk Rating Necessary Control Measures Action
y
Residual Risk
Rating
S L Rating S L Rating
;ailed lift due to failure of lifting
gear / accessories
engaged'
Lifting e+ui$ment and accessories shall be fit for $ur$ose in line with the
re+uirements set out in ()* !WP $$0 3 Lifting *$erations
3 <m$ro$er set u$ /
stabilization
Risk of ti$$ing over General site
workers
General site
staff
Site visitors
4 =
!
7ower crane bases shall be designed b# a com$etent $erson
7ower crane erection / dismantling shall be carried out b# com$etent $ersons
& method statement shall be $re$ared for all tower crane erection /
dismantling
0obile cranes shall be $ositioned as re+uired and outriggers full# e1tended'
*utrigger mats to be used and an e1clusion zone set u$ around the mobile
crane
/0
4 1
!4
= %on working / non
maintained alarms and
warning devices
Risk of ti$$ing over
Risk of dro$$ed load
General site
workers
General site
staff
Site visitors
4 =
!
&larms and warning devices on all cranes shall be maintained in working
order' Cranes with damaged or non o$erational alarms / warning devices
shall be removed from service
*$erators shall not disable alarms for an# reason and shall cease o$erations
immediatel# should o$erating tolerances be e1ceeded
/0
4 1
!4
4 9se of unsafe
slinging / rigging
techni+ues
;ailed lift due to lack of
e1$erienced riggers / signalers
leading to $ersonal in:ur# or
damage 3 financial and
$roduction loss

General site
workers
General site
staff
Site visitors
4 =
!
*nl# com$etent riggers / slingers shall be $ermitted to work on site'
)vidence of valid training shall be submitted $rior to a$$ointment
/0
4 1
!4
" 9se of non certified or
damaged lifting
accessories
2ro$$ed load due to failure of
lifting e+ui$ment com$onents or
failure of lifting gear / accessories
General site
workers
General site
staff
Site visitors
4 =
4
Lifting e+ui$ment and accessories shall be fit for $ur$ose in line with the
re+uirements set out in ()* !WP $$0 3 Lifting *$erations
/0
4 1
!4
"1ca)ations & 2unneling
? /rocurement of
substandard
e1cavation e+ui$ment
)1cavation / 7rench / 7unnel
colla$se
;looding
2amage due to falling ob:ects
leading to financial loss
.ork cessation leading to
financial and $roduction loss
General site
workers
General site
staff
Site visitors
= =
!
Re+uest certificates of conformance and calibration at $rocurement stage
Check all e1cavation e+ui$ment before allowing onto site
7horoughl# check incoming items to confirm not counterfeit or reconditioned
items have been sold as new
0aintain e1cavation e+ui$ment / $lant with a$$roved s$are $arts and fittings
not alternative non a$$roved s$are $arts and fittings
/0
= 1
!=
C Lack of e+ui$ment
maintenance &
certification
)1cavation / 7rench / 7unnel
colla$se due to e+ui$ment failure
;looding
.ork cessation leading to
financial and $roduction loss
General site
workers
General site
staff
Site visitors
= =
!
)1cavation and tunneling e+ui$ment and accessories 5)1cavators6 ;ront &
Skid Steer Loaders' .agons6 0obile Cranes6 7unnel Boring 0achines6
2irectional 2rills6 <m$act 0oles6 -#draulic Shoring S#stems6 /um$s etc shall
be fit for $ur$ose6 certified and tested in line with the re+uirements set out in
()* !WP $%' 3 0obile /lant and @ehicles and !WP $$0 3 Lifting
*$erations
/0 = 1
!=



Project Risk Register & Management Programme:
Risk Assessment
Item Hazard Risk Who is at Risk Risk Rating Necessary Control Measures Action
y
Residual Risk
Rating
S L Rating S L Rating
D *$eration of
e+ui$ment b#
incom$etent $ersons
)1cavation / 7rench / 7unnel
colla$se due to inade+uate /
ina$$ro$riate e1cavation
techni+ues or e1cavation su$$ort
installation
General site
workers
General site
staff
Site visitors
4 =
!
& com$etent e1cavation su$ervisor shall be a$$ointed to manage all lifting
o$erations
/0
4 1
!4
3! @oids )1cavation / 7rench / 7unnel
colla$se
;looding
General site
workers
General site
staff
Site visitors
4 =
!
& >GeotechnicalA surve# shall be carried out $rior to commencement of
works'
@oids shall be identified and filled backfill and com$acted or $um$ed with
concrete' &lternativel#6 tunnels shall be re,routed
/0
4 1
!4
31 Contact with e1isting
services
;ire / e1$losion leading to ma:or
in:uries6 fatalit# and / or $ro$ert#
damage
General site
workers
General site
staff
Site visitors
%eighbors
4 =
!
&c+uire current utilit# drawings
Carr# out surve# to confirm de$th and line of e1isting utilities 5utilize suitable
surve# e+ui$ment relevant to the sco$e and scale of the work' Surve#
e+ui$ment ma# include ground radar6 cable avoidance tools and accessories
5C&7 & Genn#8
&s necessar#6 dig trial $its to locate underground services
0ark the line of underground services to ensure visibilit# to all $ersons
working in the vicinit#
/re$are method statement for e1cavation of underground services
incor$orating the re+uirements of ()* !WP $$& 3 )1cavations & 7unneling
.here $ossible6 underground electrical services shall be de,energized $rior
to e1cavations'
.here services are to be re,routed6 no work shall commence until services
are confirmed as de,energized / inert
/ermits shall be secured in advance from the relevant utilit# / local authorit#
$rior to e1cavation in the vicinit# of e1isting underground services
/0
4 1
!4
3 Colla$se 57rench /
7unnel / 2ee$
)1cavation8
/ersonal in:ur# / fatalit#
.ork cessation leading to
financial and $roduction loss
General site
workers
General site
staff
Site visitors 4 =
!
)1cavations / tunnels shall be designed b# a com$etent engineer' 7he
com$etent e1cavation / tunneling su$ervisor / engineer shall $re$are a
method statement for e1cavation of underground services incor$orating the
re+uirements of ()* !WP $$& 3 )1cavations & 7unneling
)1cavation / tunnel design shall include the method of shoring / su$$orting
the e1cavation or tunnel
7em$orar# makeshift shoring shall not be $ermitted6 e+ui$ment used to
shore e1cavations shall be fit for $ur$ose and designed for the $ur$ose
em$lo#ed
/0
4 1
!4
33 Lack of e1cavation
ins$ection
)1cavation / 7rench / 7unnel
colla$se due to changing
conditions / su$$ort failure
General site
workers
General site
staff
Site visitors
4 =
!
)1cavations shall be ins$ected on a regular basis b# a com$etent $erson'
2ee$ or com$le1 e1cavations shall be ins$ected dail# and shoring
alterations made to account for changing conditions
/0
4 1
!4
3= )1cavation in the
vicinit# of or
underneath e1isting
Colla$se of e1isting structure
/ersonal in:ur# / fatalit#
General site
workers
General site
4 =
!
%o e1cavation work or tunneling shall be carried out in the immediate vicinit#
of or underneath e1isting structure until the im$act of the work on the e1isting
structure is determined b# a com$etent engineer
/0 4 1
!4



Project Risk Register & Management Programme:
Risk Assessment
Item Hazard Risk Who is at Risk Risk Rating Necessary Control Measures Action
y
Residual Risk
Rating
S L Rating S L Rating
structures staff
Site visitors
9nder$inning re+uirements shall be determined b# a com$etent structural
engineer
.here $ossible6 the structure shall be evacuated for the duration of the
works as an additional safet# measure
)1cavation work under live tunnels 5sewers etc8 shall also be held until the
im$act of the work on the e1isting tunnel is determined b# a com$etent
engineer
34 Contact with to1ic
fumes / gases
;atalit#
;ire / e1$losion
General site
workers
General site
staff
Site visitors
4 3
14
7he air +ualit# in dee$ e1cavations shall be $eriodicall# tested with a multi
gas monitor' &cce$table entr# conditions areF
*1#gen 5*8 3 greater than 1D'4G and less than 3'4G
Lower ;lammable Limit L;L 3 less than 1!G
Carbon 0ono1ide 5C*8 3 less than 34$$m
-#drogen Sul$hide 5-S8 3 less than 1!$$m
Generators shall not be $laced ad:acent to dee$ e1cavations as e1haust
fumes are likel# to settle in the e1cavation
/0
4 1
!4
3" .ater -azards 3
;looding
;looding leading to .ork
cessation leading to financial and
$roduction loss
2rowning fatalit#
General site
workers
General site
staff
Site visitors
%eighbors
= 3
1
2ewatering e+ui$ment shall be $re$ared in advance of e1cavations work
where the water table de$th will lead to continual water ingress
2ewatering e+ui$ment shall be maintained in working order and continuall#
checked b# a com$etent $erson
2ewatering out$ut shall be routed to storm water drainage / surface water
drainage where $ossible and not released on o$en ground' .here o$tions
are limited e1cess water shall be tanked or $um$ed to tem$orar# retention
$onds
/0
= 1
!=
3? .ater -azards ,
Cofferdams and
Caissons
;looding
2rowning fatalit#
General site
workers
General site
staff
Site visitors
%eighbors
4 4
4
& com$etent su$ervisor / engineer shall be a$$ointed to oversee marine
construction / water based o$erations' .ork in $ro1imit# to water shall be in
line with the re+uirements set out in ()* !WP $%3 3 .orking in /ro1imit# to
.ater
S$ecialist e1$erienced contractors onl# shall be considered for marine
construction / water based o$erations
0arine construction / water based o$erations shall not $roceed without an
a$$roved design and method statement' &$$roval for such work shall be via
a com$etent 3
rd
$art# consultant
)+ui$ment used in the formation of caissons / cofferdams shall be in line with
the re+uirements set out in ()* S./ !1? 3 0obile /lant & @ehicles6 !!= 3
Lifting *$erations6 !!D 3 /lant 7ools & )+ui$ment and !13 3 .orking in
Confined S$aces
/0
4 1
!4
4all Protection & Pre)ention
3C 9n$rotected leading
edges
/ersonal in:ur# due to falls and
im$act of falling ob:ects
2amage due to falling ob:ects
leading to financial and $roduction
loss
General site
workers
General site
staff
Site visitors
4 =
!
<dentif# leading edges
<nstall signage and illumination / lighting where necessar# to highlight and
warn of hazard
<nstall edge $rotection 5ideall# guardrails at 1m with mid,rail and toe,boards8'
)nsure fall $rotection is $rovided for those installing guardrails
/0 4 1
!4



Project Risk Register & Management Programme:
Risk Assessment
Item Hazard Risk Who is at Risk Risk Rating Necessary Control Measures Action
y
Residual Risk
Rating
S L Rating S L Rating
<nstall catch nets to $rotect $arallel works or $edestrian routes
<nstall crash decks over entrances / access routes where there the risk of
falling ob:ects is significant
;all $rotection / $revention shall be in line with the re+uirements of ()*
!WP $$3 3 ;all /rotection & /revention'
3D 9n$rotected o$ening /
holes / shafts
/ersonal in:ur# due to falls and
im$act of falling ob:ects
2amage due to falling ob:ects
leading to financial and $roduction
loss
General site
workers
General site
staff
Site visitors
4 =
!
Cover o$en holes / shafts with heav# dut# steel $late or install guardrail and
toe,boards around holes / slab o$enings
/0
4 1
!4
=! 9se of substandard
access e+ui$ment and
work $latforms
/ersonal in:ur# due to falls and
im$act of falling ob:ects
2amage due to falling ob:ects
leading to financial and $roduction
loss
General site
workers
General site
staff
Site visitors
4 =
!
Scra$ materials shall not be used to construct tem$orar# guardrails and or
$latforms
Guardrails shall be fit for $ur$ose6 sturd# enough to resist the im$act of a
falling / tri$$ing man6 and shall include a hand rail and mid rail' 7oe boards
shall be included where there is a risk of falling ob:ects' -andrails shall be at
least 1m high
.ork $latforms shall be bes$oke $latforms or constructed of rated scaffold
boards' .ork $latforms shall include handrails6 mid rails and toe,boards'
.here guardrails cannot be installed due to s$ace restrictions6 fall arrest /
restrain s#stems shall be utilized 5harness / lifeline etc8
/0
4 1
!4
=1 ;alls from mobile
elevating work
$latforms
/ersonal in:ur# due to falls and
im$act of falling ob:ects
2amage due to falling ob:ects
leading to financial and $roduction
loss

General site
workers
General site
staff
Site visitors 4 3
!
*nl# trained6 com$etent $ersons shall be $ermitted to o$erate a mobile
elevating work $latform 50)./8 or mast climber work $latform 50C./8'
7his shall include all other telesco$ic / h#draulic man lifting devices
)levating $latforms shall be maintained in accordance with the re+uirements
set out in ()* !WP $%' 3 0obile /lant and )+ui$ment and S./ !!D 3
/lant6 7ools and )+ui$ment
*$erators shall check all e+ui$ment $rior to use
*$erators shall wear restrain lan#ards in line with the re+uirements set out in
()* !WP $$3 3 ;all /rotection & /revention
/0
4 1
!4
= ;alls from ladders /ersonal in:ur# due to falls and
im$act of falling ob:ects
2amage due to falling ob:ects
leading to financial and $roduction
loss
General site
workers
General site
staff
Site visitors
= 3
!
Ladders shall be acce$table at all times when used as access within a
scaffold s#stem where the# a clam$ed / tied on and checked on a weekl#
basis as $art of the scaffold ins$ection
Ladders / ste$ ladders shall onl# be acce$table for short duration work or
ins$ections when used as a work $latform' Short durations work shall be no
longer than 3! minutes
Ladders / ste$ ladders shall be manufactured to )% or e+uivalent standards'
;abrication of ladders on site is not acce$table and the# shall be removed'
Ladders / ste$ ladders are often unstable6 outriggers ma# be re+uired or an
additional worker must foot and stead# the ladder
.ooden or steel ho$s u$s of 3 ste$s are acce$table as work $latforms but
must be of sturd# construction and stable' -o$ u$s need not meet )% or
e+uivalent standards' -o$ u$s ma# onl# be used where the clients agent has
no ob:ection
()* encourage contractors to invest in available $odium ste$s and other
/0 = 1
!=



Project Risk Register & Management Programme:
Risk Assessment
Item Hazard Risk Who is at Risk Risk Rating Necessary Control Measures Action
y
Residual Risk
Rating
S L Rating S L Rating
alternative access solutions as a substitute for ladders / ste$ / ladders
Ladders used on ()* $ro:ects shall com$l# with the re+uirements set out in
!WP $%0 3 &ccess / )gress
=3 ;alls from Scaffolds /ersonal in:ur# due to falls and
im$act of falling ob:ects
2amage due to falling ob:ects
leading to financial and $roduction
loss
General site
workers
General site
staff
Site visitors
4 3
14
Scaffold shall $rovide a safe means of access and / or a safe working
$latform' Scaffold shall be erected / dismantled in accordance with the
re+uirements set out in ()* !WP $$' 3 Scaffolding'
Scaffold s#stems shall be erected in accordance with the manufacturers
guidelines and shall utilize onl# a$$roved com$onents and accessories
Scaffold working $latforms shall include hand rail and mid rail and where
there is a danger of falling ob:ects6 toe boards shall be included
Scaffolders shall wear fall $rotection during the erection / dismantling
$rocess in line with the re+uirements of ()* !WP $$3 3 ;all /rotection &
/revention' Scaffold shall be attached to a secure anchor $oint at all times
when working at height'
/0
4 1
!4
== Lack of6 or use of6
substandard fall
arrest / fall restraint
e+ui$ment or
installation b#
incom$etent $ersons
/ersonal in:ur# due to falls and
im$act of falling ob:ects
2amage due to falling ob:ects
leading to financial and $roduction
loss
General site
workers
General site
staff
Site visitors
4 =
!
;all arrest e+ui$ment and accessories used on ()* $ro:ects shall be
manufactured to )% 5)uro$ean %orms8 or e+uivalent e'g' &%S< 5&merican
%ational Standards8
;all arrest e+ui$ment shall be .orkers $rovided with fall arrest e+ui$ment
shall be trained in its $ro$er use in line with the re+uirements set out in ()*
!WP $$3 3 ;all /rotection & /revention
Shock / energ# absorbers shall not be utilized without suitable clearance
Lifelines shall be of steel wire ro$e with the correct number of cli$s for the
intended loading' %#lon ro$e shall not be used for lifelines
.here necessar# lifelines and anchor bolts used as lan#ard anchors shall be
tested $rior to use
/0
4 1
!4
!ca..olding
=4 /rocurement of
ina$$ro$riate scaffold
s#stems
Scaffold colla$se
.ork cessation leading to
financial and $roduction loss
/ersonal in:ur# due to falls and
im$act of falling ob:ects
2amage due to falling ob:ects
leading to financial and $roduction
loss
General site
workers
General site
staff
Site visitors
4 3
14
Scaffold s#stems6 com$onents and accessories used on ()* $ro:ects shall
be manufactured to )% 5)uro$ean %orms8 or e+uivalent e'g' &%S<
5&merican %ational Standards8' .here necessar#6 certificates of
conformance for the e+ui$ment shall be $rovided for review b# ()* $ro:ect
$rior to use
/0
4 1
!4
=" )rection of scaffold b#
incom$etent $ersons
Scaffold colla$se
/ersonal in:ur# due to falls and
im$act of falling ob:ects
2amage due to falling ob:ects
leading to financial / $roduction
loss
General site
workers
General site
staff
Site visitors
4 =
!
& com$etent scaffolding su$ervisor shall be a$$ointed
*nl# trained workers shall be $ermitted to erect / dismantle scaffold
Com$etence re+uirements shall be in line with the re+uirements set out in
()* !WP $$' 3 Scaffolding
/0 4 1
!4



Project Risk Register & Management Programme:
Risk Assessment
Item Hazard Risk Who is at Risk Risk Rating Necessary Control Measures Action
y
Residual Risk
Rating
S L Rating S L Rating
=? Colla$se of scaffold
s#stems
/ersonal in:ur# due to falls and
im$act of falling ob:ects
2amage due to falling ob:ects
leading to financial / $roduction
loss
General site
workers
General site
staff
Site visitors
4 =
!
Scaffold shall be designed to meet loading and stabilit# re+uirements' -eav#
dut# scaffold designs shall be submitted to the ()* $ro:ect management
team for review and a$$roval 5-eav# dut# shall be those designed for
loading in e1cess of =! (g/m 5'=k%/m8' Light dut# scaffold shall be u$ to
1!(g/m and medium dut# u$ to but not e1ceeding =! (g/m8'
Scaffold shall be designed to resist adverse environmental conditions such
as high winds
/0
4 1
!4
=C Lack of scaffold
ins$ection
Scaffold colla$se due to a failure
to manage changing conditions
/ersonal in:ur# due to falls and
im$act of falling ob:ects
2amage due to falling ob:ects
leading to financial / $roduction
loss
General site
workers
General site
staff
Site visitors = 3
1
Scaffold s#stems shall be ins$ected b# a com$etent $erson $rior to use
Scaffold tags shall be a$$lied to scaffolding6 $referabl# at access $oints6 to
advise of the scaffold rating and latest ins$ection date' 2o not use tagging
shall be a$$lied to incom$lete or damaged scaffold
Scaffold shall be re,ins$ected dail# and scaffold tags u$dated ever# ? da#s
/0
0 1
!=
=D /ersons falling from
scaffolds
/ersonal in:ur# / fatalit#
/ro$ert# damage
General site
workers
General site
staff
Site visitors
4 3
14
Scaffold shall $rovide a safe means of access and / or a safe working
$latform' Scaffold shall be erected / dismantled in accordance with the
re+uirements set out in ()* !WP $$' 3 Scaffolding'
Scaffold s#stems shall be erected in accordance with the manufacturers
guidelines and shall utilize onl# a$$roved com$onents and accessories
Scaffold working $latforms shall include hand rail and mid rail and where
there is a danger of falling ob:ects6 toe boards shall be included
Scaffolders shall wear fall $rotection during the erection / dismantling
$rocess in line with the re+uirements of ()* !WP $$3 3 ;all /rotection &
/revention' Scaffold shall be attached to a secure anchor $oint at all times
when working at height
/0
4 1
!4
4! *b:ects falling from
scaffolds
/ersonal in:ur# / fatalit#
/ro$ert# damage
General site
workers
General site
staff
Site visitors
%eighbors
4 =
!
7oe boards shall be incor$orated into scaffold where there is a risk of falling
ob:ects
Catch nets or crash decks ma# be installed where $arallel work $resents a
hazard or where scaffolding is installed above access routes
/0
4 1
!4
41 9se of incom$lete or
damaged scaffold
Scaffold colla$se
/ersonal in:ur# due to falls and
im$act of falling ob:ects
2amage due to falling ob:ects
leading to financial / $roduction
loss
General site
workers
General site
staff
Site visitors
4 =
!
Scaffold tags shall be a$$lied to scaffolding6 $referabl# at access $oints6 to
advise of the scaffold rating and latest ins$ection date' 2o not use tagging
shall be a$$lied to incom$lete or damaged scaffold
Remove s$are / unused com$onents to stores to $revent unauthorized use
of left over com$onents b# general trades
<nstall $h#sical barriers on scaffold access using chains etc to $revent use'
<nstall additional signage as necessar#
/0 4 1
!4



Project Risk Register & Management Programme:
Risk Assessment
Item Hazard Risk Who is at Risk Risk Rating Necessary Control Measures Action
y
Residual Risk
Rating
S L Rating S L Rating
4 9se of non standard or
mi1ed com$onent
scaffolds
Scaffold colla$se
/ersonal in:ur# due to falls and
im$act of falling ob:ects
2amage due to falling ob:ects
leading to financial / $roduction
loss
General site
workers
General site
staff
Site visitors
= 3
1
S$ecialist scaffold s#stems shall be constructed with the recommended
com$onents and accessories' &lternative com$onents and accessories shall
not be used unless a$$roved b# the su$$lier
Scra$ rebar shall not be used in $lace of locking $ins in order to reduce
costs at later stages of the $ro:ect
Com$onents and accessories from different scaffold s#stems shall not be
mi1ed unless a$$roved b# the Com$etent Scaffold Su$ervisor
/0
= 1
!=
4orm5ork
43 /rocurement of
ina$$ro$riate formwork
s#stems
;ormwork colla$se
.ork cessation leading to
financial and $roduction loss
/ersonal in:ur# due to falls and
im$act of falling ob:ects
2amage due to falling ob:ects
leading to financial / $roduction
loss
General site
workers
General site
staff
Site visitors
= 3
1
;ormworks s#stems shall be a$$ro$riate to the structure and shall be
s$ecified during the $rocurement $hase
7raditional s#stems ma# not be a$$ro$riate to the structure and s$ecialist
formwork s#stems ma# be re+uired
S$ecialist formwork s#stems shall be constructed with the recommended
com$onents and accessories' &lternative com$onents and accessories shall
not be used unless a$$roved b# the su$$lier
Com$onents and accessories from different formwork s#stems shall not be
mi1ed unless a$$roved b# the Com$etent ;ormwork Su$ervisor'
/0
= 1
!=
4= Colla$se of formwork
s#stems
.ork cessation leading to
financial and $roduction loss
/ersonal in:ur# due to falls and
im$act of falling ob:ects
2amage due to falling ob:ects
leading to financial / $roduction
loss
General site
workers
General site
staff
Site visitors
%eighbors
4 3
14
;ormwork and su$$orting false work shall be designed to meet loading and
stabilit# re+uirements' ;ormwork designs shall be submitted to the ()*
$ro:ect management team for review and a$$roval
;ormwork s#stems shall be designed to resist adverse environmental
conditions such as high winds
;ormwork s#stems shall be ins$ected b# a com$etent $erson $rior to
$ouring of concrete
;ormwork s#stems shall be $rocured6 designed and managed in line with
()* !WP $$6 3 ;ormwork S#stems
/0
4 1
!4
44 )rection of formwork
b# incom$etent
$ersons
;ormwork colla$se
.ork cessation leading to
financial and $roduction loss
/ersonal in:ur# due to falls and
im$act of falling ob:ects
2amage due to falling ob:ects
leading to financial / $roduction
loss
General site
workers
General site
staff
Site visitors
4 =
!
& Com$etent Su$ervisor for formwork shall be a$$ointed
;ormwork shall be erected / dismantled b# com$etent $ersons' 7his ma#
re+uire additional instruction when s$ecialist formwork s#stems are utilized
/0
4 1
!4
4" Lack of formwork
ins$ection
;ormwork colla$se
.ork cessation leading to
financial and $roduction loss
/ersonal in:ur# due to falls and
im$act of falling ob:ects
2amage due to falling ob:ects
General site
workers
General site
staff
Site visitors
4 3
14
;ormwork s#stems shall be ins$ected b# a com$etent $erson $rior to
concrete $ours' Records of such ins$ections shall be maintained
/0 4 1
!4



Project Risk Register & Management Programme:
Risk Assessment
Item Hazard Risk Who is at Risk Risk Rating Necessary Control Measures Action
y
Residual Risk
Rating
S L Rating S L Rating
leading to financial / $roduction
loss
4? 9nsafe lifting of
formwork s#stems
2ro$$ed load
.ork cessation leading to
financial and $roduction loss
/ersonal in:ur# due to falling
ob:ects
2amage due to falling ob:ects
leading to financial / $roduction
loss
General site
workers
General site
staff
Site visitors 4 =
!
0an# $refabricated formwork tables and shutters are designed to be lifted to
the ne1t slab level' *nl# forms with certified lifting $oints shall be lifted using
a crane and chains slings
S$ecialist fl#ing table s#stems ma# be lifted with a C hook or >-orseA
Lifting of form work shall be in line with the manufacturers a$$roved method
Hum$ forms shall onl# lifted with the use of a$$roved >ShoesA and h#draulic
rams in the manner recommended b# the manufacturer under the
su$ervision of the com$etent formwork su$ervisor
/0
4 1
!4
4C /ersons falling from
formwork
/ersonal in:ur# / fatalit#
/ro$ert# damage
General site
workers
General site
staff
Site visitors
4 3
14
;all arrest e+ui$ment shall be utilized b# formwork car$enters and lifelines
de$lo#ed during the installation of formwork decking
/re,fabricated decking s#stems shall be installed b# trained workers and
edge $rotection installed at the earliest o$$ortunit#' /ersons installing edge
$rotection shall wear and utilize fall arrest e+ui$ment with suitable anchor
$oints
&ccess to formwork decks and shutters shall be through designed in
handholds in s$ecialist shutter s#stems or or via scaffold s#stems or ladders'
;orm workers shall not use the waling as a ladder and work $latform without
fall restrain e+ui$ment
/0
4 1
!4
4D *b:ects falling from
formwork
/ersonal in:ur# / fatalit#
/ro$ert# damage
General site
workers
General site
staff
Site visitors
%eighbors
4 =
!
Catch nets and crash decks shall be installed where $arallel working
$resents a hazard
)1clusion zones with signage shall be installed around formwork in $rogress
where $racticall# $ossible
/0
4 1
!4
"! 9se of incom$lete or
damaged formwork
;ormwork colla$se
.ork cessation leading to
financial and $roduction loss
/ersonal in:ur# due to falls and
im$act of falling ob:ects
2amage due to falling ob:ects
leading to financial and $roduction
loss
General site
workers
General site
staff
Site visitors = =
1"
2amaged com$onents and / or accessories shall not be used and shall be
immediatel# returned to stores and +uarantined to $revent accident re,issue
to site
/0
= 1
!=
Plant7 2ools & "*ui+ment
"1 /rocurement of
substandard $lant6
tools & e+ui$ment
;ailure during o$eration e'g'
during cutting6 grinding6 drilling etc
;inancial and $roduction loss due
General site
workers
General site
= =
1"
Re+uest certificates of conformance and calibration at $rocurement stage
Check all hand held / static $lant and $ower tools before allowing onto site
7horoughl# check incoming items to confirm no counterfeit or reconditioned
/0 = 1
!=



Project Risk Register & Management Programme:
Risk Assessment
Item Hazard Risk Who is at Risk Risk Rating Necessary Control Measures Action
y
Residual Risk
Rating
S L Rating S L Rating
to +uarantine of $lant6 tools and
e+ui$ment
staff
Site visitors
items have been sold as new
0aintain handheld / static $lant and $ower tools with a$$roved s$are $arts
and fittings not alternative non a$$roved s$are $arts and fittings
" Lack of $lant6 tools &
e+ui$ment
maintenance &
certification
;ailure during o$eration e'g'
during cutting6 grinding6 drilling etc
;inancial and $roduction loss due
to damage
;inancial and $roduction loss due
to +uarantine of hand held / static
$lant6 tools and e+ui$ment
General site
workers
General site
staff
Site visitors
= 3
1
&ll hand held / static $lant and $ower tools shall be ins$ected $rior to entr# to
site' -and held / static $lant and $ower tools failing to meet the maintenance
and certification re+uirements of ()* !WP $$8 3 /lant6 7ools & )+ui$ment
shall be re:ected
&ll hand held static $lant and $ower tools shall be routinel# maintained and
serviced' Records shall be retained on site for review b# ()* on re+uest
/ower tools and accessories shall be routinel# checked b# a com$etent
electrician6 at least +uarterl#' <deall# /&7 5$ortable a$$liance testing8 shall be
carried out' /ower tools shall be clearl# marked to show that the# have been
ins$ected in line with the current ins$ection $rogram' 7his ma# be b# /&7
labels as shown in !WP $$8 3 /lant6 7ools & )+ui$ment or through the use
of color coded ta$e
/0
= 1
!=
"3 *$eration of $lant6
tools & e+ui$ment b#
incom$etent $ersons
/ersonal in:ur# due to
ine1$erience
;inancial and $roduction loss due
to damage
General site
workers
General site
staff
Site visitors
= =
1"
*nl# trained6 e1$erienced o$erators shall be $ermitted to use hand held
$lant and $ower tools on a ()* $ro:ect site' Com$etence ma# be internal
onsite training but shall be in line with the re+uirements set out in ()* !WP
$$8 3 /lant6 7ools and )+ui$ment and the $ro:ect -S) $lan
/0
= 1
!=
"= 9se of damaged $lant6
tools & e+ui$ment
/ersonal in:ur# due to malfunction
;inancial and $roduction loss due
to damage
General site
workers
General site
staff
Site visitors
= =
1"
2amaged hand held / static $lant and $ower tools shall be ins$ected $rior to
use b# the user' 7he user shall be trained to identif# issues with the
e+ui$ment' )+ui$ment damaged in use or identified as damaged / not fit for
$ur$ose shall be removed from site
2amaged e+ui$ment shall be +uarantined $ending re$airs so that it is not
mistakenl# reissued to site at a later date
/0
= 1
!=
"4 %oise Long term ill health 3 hearing loss General site
workers
General site
staff
Site visitors
%eighbors
3 =
1
%oise assessments shall be carried out across the $ro:ect site focusing on
high use $lant6 tools and e+ui$ment' .orkers e1$osed to continuous noise in
e1cess of C4dB shall be re+uired to wear hearing $rotection of at least S%R
5Sound noise reduction8 E3!' .here national regulations or client
re+uirements e1ceed this re+uirement6 the higher re+uirement shall be
im$lemented
/0
3
!"
"" @ibration Long term ill health 3 vibration
white finger
General site
workers
General site
staff
Site visitors
%eighbors
3 =
1
Low vibration tools shall be s$ecified during the $rocurement $hase
.orkers at risk of vibration white finger e'g' those using :ack hammers for
long $eriods shall be advised of the danger of vibration white finger and
shifts using the high vibration e+ui$ment minimized
/0
3
!"
4ire !a.ety & "mergency Planning
"? Lack of fire safet# and
emergenc# $lanning
.ork cessation leading to
financial and $roduction loss
General site
workers
4 3
14
& ;ire Safet# Coordinator and )mergenc# Coordinator shall be a$$ointed
& ;ire Safet# & )mergenc# /lan shall be develo$ed utilizing or in com$liance
/0 4 1
!4



Project Risk Register & Management Programme:
Risk Assessment
Item Hazard Risk Who is at Risk Risk Rating Necessary Control Measures Action
y
Residual Risk
Rating
S L Rating S L Rating
/ersonal in:ur#
;ire / smoke damage leading to
financial and $roduction loss
General site
staff
Site visitors
with the ()* recommended format
7he ;ire Safet# & )mergenc# /lan shall be in line with the re+uirements set
out in ()* !WP $%$ 3 ;ire Safet#
)mergenc# e+ui$ment and arrangements shall be made know to all those
entering the site through the induction $rogram
"C Lack of firefighting
e+ui$ment
;ire s$read
.ork cessation leading to
financial and $roduction loss
/ersonal in:ur#
;ire / smoke damage leading to
financial and $roduction loss
General site
workers
General site
staff
Site visitors
%eighbors
4 =
!
Sufficient firefighting e+ui$ment shall be $rovided for the $ro:ect site6 in line
with the sco$e and scale of the works
;irefighting e+ui$ment6 including e1tinguishers6 shall be of the correct t#$e
relevant to the $otential emergenc# e'g' C*6 .ater6 ;oam6 /owder6 .et
Chemical etc
;irefighting e+ui$ment shall be checked weekl# and recharged / re$laced as
re+uired
;irefighting e+ui$ment shall be $laced at strategic locations and shall be
easil# visible and accessible
/0
4 1
!4
"D /rocurement of
substandard
firefighting e+ui$ment
.ork cessation leading to
financial and $roduction loss
/ersonal in:ur#
;ire / smoke damage leading to
financial and $roduction loss
General site
workers
General site
staff
Site visitors
%eighbors
4 =
!
;ire safet# / firefighting e+ui$ment used on ()* $ro:ects shall be
manufactured to )% 5)uro$ean %orms8 or e+uivalent e'g' &%S< 5&merican
%ational Standards8'
%on conforming items shall be removed from site and re$laced at the cost of
$artner com$anies
/0
4 1
!4
?! 9se of firefighting
e+ui$ment b#
incom$etent $ersons
;ire s$read
.ork cessation leading to
financial and $roduction loss
/ersonal in:ur#
;ire / smoke damage leading to
financial and $roduction loss
General site
workers
General site
staff
Site visitors
4 3
14
& ;ire Safet# Coordinator shall be a$$ointed for the $ro:ect' 7he ;ire Safet#
Coordinator6 in con:unction with the $ro:ect -S) team shall select and train a
sufficient number of ;ire 0arshalls for the $ro:ect' ;ire 0arshalls shall be
trained in evacuation $rocedures and basic fire fighting techni+ues
/0
4 1
!4
?1 9nsafe storage of
flammable materials
and substances
;ire ignition / s$read General site
workers
General site
staff
Site visitors
%eighbors
4 3
14
-ot works shall be defined in the $ro:ect -S) $lan but shall normall# include
welding 5stick / gas86 gas cutting6 steel cutting / grinding6 brazing and
elements of water$roofing using o$en flames / boilers
-ot works shall be controlled b# $ermit to work
.here $ossible6 hot work shall be segregated using fire blankets or b#
fabricating hot work ba#s
;irefighting e+ui$ment shall be $resent during hot works
;ire watch shall be a$$lied to all works where there is a risk of fire for u$ to 1
hour after the work is com$lete 5smoldering ignition sources8
/0
4 1
!4
? 9nsafe or un$lanned
hot works
;ire ignition / s$read General site
workers
General site
staff
Site visitors
4 3
14
-ot works such as welding 5stick / gas86 gas cutting6 steel cutting / grinding6
brazing and elements of water$roofing using o$en flames / boilers shall be
controlled b# a $ermit to work
-ot work in $rogress without a valid $ermit will immediatel# be sto$$ed on
discover#' 2isci$linar# action will be taken against workers and su$ervision
/0
4 1
!4
?3 ;ailure to res$ond to
changing conditions
Lack of firefighting e+ui$ment in
ke# locations
;ailure to recognize changing fire
risk / fire loading
General site
workers
General site
staff
4 =
!
;ire risk assessment 5to be carried out +uarterl# as a minimum8
Carr# out weekl# visual ins$ection of firefighting e+ui$ment
0ove / re$lace signage for firefighting e+ui$ment when the $lacement of
/0 4 1
!4



Project Risk Register & Management Programme:
Risk Assessment
Item Hazard Risk Who is at Risk Risk Rating Necessary Control Measures Action
y
Residual Risk
Rating
S L Rating S L Rating
;ailure to re$lace discharged
firefighting e+ui$ment leading to
lack of firefighting e+ui$ment
Site visitors e+ui$ment is changed
?= ;ailure to recognized
and res$ond to
infection hazards
<ll health / e$idemic from viral or
bacterial infection
<ll health / $oisoning from
venomous / diseased wild life
General site
workers
General site
staff
Site visitors
%eighbors
= 3
1
<dentif# likel# infection hazards
<dentif# wild life threats in the region
)nsure necessar# vaccinations are advised and administered for all $ersons
at risk
/re$are and distribute guidance information for staff and workers utilizing or
in com$liance with the ()* ;ire Safet# & )mergenc# $lan format
Stock medical su$$lies to combat emergenc# re+uirements
/0
= 1
!=
?4 ;ailure to recognized
and res$ond to
$olitical6 weather and
environmental hazards
/ersonal risk of in:ur# and / or ill
health due to failure to $re$are
contingenc# $lan for weather /
environmental hazards
5earth+uake / hurricane or c#clone
/ 7sunami or flooding / 7errorism
or armed conflict8
Loss of $ro$ert# / $ossessions
General site
workers
General site
staff
Site visitors
= 3
1
<dentif# likel# emergenc# scenarios utilizing ()* ;ire Safet# & )mergenc#
/lan format and emergenc# scenario risk assessment
<m$lement $reventative controls and $re$are contingenc# $lans using the
()* ;ire Safet# & )mergenc# $lan format or similar document
/re$are and distribute guidance information
/0
= 1
!=
"lectrical
?" /rocurement of
substandard electrical
distribution e+ui$ment
and accessories
)lectric shock leading to in:ur# or
fatalit#
)lectrical fire
General site
workers
General site
staff
Site visitors
4 =
!
)lectrical com$onents and accessories 5distribution boards6 switches6 fuses6
circuit breakers6 cabling6 sockets and s$litters8 used on ()* $ro:ects shall
be manufactured to )% 5)uro$ean %orms8 or e+uivalent e'g' &%S<
5&merican %ational Standards8
/0
4 1
!4
?? 9nsafe / unstable
electrical distribution
)lectric shock leading to in:ur# or
fatalit#
)lectrical fire
General site
workers
General site
staff
Site visitors
4 =
!
& Com$etent )lectrician )ngineer shall design the tem$orar# distribution
s#stem in line with e1$ected loading re+uirements
Circuit $rotection shall be built into the design and suitable circuit breakers
installed in all distribution boards' 7he minimum standard shall be 1!!m/&
)LCB6 however6 3!m/& RC2 is $referable
/0
4 1
!4
?C <nstallation or
e1tension of electrical
distribution b#
incom$etent $ersons
)lectric shock leading to in:ur# or
fatalit#
)lectrical fire
General site
workers
General site
staff
Site visitors
4 =
!
*nl# com$etent6 +ualified electricians shall be $ermitted to carr# out
electrical works' %o $erson shall be $ermitted to work as an electrician until
valid certification is $rovided to the com$etent )lectrical )ngineer
/0
4 1
!4
?D 2amage to trailing
cables
)lectric shock leading to in:ur# or
fatalit#
)lectrical fire
General site
workers
General site
4 =
!
&rmored cabling shall be used for $rinci$le distribution where there is a risk
of damage to the cable sheath
Cables crossing roads shall be armored and $rotected / buried
/0 4 1
!4



Project Risk Register & Management Programme:
Risk Assessment
Item Hazard Risk Who is at Risk Risk Rating Necessary Control Measures Action
y
Residual Risk
Rating
S L Rating S L Rating
staff
Site visitors
Cable hangers and cable stands shall be utilized on construction sites to
elevate trailing cables and $rovide additional $rotection from damage or
water ingress
C! 9nsafe connections /
s$licing
)lectric shock leading to in:ur# or
fatalit#
)lectrical fire
General site
workers
General site
staff
Site visitors
4 =
!
Cables shall not be e1tended or re$aired through cut and s$lice' *nl#
industrial cable connectors shall be used as set out in ()* !WP $%% 3
)lectricit#
*nl# com$etent electricians shall be $ermitted to construct and re$air
electrical distribution e+ui$ment and shall onl# use $arts / com$onents that
are manufactured for the $ur$ose em$lo#ed
.here transformers are used to ste$ down voltages6 the com$etent engineer
and site electricians shall ensure that all transformers are ins$ected before
use and included within the +uarterl# ins$ection $rogram
/0
4 1
!4
C1 Lack of routine
ins$ection and
maintenance
)lectric shock leading to in:ur# or
fatalit#
)lectrical fire
General site
workers
General site
staff
Site visitors
4 3
!
S$ecific electricians shall be designated to check / test all site distribution
boards on a weekl# basis' & record of ins$ection shall be retained and a
signature sheet shall be attached to each board to allow for immediate
verification b# the ()* $ro:ect -S) team
/ower tools and accessories shall be routinel# checked b# a com$etent
electrician6 at least +uarterl#' <deall# /&7 5$ortable a$$liance testing8 shall be
carried out' /ower tools shall be clearl# marked to show that the# have been
ins$ected in line with the current ins$ection $rogram' 7his ma# be b# /&7
labels as shown in !WP $$8 or through the use of color coded ta$e
/0
4 1
!4
C Lack of warning /
communication
)lectric shock leading to in:ur# or
fatalit#
)lectrical fire
General site
workers
General site
staff
Site visitors
4 =
!
)lectrical hazard / warning signage shall be set out in line with the
re+uirements ()* !WP $%% , )lectricit#
)lectrical hazards shall be detailed in the $ro:ect induction and reinforced via
tool bo1 talks
/0
4 1
!4
C3 Contact with e1isting
electrical services
5underground /
overhead8
)lectric shock leading to in:ur# or
fatalit#
)lectrical fire
General site
workers
General site
staff
Site visitors
4 3
14
Contact with e1isting electrical services underground is most likel# during
e1cavation and is detailed in this register in the site establishment and
e1cavation section above
*verhead services $resent a contact risk for h#draulic arms and crane :ibs'
-#draulic arms ma# be limited utilizing the onboard com$uter of modern
e+ui$ment or using chains to limit reach'
7he overhead line ma# also be $rotected with a steel >goal$ostA to $revent
$assing vehicles with elongated loads from contacting the overhead lines
-ighl# visible warning / hazard signage shall be $osted where there is a
danger for underground or overhead electrical services
/0
4 1
!4
C= 9nauthorized access
to electrical rooms /
boards
)lectric shock leading to in:ur# or
fatalit#
)lectrical fire
General site
workers
General site
4 =
!
)lectrical rooms shall be fitted with door and locks once e+ui$ment is
installed 5whether live or not8
&n electrical safe s#stem of work 5)SS.8 incor$orating access $ermits shall
/0 4 1
!4



Project Risk Register & Management Programme:
Risk Assessment
Item Hazard Risk Who is at Risk Risk Rating Necessary Control Measures Action
y
Residual Risk
Rating
S L Rating S L Rating
staff
Site visitors
be develo$ed' &ccess to live electrical rooms shall be controlled b# $ermit in
line with ()* !WP $%% , )lectricit#
&ll electrical rooms / e+ui$ment shall dis$la# highl# visible warning / hazard
signage
C4 9nauthorized switching )lectric shock leading to in:ur# or
fatalit#
)lectrical fire

General site
workers
General site
staff
Site visitors
4 =
!
&n electrical safe s#stem of work 5)SS.8 shall be develo$ed' &uthorized
$ersons shall be a$$ointed to control access to electrical rooms6 work on
electrical e+ui$ment and energisation / de,energisation of electrical
e+ui$ment'
7he )SS. shall be documented and shall includeF
Res$onsibilities and duties of authorized $ersons
Control of live electrical areas
/ermit s#stems
7raining of other contractors
)mergenc# $rocedures
Safe <solation / Switching 3 Lock out / 7ag *ut
/0
4 1
!4
C" ;ailure to res$ond to
changing conditions
)lectric shock leading to in:ur# or
fatalit#
)lectrical fire
General site
workers
General site
staff
Site visitors
4 3
14
Loading re+uirements shall be continuall# monitored b# the com$etent
electrical engineer as conditions change' &dditional distribution boards shall
be located where $ower re+uirements significantl# increase'
.here $ower generation is through stand alone generators6 additional units
or higher rated units shall be installed to $revent overloading
/0
4 1
!4
Material !torage7 Handling & Mo)ement
C? 9nsafe storage of
materials
;ire
*verloading and colla$se of
racking / shelving
Chemical s$ills
7i$$ing / colla$se of stacked
materials
9nsafe movement of large
diameter $i$es
General site
workers
General site
staff
Site visitors
= 3
1
0aterials shall be stored6 handled and moved in a safe manner' 7he
re+uirements of ()* !WP $%9 shall be im$lemented on all $ro:ects
Site stores shall be include heav# dut# racking with safe ladder / stair access
;lammable and / or hazardous materials shall be stored se$aratel# in steel
containers with air conditioning if necessar# with regard to local conditions
/etroleum based substances 5$etrol / diesel6 oil8 shall be stored on dri$ tra#s
or inside $ur$ose built bunds' Bunds shall be 11!G of the stored volume
Stacked materials shall be secured against ti$$ing / colla$se and shall be
$alletized where $ossible to allow safe movement b# forklift or crane
Blocks shall be $alletized and banded
/i$e racks shall be $re$ared for $i$e storage
Sheet racks shall be $re$ared for glass and dr# wall or other sheet material
Cables shall be stored on drums in a level area and chocked
Large diameter steel or $re,cast $i$es shall stored in a level area and be
/0 = 1
!=



Project Risk Register & Management Programme:
Risk Assessment
Item Hazard Risk Who is at Risk Risk Rating Necessary Control Measures Action
y
Residual Risk
Rating
S L Rating S L Rating
chocked
Gas c#linders shall be stored in a se$arate cage located in an e1ternal area
Lockable storage bo1es shall be used for general items stored on site
&ll stores shall include signage for both identification of materials and safet#
Stores shall be fitted with suitable firefighting e+ui$ment and fire alarms
/ackaging and waste materials shall be removed from stores at the earliest
o$$ortunit# to reduce fire loading
CC 9nsafe handling and
movement of materials
7i$$ing / colla$se of stacked /
stored materials
/ersonal in:ur# through e1cessive
manual handling
/ersonal in:ur# through contact
with shar$ edges / abrasions /
contact with moving materials
General site
workers
General site
staff
Site visitors
= =
1"
Store man shall be issued with suitable //) as re+uired' -eav# dut# rigger
gloves shall be used for general handling of materials
0anual handling shall be minimized and mechanical aids shall be utilized to
lift and move heav# materials' 0echanical aids shall be fit for $ur$ose in line
with those set out in ()* !WP $%9 3 0aterial Storage6 -andling &
0ovement
/0
= 1
!=
CD Lack of maintenance
and certification of
mechanical aids
5e+ui$ment8
;ailure of mechanical e+ui$ment
leading to leading to in:ur# or
fatalit# / $ro$ert# damage
General site
workers
General site
staff
Site visitors
4 =
!
&ll lifting e+ui$ment and lifting accessories used in site stores6 such as
cranes6 winches6 chain blocks6 :acks etc shall be o$erated6 maintained and
certified in line with ()* !WP $$0 3 Lifting )+ui$ment
&ll mobile $lant and vehicles used in site stores6 such as forklifts6 tele,
handlers6 truck and trailer6 0)./S etc shall be o$erated6 maintained and
certified in line with ()* !WP $%' 3 0obile /lant & @ehicles
/0
4 1
!4
D! 9nauthorized access
to material stores
/ersonal in:ur# / damage General site
workers
General site
staff
Site visitors
= 3
1
Site stores shall be lockable and e1ternal storage areas shall be secured b#
fencing to $revent unauthorized access' 7am$ering with stored materials
ma# lead to an incident at a later date if safe conditions are altered'
9nauthorized $ersons intent on theft ma# in:ure themselves and others' 7o
deter theft6 site securit# shall routinel# $atrol site stores
/0
= 1
!=
D1 0ovement of /lant and
heav# / unstable loads
/ersonal <n:ur# due to tra$$ing or
crushing when moving heav# or
unstable loads'
2amage due to ti$$ing over or
contact with structures /
e+ui$ment leading to financial and
$roduction loss
General site
workers
General site
staff
Site visitors
4 =
!
/lant ma# include ma:or items of $lant such as chillers6 air handling units6
generators6 turbines6 $um$s6 $refabricated concrete or steel structures and
cladding etc
& s$ecific method statement shall be generated for the movement of ma:or
$lant items
0echanical aids and accessories shall be fit for $ur$ose and in line with the
t#$ical items set out in ()* !WP $%9 3 0aterial Storage6 -andling &
0ovement
/0
4 1
!4
Con.ined !+aces



Project Risk Register & Management Programme:
Risk Assessment
Item Hazard Risk Who is at Risk Risk Rating Necessary Control Measures Action
y
Residual Risk
Rating
S L Rating S L Rating
D ;ailure to identif#
confined s$aces
&s$h#1iation fatalit#
2rowning fatalit#
)ngulfment fatalit#
;ire leading to fatalit# / $ro$ert#
damage

General site
workers
General site
staff
Site visitors 4 =
!
Current and foreseeable confined s$aces shall be identified and recorded
Confined s$ace work shall not $roceed until a detail method statement
com$lete with rescue $lan is $re$ared and a$$roved
*nl# com$etent6 trained workers shall be $ermitted to work in confined
s$aces
Confined s$ace working shall be controlled b# $ermit to work
Confined s$ace work shall be carried out in line with the re+uirements of
()* !WP $%( 3 .orking in Confined S$aces
/0
4 1
!4
D3 Confined s$ace entr#
b# incom$etent
$ersons
;ailure to recognize hazards
leading to fatalit#
General site
workers
General site
staff
Site visitors
4 =
!
& com$etent confined s$ace su$ervisor shall be a$$ointed
*nl# com$etent6 trained workers shall be $ermitted to work in confined
s$aces' )vidence of com$etence shall be submitted to ()* $rior to
commencement of confined s$ace work
*nl# trained workers shall attem$t to rescue others from a confined s$ace'
7he first $riorit# of rescue teams is to avoid becoming the ne1t casualt#
/0
4 1
!4
D= ;ailure to $rocure
a$$ro$riate confined
s$ace entr# e+ui$ment
and accessories
;ailure to identif# atmos$heric
hazards leading to as$h#1iation
fatalit#
;ailure of $ersonal safet#
e+ui$ment and //) / R/)
leading to fatalit#
General site
workers
General site
staff
Site visitors
4 =
!
&tmos$heric testing e+ui$ment shall be manufactured to )% or e+uivalent
standard' Certificates of conformance and calibration shall be re+uested at
the $rocurement stage
Life safet# / rescue e+ui$ment shall be fit for $ur$ose6 s$ecificall# designed
for the function and manufactured to )% or e+uivalent standards
/0
4 1
!4
D4 ;ailure to test and
monitor air +ualit# in
confined s$aces
&s$h#1iation fatalit#
2rowning fatalit#
)ngulfment fatalit#
;ire leading to fatalit# / $ro$ert#
damage
General site
workers
General site
staff
Site visitors
4 =
!
7he method of work shall include initial and $eriodic testing of the air +ualit#
b# calibrated gas monitor to determine the $resence of as$h#1iating6
flammable and to1ic gases / va$ors'
&cce$table entr# conditions areF
*1#gen 5*8 3 greater than 1D'4G and less than 3'4G
Lower ;lammable Limit L;L 3 less than 1!G
Carbon 0ono1ide 5C*8 3 less than 34$$m
-#drogen Sul$hide 5-S8 3 less than 1!$$m
/0
4 1
!4
Access : "gress
D" ;ailure to designate
and se$arate e1ternal
traffic / $edestrian
routes
7raffic accident 3 fatalit# / damage
/ lost $roduction
General site
workers
General site
staff
Site visitors
%eighbors
General $ublic
4 3
14
7raffic management shall be in line with the re+uirements of ()* !WP $$% 3
General -S) Re+uirements for Contractors
Site access / egress shall be in line with the re+uirements of ()* !WP $%0
3 &ccess / )gress
& site logistics $lan shall be $re$ared' 7his shall detail the site boundar#6
$edestrian and vehicle access and site roads
Barriers shall be installed to se$arate $edestrians from vehicle traffic'
/edestrian routes shall be clearl# marked and illuminated where necessar#'
Signage should be in a language understood b# the ma:orit# of the labour
7raffic management signage and lighting shall be installed as necessar#
7raffic management arrangements for labour dro$ off / collection shall be
im$lemented' Labour shall not be $ut at risk from moving vehicles and
machiner#
/0 4 1
!4



Project Risk Register & Management Programme:
Risk Assessment
Item Hazard Risk Who is at Risk Risk Rating Necessary Control Measures Action
y
Residual Risk
Rating
S L Rating S L Rating
7raffic 0arshalls or >;lagA men shall control heav# traffic routes and crossing
$oints' ;lag men shall be suitabl# trained
D? ;ailure to
communicate and
maintain internal
$edestrian routes6
entrances and e1its
/edestrian in:ur# / fatalit# General site
workers
General site
staff
Site visitors
%eighbors
General $ublic
4 3
14
<nternal access routes shall not be blocked with materials and e+ui$ment
and shall be maintained in clean and tid# condition at all times
@ehicles shall not travel on designated $edestrian routes without a flag man /
banks man
<nternal routes shall be $rotected against leading edges and o$en holes /
voids
)ntrances / e1its and emergenc# e1its shall be clearl# marked and shall be
free from obstructions at all time
()* continuall# monitor $edestrian routes and e1its and take immediate
action against unsafe conditions
/0
4 1
!4
DC Lack of illumination /ersonal in:ur#
/ro$ert# damage
General site
workers
General site
staff
Site visitors
= =
1"
7o $revent general sli$s / tri$s / falls internal access shall be free from
obstructions6 clean6 dr# and clearl# marked with signage' ;estoon or other
tem$orar# lighting shall be set out
<llumination levels 5L9I8 shall be in line with that set out ()* !WP $%0 3
&ccess / )gress
/0
= 1
!=
DD /rotection of
$edestrians from
falling ob:ects
/ersonal in:ur#
/ro$ert# damage
General site
workers
General site
staff
Site visitors
%eighbors
General $ublic
4 3
14
.here $ossible6 $edestrian access shall not be routed directl# beneath work
in $rogress' .here this is not $ossible catch nets or crash decks shall be
installed where there is a danger of falling ob:ects
/0
4 1
!4
C/!HH ;Control o. !u#stances Hazardous to Health<
1!! ;ailure to identif#
substances hazardous
to health
/ersonal in:ur# / longer term ill
health
General site
workers
General site
staff
Site visitors
= 3
1
0aterial safet# data sheets 50S2S8 shall be re+uested for all $roducts at the
$rocurement stage
& C*S-- &ssessment shall be generated for all hazardous substances
9nsafe work with hazardous substances shall be sto$$ed b# the ()*
$ro:ect -S) team until the necessar# $recautions are im$lemented
/0
= 1
!=
1!1 <ssue / unsafe handling
of substances
hazardous to health
without information /
instruction
/ersonal in:ur# / longer term ill
health
General site
workers
General site
staff
Site visitors
= 3
1
C*S-- &ssessments shall be retained in the relevant stores' .orkers
issued with hazardous substances shall be verball# advised of the handling
$recautions and issued relevant //) as necessar#
/0
= 1
!=
1! 9nsafe trans$ortation
of substances
hazardous to health
/ersonal in:ur# / longer term ill
health
;ire
General site
workers
General site
staff
Site visitors
%eighbors
= 3
1
-azardous / flammable substances shall not be decanted into unmarked
containers $articularl# water bottles or unmarked buckets' Containers shall
be clearl# labeled with relevant warning s#mbols as set out in ()* !WP $%&
3 Control of Substances -azardous to -ealth

/0 = 1
!=



Project Risk Register & Management Programme:
Risk Assessment
Item Hazard Risk Who is at Risk Risk Rating Necessary Control Measures Action
y
Residual Risk
Rating
S L Rating S L Rating
General $ublic
1!3 ;ailure to store
substances hazardous
to health in line with
manufacturers
guidelines
/ersonal in:ur# / longer term ill
health
;ire
General site
workers
General site
staff
Site visitors
%eighbors
= 3
1
-azardous and / or flammable substances shall be stored se$aratel# from
general materials as set out in ()* !WP $%& 3 Control of Substances
-azardous to -ealth
C*S-- / ;lammable stores shall be locked to $revent unauthorized access
C*S-- stores shall be tem$erature controlled should the local conditions /
environment $revent safe storage at local tem$eratures
C*S-- stores shall be clearl# marked with a$$ro$riate6 highl# visible
signage
/0
= 1
!=
Project: & 3 &rchitect 5&rchitect or )ngineer engaged b# ()*8
/0 3 /ro:ect 0anager
C0 3 Construction 0anager
L0 3 Logistics 0anager
/L0 3 /lant 0anager
-S)0 3 -S) 0anager
/S 3 /ro:ect Su$ervisor 5()* / Subcontractor8
SC 3 Subcontractor
Assessment Carried out #y:
Assessment =ate:
Risk Matri1 !e)erity
1 3 = 4
-ikelihood o.
Harm
1 1 3 = 4
= " C 1!
3 3 " D 1 14
= = C 1 1" !
4 4 1! 14 ! 4
(e#
S J Severit#
L J Likelihood
Rating J S I L
14 to 4 -igh
C to 1 0edium -igh
= to " 0edium Low
to 3 Low
1 <nsignificant

You might also like