The document describes performing a seismic load analysis on a steel building according to ASCE 7-02. It outlines the calculations to determine the total design lateral force or shear at the base of the building and how that force is distributed amongst building levels based on each level's mass and height.

Uploaded by

mttaib
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
88 views3 pages

Aisc 08

The document describes performing a seismic load analysis on a steel building according to ASCE 7-02. It outlines the calculations to determine the total design lateral force or shear at the base of the building and how that force is distributed amongst building levels based on each level's mass and height.

Uploaded by

mttaib
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

PROJECT: STEEL BUILDING DESIGN CASE STUDY

SUBJECT: LOAD TAKEOFF


SEISMIC LOAD ANALYSIS PER ASCE 7-02 - EQUIVALENT LATERAL FORCE METHOD
Notation:
V - total design lateral force or shear at the base of the building
Cs - seismic response coefficient
W - total gravity load of the building located or assigned to Levels
SDS - design spectra response acceleration in the short period range (see ASCE 7-02 Section 9.4.1.2.5-1)
R - response modification factor (see ASCE 7-02 Table 9.5.2.2)
I - occupancy importance factor (see ASCE 7-02 Section 9.1.4)
SMS - maximum considered earthquake spectral response acceleration for short periods (see ASCE 7-02 Section 9.4.1.2.4-1)
SS - mapped maximum considered earthquake spectral response acceleration at short periods (see ASCE 7-02 Figure 9.4.1.1a)
Fa - acceleration-based site coefficient at .3 s-period (see ASCE 7-02 Table 9.4.1.2.4a)
SD1 - design spectral response acceleration at a period of 1s (see ASCE 7-02 Section 9.4.1.2.5-2)
SM1 - maximum considered earthquake spectral acceleration for 1s period (see ASCE 7-02 Section 9.4.1.2.4)
Fv - velocity-based site coefficient at 1s period (see ASCE 7-02 Table 9.4.1.2.4b)
S1 - mapped maximum considered earthquake spectral response acceleration at a period of 1s (see ASCE 7-02 Section 9.4.1.1b)
T - fundamental period of the building (see ASCE 7-02 Section 9.5.5.3)
Ta - approximate fundamental period (see ASCE 7-02 Section 9.5.5.3.2-1)
CT = building period coefficient (see ASCE 7-02 Table 9.5.5.3.2)
Cu - coefficient for upper limit on calculated period (see ASCE 7-02 Table 9.5.5.3.1)
hn - height in feet (meters) above the base to the highest level of the building
Cvx - vertical distribution factor
Wx, Wi - the portion of the total gravity load of the building (W) located or assigned to level I or x
hx - the height (feet or m) from the base level I or x
Fx - the portion of the seismic base shear, V, induced at level x
Analysis:
SHEET 13 of 131
Wx * hx
K
Wi * hi
K
Analysis:
Assume Soil Profile D ---> Stiff Soil - ASCE 7-02 Table 9.4.1.2
Occupancy Category II (ASCE 7-02 Table 1-1)
V = Cs * W
ASCE 7-02 Eq. 9.5.4.1
Cs = For SDS : SDS = 2 / 3 * SMS
ASCE 7-02 Eq. 9.4.1.2.5-1
ASCE 7-02 Eq. 9.5.5.2.1-1
SMS = Fa * Ss
Ss
a
= 0.12 SMS = 0.192
ASCE 7-02 Eq. 9.4.1.2.4-1
Fa
a
= 1.6
S
DS
= 0.128
R = 3
a
For I: Seismic Use Group I (ASCE 7-02 Table 9.1.3)
I = 1
a
Cs = 0.0427
a -- refer to Notation list above to find location of table for value Red font indicates user input
S
DS
R / I
Wx * hx
K
Wi * hi
K
PROJECT: STEEL BUILDING DESIGN CASE STUDY
SUBJECT: LOAD TAKEOFF
SEISMIC LOAD ANALYSIS - CONT.
Check Constraints
Cs min = 0.044 * I * SDS
Cs max = SD1 / T (R / I)
Cs min = 0.006
For SD1 : SD1 = 2/3 * SM1
ASCE 7-02 Eq. 9.4.1.2.5-2
SM1 = Fv * S1 S1
a
= 0.055 SM1 = 0.132
ASCE 7-02 Eq. 9.4.1.2.4-2
Fv
a
= 2.4
S
D1
= 0.088
For T: T = Cu * Ta Cu =
1.7
a
Ta = CT * hn
3/4
CT = 0.02
a
hn =
52
Ta = 0.387
T = 0.658
Cs max = 0.0446
SHEET 14 of 131
S
DS
R / I
Cs max = 0.0446
Cs FINAL = 0.0427
V = Cs * W
For W:
D. load Mech. Load Total (Kips)
W penthouse = 30*(36*30) 0 45.3
W roof = 30*(108*90) 100*(36*30) 451.1
W3 = 61*(108*90) 0 864.5
W2 = 61*(108*90) 0 864.5
W = 2225.4
k
V = 95
k
Cvx =
For K: Look at T
if T < 0.5 ---> K = 1.0
if 0.5 < T < 2.5 ---> K = 2.0
if T > 2.5 ---> K = 2.0
K = 2.0
Fx = Cvx * V
a -- refer to Notation list on sheet 12 to find location of table for value Red font indicates user input
0
0
20*(108*90)
15*(108+90)*2*13 20*(108*90)
Exterior walls
15*(36+30)*2*13/2
15*[(108+90)*2*13/2+(36+30)*2*13/2]
15*(108+90)*2*13
Partitions
S
DS
R / I
Wx * hx
K
Wi * hi
K
PROJECT: STEEL BUILDING DESIGN CASE STUDY
SUBJECT: LOAD TAKEOFF
SEISMIC LOAD ANALYSIS - CONT.
Level Wx hx
hx
K
Wx*hx
K
Cvx
Fx
Roof
45.3 52
2704.0 122491.2 0.080
7.6
k
4
451.1 39
1521.0 686123.1 0.446
42.3
k
3
864.5 26
676.0 584402 0.380
36.1
k
2
864.5 13
169.0 146100.5 0.095
9.0
k

=
1539117 1.00
95.0
k
7.6
42.3
36.1
9.0
SHEET 15 of 131
S
DS
R / I
Wx * hx
K
Wi * hi
K
Red font indicates user input
S
DS
R / I
Wx * hx
K
Wi * hi
K