PONDASI BORED PILE ( SST )

3 - 2 DESIGN CALCULATION OF FOUNDATION


1) Design load :
- compression
- tension
- shear
- dead load
- timbunan
2) Ultimate load capacity in compression
Qu = Nc.cb. Ab + a. cu. As
Qu tot = n tot . Qu . eta
eta = 1 - ksi [{( n-1)m + (m-1)n}/mn]/90
Qa = Qu tot / SF
qcb =
qca =
z=
Nc =
cb =
a=
a. cu = a.qca =ca =
d=
Ab =
As =
SF =
Qb =
Qu =
Qa =

550.00
43.00
16.00
8.70
36.67
0.70
2.01
0.40
0.126
20.096
2.5
40.07
80.39

Counterweight
13
=
=
=
=
=

61.689
27.981
4.189
16.854
0.000

kN
53 m Light
477.347 4 Bore
401.772 Antapani
41.068 Lebar kaki menara
29 Februari 2008
Tie Beam

ton
ton
ton
ton
m

Qu = 4. N. Ab + Ns. As/50

ton/m2
ton/m2
m

s=
1.20 m
m=
2
n=
2
ntot =
4
ksi = atan d/s =
eta =
0.795

ton/m2
ton/m2
m
m2
m2
ton
ton

102.28 ton

PT. TOWER BERSAMA

>

r=

0.20 m

Qs =
Qutot =

40.33 ton
255.70 ton

61.69 .......................
OK

3) Ultimate load capacity in tension


Tu = ca. As
Tutot = ntot Tu . eta
Ta = Tutot/SF + weight of pile + weight of pile cap
SF =
jc =
Wp =
Tu =
Tutot =
Ta =

3.00
2.40 ton/m3
4.55 ton
40.33 ton
128.26 ton
67.93 ton

L=
B=
T=
Wpc =

>

2.20
2.20
0.60
6.97

m
m
m
ton

27.98 .......................
OK

4) Lateral allowable bearing capacity of pile


k=
0.5
d=
40
a=
1
E=
100,000
I=
125,600
b=
0.00447
Ha =
4.477
Hatot = Ha . ntot. eta
Ha =

kg/cm3
cm
cm
kg/cm2
cm4
cm-1
ton
ton

14.241 ton

>

4.19 .......................
OK

18.43

485 cm
0

3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

48.813
58.619
49.462
42.452
37.361
33.390
30.500
28.176
26.357
25.262
24.333
23.394
22.395
21.556
20.860
20.429
20.429
20.429

2.750
3.000
4.692
6.032
6.250
6.250
6.250
6.250
6.250
6.250
6.250
6.250
6.250
6.250
6.250
6.250
6.250
6.250