Material Master:
1) Material No (Will
Automatically Generated)
2) Industry = “M”
3) Material Type
HALB – Semi Finished
ROH - Raw Materials
ERSA – Spares
HAWA – Trading Goods
E.g.
1) For MRP planning MRP
views are required to
update.
2) W/o accounting view no
inventory posting in value
terms is possible
3) W/o Sales & Purchase
View respective transactions
execution are not possible
etc
Give relevant
organization data
Plant
Storage location,
Sales Org,
Distribution channel
1) Material Group –
Will be
automatically
copied to Sales
Org. View-1
2) Tax indicator will
decide material is
taxable or not.
1) Material Stat.
Group = “1” – Will
decide database
updation for Sales
reporting purpose.
2) Item category =
“NORM” – Will decide
pricing, Billing,
Inventory Posting
3) Material Pricing
group determines
Pricing in SD.
1) Availability
Check – Will decide
Stock to be
checked in Sales
Order
2) Transport group
& Loading Group =
“0001”
It is necessary to
carry Sales activity
& parameter to
decide shipping
point in Sales.
1) Purchasing Group
will default in PR & used
for Reporting Purpose.
2) Order Unit - Different
order unit can be
maintained for Ordering
purpose.
Additional Purchase
activity Specific text
can be maintained
1) Planned
delivery time –
Will decide
Material delivery
date for MRP
output & manual
PR.
2) Schedule
Margin Key =
“000”
1) Prod version –
Will decide which
BOM & routing is
used for production
No need to maintain any data. All data are reflected from the data entered in other views.
Insp. Setup – To
update inspection
parameters of QM.
1) Valuation Class
– Decides Which
Stock G/L account
will be updated
2) Price Control –
Stock valuated at
Moving or Standard
price
3) Moving /
Standard Prices –
Price at which
stocks will be
valuated
Note: Any Units of measure other than Base Unit, has to be brought in
relation with (Conversion) Base unit Only.