This method statement is for a construction project called Beach Villa located in Pearl Qatar. It details the procedures, responsibilities, safety measures, and documentation requirements for installing [blank]. The method statement includes a scope, references, access and logistics plan, hazards identification, roles and supervision structure, installation procedures, training requirements, schedules, quality control processes, and attachments like a risk assessment, inspection and test plan, and checklists. The overall purpose is to outline the method for safely installing [blank] in accordance with the project plans and safety standards.
This method statement is for a construction project called Beach Villa located in Pearl Qatar. It details the procedures, responsibilities, safety measures, and documentation requirements for installing [blank]. The method statement includes a scope, references, access and logistics plan, hazards identification, roles and supervision structure, installation procedures, training requirements, schedules, quality control processes, and attachments like a risk assessment, inspection and test plan, and checklists. The overall purpose is to outline the method for safely installing [blank] in accordance with the project plans and safety standards.
This method statement is for a construction project called Beach Villa located in Pearl Qatar. It details the procedures, responsibilities, safety measures, and documentation requirements for installing [blank]. The method statement includes a scope, references, access and logistics plan, hazards identification, roles and supervision structure, installation procedures, training requirements, schedules, quality control processes, and attachments like a risk assessment, inspection and test plan, and checklists. The overall purpose is to outline the method for safely installing [blank] in accordance with the project plans and safety standards.
This method statement is for a construction project called Beach Villa located in Pearl Qatar. It details the procedures, responsibilities, safety measures, and documentation requirements for installing [blank]. The method statement includes a scope, references, access and logistics plan, hazards identification, roles and supervision structure, installation procedures, training requirements, schedules, quality control processes, and attachments like a risk assessment, inspection and test plan, and checklists. The overall purpose is to outline the method for safely installing [blank] in accordance with the project plans and safety standards.
Download as DOCX, PDF, TXT or read online from Scribd
Download as docx, pdf, or txt
You are on page 1of 7
At a glance
Powered by AI
The document provides a method statement template for a construction project.
The method statement describes the method and procedures for carrying out a specific construction activity or task.
The method statement includes details like scope, references, access, logistics, health and safety, responsibilities, procedures, training, documentation requirements etc.
Project Logo
Project Name : BEACH VILLA (B+G+1+PH) ON BVN 55-60, PEARL QATAR
Project No. : 242 Form No.: P07-F06 / Rev. 0 / Nov. 2012 Client Consultant Contractor Subcontractor MR. FAHAD ALFARDAN
Method Statement for ____________________ Form No. P07-F06 / Rev. 0 / Nov. 2012 AEB-CSD Quality Forms Page 1 of 7 METHOD STATEMENT FOR aaaaaaa METHOD STATEMENT No: REV : 0 ORIGINATOR : DISCIPLINE: Architectural Title : PROVIDE TITLE OF ACTVITES HERE
REV DATE STATUS REVISION DETAILS REVIEWER / APPROVER Sub Con Main Con EXTERNAL 0 12-Nov.-12 FA FOR REVIEW & APPROVAL
Status Code: D : Draft FI : For Information FC : For Construction P : Preliminary FA : For Approval * External Authorization (Client), where required
Distribution :
Project Logo
Project Name : BEACH VILLA (B+G+1+PH) ON BVN 55-60, PEARL QATAR Project No. : 242 Location: PEARL QATAR Client Consultant Contractor Subcontractor MR. FAHAD ALFARDAN
Method Statement for ____________________ Form No. P07-F06 / Rev. 0 / Nov. 2012 AEB-CSD Quality Forms Page 2 of 7
Table of Contents
1. Scope /Objectives 2. Reference 3. Access/Egress 4. Logistics 5. Health and Safety Hazards 6. Definitions 7. Responsibilities / Supervision 8. Procedures /Method to be Employed 9. Training 10. Working hours 11. House keeping 12. Manpower Requirement & Supervision 13. Material Requirement 14. Plant & Equipment Requirement 15. Q.C Approvals and other Documentation 16. Supporting documentation 17. Distribution 18. Other information 19. Site Safety Engineers Approval 20. Attachments (Compulsary) Risk Assessment Inspection and Test Plan Checklist
Project Logo
Project Name : BEACH VILLA (B+G+1+PH) ON BVN 55-60, PEARL QATAR Project No. : 242 Location: PEARL QATAR Client Consultant Contractor Subcontractor MR. FAHAD ALFARDAN
Method Statement for ____________________ Form No. P07-F06 / Rev. 0 / Nov. 2012 AEB-CSD Quality Forms Page 3 of 7
1. SCOPE & OBJECTIVES
This method statement describes the method of installation for.
Access will be through hoist lifts to carry out the work .
4. LOGISTICS
SubContractor will deploy a dedicated team for the ..
5. HEALTH & SAFETY HAZARDS
SubCon will comply with all safety measures as applicable to project safety requirements
6. DEFINITIONS
AEB Arab Engineering Bureau (Consultant/Engineer)
xxx xxx xxx (Main Contractor)
xxxx xxxx xxxx (Sub contractor Contractor)
MS Method Statement
QCP Quality Control Procedures
ITP Inspection and Test Plan
ITA Independent Testing Agency
7. RESPONSIBILITIES/ SUPERVISION
Project Manager
Construction Manager
Project Engineer Project Logo
Project Name : BEACH VILLA (B+G+1+PH) ON BVN 55-60, PEARL QATAR Project No. : 242 Location: PEARL QATAR Client Consultant Contractor Subcontractor MR. FAHAD ALFARDAN
Method Statement for ____________________ Form No. P07-F06 / Rev. 0 / Nov. 2012 AEB-CSD Quality Forms Page 4 of 7
Site Engineer
QA/QC Engineer
Safety Engineer
8. PROCEDURE / METHOD TO BE EMPLOYED:
Detailed procedures and methodology must be explained here
9. TRAINING
Proposed training to all operatives must be explained here
10. WORKING HOURS
11. HOUSE KEEPING
Working Areas will be kept clean by disposing the waste materials at the designated areas. At the end of days work, installation supervisor will ensure that the debris are disposed off.
12. MAN POWER REQUIREMENT
Provide details of manpower to be utilized.
13. MATERIAL REQUIREMENT
Provide details of Material Approvals, requirements, etc
14. PLANT & EQUIPMENT REQUIREMENT
Provide details of equipment and tools to be utilized.
15. QC APPROVAL AND OTHER DOCUMENTRY REQUIREMENTS:
This MS to be read in conjunction with the below referenced documents Project Logo
Project Name : BEACH VILLA (B+G+1+PH) ON BVN 55-60, PEARL QATAR Project No. : 242 Location: PEARL QATAR Client Consultant Contractor Subcontractor MR. FAHAD ALFARDAN
Method Statement for ____________________ Form No. P07-F06 / Rev. 0 / Nov. 2012 AEB-CSD Quality Forms Page 5 of 7
Contract Specification & approved drawings. Project Quality Plan Project HSE Plan
17. DISTRIBUTION
Copies of this MS will be circulated to the following for Information & action Sr. Construction Manager Site Engineer QA/QC Engineer HSE Engineer
18. OTHER INFORMATION
Ensure that all the activities have been carried out to suit the site conditions and involved With Site in charge
19. MAIN CONTRACTORS SAFETY ENGINEERS APPROVAL
APPROVAL STATUS SIGNATURE
Approved
Approved subject to compliance with the following notes
Not Approved with reason
20. ATTACHMENTS (Compulsory)
Risk Assessment Inspection & Test Plan Quality Control Check Lists Project Logo
Project Name : BEACH VILLA (B+G+1+PH) ON BVN 55-60, PEARL QATAR Project No. : 242 Location: PEARL QATAR Client Consultant Contractor Subcontractor MR. FAHAD ALFARDAN
Method Statement for ____________________ Form No. P07-F06 / Rev. 0 / Nov. 2012 AEB-CSD Quality Forms Page 6 of 7
Project Logo
Project Name : BEACH VILLA (B+G+1+PH) ON BVN 55-60, PEARL QATAR Project No. : 242 Location: PEARL QATAR Client Consultant Contractor Subcontractor MR. FAHAD ALFARDAN
Method Statement for ____________________ Form No. P07-F06 / Rev. 0 / Nov. 2012 AEB-CSD Quality Forms Page 7 of 7