Training Activity Matrix

This document outlines a training activity matrix for three groups of trainees. It details the activities, facilities and equipment, venue, date, time and remarks for each group. Group 1 will perform activities related to dismantling a computer system on the first day. Group 2 will perform activities related to disassembling the CPU over two days. Group 3 will perform activities related to administering basic computer and network use over two days. The same facilities, equipment and venues will be used for each activity.

Uploaded by

RJ_NHUGHES
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
863 views3 pages

Training Activity Matrix

This document outlines a training activity matrix for three groups of trainees. It details the activities, facilities and equipment, venue, date, time and remarks for each group. Group 1 will perform activities related to dismantling a computer system on the first day. Group 2 will perform activities related to disassembling the CPU over two days. Group 3 will perform activities related to administering basic computer and network use over two days. The same facilities, equipment and venues will be used for each activity.

Uploaded by

RJ_NHUGHES
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Training Activity Trainee

Facilities/Tools and
Equipment
Venue
Date &
Time
Remarks
(Workstation/
Area)
Prayer






October7,
2013

8:00 AM to
8:30 AM

Recap of Activities
Unfreezing Activities All trainees
Practical Work
Area

Feedback of Training





(0.5 day)
Motivation


Activity A
Read Information Sheet
4.2.1
Answer Self checks
4.2.1
(Compare it with
Answer key 4.2.1)
Perform Job Sheet 4.2.1
Dismantling The
Computer System and
Perform the Basic
Hardware Maintenance
Answer Performance
Criteria Checklists 4.2.1
Answer Written Test
and Oral Questioning (if
done with Activity A

Group 1



CBLM Manuals
(Maintain Computer
System and Network)
Pen
Paper
System unit
Screw Drivers
Contact Cleaner
Anti wrist strap


Practical Work
Area
8:00 AM
5:00 PM
(1 day)
After finishing
Activity A,
Group 1 may
proceed to
Activity B and
c respectively.
Training Activity Matrix
and B)
Activity B
Read Information Sheet
4.2.1
Answer Self checks
4.2.1 (Compare it with
Answer key 4.2.1)
Perform Task Sheet
4.2.1 Disassemble the
CPU
Answer Performance
Criteria Checklists 4.2.1
Answer Written Test
and Oral Questioning (if
done with Activity A
and B
Group 2
1. Aballe, Josseph
2. Capales, Florame
3. Montalban, Edmar
4. Tuling, Jose
5. Pacatang, Shiela

CBLM Manuals
(Maintain Computer
System and Network)
Pen
Paper
System unit
Screw Drivers
Contact Cleaner
Anti wrist strap



Computer
Laboratory

8:00 AM
5:00 PM
(2 days)
After finishing
Activity B,
Group 2 may
proceed to
Activity A and
C respectively.
Activity C
Read Information Sheet
4.2.1
Answer Self-checks
4.2.1
(Compare it with
Answer key 4.2.1)
Perform Operation Sheet
4. 2.1 Administering
the Basic use of
Computer and
Network System
Answer Written Test
and Oral Questioning (if
done with Activity C and
Group 3
1. Amora, Sarah
2. Dela Pena, Albert
3. Hondo, Jirly
4. Ranises, Shane
5. Timbal, Cesar


CBLM Manuals
(Maintain Computer
System and Network)
Pen
Paper
System unit
Screw Drivers
Contact Cleaner
Anti wrist strap



Computer
Laboratory

8:00 AM
5:00 PM
(2 days)
After finishing
Activity C,
Group 3 may
proceed to
Activity A and
B respectively.