0% found this document useful (0 votes)
107 views13 pages

New Waste Heat Recovery System - Challenges and Solutions: Heimdal New Power Generator Project

This document summarizes the challenges and solutions for a new waste heat recovery system being installed on the Heimdal power generator project. Key points include: - A new cantilevered module will be installed in 2008 to capture waste heat from the gas turbine exhaust and use it to power a hot oil system. - Alternative configurations were evaluated, settling on locating the heat recovery unit in the bypass stream to avoid issues if hot oil leaked into the turbine. - Main challenges involve detecting and addressing potential hot oil leaks, preventing fires, and ensuring structural integrity during operation. - Design changes have been made to ducting, piping and valves to minimize leaks and vibrations at high temperatures. Detection

Uploaded by

Manuel Rosas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
107 views13 pages

New Waste Heat Recovery System - Challenges and Solutions: Heimdal New Power Generator Project

This document summarizes the challenges and solutions for a new waste heat recovery system being installed on the Heimdal power generator project. Key points include: - A new cantilevered module will be installed in 2008 to capture waste heat from the gas turbine exhaust and use it to power a hot oil system. - Alternative configurations were evaluated, settling on locating the heat recovery unit in the bypass stream to avoid issues if hot oil leaked into the turbine. - Main challenges involve detecting and addressing potential hot oil leaks, preventing fires, and ensuring structural integrity during operation. - Design changes have been made to ducting, piping and valves to minimize leaks and vibrations at high temperatures. Detection

Uploaded by

Manuel Rosas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 13

New Wast e Heat Rec over y Syst em c hal l enges and sol ut i ons

Heimdal New Power Generator Project


Prepared by:
Hydro: Unn Orstein, Project manager
Knuth Jahr, Mechanical Disipline Lead
Reinertsen: Morten Kongelf, Mechanical Discipline Lead
Petroleumstilsynet
Seminar exhaust stacks and waste heat recovery
2007-02-07
Page: 2
I nt r oduc t i on
l New cantilevered module to be installed on Heimdal summer 2008
- Reinertsen AS is engineering and fabrication contractor
l Gas turbine from GE: LM 1600 gas generator with PGT 16 power turbine
and ABB generator
- Iso rating 14 MW, Design case 10 MW
- Exhaust data:
- 40 kg/sec 492 oC (10 MW)
- 33.7 kg/sec 523 oC ( 7 MW) normal operating)
- Max temp: 597 oC (3-4 MW)
l 11 MW hot oil waste heat recovery package (including silencer) - Letter of
Intent to Kanfa-Tec mid January
- Procurement direct to KanfaTec and not via GE as planned
l The system has been improved - ref sgard B fire in the exhaust stack
2005, and other experiences
l The hot oil heat exchanger is located in the bypass to avoid:
- Hot oil leakage into the turbine
- Fire water inside the stack
Page: 3
WHRU - hot oil systems - challenges
l Leakage from tube bundle in traditional vertical exhaust stack
- Accumulates in bellows textile a special problem
- Tube rupture can result in > 3 M3 drainage to the turbine collector
- Fire - due to oxygen in the exhaust, air during rundown of turbine and the
chimney effect
l Detect the hydrocarbon in the exhaust before the fire starts
l Drainage of hot oil
l Fire fighting system
l Damage to turbine and turbine casing due to fire and water
l Leakage from flanges in the hot oil piping hitting warm surfaces
Page: 4
Al t er nat i ve c onf i gur at i ons eval uat ed
l Traditional configuration
with WHRU above the
turbine exhaust outlet
l WHRU in the bypass stream
Silencer not shown
Exhaust
Exhaust
Silencer shown partly
Drawings & photo from Kanfa-Tec
Page: 5
Mai n i ssues i n c ase of hot oi l l eak age
l Sump to collect hot oil leakage
- Separate tank not shown on figure, 3 m3
l Detect liquid in sump
- Drain test valve
- Level indication
l Bellows should avoid:
- small hot oil leakage into the exhaust
stream to collect in the textile and ignite
In case of leakage:
- Close the louver (shut off air flow)
- Nitrogen to inert the volume?
- Drain the bundle to recovery tank
- Fire water monitor on the LQ roof
Ideas:
- Detection of hydrocarbon in exhaust?
- Separate the 2 exhaust stream to avoid bellows?
Page: 6
Mat er i al sel ec t i on
l Ducting: AISI 321
- Max operating temperature is 597 0C at 25 oC ambient
- WHRU Supplier recommend design temperature of 593 oC
- Ambient temperature is normally well below the 25 oC
- Max operating temperature is a transient case and not a normal operating case
- Due to cooling of the outside of the duct
- Duct downstream the bundle is exposed to lower exhaust temperature
- AISI 321 is the standard material for GE Energy LM1600 Exhaust Collector.
l Heatexchanger tube bundle/fins: ASTM A 106 GrB
Page: 7
Duc t l eak ages
l Design changes to reduce vibrations
- avoid fatigue
- Rounded corners
- Minimum temperature gradients
- Avoid lifting ears or other additional
structures
- reduced swirls
- LM 1600 has trippel diffusers in the
Exhaust Collector
l Improved bolt design
- Thermobolt has been specified
- Bolt does not loose pre-tension during
turbine start cycle
- Lover loads on bolts
- Controlled compression loads on gasket
Page: 8
Reduc e pot ent i al f or hot oi l l eak age f r om
WHRU heat ex c hanger
l Improved bundle support
- Avoid U-clamps interfering with the tubes
- Possible tube contacts with screw, bolts etc is avoided
l Inspection of support of tube bundle during assembly
l The deck structure to be designed to reduce WHRU casing deflection
Page: 9
Leak age f r om hot oi l pi pi ng
l The following has been specified:
- The hot oil/supply and return lines shall be welded to the WHRU
l Flanges are minimized and located away from hot surfaces
Page: 10
Val ve c ompar i son
Louver selected
Pro
l Smoother regulation in almost
closed position
- Improved temperature control
l Improved flow distribution
l Lower torque and material stresses
l Pneumatic control system
Con
l Leakage rate is 0.04 %
l Pressure loss is higher not critcal
l More moving parts
Flap (new type used on Grane)
Pro
l Improved sealing to avoid
oveheating the oil/cracking
- Leakage rate 0.02 %
l Grane experience is positive
Con
l Hydraulic control is required due to
high torque required
l More expensive
l Higher weight
Page: 11
2 separ at e ex haust out l et s - i dea
Pro
l Avoid potential small hot oil leakage
into the exhaust to collect in the
textile in the bellow
l Reduce maintenance
- Remove 2 bellows
- Simplify removal of silencer and bundle
l Reduce weight
Con
l The reduced velocity in case of part
load will have effect on dispersion
Note:
Turbine has excess power and
a restriction in the outlet to increase
flow is possible
Page: 12
Ear l y det ec t i on of hydr oc ar bon l eak age - i dea
l Install suction probe downstream
hot oil heatexchanger
l Dual oven gas chromatographs to
detect the hot oil
- Large differance between exhaust and
hot oil fractions
l Plan to be issued for inquiry Februar
2007
Page: 13