0% found this document useful (0 votes)
33 views7 pages

Fees and Charges-Development Control-2011

This document outlines approved fees and charges for development control and enforcement in 2011. It provides the fee structure for residential, public, office and other building plans based on the building area. Fees are higher for initial plans than renewal plans. There are also fees for occupation certificates, demolitions, regularization of illegal developments and minor works authorizations. Fees range from Kshs. 1,000 to Kshs. 200,000 depending on the type and size of the building or work.

Uploaded by

Hesbon Moriasi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
33 views7 pages

Fees and Charges-Development Control-2011

This document outlines approved fees and charges for development control and enforcement in 2011. It provides the fee structure for residential, public, office and other building plans based on the building area. Fees are higher for initial plans than renewal plans. There are also fees for occupation certificates, demolitions, regularization of illegal developments and minor works authorizations. Fees range from Kshs. 1,000 to Kshs. 200,000 depending on the type and size of the building or work.

Uploaded by

Hesbon Moriasi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

APPROVED FEES AND CHARGES, 2011

DEVELOPMENT CONTROL SECTION


ITEM
A) RESIDENTIAL

CURRENT CHARGES

Building Plans Range in M2


0-46
46-93
93-140
140-186
186-240
240-294
294-350
350-400
400-465
465-530
530-595
595-660
660-725
725-790
790-855
855-930
For every additional 93m2 or part thereof over
930m2

ITEM

1,200
1,410
2,250
2,520
3,360
3,780
4,200
4,830
5,200
5,670
6,300
7,140
7,980
8,600
9,430
9,930
1,200

CURRENT CHARGES

B)RENEWAL RESIDENTIAL
Building Plans Range in M2
0-46
46-93
93-140
140-186
186-240
240-294
294-350
350-400
400-465
465-530
530-595
595-660
660-725
725-790
790-855
855-930
For every additional 93m2 or part thereof over
930m2

ITEM

400
600
800
1,000
1,200
1,400
1,600
1,800
2,000
2,200
2,400
2,600
2,800
3,000
3,200
3,400
100

CURRENT CHARGES

C) PUBLIC
Building Plans Range in M2
0-46
46-93
93-140
140-186
186-240
240-294
294-350
350-400
400-465
465-530
530-595
595-660
660-725
725-790
790-855
855-930
For every additional 93m2 or part thereof over
930m2

2,250
2,520
3,360
3,780
4,200
4,830
5,200
5,670
6,300
7,140
7,870
8,600
9,430
9,930
10,660
11,930
1,500

Inter Amendments

1,000

Inter Alterations

1,000

Conversions

5,000

ITEM

CURRENT CHARGES

D) RENEWAL PUBLIC
Building Plans Range in M2
0-46
46-93
93-140
140-186
186-240
240-294
294-350
350-400
400-465
465-530
530-595
595-660
660-725
725-790
790-855
855-930
For every additional 93m2 or part thereof over
930m2

ITEM

800
1,000
1,200
1,400
1,600
1,800
2,000
2,200
2,400
2,600
2,800
3,000
3,200
3,400
3,600
3,800
120

CURRENT CHARGES

E) OFFICES, WAREHOUSE/SHOPS
Building Plans Range in M2
46-93

3,360

93-140
140-186
186-240
240-294
294-350
350-400
400-465
465-530
530-595
595-660
660-725
725-790
790-855
855-930
For every additional 93m2 or part thereof over
930m2

ITEM

3,780
4,200
5,200
5,670
6,300
7,140
7,980
8,600
9,430
9,930
10,660
11,930
12,120
12,850
1,500

CURRENT CHARGES

F)RENEWAL OFFICES,
WAREHOUSES/SHOPS
Building Plans Range in M2
0-46
46-93
93-140
140-186
186-240
240-294
294-350
350-400
400-465
465-530
530-595
595-660
660-725
725-790
790-855
855-930
For every additional 93m2 or part thereof over
930m2

ITEM

1,500
1,800
2,000
2,500
3,000
4,000
5,000
6,000
7,000
8,000
9,000
10,000
11,000
12,000
13,000
14,000
120

CURRENT CHARGES

G)SPECIAL DENSITY AREAS


RESIDENTIAL
Structural Plans Range in M2
0-46
46-93
93-140
140-186
186-240
240-294
294-350
350-400

600
705
1,125
1,260
1,680
1,890
2,100
2,600

400-465
465-530
530-595
595-660
660-725
725-790
790-855
855-930
For every additional 93m2 or part thereof over
930m2
ITEM

2,815
2,835
3,150
3,570
3,935
4,300
4,765
4,965
630
CURRENT CHARGES

H)AREAS PUBLIC
Structural Plans Range in M2
0-46
46-93
93-140
140-186
186-240
240-294
294-350
350-400
400-465
465-530
530-595
595-660
660-725
725-790
790-855
855-930
For every additional 93m2 or part thereof over
930m2

ITEM

850
1,260
1,680
1,890
2,100
2,415
2,600
2,835
3,150
3,570
3,935
4,300
4,715
4,965
5,330
5,965
630

CURRENT CHARGES

I)OFFICES,WAREHOUSES/SHOPS
Structural Plans Range in M2
0-46
46-93
93-140
140-186
186-240
240-294
294-350
350-400
400-465
465-530
530-595
595-660
660-725
725-790
790-855
855-930
For every additional 93m2 or part thereof over
930m2

1,680
1,890
2,100
2,415
2,600
2,835
3,150
3,570
3,935
4,300
4,715
4,965
5,330
5,965
6,060
6,425
630

Infrastructure Development Levy

.05% of Estimated Cost of Building

ITEM

CURRENT CHARGES

J)OCCUPATION CERTIFICATE
Structural Plans Range in M2
0-46
46-93
93-140
140-186
186-240
240-294
294-350
350-400
400-465
465-530
530-595
595-660
660-725
725-790
790-855
855-930
For every additional 93m2 or part thereof over
930m2

1,500
2,000
2,500
3,000
3,500
4,000
4,500
5,000
5,500
6,000
6,500
7,000
7,500
8,000
8,500
9,000
500

Inspection of Building File

1,000

Supply of Certified Occupation Certificate

1,000

Supply of a list of Approved Plans

1 ,000

Commencement and Completion Certificate


Preliminary Submission of Building Plans and
Proposals

1,000

Ordinary Schemes (and thereafter)

5,600

Comprehensive (500 per resubmission)

8,400

Fee Payable under By-laws 26 of Grade II for Single


Dwelling Kshs. 300/= and Kshs. 200/= for Each
Additional Dwelling

2,000

Fee Payable for Testing of Plumbers and Drainage


Layers.

10,000

HORDING LICENCES FEES


Central Business District

60,000 Per Annum

Other Areas

36,000 Per Annum

Fees for Certified Copy of Original Plans Per copy

1,400

Painting e.t.c

2,000

Regularization Plinth Area Fee X 2

Renovation

For Every Estimated cost of Kshs. 2,000/=


Chargeable Fee Kshs. 5.00/=
Infrastructure Development Levy Fee
=0 .05% of Estimated Development Cost of a
Building
Amendment to approved plans

2,000

Fee payable for demolition works

2,000

REGULARIZATION
Penalty charged on regularization all illegal
developments within required densities

200,000

100,000
Zone: 1,2,3,4,5,6,7,12,13,14
Zone : 8,9,10,11,15,16,17,18,19 Plinth area x2

Penalty charge on regularization on all illegal


developments with exceeded densities

Zone : 1,23,4,5,6,7,12,13,14 Plinth area x2


200
Zone : 8,9,10,11,15,16,17,18,19
100

ENFORCEMENT SECTION
DEMOLITION (CATEGORY A)

Permanent building of plinth area not exceeding


200m2 and maximum two levels including ground
level

52,000

Every extra floor or extra plinth area of 150m2 or


part thereof

6,500

Security provision (Administration police)

Day
Night

Miscellaneous expenses (helmet, masks, repair of


tools)

10% Total cost of the demolition

DEMOLITIONS (CATEGORY B)

100
2500

Semi-Permanent or temporary structures within plots


(preferably registered plots) on a site/plot not
exceeding one are (4000m2)

52,000

Every extra floor or extra plinth area of 150m2 or


part thereof

15,000

Security Provision (Administration police)

Miscellaneous expenses (helmets, masks, repair of


tools)
Authorization of minor works/renovations

Day

1000

Night
2500
10% Total cost of the demolition

4,000

You might also like