BAMTEC Detailing Manual
BAMTEC Detailing Manual
BAMTEC Detailing Manual
Copyright OneSteel Reinforcing Pty Limited PO Box 55 Five Dock NSW 2046 Australia ABN 2 004 148 289
OSR107 10/02
BAMTEC Detailing Manual
2
Copyright OneSteel Reinforcing Pty Limited PO Box 55 Five Dock NSW 2046 Australia ABN 2 004 148 289
This information is provided as a service to those interested in steel reinforcement. Since the information is provided for general guidance only, and in
no way replaces the services of professional consultants on particular projects or subjects, no legal liability can be accepted by OneSteel for its use.
Contents
Item Page No.
General
Introduction to BAMTEC
3
Slab Shapes 3
Slab Types 4
Bar Size and Spacing 5
Additional Reinforcing 5
Specifying BAMTEC
reinforcing 5
Columns 6
Walls 11
Beams 16
Standard Beams 16
Edge Beams 18
Band Beams 20
Step Downs 21
Construction Joints 21
3
Copyright OneSteel Reinforcing Pty Limited PO Box 55 Five Dock NSW 2046 Australia ABN 2 004 148 289
This information is provided as a service to those interested in steel reinforcement. Since the information is provided for general guidance only, and in
no way replaces the services of professional consultants on particular projects or subjects, no legal liability can be accepted by OneSteel for its use.
General
Introduction to BAMTEC
BAMTEC
is a system developed to assist with the fast, accurate and economical placement of
reinforcing bars in a reinforced concrete slab. It was developed in Germany and OneSteel Reinforcing
have the licence to market the product in Australia.
BAMTEC
is straight reinforcing bars spot welded to a number of continuous metal straps and rolled
around shape forming rings to create a BAMTEC
carpets. Changes to standard construction details may be required to best utilise BAMTEC
.
Slab Shapes
The BAMTEC
system is ideal for complicated slab shapes as it is scheduled using a CAD package and
bars are positioned in the BAMTEC
system best suits a flat plate slab type design, with or without drop panels, however it
can be incorporated into beam and slab type designs.
Flat Plate Slab Design
Beam and Slab Design
5
Copyright OneSteel Reinforcing Pty Limited PO Box 55 Five Dock NSW 2046 Australia ABN 2 004 148 289
This information is provided as a service to those interested in steel reinforcement. Since the information is provided for general guidance only, and in
no way replaces the services of professional consultants on particular projects or subjects, no legal liability can be accepted by OneSteel for its use.
Bar Size and Spacing
500PLUS
reinforcing bar of 10mm to 32mm diameter and ribbed wire of 8mm to12mm diameter can be
incorporated into the BAMTEC
carpet. A
minimum bar length of 1.7m is required to achieve a rollable carpet.
Additional Reinforcement
Additional reinforcing can be tied to the carpets once laid if required, however the BAMTEC
system
can incorporate them in the BAMTEC
reinforcing
BAMTEC
can be drawn up as for conventional reinforcing or the required minimum design steel
intensities (mm
2
/m) can be provided for more efficient use of reinforcing.
6
Copyright OneSteel Reinforcing Pty Limited PO Box 55 Five Dock NSW 2046 Australia ABN 2 004 148 289
This information is provided as a service to those interested in steel reinforcement. Since the information is provided for general guidance only, and in
no way replaces the services of professional consultants on particular projects or subjects, no legal liability can be accepted by OneSteel for its use.
Columns
BAMTEC
carpets cannot be rolled over column starters that protrude more than 100mm above the slab
soffit. This may require standard slab and column details or construction practices to be altered to suit the
most appropriate method for each project. The options available are as follows:
1) Detail BAMTEC carpets to roll up to the edge of columns and provide lap bars and some
extra loose bars to make the slab reinforcement continuous around the columns.
2) The use of a coupling system to join column bars just above the slab soffit. It is preferred
if the bars to be coupled are splice bars that lap with the main column reinforcement, this
allows the next lift of column steel to be prefabricated improving placement efficiency.
7
Copyright OneSteel Reinforcing Pty Limited PO Box 55 Five Dock NSW 2046 Australia ABN 2 004 148 289
This information is provided as a service to those interested in steel reinforcement. Since the information is provided for general guidance only, and in
no way replaces the services of professional consultants on particular projects or subjects, no legal liability can be accepted by OneSteel for its use.
8
Copyright OneSteel Reinforcing Pty Limited PO Box 55 Five Dock NSW 2046 Australia ABN 2 004 148 289
This information is provided as a service to those interested in steel reinforcement. Since the information is provided for general guidance only, and in
no way replaces the services of professional consultants on particular projects or subjects, no legal liability can be accepted by OneSteel for its use.
3) Back pouring of column allows column steel to be placed after placing BAMTEC
carpets
which incorporate a penetration for the column steel. Lap bars are required to make the
slab reinforcement continuous around the column.
9
Copyright OneSteel Reinforcing Pty Limited PO Box 55 Five Dock NSW 2046 Australia ABN 2 004 148 289
This information is provided as a service to those interested in steel reinforcement. Since the information is provided for general guidance only, and in
no way replaces the services of professional consultants on particular projects or subjects, no legal liability can be accepted by OneSteel for its use.
4) A variation to 3 above is to part pour column so that the lapping of column steel occurs
below the slab soffit.
10
Copyright OneSteel Reinforcing Pty Limited PO Box 55 Five Dock NSW 2046 Australia ABN 2 004 148 289
This information is provided as a service to those interested in steel reinforcement. Since the information is provided for general guidance only, and in
no way replaces the services of professional consultants on particular projects or subjects, no legal liability can be accepted by OneSteel for its use.
5) The use of a precast column element to eliminate lap bar protrusion.
11
Copyright OneSteel Reinforcing Pty Limited PO Box 55 Five Dock NSW 2046 Australia ABN 2 004 148 289
This information is provided as a service to those interested in steel reinforcement. Since the information is provided for general guidance only, and in
no way replaces the services of professional consultants on particular projects or subjects, no legal liability can be accepted by OneSteel for its use.
Walls
BAMTEC
carpets cannot be rolled over wall starters that protrude more than 100mm above the slab
soffit. This may require standard slab and wall details or construction practices to be altered to suit the
most appropriate method for each project. The options available are as follows:
1) Detail BAMTEC
carpets around the wall and provide lap bars to make the bottom slab
reinforcement continuous over the wall. Top steel will need to be loose tied.
12
Copyright OneSteel Reinforcing Pty Limited PO Box 55 Five Dock NSW 2046 Australia ABN 2 004 148 289
This information is provided as a service to those interested in steel reinforcement. Since the information is provided for general guidance only, and in
no way replaces the services of professional consultants on particular projects or subjects, no legal liability can be accepted by OneSteel for its use.
2) Bend wall starter bars into the slab in a direction parallel to the wall. If the wall is to be
continuous, then place new starter bars in the slab after BAMTEC
carpet placement.
13
Copyright OneSteel Reinforcing Pty Limited PO Box 55 Five Dock NSW 2046 Australia ABN 2 004 148 289
This information is provided as a service to those interested in steel reinforcement. Since the information is provided for general guidance only, and in
no way replaces the services of professional consultants on particular projects or subjects, no legal liability can be accepted by OneSteel for its use.
3) Bend wall bars perpendicular to the wall and tie a dummy bar to the top of the wall bars to
allow rolling of bottom BAMTEC
carpets have been placed, this will allow bottom carpets to drop into the correct position.
14
Copyright OneSteel Reinforcing Pty Limited PO Box 55 Five Dock NSW 2046 Australia ABN 2 004 148 289
This information is provided as a service to those interested in steel reinforcement. Since the information is provided for general guidance only, and in
no way replaces the services of professional consultants on particular projects or subjects, no legal liability can be accepted by OneSteel for its use.
4) Precast walls can remove rolling restrictions which suits the BAMTEC
system.
15
Copyright OneSteel Reinforcing Pty Limited PO Box 55 Five Dock NSW 2046 Australia ABN 2 004 148 289
This information is provided as a service to those interested in steel reinforcement. Since the information is provided for general guidance only, and in
no way replaces the services of professional consultants on particular projects or subjects, no legal liability can be accepted by OneSteel for its use.
5) Insitu walls can be handled with a starter bar system such as Rebox if the construction
process favours jump or slip form. Otherwise insitu walls can be handled using lapping
U bars at the top and bottom of the wall.
16
Copyright OneSteel Reinforcing Pty Limited PO Box 55 Five Dock NSW 2046 Australia ABN 2 004 148 289
This information is provided as a service to those interested in steel reinforcement. Since the information is provided for general guidance only, and in
no way replaces the services of professional consultants on particular projects or subjects, no legal liability can be accepted by OneSteel for its use.
Beams
Where possible the BAMTEC
system best suits a flat plate slab type design, however it can be used
with beam and slab type designs. To incorporate BAMTEC
carpets to be
rolled short of the beam and then made continuous with the lap bar through the beam.
2) Changing the reinforced beam placement process to allow a prefabricated cage to be lowered
into place after the bottom BAMTEC
carpet has been placed remove the required top beam bars to allow the
BAMTEC
carpet to fall into the required position then re-tie the beam bars into their correct
position. This method would be suitable for slabs up to 200mm thick.
18
Copyright OneSteel Reinforcing Pty Limited PO Box 55 Five Dock NSW 2046 Australia ABN 2 004 148 289
This information is provided as a service to those interested in steel reinforcement. Since the information is provided for general guidance only, and in
no way replaces the services of professional consultants on particular projects or subjects, no legal liability can be accepted by OneSteel for its use.
Edge Beams
Edge beams can be handled in various ways; some are detailed below.
1) Changing the reinforced beam placement process to allow a prefabricated cage to be lowered
into place after the bottom BAMTEC
carpet to be
rolled short of the beam and then be made continuous with the lap bar.
19
Copyright OneSteel Reinforcing Pty Limited PO Box 55 Five Dock NSW 2046 Australia ABN 2 004 148 289
This information is provided as a service to those interested in steel reinforcement. Since the information is provided for general guidance only, and in
no way replaces the services of professional consultants on particular projects or subjects, no legal liability can be accepted by OneSteel for its use.
3) Changing the reinforced beam placement process to allow a prefabricated cage to be lowered
into place after the bottom BAMTEC
carpets into the edge beam. Longitudinal bars confined within the U bar will need to
placed as loose bars.
20
Copyright OneSteel Reinforcing Pty Limited PO Box 55 Five Dock NSW 2046 Australia ABN 2 004 148 289
This information is provided as a service to those interested in steel reinforcement. Since the information is provided for general guidance only, and in
no way replaces the services of professional consultants on particular projects or subjects, no legal liability can be accepted by OneSteel for its use.
Band Beams
Standard band beams can be handled in various ways; some are detailed below.
1) For band beams which require ligatures, change the reinforced beam placement process to
allow a prefabricated cage or ligature skeleton to be lowered into place after the bottom
BAMTEC
carpets.
21
Copyright OneSteel Reinforcing Pty Limited PO Box 55 Five Dock NSW 2046 Australia ABN 2 004 148 289
This information is provided as a service to those interested in steel reinforcement. Since the information is provided for general guidance only, and in
no way replaces the services of professional consultants on particular projects or subjects, no legal liability can be accepted by OneSteel for its use.
Step Downs
To incorporate BAMTEC
with a step down, the Z bar must be separate from the main slab reinforcing
bars. The Z bar can be loose tied or prefabricated into cages and installed before top carpets.
Construction Joint
No major changes are required to a construction joint detail when using BAMTEC
. Commonly cogs or
hooks are specified on the end of the bars at a construction joint, this must be changed to a U bar tied
between the bottom and top carpets (refer type 1). The U Bars can be incorporated into a prefabricated
cage to improve speed of placement.
If main slab reinforcement is to continue through the joint and lap with the next stage then strap location
will need to be specified during scheduling to allow placement of joint formwork. (refer type 2)