Engineering Change Proposal

This document is an engineering change proposal form containing sections for proposing, designing, approving, and implementing an engineering change. It includes sections to describe the proposed change, conduct a preliminary design, develop detailed design plans, evaluate logistic factors, obtain executive approval, and implement the change through an engineering change order. If approved, the change would be carried out according to schedules and budgets specified in the form.

Uploaded by

RajaSekarsajja
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
949 views8 pages

Engineering Change Proposal

This document is an engineering change proposal form containing sections for proposing, designing, approving, and implementing an engineering change. It includes sections to describe the proposed change, conduct a preliminary design, develop detailed design plans, evaluate logistic factors, obtain executive approval, and implement the change through an engineering change order. If approved, the change would be carried out according to schedules and budgets specified in the form.

Uploaded by

RajaSekarsajja
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

TRAMM ANNEX B TO

Volume 3 Section 2 CHAPTER 1


Version 3.0
GM 156 - ENGINEERING CHANGE PROPOSAL
Page 1 of 8
Originators Reference Proposal No. Proposal Revision No.
TYPE OF CHANGE BEING PROPOSED: A. FLEET ENGINEERING CHANGE
B. LOCAL ENGINEERING CHANGE
C. ARTICLES MANUFACTURED IN WORKSHOP
D. MANUFACTURE OF TECHNICAL COMPONENTS
FOR TYPE A, B, C & D CHANGES
PART 1 CHANGE REQUEST / CONCEPT / STATEMENT OF REQUIREMENT
Priority: Routine Urgent Emergency
Title of Proposed Change:
Capability Title (main equipment): Contract Ref (if applicable):
Prime CI (major assembly): Qty affected:
Affected CI / component to be
substituted:
NSN: Manufacturers Part Number (if known):
Description of Proposed Change / details of substituting part (including manufacturer, Manufacturers Part Number, NSN, etc):
Attachment No. (if used)
Reason/Justification for change (insert RODUM number if applicable):
Attachment No. (if used)
Originator:
Organisation:
Ph: FAX:
Address:
Clearance by Originators Supervisor
Name: Rank/Position: Signed: Date:
TRAMM
Volume 3 Section 2 1B2
Version 3.0
Page 2 of 8
Originators Reference Proposal No. Proposal Revision No.
FOR TYPE A, B, C & D CHANGES
PART 2 PRELIMINARY DESIGN
Broad scope detail: Attachments provided? Yes No Attach No :
Judgement of Significance
Significant Non-sigificant Attach Judgement of significance. Attach No :
Possible safety / operational impact: Attachments provided? Yes No Attach No :
Possible logistic impact: Attachments provided? Yes No Attach No :
Approximate cost Labour: $A Materiel: $A
Approximate cost to further develop design / investigate feasibility of proposal (if required): $A
Expected date of completion / days to complete for detailed design:
Designer Attach Preliminary Design. Attach No :
Name: Rank/Position: Signed: Date:
Reviewer
Name: Rank/Position: Signed: Date:
Release of Prelim Design Prelim design released? Yes No
Recommendation:
Name: Rank/Position: Signed: Date:
Executive Authority approval to proceed Approved to proceed with detailed design? Yes No (Go to Part 6 Section 2)
Comments:
Name: Rank/Position: Signed: Date:
TRAMM
Volume 3 Section 2 1B3
Version 3.0
Page 3 of 8
Originators Reference Proposal No. Proposal Revision No.
FOR TYPE A, B, C & D CHANGES
PART 3 DETAILED DESIGN
Designer
Judgement of Significance Significant Non-sigificant Attach Judgement of significance. Attach No :
Comments: Attach Detailed Design. Attach No :
Name: Rank/Position: Signed: Date:
Reviewer
Judgement of Significance Significant Non-sigificant Attach Judgement of significance. Attach No :
Design endorsed? Yes No
Name: Rank/Position: Signed: Date:
Design Authority Approval
Safety / risk assessment conducted? Yes No
Comments: Attach No :
Design Approved? Yes No
Comments: Attach No :
Name: Rank/Position: Signed: Date:
DESIGN ACCEPTANCE
Judgement of Significance Significant Non-sigificant Attach Judgement of significance. Attach No :
Safety / risk assessment satisfactory? Yes No
Comments: Attach No :
Design Accepted? Yes No Provisionally
If yes or provisionally, Design Acceptance Certificate number: __________
Comments: Attach No :
If provisionally design accepted, list Design Acceptance Concession number(s):___________
Comments: Attach No :
Name: Rank/Position: Signed: Date:
TRAMM
Volume 3 Section 2 1B4
Version 3.0
Page 4 of 8
Originators Reference Proposal No. Proposal Revision No.
FOR TYPE A, B, C & D CHANGES
PART 4 EXECUTIVE SUMMARY OF LOGISTIC FACTORS DETAILED IN PART 7
Organisation responsible for carrying out change on equipment (if reqd)
Part 7 completed? Yes No Incorporation plan attached? Yes No
Start date
Finish date
Estimated time required to carry out action
Hrs / item
(if applicable)
Production $A
Installation $A
Estimated Costs / Savings
Through Life $A
Estimated Net Costs or Savings through to Life of Type $A
FOR TYPE A CHANGES ONLY
PART 5 CONFIGURATION MANAGEMENT ACTION
Engineering Change Proposal: Class 1 Class 2
Matter to be considered by: CAP Configuration Manager CCB SCCB Configuration Manager Init:
CCB member recommendations
Board Position Name Signature Date
Recommended
?
Attach No.
Configuration Manager Yes No
Fleet Manager Yes No
DAAR Yes No
User Representative Yes No
Yes No
Yes No
Yes No
Yes No
TRAMM
Volume 3 Section 2 1B5
Version 3.0
Page 5 of 8
Originators Reference Proposal No. Proposal Revision No.
FOR TYPE A, B, C & D CHANGES
PART 6 EXECUTIVE APPROVAL (executive authority to complete)
This proposal is: Approved Not Approved If approved, go to section 1. If not approved, go to section 2.
SECTION 1 - ENGINEERING CHANGE ORDER
Date by which incorporation is to begin:
Date by which incorporation is to be complete:
Date and type of progress report(s):
Qty of main items to be modified: Attach No
ARN, Serial Number of item(s) to be modified (or refer attached list): Attach No
Budget allocation (attach phasing information as required): Attach No
Additional information or limitations/conditions placed upon approval: Attach No
I hereby certify that this engineering change has been proposed and considered in accordance with the TRAMM, and authorise this
change for incorporation as ECO number :_____________
(Signed by the Exec Authority, or the CMGR (Class 2 ECP only) when delegated.)
Name: Rank/Position: Signed: Date:
I hereby certify that all action arising from this ECO has been completed and as such this ECO is now closed.
(Signed by the Exec Authority or the CMGR (Class 2 ECP only) when delegated.)
Name: Rank/ Position: Signed: Date:
SECTION 2 REASON FOR NON-APPROVAL
This proposal was not approved due to: Attach No
(Signed by the Exec Authority or the CMGR (Class 2 ECP only) when delegated.)
Name: Rank/ Position: Signed: Date:
TRAMM
Volume 3 Section 2 1B6
Version 3.0
Page 6 of 8
Originators Reference Proposal No. Proposal Revision No.
FOR TYPE A, B, C & D CHANGES (commensurate with complexity of proposed change)
PART 7 LOGISTIC ISSUES
Ser Effect upon: Effect: Attach No.
1 Baseline /
Build Standard /
Build State
2 Other systems / CI affected
(list ECP Numbers which
refer)
3 Capability Performance
Master Document
Index
Specification
Drawings
Contract
EMEIs,
Handbooks,
Manuals,
RPS/CES
4
Docn
LSAR
TRAMM
Volume 3 Section 2 1B7
Version 3.0
Page 7 of 8
Originators Reference Proposal No. Proposal Revision No.
Ser Effect upon: Effect: Attach No
5 Current Tests or Trials
6 Lower level CI
7 Schedules (project,
production, maint, etc)
8 Stock/spares holdings
9 Interfaces (internal/external)
10 Maintenance procedures
11 Reliability, Availability or
Maintainability
12 Test & Support Eqpt
13 Facilities
14 Training &
Training Support
TRAMM
Volume 3 Section 2 1B8
Version 3.0
Page 8 of 8
Originators Reference Proposal No. Proposal Revision No.
Ser Effect upon: Effect: Attach No
15 Personnel
16 Packaging, Handling, Storage
& Transport
17 Computer Support
18 Cataloguing/Codification
19 Safety
20 Operational Use
21 Environmental Considerations
22
23
24
25
Appendix:
1. A Guide to the Content of Engineering Change Proposal (GM 156)