100% found this document useful (1 vote)
587 views11 pages

Asme Boiler and Pressure Vessel Code, Section I Design Guide

This document outlines the requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Section I. It defines key terms, outlines design conditions and safety requirements for Section I vessels, and specifies piping requirements for external steam and feedwater piping connected to boilers. Safety relief valves must be sized and set according to code, with discharge capacities calculated based on boiler design pressure and maximum heat input. External piping must meet additional standards for allowable pressure variations and minimum design conditions.

Uploaded by

peach5
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
587 views11 pages

Asme Boiler and Pressure Vessel Code, Section I Design Guide

This document outlines the requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Section I. It defines key terms, outlines design conditions and safety requirements for Section I vessels, and specifies piping requirements for external steam and feedwater piping connected to boilers. Safety relief valves must be sized and set according to code, with discharge capacities calculated based on boiler design pressure and maximum heat input. External piping must meet additional standards for allowable pressure variations and minimum design conditions.

Uploaded by

peach5
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 11

PROCEDURE NO.

PTD-DSG-116
PAGE OF
1 9
PROCESS TECHNOLOGY PROCEDURES
PREPARED BY
Edited from existi!
do" #$ %.R. B&r'&rt
DATE
A(ri) *+. ,+++
DEPART-ENT. PROCESS TEC/NO0OGY
APPRO1ED BY
%RB
SUB%ECT. AS-E BO20ER AND PRESSURE 1ESSE0 CODE3
SECT2ON 2 DES2GN GU2DE
RE12S2ON DATE
114+14+,
RE1.
1

1.0 SCOPE
This design guide
1
outlines the requirements of the American Society of Mechanical
Engineers (ASME) Boiler and Pressure Vessel Code Section !"
2.0 CODES AND STANDARDS
The latest issue of each of the follo#ing codes and standards shall $e considered a %art
of this design guide"
1" ASME Boiler and Pressure Vessel Code
Section ! &ules for Construction of Po#er Boilers
Section V!!! &ules for Construction of Pressure Vessels
'" American (ational Standards !nstitute (A(S!)
B)1"1 Chemical Plant and &efinery Pi%ing
3.0 RESPONSIBILITIES
The %rocess engineer is res%onsi$le for*
1" Setting the design %ressure ma+imum allo#a$le #or,ing %ressure (MA-P) and
tem%erature of Section ! .essels
'" /etermining the num$er si0e and set %ressures of the safety relief .al.es
)" Setting design conditions and configuration of attached %i%ing and certain
instrumentation requirements as outlined in ASME Code Section !
4.0 DEFINITIONS
ASME Code Section ! defines the follo#ing terms*
1" Po#er Boiler is a $oiler in #hich steam or other .a%or is generated at a %ressure of
more than 11 %ounds %er square inch gauge (%sig) for use e+ternal to itself"
'" 2igh3Tem%erature -ater Boiler is a #ater $oiler intended for o%eration at
%ressures in e+cess of 145 %sig and6or tem%eratures in e+cess of '15 degrees
7ahrenheit (7)"
)" 7ired Steam Boiler is a %ressure .essel in #hich steam is generated $y the
a%%lication of heat resulting from the com$ustion of fuel (solid liquid or gaseous)"
1
Re5. + of t'e Desi! G6ide 7&s &d&(ted 7it' miim&) "'&!es from & P&s&de& do"6met3 DSG--P1B3 1+49,
8" Vessels ,no#n as e.a%orators or heat e+changers or .essels in #hich steam is
generated $y the use of heat resulting from the o%eration of a %rocessing system
containing a num$er of %ressure .essels are unfired %ressure .essels"
5.0 DESIGN CONDITIONS OF SECTION I VESSELS
Mechanical design conditions of %ressure and tem%erature indicated in the design criteria
for the %articular 9o$ shall $e used" The ASME Code 9urisdictional limits for %i%ing drum3
ty%e $oilers are dis%layed in 7igure 1"
7igure 1 3 ASME Code :urisdictional ;imits for Pi%ing 3 /rum3Ty%e Boilers
6.0 SAFETY-RELIEF VALVES
ASME Code Section ! requirements for safety3relief .al.es are summari0ed $elo#" All
%ressures are %sig"
6.1 Safet Va!"e# Re$%&'e(
The follo#ing safety .al.es are required*
1" <ne safety .al.e or safety relief .al.e is required if the #ater3heating surface area
is less than 155 square feet"
'" T#o or more safety .al.es or safety relief .al.es are required for areas of 155
square feet or more"
6.2 P'e##%'e Sett&)*# +f Safet Va!"e#
The follo#ing requirements shall a%%ly to %ressure settings of safety .al.es*
1" <ne or more safety .al.es must $e set at or $elo# the MA-P (design %ressure) of
the $oiler"
'" !f additional .al.es are used the highest %ressure setting shall not e+ceed the
MA-P $y more than ) %ercent %sig"
)" The com%lete range of %ressure settings of all the safety .al.es on a $oiler shall
not e+ceed 15 %ercent of the highest %ressure to #hich any .al.e is set" E+am%les
are gi.en $elo#*
PS!=
E+am%le 1
/esign %ressure '55"5
7irst %ressure setting '55"5
2ighest setting allo#ed '54"5
&ange of settings allo#ed '54"5 to 1>1"8
E+am%le '
/esign %ressure '55"5
7irst %ressure setting 1?1"5
2ighest setting allo#ed 1@8"8
&ange of settings allo#ed 1@8"8 to 1?1"5
AS-E BO20ER AND PRESSURE 1ESSE0 CODE3
SECT2ON 1 DES2GN GU2DE
PROCEDURE NO.
PTD-DGS-116
RE1.
1
DATE
114+14+,
PAGE OF
, 1,
6.3 O"e','e##%'e L&-&tat&+)#
The highest %ressure allo#ed in a $oiler #hen the safety .al.es are relie.ing shall not $e
more than 4 %ercent a$o.e the highest %ressure to #hich any .al.e is set (%sig) and in no
case shall the %ressure rise to more than 4 %ercent a$o.e the MA-P (design %ressure)"
E+am%les are gi.en $elo#*
PS!=
E+am%le 1
/esign Pressure 155
Ma+imum $oiler %ressure allo#ed 154 (#hen .al.es are relie.ing)
7irst %ressure setting
155
1
(4A ma+imum accumulation)
Second %ressure setting 15) ()A ma+imum accumulation)
E+am%le '
/esign %ressure '55
7irst %ressure setting
1?1
1
(1'A ma+imum accumulation)
Second %ressure setting
1>1
1
(4A ma+imum accumulation)
Ma+imum o.er%ressure 1>1 B4A C 1@4
1?1 B1)A C 1@4
1
Although the ASME Code allo#s 4 %ercent o.er%ressure (4 %ercent
accumulation for safety3relief .al.es set at or $elo# the design %ressure)
the #idely acce%ted standard is to use ) %ercent accumulation for all
safety3relief .al.es on Section ! .essels" Consequently .al.e
manufacturers ha.e $een a$le to standardi0e their ca%acity charts at )
%ercent accumulation"
6.4 Ca,a.&t +f Safet Va!"e#
The required steam relie.ing ca%acity in %ounds %er hour on a high tem%erature #ater
$oiler is determined $y di.iding the ma+imum British thermal units (Btus) %roduced at the
$urners $y 1555"
6.5 S%,e'/eate' Safet Va!"e Re$%&'e-e)t#
The follo#ing requirements shall a%%ly to su%erheater safety .al.es*
1" E.ery attached su%erheater shall ha.e one or more safety .al.es in the steam flo#
%ath $et#een the su%erheater outlet and the first sto%3.al.e"
'" /ischarge ca%acity of the safety .al.es on an attached su%erheater may $e
included in determining the num$er and si0e of safety .al.es for the $oiler
%ro.iding there are no inter.ening .al.es and that the $oiler safety .al.es ha.e at
least ?1 %ercent of the total ca%acity required"
AS-E BO20ER AND PRESSURE 1ESSE0 CODE3
SECT2ON 1 DES2GN GU2DE
PROCEDURE NO.
PTD-DGS-116
RE1.
1
DATE
114+14+,
PAGE OF
* 1,
)" All inde%endently fired su%erheaters that may $e shut off from the $oiler must ha.e
one or more safety .al.es ha.ing a ca%acity equal to 4 %ounds of steam %er hour
%er square foot of area e+%osed to the hot gases"
AS-E BO20ER AND PRESSURE 1ESSE0 CODE3
SECT2ON 1 DES2GN GU2DE
PROCEDURE NO.
PTD-DGS-116
RE1.
1
DATE
114+14+,
PAGE OF
8 1,
0.0 E1TERNAL PIPING RE23IRE4ENTS
E+ternal %i%ing shall $e in accordance #ith ASME Code Section ! $ut the design
fa$rication installation and testing shall $e in accordance #ith A(S!6ASME B)1"1 Po#er
Pi%ing"
0.1 C+(e 5%'&#(&.t&+)a! L&-&t#
7or the latest code and reference num$ers refer to A(S! B)1"1" Dse the code and
reference num$ers in accordance #ith the follo#ing sections"
0.2 Re$%&'e-e)t - Va'&at&+)# f'+- N+'-a! O,e'at&+)
There is no short3term .ariation from normal o%eration %ermitted in $oiler e+ternal %i%ing
inside the .alues required $y ASME Code Section !" The %i%ing system under A(S!
B)1"1 9urisdiction ho#e.er shall $e considered safe for occasional o%eration for short
%eriods at higher than the design %ressure and6or tem%erature according to the follo#ing
conditions*
1" D% to 11 %ercent increase a$o.e the allo#a$le stress (S) .alue during 15 %ercent
of the o%erating %eriod
'" D% to '5 %ercent of the S .alue during 1 %ercent of o%erating %eriod
)" Stresses resulting from hydrostatic head shall $e ta,en into account
0.3 Stea- P&,&)*
The follo#ing requirements shall a%%ly to steam %i%ing*
1" Steam %i%ing connected to the $oiler drum or to the su%erheater outlet header shall
e+tend u% to and include the first sto% .al.e in each connection e+ce%t as required
$y A(S! B)1"1" !n the case of a single $oiler and %rime mo.er installation the sto%
.al.e required may $e omitted %ro.ided the %rime mo.er throttle .al.e is equi%%ed
#ith an indicator to sho# #hether the .al.e is o%en or closed and designed to
#ithstand the required hydrostatic %ressure test of the $oiler (A(S! B)1"1)"
'" -hen t#o or more $oilers are connected to a common steam header the
connection from each $oiler ha.ing a manhole o%ening shall $e fitted #ith t#o sto%3
.al.es ha.ing an am%le free3$lo# drain $et#een them" The e+ternal %i%ing is u% to
and including the second sto% .al.e and the free3$lo# drain .al.e (A(S! B)1"1)"
)" /esign %ressure of steam %i%ing u% to the first sto% .al.e shall not $e less than the
lo#est set %ressure of any safety6relief .al.e (A(S! B)1"1)" Static head should $e
considered"
8" /esign %ressure of the steam %i%ing $et#een the first and second sto% .al.e
(#here required) shall not $e less than the e+%ected o%erating %ressure or >1
%ercent of the lo#est set %ressure at #hich any drum safety .al.e is set #hiche.er
is greater (A(S! B)1"1)"
AS-E BO20ER AND PRESSURE 1ESSE0 CODE3
SECT2ON 1 DES2GN GU2DE
PROCEDURE NO.
PTD-DGS-116
RE1.
1
DATE
114+14+,
PAGE OF
9 1,
1" Minimum design %ressure shall not $e less than 155 %sig for any condition of
ser.ice or material (A(S! B)1"1)"
4" /esign tem%erature shall not $e less than the saturated steam tem%erature at the
design %ressure (A(S! B)1"1)"
0.4 Fee(6ate' P&,&)*
The follo#ing requirements shall a%%ly to feed#ater %i%ing*
1" 7eed#ater %i%ing for all $oilers e+ce%t high3tem%erature #ater $oilers and forced3
flo# steam generators shall e+tend through the required sto% .al.e and u% to and
including the chec, .al.e e+ce%t as required $y A(S! B)1"1" <n a single $oiler3
tur$ine unit installation the $oiler feed shutoff .al.e may $e located u%stream from
the $oiler feed chec, .al.e (A(S! B)1"1)"
'" -hen t#o or more $oilers are fed from a common source the %i%ing shall $e u% to
and including a glo$e or regulating .al.e located $et#een the chec, .al.e and the
source of su%%ly (A(S! B)1"1)"
)" /esign %ressure of the feed#ater %i%ing from the $oiler u% to and including the
required sto% and chec, .al.e shall e+ceed the MA-P of the $oiler $y either '1
%ercent or ''1 %ounds %er square inch (%si) #hiche.er is the lesser (A(S! B)1"1)"
8" /esign %ressure of the feed#ater %i%ing $et#een the required chec, .al.e and any
regulating .al.e including any $y%ass %i%ing shall not $e less than the %ressure
required to feed the $oiler (A(S! B)1"1)"
1" Minimum design %ressure shall not $e less than 155 %sig for any condition of
ser.ice or material and shall ne.er $e less than the %ressure required to feed the
$oiler (A(S! B)1"1)"
4" /esign tem%erature of the feed#ater %i%ing shall not $e less than the saturated
steam tem%erature at the MA-P of the $oiler (A(S! B)1"1)" !f a $oiler has an
alternati.e feed arrangement each must $e equi%%ed as required $y ASME Code
Section !"
?" 7or $oilers #ith a #ater3heating surface more than 155 square feet the smallest
feed %i%ing and connection shall ha.e a %i%e si0e of )68 inch"
0.5 B!+6+ff P&,&)*
Blo#off %i%ing is a %i%e connection %ro.ided #ith .al.es located in the e+ternal %i%ing
through #hich the #ater in the $oiler may $e $lo#n out under %ressure e+ce%ting drains
such as are used on #ater columns gauge glasses or %i%ing to feed#ater regulators etc"
The follo#ing requirements shall a%%ly to $lo#off %i%ing*
AS-E BO20ER AND PRESSURE 1ESSE0 CODE3
SECT2ON 1 DES2GN GU2DE
PROCEDURE NO.
PTD-DGS-116
RE1.
1
DATE
114+14+,
PAGE OF
6 1,
1" -hen the allo#a$le #or,ing %ressure e+ceeds 155 %si the $lo#off %i%ing for all
$oilers e+ce%t forced3flo# steam generators #ith no fi+ed steam and #ater line
high3tem%erature #ater $oilers and those used for traction and6or %orta$le
%ur%oses shall e+tend through and including the second .al.e (A(S! B)1"1)" The
$lo#off %i%ing for all traction and6or %orta$le $oilers and for forced circulation and
electric $oilers #ith a normal #ater content not e+ceeding 155 gallons is required to
e+tend through only one .al.e #hich is used to determine the o%erating condition
of such equi%ment (ASME Code Section !)"
'" Continuous $lo#do#n %i%ing is not considered as $lo#off %i%ing $y the ASME
Code" 2o#e.er continuous $lo#do#n %i%ing through the first shutoff .al.e must
ha.e a design %ressure rating at least equal to the lo#est set %ressure of any
safety .al.e at the corres%onding saturated3steam tem%erature (A(S! B)1"1)"
)" Surface $lo#off shall not e+ceed a '316'3inch %i%e si0e (ASME Code Section !)"
8" Each $oiler shall ha.e a $ottom $lo#off %i%e fitted #ith a .al.e or coc, in direct
connection #ith the lo#est #ater s%ace %ractica$le (ASME Code Section !)"
1" Minimum si0e of %i%e and fittings for $oilers #ith greater than 155 square feet of
heating surface shall $e 1 inch (ASME Code Section !)"
4" /esign %ressure shall e+ceed the MA-P of the $oiler $y either '1 %ercent or ''1
%sig #hiche.er is less (A(S! B)1"1)"
?" Minimum design %ressure is 155 %sig in any case (A(S! B)1"1)"
>" /esign tem%erature shall not $e less than the tem%erature of saturated steam at
the MA-P of the $oiler (A(S! B)1"1)"
a" Minimum %i%e thic,ness is Schedule >5 (A(S! B)1"1)"
$" 7or design %ressures o.er '55 %sig the .al.es shall $e steel #ith a rating of
)55 %ounds (A(S! B)1"1)"
0.6 4&#.e!!a)e+%# P&,&)*
Miscellaneous %i%ing shall include the %i%ing for such items as drains .ents surface3
$lo#off steam and #ater %i%ing for #ater columns gauge glasses and %ressure gauges
and the recirculation return line for a high3tem%erature #ater $oiler" -hen a drain is not
intended for $lo#off %ur%oses #ith the $oiler under %ressure a single .al.e is acce%ta$leE
other#ise t#o .al.es in series are required (A(S! B)1"1)"
0.0 D'a&)#
The follo#ing requirements shall a%%ly to drains*
1" Am%le drains shall $e %ro.ided #here required to %ermit com%lete drainage of all
%i%ing su%erheaters #ater#alls #ater screens integral economi0ers high3
tem%erature #ater $oilers and all other $oiler com%onents in #hich #ater may
collect (A(S! B)1"1)"
AS-E BO20ER AND PRESSURE 1ESSE0 CODE3
SECT2ON 1 DES2GN GU2DE
PROCEDURE NO.
PTD-DGS-116
RE1.
1
DATE
114+14+,
PAGE OF
: 1,
'" /rain or $lo#off .al.es shall $e %ro.ided as necessary"
)" /rain lines including %i%e fittings and .al.es shall com%ly #ith the requirements
for steam %i%ing or #ater %i%ing according to the ser.ice"
8" Each su%erheater shall $e equi%%ed #ith at least one drain located to effecti.ely
%ro.ide for the %ro%er o%eration of the a%%aratus"
1" Each high3tem%erature #ater $oiler shall ha.e a $ottom drain connection #ith a 13
inch minimum %i%e si0e fitted #ith a .al.e or coc, in direct connection #ith the
lo#est #ater s%ace %ractica$le"
4" -hen the .al.e or .al.es for #ater#alls #ater screens and integral economi0ers
in A(S! B)1"1 are not intended for $lo#off %ur%oses $ut are intended for use only
as a drain .al.e #hen the $oiler is not under %ressure a single shutoff .al.e is
acce%ta$le %ro.ided it is a ty%e that can $e loc,ed in the closed %osition or
%ro.ided a $lan, is inserted in a suita$le flanged and $olted connection located on
the do#nstream side of the .al.e" -hen such a single .al.e is used it need not $e
designed s%ecifically for $lo#off ser.ice $ut shall $e adequate for the %ressure and
tem%erature conditions at #hich the $oiler o%erates"
0.7 I)#t'%-e)tat&+)
?">"1 -ater ;e.el !ndicators (A(S! B)1"1)
The follo#ing requirements shall a%%ly to #ater le.el indicators*
1" Each $oiler e+ce%t forced3flo# steam generators #ith no fi+ed steam and #ater
line and high3tem%erature #ater $oilers of the forced3circulation ty%e that ha.e no
steam and #ater line shall ha.e at least one #ater gauge glass"
'" Boilers o%erated at %ressures o.er 855 %sig e+ce%t electric $oilers of the electrode
ty%e shall $e %ro.ided #ith t#o #ater gauge glasses #hich may $e connected to a
single #ater column or connected directly to the drum"
)" T#o inde%endent remote le.el indicators may $e used instead of one of the t#o
required gauge glasses for $oiler drum #ater le.el indication in the case of %o#er
$oilers #ith all drum safety .al.es set at or a$o.e @55 %si" -hen $oth remote le.el
indicators are in relia$le o%eration the gauge glass may $e shut off $ut shall $e
maintained in a ser.icea$le condition"
8" -hen the direct reading of gauge glass #ater le.el is not readily .isi$le for the
o%erator in the #or,ing area t#o de%enda$le indirect indications shall $e %ro.ided
either $y transmission of the gauge glass image or $y remote le.el indicators"
?">"' Pressure =auges (A(S! B)1"1)
AS-E BO20ER AND PRESSURE 1ESSE0 CODE3
SECT2ON 1 DES2GN GU2DE
PROCEDURE NO.
PTD-DGS-116
RE1.
1
DATE
114+14+,
PAGE OF
; 1,
The follo#ing requirements shall a%%ly to %ressure gauges*
1" Each $oiler shall ha.e a %ressure gauge located so that it is easily reada$le" The
%ressure gauge shall $e installed so that it shall indicate the %ressure in the $oiler
at all times"
'" Each steam $oiler shall ha.e the %ressure gauge connected to the steam s%ace or
to the #ater column or its steam connection"
)" A .al.e or coc, shall $e %laced in the gauge connection ad9acent to the gauge" An
additional .al.e or coc, may $e located near the $oiler %ro.iding it is loc,ed or
sealed in the o%en %osition" (o other shutoff .al.es shall $e located $et#een the
gauge and the $oiler"
8" The %i%e connection shall $e of am%le si0e and shall $e arranged so that it may $e
cleared $y $lo#ing out"
1" Steam $oilers shall ha.e a gauge or connection that contains a si%hon or
equi.alent de.ice #hich #ill de.elo% and maintain a #ater seal that #ill %re.ent
steam from entering the gauge tu$e"
4" Pressure gauge connections shall $e suita$le for the MA-P and tem%erature $ut
if the tem%erature e+ceeds 854 degrees 7 $rass or co%%er %i%e or tu$ing shall not
$e used"
?" !f connections to the $oiler e+ce%t the si%hon are used they shall not $e less than
1683inch standard %i%e si0eE ho#e.er #here steel or #rought iron %i%e or tu$ing is
used it shall not $e less than 16'3inch inside diameter"
>" Minimum si0e of a si%hon if used shall $e 1683inch inside diameter"
@" The dial of the %ressure gauge shall $e graduated to a%%ro+imately dou$le the
%ressure at #hich the safety .al.e is set $ut in no case shall it $e less than 1316'
times this %ressure (ASME Code Section !)"